Handling Manual 1
Buildings 4 Handling Manual
BUILDING 4 (AL-JAZRI)
HANDLING MANUAL
Handling Manual 2
Buildings 4 Handling Manual
The Operations Manual is a set of record documentation, (manuals and drawings), for the client/facility
manager focused primarily on the technical/mechanical systems in the assigned buildings.
It is the requirement of the operation to coordinate, monitor, and facilitate the maintenance (PM & RM)
works in the buildings.
The Manual should be made available for any person who needs to coordinate and make sure any building
related tasks are done.
INDEX
1 INTRODUCTION & GUIDE
Section Title Notes
1 Introduction and
guide
Definition of this manual and what it is needed
2 General Build-
ings Information
A brief description of the buildings nature and layouts
(including labs).
3 HVAC Details of different parts and equipments within the service
4 Hydraulics Details of different parts and equipments within the service
5 Fire Fighting &
Alarm Systems
Details of different parts and equipments within the service
6 Electrical Details of different parts and equipments within the service
7 Civil Details of different parts and equipments within the service
8 Elevators Details of different parts and equipments within the service
9 Audio Visual Details of different parts and equipments within the service
10 Evacuation Plan Emergency evacuation route
Handling Manual 3
Buildings 4 Handling Manual
Al Jazri is a Laboratory Facility with the area of 59, 545 Sqm. The occupied areas are predominantly on
levels 2, 3, & 4 and each level in the buildings is consisted of six areas as follows:
Areas 3 & 6 consist of 1 meeting room, 5 huddle rooms, and 72 workstations.
Areas 2 & 5 consist of 16 PI offices, 2 meeting rooms, and 32 workstations.
Areas 1 & 4 consist of 12 PI offices, 5 meeting rooms, 3 huddle rooms, and 80.
Areas 1 & 4 in level 5 consist of 2 main conference rooms with sky fold partitions and 6 meeting
rooms.
All meeting rooms are equipped with a state of the art audio visual system.
2 GENERAL BUILDINGS INFORMATION
Handling Manual 4
Buildings 4 Handling Manual
Levels 0, 5 & 6 rooftop: in level 0 we have an auditorium seating 135 persons for big workshops/seminars.
There is also a state of the art mechanical workshop serving all the PIs & researchers in Campus. In addi-
tion, to SOL maintenance storage rooms, workshops, and mechanical systems serving both buildings with
water, nitrogen, and other general services.
Level 5 consists of HVAC units cooling the facilities and extraction systems from the labs to the roof
stacks. Solar panels are installed in level 6 rooftop and that’s to provide the buildings with hot water and
solar energy through a converter in level 0.
Handling Manual 5
Buildings 4 Handling Manual
LAB
NO.
NEW
LAB NA
LOCATION
LAB NAME STATUS Build-
ing Level
Ar-
ea
Zo
ne
LFO7 4-4650 B4 L4 A1 600 Membranes Research Center (Zones 1 & 2)
In Operation
LFO11 4-4710 B4 L4 A3 700 Organic Functional Materials In Operation
LFO13 4-2620 B4 L2 A1 600 High Speed Fluids In Operation
LFO15A 4-2610 B4 L2 A1 600 Heterogeneous Materials Analysis and Simulation
In Operation
LFO15B 4-0810 B4 L0 A4 800 Heterogeneous Materials Analysis and Simulation
In Operation
LFO19 4-0820 B4 L0 A4 800 Applied Math In Operation
LFO32 4-4830 B4 L4 A4 800 Water Desalination & Reuse Re-search Center
In Operation
LFO41 4-4720 B4 L4 A3 700 Inorganic Membranes In Operation
