> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > TP-119 GZ-101 GZ-102 GZ-104 GZ-103 120 130 140 110 120 130 140 150 160 130 140 140 150 150 140 150 160 60 70 80 90 100 110 120 130 140 150 160 170 180 190 60 70 80 90 100 110 120 130 140 150 160 170 180 190 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+00 RR FLAGMAN MUST BE PRESENT WHENEVER DRILLING IS IN PROGRESS RR FLAGMAN & BUCKEYE ON-SITE INSPECTOR MUST BE PRESENT WHENEVER DRILLING IS IN PROGRESS LEGEND APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED PERIMETER FENCING PROPOSED FIXED SOLAR PANEL RACKING DELINEATED WETLANDS EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED GRAVEL ACCESS DRIVE EXISTING OVERHEAD POWER PROPOSED LIMIT OF VEGETATION MANAGEMENT ZONE EXISTING TREELINE PLAN NOTES: SETBACKS 1. ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM AERIAL PHOTOGRAPHY. REFERENCE VHB SITE DRAWINGS FOR CLARIFICATIONS. 2. THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 CONNECTICUT STATE PLANE (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3. ELEVATION CONTOURS ARE FROM STATE OF CONNECTICUT LiDAR DATA AND SURVEY INFORMATION PROVIDED BY VHB. 4. UTILITIES ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE, CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" (811 OR 1-800-922-4455) AT LEAST 72 HOURS BEFORE BEGINNING ANY EXCAVATION. 5. THIS IS IN NO WAY A BOUNDARY SURVEY. PROPERTY LINES SHOWN ON THIS PLAN ARE FROM INFORMATION PROVIDED BY VHB. TAX MAP LINES ARE ADJUSTED TO EVIDENCE FOUND IN THE AERIAL PHOTOGRAPHY. PROPERTY LINES MAY BE OUT OF DATE AND MAY NOT MATCH THE MOST RECENT PLANS. REFERENCE VHB SITE DRAWINGS FOR CLARIFICATIONS. ALTERNATE BORE SECTION HORIZONTAL & VERTICAL SCALE: 1" = 50' PROPOSED HDD ALIGNMENT WETLAND BORE PIT 100' X 50' BORE PIT 100' X 50' 18' MIN. APPROXIMATE RAILROAD R.O.W. TEMPORARY CONSTRUCTION ACCESS 600' RADIUS 15° 15° TEMPORARY ROAD BEGINS AT EXISTING FARM ROAD ON EDGE OF FIELD FOUR CONDUITS SPACED 10 FEET APART INSTALLED BY HORIZONTAL DIRECTIONAL DRILLING METHODS CONDUITS SHALL BE FUSED 10" POLYETHYLENE PRESSURE PIPE BY PRESCOTT OR APPROVED EQUAL, SRD 9, 200 PSI, MIN. I.D. = 8.219", MIN. WALL THICKNESS = 0.194, POLYETHYLENE PIPE SHALL BE MADE FROM HIGH DENSITY, EXTRA HIGH MOLECULAR WEIGHT COMPOUND EQUALING A PE 3408 DESIGNATION AND SHALL CONFORM TO ASTM-1248 AND ASTM- 3350; WITH A CELL CLASSIFICATION OF 345434C. LOCATION OF AN EXISTING PETROLEUM PIPELINE OWNED BY BUCKEYE PARTNERS, LP. PIPELINE RUNS PARALLEL TO THE RAILROAD TRACKS. THE PIPELINE COVER DEPTH IS ESTIMATED TO BE 2 TO 3 FEET. ALL WORK NEAR THE PIPELINE IS TO BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS DETAILED IN THE DOCUMENT ENTITLED "BUCKEYE PARTNERS, L.P. AND AFFILIATES FIVE TEK PARK, 9999 HAMILTON BOULEVARD, BREINIGSVILLE, PA 1803, RIGHT-OF-WAY USE RESTRICTIONS SPECIFICATION, REVISION 6". MINIMUM PIPELINE WORK RESTRICTIONS FROM BUCKEYE RIGHT-OF-WAY USE RESTRICTIONS SPECIFICATION: SECTION 1.5 When any construction activity is conducted in or around our pipeline right-of-way, Buckeye's On-Site Inspector must be present at all times. NO WORK SHALL TAKE PLACE WITHOUT A BUCKEYE ON-SITE INSPECTOR PRESENT. For this free-of-charge service, contact Buckeye local Field Operations Manager at the Buckeye facility nearest to your proposed project. SECTION 1.6 The Crossing Party shall contact Buckeye for re-marking of a pipeline if the existing markers are inadequate for any reason, including disturbance due to construction activities. SECTION 1.7 The Crossing Party shall not burn trash, brush, or other items or substances within 50 feet of the pipeline. SECTION 1.8 The Crossing Party shall not store any equipment or materials on the right-of-way. Full access must be maintained to the pipeline(s) at all times. The stockpiling of items including soil, or topsoil over the pipeline(s) is not permitted. SECTION 1.10 Depending on the type and nature of the encroachment, Buckeye may require the pipeline(s) within the proposed encroachment to be exposed, visually inspected, and backfilled by a Buckeye representative at the full expense of the Crossing Party. Buckeye will evaluate the pipeline(s) cathodic protection system, including the coating type and condition, for suitability of service in relation to the proposed encroachment. Should Buckeye deem that the cathodic protection system and/or coating system is insufficient