Building a Combined 25F Nomogram Step 0: Define Terms
Safe operating area: System remains within limits following the next worst contingency, regardless of PSA generation levels.
Potentially safe operating area: Depending on PSA generation, the system may not remain within limits following the next worst contingency.
Unsafe operating areas: System WILL NOT remain within limits following the next worst contingency, regardless of PSA generation levels.
Danger area: blind spot: Depending on PSA generation levels, a specific contingency may cause a transmission element to exceed its limits. With current tools, the System Operators may not be aware of this risk.
Building a Combined 25F Nomogram Step 0: Define Terms
Safe operating area: System remains within limits following the next worst contingency, regardless of PSA generation levels.
Potentially safe operating area: Depending on PSA generation, the system may not remain within limits following the next worst contingency.
Unsafe operating areas: System WILL NOT remain within limits following the next worst contingency, regardless of PSA generation levels.
Danger area: blind spot: Depending on PSA generation levels, a specific contingency may cause a transmission element to exceed its limits. With current tools, the System Operators may not be aware of this risk.
Sensitivity of South-North Ingledow-Custer limits to PSE, SCL, and SNOH Generation
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400
PSE Generation (MW)
Ing
led
ow
-Cu
ster
lim
it (
MW
)
S-N Westside Limit=2000 MW
S>N SCL+SNOH Gen= 140 MW
S>N SCL+SNOH Gen= 460 MW
S>N SCL+SNOH Gen= 775 MW
N-S Westside Limit=2850 MW"
Canadian Entitlment
Building a Combined 25F Nomogram Step 1: Import South-to-North Nomogram
Tacoma-Covington #2 230kV line O/S
Winter 2007
Heavy LoadsOutage: 931
Temp: 25Fahrenheit
Safe operating area
Potentially safe operating area
Unsafe operating areas
Danger area: blind spot
Sensitivity of South-North Ingledow-Custer limits to PSE, SCL, and SNOH Generation
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400
PSE Generation (MW)
Ing
led
ow
-Cu
ster
lim
it (
MW
)
S-N Westside Limit=2000 MW
S>N SCL+SNOH Gen= 140 MW
S>N SCL+SNOH Gen= 460 MW
S>N SCL+SNOH Gen= 775 MW
N-S Westside Limit=2850 MW"
Canadian Entitlment
Building a Combined 25F Nomogram Step 2: Evaluate the S>N Operating Areas
Tacoma-Covington #2 230kV line O/S
Winter 2007
Heavy LoadsOutage: 931
Temp: 25Fahrenheit
Safe operating area
Potentially safe operating area
Unsafe operating areas
Danger area: blind spot
Sensitivity of South-North Ingledow-Custer limits to PSE, SCL, and SNOH Generation
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400
PSE Generation (MW)
Ing
led
ow
-Cu
ster
lim
it (
MW
)
S-N Westside Limit=2000 MW
N-S Westside Limit=2850 MW"
S>N SCL+SNOH Gen= 140 MW
N>S SCL+SNOH Gen= 460 MW
N>S SCL+SNOH Gen= 775 MW
Building a Combined 25F Nomogram Step 3: Import & Invert North-to-South Nomogram
Tacoma-Covington #2 230kV line O/S
Winter 2007
Heavy LoadsOutage: 931
Temp: 25Fahrenheit
Safe operating area
Potentially safe operating area
Unsafe operating areas
Danger area: blind spot
Sensitivity of South-North Ingledow-Custer limits to PSE, SCL, and SNOH Generation
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400
PSE Generation (MW)
Ing
led
ow
-Cu
ster
lim
it (
MW
)
S-N Westside Limit=2000 MW
N-S Westside Limit=2850 MW"
S>N SCL+SNOH Gen= 140 MW
N>S SCL+SNOH Gen= 460 MW
N>S SCL+SNOH Gen= 775 MW
Building a Combined 25F Nomogram Step 4: Evaluate the N>S Operating Areas
Tacoma-Covington #2 230kV line O/S
Winter 2007
Heavy LoadsOutage: 931
Temp: 25Fahrenheit
Safe operating area
Potentially safe operating area
Unsafe operating areas
Danger area: blind spot
Sensitivity of South-North Ingledow-Custer limits to PSE, SCL, and SNOH Generation
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400
PSE Generation (MW)
Ing
led
ow
-Cu
ster
lim
it (
MW
)
S-N Westside Limit=2000 MWS>N SCL+SNOH Gen= 140 MWS>N SCL+SNOH Gen= 460 MWS>N SCL+SNOH Gen= 775 MWN-S Westside Limit=2850 MW"S>N SCL+SNOH Gen= 140 MWN>S SCL+SNOH Gen= 460 MWN>S SCL+SNOH Gen= 775 MWCanadian Entitlment
Building a Combined 25F Nomogram Step 5: Combine & identify blind spots
Tacoma-Covington #2 230kV line O/S
Winter 2007
Heavy LoadsOutage: 931
Temp: 25Fahrenheit
Safe operating area
Potentially safe operating area
Unsafe operating areas
Danger area: blind spot
N-2: Echo Lk-Maple VL/Rocky Rch-ML
contingency will overloadCOVINGTN TO CRESTON CKT 1
Sensitivity of South-North Ingledow-Custer limits to PSE, SCL, and SNOH Generation
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
3000
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400
PSE Generation (MW)
Ing
led
ow
-Cu
ster
lim
it (
MW
)
S-N Westside Limit=2000 MWS>N SCL+SNOH Gen= 140 MWS>N SCL+SNOH Gen= 460 MWS>N SCL+SNOH Gen= 775 MWN-S Westside Limit=2850 MW"S>N SCL+SNOH Gen= 140 MWN>S SCL+SNOH Gen= 460 MWN>S SCL+SNOH Gen= 775 MWCanadian Entitlment
Building a Combined 25F Nomogram Step 6: Combine all Operating Areas
Tacoma-Covington #2 230kV line O/S
Winter 2007
Heavy LoadsOutage: 931
Temp: 25Fahrenheit
Safe operating area
Potentially safe operating area
Unsafe operating areas
Danger area: blind spot