LFO44 4-4730 B4 L4 A3 700 Environmental and Nanotechnology In Operation
LFO32C 4-4810 B4 L4 A4 800 Microbial Ecology In Operation
LF053 B4 L0 A1 Metrology Core Facilities In Operation
LF057 4-0620 B4 L0 A1 600 Electronics Shop In Operation
LFO62 4-4910 B4 L4 A6 900 Nanostructured Polymeric Mem-branes & Water Desalination
In Operation
LFO62 4-4920/30
B4 L4 A6 900 Nanostructured Polymeric Mem-branes & Water Desalination
In Operation
LFO60 B4 L3 A1 Macromolecular Science & Engi-neering
Under Design
LFO63 B4 L4 A3 Multicomponent Membranes Lab Under Design
BUILDING 4 LAB’S
Handling Manual 6
Buildings 4 Handling Manual
BUILDING 4 LEVEL 0 LAYOUT
Consist of:
3 Substation Room 5 MTER and TER Room s 1 Work Shop
1 Auditorium 1 Fire Command room 3 operational Labs
5 Mechanical and Pumps Rooms 4 Electrical Rooms 1 TEA & Break Room
2 AHU 1 Server and Operation room 5 Storage Rooms
9 PI Offices 3 Conference Rooms 2 Toilets
Handling Manual 7
Buildings 4 Handling Manual
BUILDING 4 LEVEL 2 LAYOUT
Consist of:
4 PI Rooms 1 Café and Reading Rooms (Spine Area)
4 Huddle Rooms 2 Break Areas
5 Conference Rooms 4 Janitorial Rooms 10 toilets
142 Open Office Cubicles 6 TER Rooms
6 Electrical Rooms 1 Active LAB
Handling Manual 8
Buildings 4 Handling Manual
BUILDING 4 LEVEL 3 LAYOUT
Consist of:
32 PI Rooms 2 Break Areas 10 Toilets
7 Huddle Rooms 4 Copy Print Rooms
8 Conference Rooms 2 TEA Room
180 Open Office Cubicles 6 Electrical Rooms
6 TER Rooms 4 Janitorial Rooms
Handling Manual 9
Buildings 4 Handling Manual
BUILDING 4 LEVEL 4 LAYOUT
Consist of:
32 PI Rooms 2 Break Areas 10 Toilets
7 Huddle Rooms 4 Copy Print Rooms
8 Conference Rooms 2 TEA Rooms
180 Open Office Cubicles 4 Janitorial Rooms
6 Electrical Rooms 6 TER Rooms
Handling Manual 10
Buildings 4 Handling Manual
BUILDING 4 LEVEL 5 LAYOUT
Consist of:
8 Conference Rooms 24 AHU’S 4 Mechanical Rooms
2 Kitchen 3 Storage Rooms 4 Toilets
10 Fan Rooms 1 Electrical Room
Handling Manual 11
Buildings 4 Handling Manual
3. HVAC
SERVICE
Handling Manual 12
Buildings 4 Handling Manual
Heating, ventilation, and air conditioning is the technology of indoor and vehicular environmental comfort.
HVAC Equipment/s:
AN AIR HANDLER, or air handling unit (often abbreviated to AHU), is a device used to condition and
circulate air as part of a heating, ventilating, and air-conditioning (HVAC) system. An air handler is usual-
ly a large metal box containing a blower, heating or cooling elements, filter racks or chambers, sound at-
tenuators, and dampers. Air handlers usually connect to a ductwork ventilation system that distributes the
conditioned air through the building and returns it to the AHU. Sometimes AHUs discharge (supply) and
admit (return) air directly to and from the space served without ductwork.
Air handling unit ( AHU 200 & 100 ) made HUNTAIR, 24 AHUs located in Bldg.4 level 5 mechani-
cal and 1 located in level 0 of both buildings. Fan Coil Unit ( FCU 100 ) : they are mostly located in staircases of Building 4 level 5 and level 0. FAN COIL UNIT (FCU) is a simple device consisting of a heating or cooling coil and fan. It is part of
an HVAC system found in residential, commercial, and industrial buildings. Typically a fan coil unit is not connected
to ductwork, and is used to control the temperature in the space where it is installed, or serve multiple spaces. It is
controlled either by a manual on/off switch or by thermostat.