for any reason, Buckeye will repair or upgrade the system at the Crossing Party's expense to accommodate the proposed encroachment. Potential cathodic protection modifications can include, but are not limited to equipment such as rectifiers, anode systems, test stations, casing pipe, and coating. SECTION 2.5 When excavating within the right-of-way, the Crossing Party's backhoe shall have a plate welded over the teeth of the backhoe bucket, and the side cutters must be removed prior to excavation. However, if within 24 inches of the outer edge of the pipe (this “tolerance zone” extends on all sides of the pipe), only hand excavation, air cutting, and vacuum excavation are permitted. SECTION 3.4 Foreign Utility Crossings h. Trenchless Excavations: [1] Utilities installed by a trenchless excavation method (directional drilling, jacking, slick boring, etc.) shall be reviewed by Buckeye on a case-by-case basis. [2] Buckeye reserves the right to select the method of crossing for the proposed utility. [3] A minimum clearance of 60 inches (5 feet) below the pipeline is required. [4] For directional drilling operations, a tracking system is required to verify the exact location of the drill head. [5] For perpendicular crossings, a 4 feet by 4 feet excavation window, 24 inches below the pipeline is required for visual inspection of the pipeline to ensure the drill (or bore) does not impact the pipeline. [6] Blind boring is not permitted within Buckeye's right-of-way. [7] When trenchless excavations are authorized by Buckeye parallel to and within 10 feet of an existing pipeline, observation holes shall be excavated at 25-foot intervals to monitor the progress and horizontal/vertical location of the drill head. [8] Buckeye must be provided with an advance copy of the horizontal directional drill (HDD) plan for the trenchless excavation which specifies how the HDD will be tracked, monitored and controlled at least two weeks before work is to commence. The plan must detail preventative measures to prevent conflicts with Buckeye's existing facility. The plan must state the planned HDD bore diameters, rod lengths, ream diameters, method of guidance, method of drill head tracking, etc. Additionally, the plan needs to include procedures for continuous monitoring and reporting of the drill head location, and state the appropriate vertical and horizontal deviation tolerances for the HDD operations in accordance with API RP 1172 - “6 Final Design”. The procedure must include reporting requirements and procedures to correct or shut down the HDD trajectory should the operation exceeds the established tolerances. Buckeye Operations must be notified immediately if tolerances are compromised and should be involved in the recommencement of operations after tolerances are exceeded. SECTION 3.5 Temporary Access Roads and Heavy/Construction Vehicle Crossings 3.5.1 General Requirements: a. The Encroaching Party shall provide Buckeye information as to the type, model, size, and axle weight of construction equipment that will be used over or in the vicinity of the pipeline(s). b. Trucks carrying a maximum axle load up to 15,000 pounds may cross the right-of way after Buckeye has confirmed a minimum cover of 48 inches over the pipeline. c. For all other cases, earthen ramps (see Attachment 6), swamp mats, air bridges, reinforced-concrete slabs (see Attachment 5), or steel plates may be required. Loading conditions and protection measures will be evaluated and dictated by Buckeye's Right of Way Department. d. When temporary fill must be added, colored sheets of plastic shall be placed under the temporary fill at original grade so that the original grade will not be disturbed when the temporary fill is removed. e. At all crossing locations, the Crossing Party will provide 12” of clean AASHTO 1 stone over the pipeline right-of-way. f. During the use of an approved temporary construction road, Buckeye may require that the Crossing Party provide additional protective measures deemed necessary to prevent damage to the pipeline. g. Buckeye will limit the number of temporary construction roads constructed by the Crossing Party. SECTION 3.8 Construction-Induced Vibrations 3.8.1 General Requirements: a. Construction activities that generate ground vibrations, including, but without limitation, pile driving, sheet driving, soil compaction work, jackhammering, or ramming, shall be reviewed by Buckeye on a case-by-case basis. b. If the Crossing Party anticipates such an activity within 10 feet of the pipeline, then continuous testing monitored by a seismograph located directly over the pipeline at its closest point to the activity must be conducted. The Crossing Party shall provide, at their expense, the monitoring service which must be approved by Buckeye. c. The particle velocity of any one component of a three-component seismograph must not exceed 2.0 inches per second as recorded on the seismograph placed directly over the pipeline. RAILROAD GENERAL HORIZONTAL DIRECTIONAL DRILLING SPECIFICATION 1.01 DESCRIPTION The work specified in this section consists of furnishing and installing underground utilities using the horizontal directional drilling (HDD) method of installation, also commonly referred to as directional boring or guided horizontal boring. 1.02 REFERENCES Specifications for High Density Polyethylene DR9 PE3408, 200 PSI pressure-rating Piping shall be used as a reference. 1.03 QUALITY ASSURANCE The requirements set forth in this document specify a wide range of procedural precautions necessary to insure that the very basic, essential aspects of a proper directional bore installation are adequately controlled. Strict adherence shall be required under specifically covered conditions outlined in this specification. Adherence to the specifications contained herein, or the Contracting Officer's approval of any aspect of any directional bore operation covered by this specification, shall in no way relieve the Contractor of their ultimate responsibility for the satisfactory completion of the work authorized under the Contract. 1.04 SUBMITTALS A. Work Plan: Prior to beginning work, the Contractor must submit to the Owner's representative a general work plan outlining the procedure and schedule to be used to execute the project. Plan should document the thoughtful planning of equipment, materials and personnel required to successfully complete the project. B. Equipment: Contractor will submit specifications on directional drilling equipment and materials to be used to ensure that the equipment will be adequate to complete the project. C. Boring Plan: Prior to beginning work the Contractor must submit a Boring Plan to the Owner's representative. The Boring Plan shall include the length of rods, distance from the drilling machine, drilling fluid specifications, depth below grade and horizontal and vertical orientation in tabular format. A sketch of the bore path shall also be provided. D. As-Built Record: The Contractor shall submit a plan, profile and tabular record of the position of the HEF supply line. The record data shall be similar to that shown on the boring plan. PART 2.00 PRODUCTS 2.01 EQUIPMENT The directional drilling equipment shall consist of a directional drilling rig of sufficient capacity to perform the bore and pullback the pipe, a drilling fluid mixing and delivery system of sufficient capacity to successfully complete the crossing, a guidance system to accurately guide boring operations and trained and competent personnel to operate the system. All equipment shall be in good, safe operation condition with sufficient supplies, materials and spare parts on hand to maintain the system in good working order for the duration of this project. 2.02 DRILLING SYSTEM A. Drilling Rig: The directional drilling machine shall consist of a hydraulically powered system to rotate, push and pull hollow drill pipe into the ground at a variable angle while delivering pressurized fluid mixture to a guidable drill (bore) head. The machine shall be anchored to the ground to withstand the pulling, pushing and rotating pressure required to complete the crossing. The hydraulic power system shall be self-contained with sufficient pressure and volume to power drilling operations. Hydraulic system shall be free of leaks. Rig shall have a system to monitor and record maximum pull-back pressure during pull-back operations. B. Drill Head: The drill head shall be steerable by changing its rotation and shall provide the necessary cutting surfaces and drilling fluid jets. C. Mud Motors (if required): Mud motors shall be of adequate power to turn the required drilling tools. D. Drill Pipe: Shall be constructed of high quality 4130 seamless tubing, grade D or better, with threaded box and pins. Tool joints should be hardened to 32-36 RC. 2.03 GUIDANCE SYSTEM The Guidance System shall be of a proven type and shall be set up and operated by personnel trained and experienced with this system. The Operator shall be aware of any magnetic anomalies and shall consider such influences in the operation of the guidance system if using a magnetic system. 