Due to their simplicity, fan coil units are more economical to install than ducted or central heating systems with air
handling units. However, they can be noisy because the fan is within the same space. Unit configurations are numer-
ous including horizontal (ceiling mounted) or vertical (floor mounted).
3. HVAC SERVICE
Handling Manual 13
Buildings 4 Handling Manual
Air Cooling Unit ( ACU 101 ) : Air Cooling Unit is a major or home appliance, system, or mechanism designed to change the air tempera-
ture and humidity within an area (used for cooling and sometimes heating depending on the
air properties at a given time). The cooling is typically done using a simple refrigeration cycle, but some-
times evaporation is used, commonly for comfort cooling in buildings and motor vehicles. In construction,
a complete system of heating, ventilation and air conditioning is referred to as "HVAC"
Handling Manual 14
Buildings 4 Handling Manual
Exhaust Fan Unit ( EXF 100 ) : located in level 5 mechanical area by the atrium of both bldgs.
A mechanical ventilation device that helps to draw out stale and impure air from your occupied area and
bring in fresh air, thereby improving the quality of indoor air. Exhaust fans are typically ducted to the exte-
riors of your facility, through which bad indoor air can effectively be removed.
STAIR PRESSURIZATION SYSTEMS: located in level 5 mechanical areas 2 & 5 of both Bldgs.
Are the most commonly utilized means for protecting exit stairwells in high-rise buildings from smoke in
the event of fire. Stair pressurization systems are difficult to design for tall buildings due to the impact of
stack effect on maintaining uniform pressures over the building’s height, and creation of excessive
door overpressures that may impact exiting is a concern. The effectiveness of a stair pressurization system
is also dependent on maintaining the doors predominately closed to maintain the required pressure differen-
tial to keep smoke from entering the stair, a situation that may not be possible during the event of a full
building evacuation or where catastrophic damage has occurred to the stair.
Handling Manual 15
Buildings 4 Handling Manual
Control Valves: located in Building 4 level 5 mechanical areas and level 0 & it s installed on every
AHU.
Are valves used to control conditions such as flow, pressure, temperature, and liquid level by fully or par-
tially opening or closing in response to signals received from controllers that compare a "set point" to a
"process variable" whose value is provided by sensors that monitor changes in such conditions.
Chilled Water Pump: located in pump rooms in building 4 level 0 areas 3 & 6.
Is a commodity often used to cool a building's air and equipment, especially in situations where many indi-
vidual rooms must be controlled separately, such as our academic buildings.
Handling Manual 16
Buildings 4 Handling Manual
Motor Control Panel: located in level 5 mechanical areas of both bldgs.
It is a Power distribution systems used in large commercial and industrial applications & can be complex.
Power may be distributed through switchgear, switchboards, transformers, and panel boards.
Power distributed throughout a commercial or industrial application is used for a variety of applications
such as heating, cooling, lighting, and motor-driven machinery
Variable Air Valve & Volume Unit: located in all catwalks and level 5 mechanical areas of both Bldgs
Is a type of heating, ventilating, and/or air-conditioning (HVAC) system. The simplest VAV system incor-
porates one supply duct that, when in cooling mode, distributes approximately 13 °C supply air. Because
the supply air temperature, in this simplest of VAV systems, is constant, the air flow rate must vary to meet
the rising and falling heat gains or losses within the thermal zone served.
Handling Manual 17
Buildings 4 Handling Manual
Fume Hood:
Is a type of local[1] ventilation device that is designed to limit exposure to hazardous or toxic
fumes, vapors or dusts. A fume hood is typically a large piece of equipment enclosing five sides of a work
area, the bottom of which is most commonly located at a standing work height. Two main types ex-
ist, ducted and re circulating (aka ductless). The principle is the same for both types: air is drawn in from
the front (open) side of the cabinet, and expelled outside the building.