2.04 DRILLING FLUID (MUD) SYSTEM A. A self-contained, closed, drilling fluid mixing system shall be of sufficient size to mix and deliver drilling fluid composed of bentonite clay, potable water and appropriate additives. Mixing system shall be able to molecularly shear individual bentonite particles from the dry power to avoid clumping and ensure thorough mixing. The drilling fluid reservoir tank shall be sized for adequate storage of the mud. Mixing system shall continually agitate the drilling fluid during drilling operations. B. Drilling Fluids: Drilling fluid shall be composed of clean water and an appropriate additive. Water shall be from a clean source with a pH of 8.5 B 10 and/or as per mixing requirements of the manufacturer. Water of a lower pH or with excessive calcium shall be treated with the appropriate amount of sodium carbonate of equal. The water and additives shall be mixed thoroughly and be absent of any clumps or clods. No hazardous additives may be used. Drilling fluid shall be maintained at a viscosity sufficient to suspend cuttings and maintain the integrity of bore wall. C. Delivery System: The mud pumping system shall have a minimum capacity to supply mud in accordance with the drilling equipment pull-back rating at a constant required pressure. The delivery system shall have filters in-line to prevent solids from being pumped into the drill pipe. Connections between the pump and drill pipe shall be relatively leak-free. Used drilling fluid and drilling fluid spilled during drilling operations shall be contained and properly disposed of. A berm, minimum of 12” high, shall be maintained around drill rigs, drilling fluid mixing system, entry and exit pits and drilling fluid recycling system (if used) to prevent spills into the surrounding environment. Pumps and or vacuum truck(s) of sufficient size shall be in place to convey excess drilling fluid from containment areas to storage facilities. PART 3.00 EXECUTION 3.01 GENERAL The Owner and Engineer must be notified at least 48 hours in advance of starting work. The directional bore shall not begin until the Owner's representative is present at the job site and agrees that proper preparations for the operation have been made. The Owner' representative approval for beginning the installation shall in no way relieve the Contractor of the ultimate responsibility for the satisfactory completion of the work as authorized under the Contract. 3.02 PERSONNEL REQUIREMENTS A. Use only experienced installers, equipment operators, supervisors and engineer designers. B. Contractor's experience shall include: 1) A minimum of 5 years experience in Horizontal Directional Drilling. 2) Upon request, Directional Drill Contractors shall provide references for previous projects completed in the area. 3.03 DRILLING PROCEDURE A. Site Preparation: 1) Prior to any alterations to worksite, Contractor shall photograph or videotape entire work area, including entry and exit points. One copy of which shall be given to the Owner and one copy to remain with Contractor for a period of one year following the completion of the project. The Contractor shall coordinate with the Owner's representative and obtain permission before photography or video taping the work area. 2) Worksite as indicated on drawings, with right-of-way, shall be graded or filled to provide a level working area. No alterations beyond what is required for operations are to be made. Contractor shall confine all activities to designated work areas. B. Drill Path Survey: Entire drill path shall be accurately surveyed with entry and exit stakes placed in the appropriate locations within the areas indicated on drawings. If contractor is using a magnetic guidance system, drill path will be surveyed for any surface geomagnetic variations or anomalies. C. Safety: Contractor shall adhere to all applicable state, federal and local safety regulations and all operations shall be conducted in a safe manner. Safety meetings shall be conducted at least weekly with a written record of attendance and topic submitted to Engineer. D. Pipe: Pipe shall be heat welded/fused together in one length, if space permits. E. Pilot Hole: 1) Pilot hole shall be drilled on bore path with no deviations greater than 5% of depth per a length of 100'. In the event that pilot does deviate from bore path more than 5% of depth in 100', Contractor will notify the contracting Owner's representative and the Owner's representative may require Contractor to pull-back and re-drill from the location along bore path before the deviation. 