Cold Rooms: located inside labs.
Are designed to control temperature and humidity levels at very close tolerance control. The levels based
on the requirements of each specific application. Many rooms are utilized for medical and biopharmaceuti-
cal research and development, with other applications requiring close tolerance control for human perfor-
mance test labs, film testing and development, materials testing, and stability testing. The designs of these
rooms based on the fundamental guideline
that no compromises concerning room temperature gradient, microprocessor controls, refrigeration system
quality, and humidity control devices can be allowed past our doors.
Handling Manual 18
Buildings 4 Handling Manual
Fire Smoke Dampers: located in level 5 mechanical areas on the fire damper system and areas 2 & 5.
Are passive fire protection products used in heating, ventilation, and air conditioning (HVAC) ducts to pre-
vent the spread of fire inside the ductwork through fire-resistance rated walls and floors.
Handling Manual 19
Buildings 4 Handling Manual
4. HYDRAULICS SERVICE
Handling Manual 20
Buildings 4 Handling Manual
Reverse osmosis (RO): the system is located in areas 3 & 6 mechanical rooms in level 0 in each building.
Is a water purification technology that uses a semi permeable membrane. This membrane-technology is not
properly a filtration method. In RO, an applied pressure is used to overcome osmotic pressure, a colligative
property, that is driven by chemical potential, a thermodynamic parameter. RO can remove many types
of molecules and ions from solutions and is used in both industrial processes and in producing potable wa-
ter. The result is that the solute is retained on the pressurized side of the membrane and the pure solvent is
allowed to pass to the other side
Liquid nitrogen (N2): Nitrogen plant is located behind the loading area of building 5.
Is nitrogen in a liquid state at an extremely low temperature.
It is produced industrially by fractional distillation of liquid air. Liquid nitrogen is a colorless clear liquid
with density of 0.807 g/mL at its boiling point and a dielectric constant of 1.43. Liquid nitrogen is often
referred to by the abbreviation LN2.
LN2 Withdrawal Vessels: Primary Vessel; 34,070 Liters feeding to the Vaporizers then converted to Nitrogen gas for the Buildings
nitrogen gas system.
Secondary Vessel; 22,712 Liters supplying directly Liquid Nitrogen-LN2 thru vacuum jacketed (VJ) piping
system to NMR & Clean room.
4. HYDRAULICS SERVICE
Handling Manual 21
Buildings 4 Handling Manual
Vaporizers at South Pad: There are total of 2 Vaporizers in the same area of the nitrogen plant behind building 4&5.
Vacuum Systems:
Their purpose is to remove the toxic gases released from chemical reactions. The system is located in
Building 4 areas 3 & 6 mechanical rooms in level 0.
Compressed Air System: the system is located in Building 4 areas 3 & 6 mechanical rooms in level 0.
It is needed to supply air in the labs.
Handling Manual 22
Buildings 4 Handling Manual
Air Quality:
Adsorption dryers remove water vapor by passing air over a regenerative adsorbent material known as des-
iccant, which strips the moisture from the air. All adsorption dryers remove water vapor using this method,
however the adsorbent must be periodically regenerated to ensure a continuous supply of dry air. A number
of different regeneration methods are available.
Pressure Dew Point, PDP:
Pressure dew point is the term used to describe the temperature at which condensation will occur and the
water removal efficiency of a dryer is expressed as a pressure dew point (written as a temperature). Adsorp-
tion dryers are extremely efficient and typically provide pressure dew point's of -40°C or -70°C. This
means for water vapor to condense into a liquid, the air temperature would need to drop below -40°C or -
70°C respectively.
Typically, a pressure dew point of -40°C is used in most applications as compressed air with
a dew point below -26°C will not only prevent corrosion, it will also inhibit the growth of microorganisms
within the compressed air system.
Solar Panels: located in Building 4 level 6 roof top.
Their purpose is to provide hot water and solar energy into the building
Handling Manual 23
Buildings 4 Handling Manual
5. FIRE FIGHTING & ALARM SYSTEMS
Handling Manual 24
Buildings 4 Handling Manual
Fire Alarm System:
Cultural property management is entrusted with the responsibility of protecting and preserving an institu-
tion's buildings, collections, operations and occupants. Constant attention is required to minimize adverse
impact due to climate, pollution, theft, vandalism, insects, mold and fire. Because of the speed and totality
of the destructive forces of fire, it constitutes one of the more serious threats. Vandalized or environmental-
ly damaged structures can be repaired and stolen objects recovered. Items destroyed by fire, however, are
gone forever. An uncontrolled fire can obliterate an entire room's contents within a few minutes and com-
pletely burn out a building in a couple hours. The first step toward halting a fire is to properly identify the
incident, raise the occupant alarm, and then notify emergency response professionals. This is often the func-
tion of the fire detection and alarm system.
Vesda (Early Warning Aspirating Smoke Detection):
VESDA by Xtralis very early warning aspirating smoke detection solutions with continuous air sampling
provide the earliest possible warning of an impending fire hazard. VESDA ASDs buy the critical time
needed to investigate an alarm and initiate an appropriate response to prevent injury, property damage or
business disruption. VESDA detectors have multi-level warnings and a wide range of sensitivity that does
not degrade or change over time, so even minute levels of smoke can be detected before a fire has time to
escalate. In addition, VESDA systems are manufactured using targeted Six Sigma techniques and ISO 9000
standards and have been certified by regulatory bodies worldwide.
5. FIRE FIGHTING & ALARM SYSTEMS
Handling Manual 25
Buildings 4 Handling Manual
Supply Piping Network:
The riser diagram below shows the supply network for the campus buildings.
Each branch controlled by check valve and alarm control gate valve.
Three control valves installed on the main line between building 18 and 5 ,building 3 and 1,the third inside
the pump room between building 2 and 14 .
The main line supply to RPIC and two hydrants FH9 and FH11 a crossing the
road under the ground by 200mm UPVC pipe.
Handling Manual 26
Buildings 4 Handling Manual
Sprinklers: The ones used in the campus are of different manufacturers but of the same specification. There are differ-
ent types of sprinklers used and they are manufactured by two different companies Tyco and Reliable.
The ones used in Campus by Tyco are:
Fast response pendent sprinklers.
Rapid response residential pendent sprinklers ( white cover ).
Recessed pendent sprinklers.
The one used from Reliable is:
Concealed pendent (chrome cover ) RFC 43.
The common specifications for all types of sprinklers are:
Ambient temperature : 38 C.
Operation temperature : Varies from 68 to 74 C.
Minimum distance between sprinklers : 2200 mm .
Maximum covers : 3600*3600 mm2.
Maximum pressure discharge :12 bars.
Minimum pressure discharge : 7.2 bars.
Handling Manual 27
Buildings 4 Handling Manual
Stand pipes:
The stand or the main riser is installed in the corner of the emergency stair case. The role of this riser is to
supply the water to each branch in the building. The landing valve is installed on stand pipe per each level
to supply water to the fire hoses in emergency cases. The check valve and alarm control gate valve is in-
stalled per each level.
Hose Cabinets:
Are installed in each level behind the landing valve for emergency cases. Each cabinet contains two high
pressure fire hoses and one water regulator gun. These cabinets should be checked every month.
Handling Manual 28
Buildings 4 Handling Manual
Fire fighting pumps:
Pre Action System:
It is a dry system with the following model: TOTAL PAC 2.
Handling Manual 29
Buildings 4 Handling Manual
6. ELECTRICAL
SERVICE
Handling Manual 30
Buildings 4 Handling Manual
Light Fixtures by:
Voice Suspended Product ( F – 39 -1 ) , located inside PI offices and open areas 2, 5, 1, & 4 of all levels.