2) In the event that a drilling fluid fracture, inadvertent returns or returns loss occurs during pilot hole drilling operations, Contractor shall cease drilling, wait at least 30 minutes, inject a quantity of drilling fluid with a viscosity exceeding 120 seconds as measured by a March funnel and then wait another 30 minutes. If mud fracture or return loss continues, Contractor shall cease operations and notify the Owner's representative. The Contractor shall be responsible for the restoration of any area heaved or damaged by the escape of drilling mud. F. Reaming: Upon successful completion of pilot hole, Contractor will ream bore hole to a minimum of 25% greater than outside diameter of pipe using the appropriate tools. Contractor shall not attempt to ream at one time more than the drilling equipment and mud system are designed to safely handle. G. Pull-Back: 1) After successfully reaming borehole to the required diameter, Contractor will pull the pipe and tracer wire through the borehole. In front of the pipe will be a swivel. Once pull-back operations have commenced, operations must continue without interruption until pipe is completely pulled into bore hole. During pull-back operations Contractor shall not apply more than the maximum safe pipe pull pressure at any time. 2) In the event that pipe becomes stuck, Contractor will cease pulling operations to allow any potential hydro-lock to subside and will commence pulling operations. If pipe remains stuck, Contractor shall notify the Owner's representative. The contractor shall not be relieved of his responsibility to satisfactory complete the work as authorized under the contract if a stuck pipe can not be pulled. If all other pipe pulling and/or boring methods fail, the contractor officer may direct the contractor to complete the electric lines via overhead methods. Payment for the work to that point shall be as dictated by the Contract between the Owner and Contractor. The Contractor shall submit revised pricing for review and approval before proceeding with overhead electric work. No such work shall be commenced before it is confirmed that all necessary permits are in place. APPROXIMATE LOCATION OF EXISTING BUCKEYE PARTNERS PETROLEUM PIPELINE, SEE NOTE ON PLAN SCHEMATIC CROSS SECTION OF OF CONDUIT GROUPING INSTALLED BY HORIZONTAL DIRECTION DRILLING METHODS NOT TO SCALE 34.5Kv POWER CABLE AND GROUND (TYPICAL) HDPE INNERDUCT FOR FIBER OPTIC CABLE (TYPICAL) SEE PLAN FOR MINIMUM COVER DEPTH 10' (TYP.) 10' (TYP.) 10' (TYP.) 10" DIAMETER HDPE CONDUITS, SEE NOTE ON PLAN EXISTING GROUND SURFACE OVERALL BORE LENGTH = ±1,090' APPROXIMATE RAILROAD LOCATION 600' RADIUS 35' MIN. 25' MIN. TP-119 (Sta. 0+00, 197' RT) GZ-102 (Sta, 2+1.37, 72' L) GZ-101 (Sta. 3+80.0, 434' RT) GZ-104 (Sta. 10+65.97, 42' RT) GZ-103 (Sta. 11+95.87, 38' RT) BUCKEYE PETROLEUM PIPELINE BUCKEYE PETROLEUM PIPELINE NOTE: CONTRACTOR SHALL MONITOR TRACK ELEVATIONS AT ALL TIMES DURING DRILLING. METHOD OF MONITORING MUST BE PRE-APPROVED BY RR REPRESENTATIVE. RR FLAGMAN AND BUCKEYE PIPELINE ON-SITE INSPECTOR MUST BE PRESENT DURING ACTIVE DRILLING. SEE PROFILE VIEW FOR NOTES Gravel Pit Solar Apothecaries Hall Road, Windsorville Road, Wapping Road and Plantation Road East Windsor, Connecticut C-1.04 40' 0' 80' 160' 240' 0" 1" 2" 3" CTDOT Application January 15, 2021 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com STANDARD GRAPHIC SCALE (1" = 80') VALID WHEN PLOTTED ON 24" BY 36" MEDIA CIVIL ENGINEERING: Krebs and Lansing Consulting Engineers, Inc. 164 Main Street, Suite 201 Colchester, Vermont 05446 VHB (Engineer of Record) 100 Great Meadow Road, Suite 200 Weathersfield, Connecticut 06109 PLAN AND PROFILE HORIZONTAL DIRECTION DRILL (HDD) Not Approved for Construction REFER TO VHB DRAWINGS FOR CONFLITS REFER TO VHB DRAWINGS FOR CONFLITS