Leda Light Pure FX ( F – 34 ): located in lab corridors and the glass conference rooms in bldg.4 areas 2 & 5
of all levels 2, 3, & 4.
Eklisse ( F – 14 ), located in all staircases in bldg. 4 all levels all areas and in lev-
el 5 mechanical areas 2 & 5.
6 ELECTRICAL SERVICE
Handling Manual 31
Buildings 4 Handling Manual
Stiller ( F – 28 ), located in all labs of Building 4.
Infinite 3 fixture( F – 28 ), located in break areas in areas 1,
4, 3, & 6 of all levels in bldg.4. In addition to the inside of
all toilets. The round one is located by corridor doors in all
levels all areas of the bldgs.
Leda Light Voice ( F – 40 ), located inside all toilets of Building 4.
Handling Manual 32
Buildings 4 Handling Manual
Light cast Down light ( C – 01 ), it has different sizes and located in toilets and
hall ways to the toilets of Building 4 all levels all areas.
Sure Lights – EXIT Signs ( X – 04 ), located on all
kinds of exit doors in building 4 all level all areas.
HID Mini Base Mount ( H – 28 ), located in level 5 mechanical areas
2 & 5. In addition to the external on the buildings in level 5 only.
Projector – Flood Lights( H – 25 ), located in the plaza of building 4 level 2 by sign
boards.
Handling Manual 33
Buildings 4 Handling Manual
Square Aperatur Lights ( H – 23 ), located in Building 4 areas 2 & 5 of levels 2, 3,
& 4.
Handling Manual 34
Buildings 4 Handling Manual
Substation:
Normal Power Supply, Located in Unit Substation (Room 0128) Bldg.4 Level 0, Between Area 3&6.
13.8KV to 380Y/220V.
Emergency Power Supply, Located in Unit Substation (Room 0127) Bldg.4 Level 0, Between Area 3&6.
Panel Board (EATS-Emergency Power / BATS-Optional stand by power / SATS-Legally Required stand
by power). Located in Unit Substation (Room 0128&0127) Bldg.4 Level 0, Between Area 3&6.
Handling Manual 35
Buildings 4 Handling Manual
Switch Board panel, Located in Unit Substation (Room 0128) Bldg.4 Level 0, Between Area 3&6.
Normal Lighting Panel Board, Located in All electrical rooms in the building.
Emergency Lighting Panel Board, Located in All electrical rooms in the building.
Handling Manual 36
Buildings 4 Handling Manual
7. CIVIL
SERVICE
Handling Manual 37
Buildings 4 Handling Manual
Walls:
WD-22 Trade 134 (Wood), Located in all PI offices and Toilet rooms of the bldg.
P-40 & 41 Trade 260 (Latex Paint), Located in Level 0&5 All areas of the bldg.
Durasan—03, Located in Level 2,3,4 All areas of the bldg.
Handling Manual 38
Buildings 4 Handling Manual
Ceiling:
CLG-10 Trade 130 (Metal Ceiling), Located in Labs Corridor of the bldg.
CLG-11 Trade 130 (Ultima), Located in Open office areas of the bldg.
CLG-03B & 03C (Diacaustic) Located in all janitorial rooms of the bldg.
7 CIVIL SERVICE
Handling Manual 39
Buildings 4 Handling Manual
WC-10 Trade 260 ( Wall Fabric), Located in all PI offices of the bldg.
ST-30 Trade 240 (Stone Basalt), Located in all Toilets of the building.
GT-01C and 17C Trade 220 (Glass Tiles), Located in All women toilet in the bldg.
Handling Manual 40
Buildings 4 Handling Manual
CT-21 & 19 Trade 220 (Royal Mosa)
P-37 Trade 260 (Latex Paint), Located in Bldg.4 Level 2, 3, & 4 Huddle rooms.
ST-52 Trade 240 (Marble). Located outside of the bldg.
Handling Manual 41
Buildings 4 Handling Manual
WD-20 Trade 330 (Cherry Wood), This located in all toilet and Double Doors in the bldg.
WD-08 Trade 159 (Wood), Located in all PI Offices of the bldg.
WD-41 Trade 334 ( Solid IPE), This located in center stairs in level 4 to Level 2 of the bldg.
Handling Manual 42
Buildings 4 Handling Manual
Flooring:
ST-30 Trade 240 (Stone Basalt), This is located in All toilets of the bldg.
ST-50A Trade 240 (Stone Base), This is located in Level 2, 3 & 4 Walkway and Break Areas.
QT-01 Trade 220 (Vinyl), This is located in all Labs of the bldg.
Handling Manual 43
Buildings 4 Handling Manual
LN-10 Trade 210 (Marmoleum), This is located inside the top of cabinet in conference room .
ST-01 Trade 249 (Granite), This is located inside Toilet rooms.
Handling Manual 44
Buildings 4 Handling Manual
Carpet:
C-50 Trade 210 (Carpet Syncopation), Located in Bldg.4 Level 2,3&4 Corridors of the bldg.
C-52 Trade 210 , Located in all huddle rooms of the bldg.
C-56 Trade 210 (Carpet Solmates), Located in Level 2,3&4 conference rooms.
Handling Manual 45
Buildings 4 Handling Manual
C-63 Trade 210 (Brocatelle), Located in Level 5, Big conference rooms of the bldg.
C-64 Trade 210 , Located in Bldg.5 Level 2,3&4 Corridors of the bldg.
C-65 Trade 210 (Carpet tile—SIAM), Located in Level 2 center carpet of the building.
Handling Manual 46
Buildings 4 Handling Manual
Doors:
Double steel doors, Located in level 6, area 3 (roof top) of the bldg.4
Single steel doors, Located in level 5 areas 1,4,3&6 mechanical rooms.
Single metal door with glass, Located in Bldg. 4 level 5 area 5 exit stairs.
Handling Manual 47
Buildings 4 Handling Manual
Push bar double wooden doors, Located in bldg.4 all Labs corridors.
Single wooden doors, Located in bldg.4 all mechanical rooms.
Single glass doors, Located in Bldg. 4 all huddle rooms.
Handling Manual 48
Buildings 4 Handling Manual
Double glass doors, Located in Level 2, 3, & 4 Entrance door of the office areas.
Push bar double door glass with frame, Located in bldg.4 Level 3, 4 & 5 in connecting bridge.
Single glass sliding doors, Located in some huddle rooms in Bldg.4 all level and areas.
Handling Manual 49
Buildings 4 Handling Manual
Single push bar wooden door, Located in all Exit doors in the bldg.
Single glass door with frame, Located in Bldg.4 all door labs.
Single glass door with wood frame. Located in Bldg.4 all Print rooms in the bldg.
Handling Manual 50
Buildings 4 Handling Manual
Double glass door with frame, Located in level 5, Big conference room accessing to lobby.
Single Wooden doors, Located in Bldg.4 all PI Rooms and Toilets.
Single wooden doors, Located in bldg.4 toilet cubicle doors.
Handling Manual 51
Buildings 4 Handling Manual
Double wooden door with glass. Located in level 0, Lab corridor.
Single Metal door. Located in bldg.4 Level 0 Exit doors going outside the bldg.
Single Metal doors with frame. Located in Level, 2,3,4 all areas access to outside terracotta.
Handling Manual 52
Buildings 4 Handling Manual
Double Metal doors. Located in bldg.4 Level 0, area 3&6 Emergency exit doors going outside of the bldg.
Double Metal door (White paint). Located in bldg.4 level 0 area 3&6, Mechanical rooms.
Handling Manual 53
Buildings 4 Handling Manual
Electric and Manual Curtains located in glass wall and PI Offices.
Handling Manual 54
Buildings 4 Handling Manual
8. ELEVATOR SERVICE
Handling Manual 55
Buildings 4 Handling Manual
Panoramic Elevators # 4 & 5, located in areas 2 & 5 on the main entrance side of Bldg.4.
They serves levels 2, 3, & 4. Manufacturer is SCHENDLER.
Service Elevators # 2, 3, 7, & 8 - SCEHNDLER, located in service corridors of areas 3, 6, 1, & 4 of
Bldg.4. They serve levels 0, 2, 3, 4, 5 mechanical, & 6 where accessible and this includes catwalks.
Seaside Elevators # 1 & 6– SCHENDLER, located in areas 1 & 4 seaside open space of bldg.4. They
serve levels 0, 2, 3, 4, & 5 conference rooms area.
8 ELEVATOR SERVICE
Handling Manual 56
Buildings 4 Handling Manual
Auditorium Elevator # 9 - SCHENDLER, it is located in bldg.4 area 2 and it is currently put off ser-
vice.
It serves the auditorium area, 2, levels 0 & 2.
Glass Sliding Doors, located in Bldg.4 level 2 plaza by the solar tower.
Shutter Doors, located in bldg.4 level 5 mechanical areas and level 0 loading areas.
Handling Manual 57
Buildings 4 Handling Manual
Elev.#6 Elev.#1
Elev.#2
Elev.#4 Elev.#5
Elev.#7
Elev.#9
Elev.#8
Elev.#3
Handling Manual 58
Buildings 4 Handling Manual
9. AUDIO
VISUAL
Handling Manual 59
Buildings 4 Handling Manual
Plasma TV, Located in Small conference rooms in bldg.4 Level, 2,3,4&5 Area 1&4.
Touch Panel (CRESTRON), Located in all Conference room.
2 Sets of Projector Controller with Laptop. Located in Level 5, Area 1&4 Seaside (Huge Conference room
5209&5220)
9 AUDIO VISUAL
Handling Manual 60
Buildings 4 Handling Manual
Huge Plasma TV Screen, Located in Bldg.4 Level 2,3 & 4 Blue Conference room and Spine areas.
Video Camera (TANBERG), Located in All Conference rooms in Bldg.4 level 0, 2, 3 & 4.
Projector White Screen, Located in Conference rooms in bldg.4 Area 2&5 Level 3&4.
Handling Manual 61
Buildings 4 Handling Manual
IT Controller and Touch Panels. Located in Auditorium in bldg. 4 level 0,.
2 white screen board and projector with plasma TV and cameras. Located bldg.4 in level 0, conference
room 0147.
Handling Manual 62
Buildings 4 Handling Manual
Evacuation Plan in Level 0
Assembly Area
Handling Manual 63
Buildings 4 Handling Manual
Evacuation Plan in Level 2
Handling Manual 64
Buildings 4 Handling Manual
Evacuation Plan in Level 3
Handling Manual 65
Buildings 4 Handling Manual
Evacuation Plan in Level 4
Handling Manual 66
Buildings 4 Handling Manual
Evacuation Plan in Level 5
Handling Manual 67
Buildings 4 Handling Manual
UNIT 1 C MANAGEMENT & ADMINISTRATION TEAM:
HASSAN SIDAOUI, UNIT MANAGER. TEL: 012 8084879,
EMAIL: [email protected].
BILAL KAHWAJI, UNIT SUPERVISOR. TEL: 012 8081202, EMAIL: [email protected].
ADEL AL TALHI, UNIT SUPERVISOR. TEL: 056 4007080, EMAIL:
YASIR KHATEEB, UNIT SUPERVISOR. TEL: 054 6634423,
EMAIL: [email protected].\
JOHN CENON CASAYURAN, ADMINISTRATOR. TEL: 012
8084982, EMAIL: [email protected].
MARK ANTHONY MUZONES, ADMINISTRATOR. TEL: 012
8082173, EMAIL: [email protected]