BUCKEYE PETROLEUM PIPELINE · 2021. 3. 31. · Buckeye will evaluate the pipeline(s) cathodic protection system, including the coating type and condition, for suitability of service

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BUCKEYE PETROLEUM PIPELINE · 2021. 3. 31. · Buckeye will evaluate the pipeline(s) cathodic protection system, including the coating type and condition, for suitability of service

>

>

>

>

>

>

>

>

>

>

>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

TP-119

GZ-101

GZ-102

GZ-104

GZ-103

1

2

0

1

3

0

1

4

0

110

1

2

0

1

3

0

140

1

5

0

1

6

0

1

3

0

1

4

0

1

4

0

1

5

0

1

5

0

1

4

0

150

1

6

0

60

70

80

90

100

110

120

130

140

150

160

170

180

190

60

70

80

90

100

110

120

130

140

150

160

170

180

190

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+0013+00

RR FLAGMAN MUST BE PRESENT WHENEVER DRILLING IS IN PROGRESS RR FLAGMAN & BUCKEYE ON-SITE INSPECTOR MUST BE PRESENT WHENEVER DRILLING IS IN PROGRESS

LEGEND

APPROXIMATE

PROPERTY LINES

EXISTING GRADE

CONTOUR LINES

(5 FOOT INTERVALS)

PROPOSED PERIMETER

FENCING

PROPOSED FIXED SOLAR

PANEL RACKING

DELINEATED

WETLANDS

EXISTING GRADE

CONTOUR LINES

(1 FOOT INTERVALS)

PROPOSED GRAVEL

ACCESS DRIVE

EXISTING

OVERHEAD POWER

PROPOSED LIMIT

OF VEGETATION

MANAGEMENT

ZONE

EXISTING TREELINE

PLAN NOTES:

SETBACKS

1. ASPECTS OF PLAN ARE APPROXIMATE

AND DERIVED FROM AERIAL

PHOTOGRAPHY. REFERENCE VHB SITE

DRAWINGS FOR CLARIFICATIONS.

2. THE HORIZONTAL COORDINATE

SYSTEM IS BASED ON NAD83

CONNECTICUT STATE PLANE (US

SURVEY FEET). ELEVATIONS ARE

BASED ON THE NAVD88 (US SURVEY

FEET).

3. ELEVATION CONTOURS ARE FROM

STATE OF CONNECTICUT LiDAR DATA

AND SURVEY INFORMATION PROVIDED

BY VHB.

4. UTILITIES ARE NOT WARRANTED TO BE

COMPLETE OR ACCURATE,

CONTRACTOR SHALL CONTACT "CALL

BEFORE YOU DIG" (811 OR

1-800-922-4455) AT LEAST 72 HOURS

BEFORE BEGINNING ANY EXCAVATION.

5. THIS IS IN NO WAY A BOUNDARY

SURVEY. PROPERTY LINES SHOWN

ON THIS PLAN ARE FROM

INFORMATION PROVIDED BY VHB. TAX

MAP LINES ARE ADJUSTED TO

EVIDENCE FOUND IN THE AERIAL

PHOTOGRAPHY. PROPERTY LINES

MAY BE OUT OF DATE AND MAY NOT

MATCH THE MOST RECENT PLANS.

REFERENCE VHB SITE DRAWINGS FOR

CLARIFICATIONS.

ALTERNATE BORE SECTION

HORIZONTAL & VERTICAL SCALE: 1" = 50'

P

R

O

P

O

S

E

D

H

D

D

A

L

I

G

N

M

E

N

T

WETLANDBORE PIT100' X 50'

BORE PIT100' X 50'

18' MIN.

APPROXIMATERAILROAD R.O.W.

TEMPORARYCONSTRUCTIONACCESS

600' RADIUS

15°15°

TEMPORARYROAD BEGINS AT

EXISTING FARMROAD ON EDGE

OF FIELD

FOUR CONDUITS SPACED 10FEET APART INSTALLED BYHORIZONTAL DIRECTIONAL

DRILLING METHODS

CONDUITS SHALL BE FUSED 10" POLYETHYLENEPRESSURE PIPE BY PRESCOTT OR APPROVEDEQUAL, SRD 9, 200 PSI, MIN. I.D. = 8.219", MIN.WALL THICKNESS = 0.194, POLYETHYLENE PIPESHALL BE MADE FROM HIGH DENSITY, EXTRAHIGH MOLECULAR WEIGHT COMPOUND EQUALINGA PE 3408 DESIGNATION AND SHALL CONFORM TOASTM-1248 AND ASTM- 3350; WITH A CELLCLASSIFICATION OF 345434C.

LOCATION OF AN EXISTING PETROLEUM PIPELINEOWNED BY BUCKEYE PARTNERS, LP. PIPELINE RUNSPARALLEL TO THE RAILROAD TRACKS. THE PIPELINECOVER DEPTH IS ESTIMATED TO BE 2 TO 3 FEET. ALLWORK NEAR THE PIPELINE IS TO BE COMPLETED INACCORDANCE WITH THE REQUIREMENTS DETAILEDIN THE DOCUMENT ENTITLED "BUCKEYE PARTNERS,L.P. AND AFFILIATES FIVE TEK PARK, 9999 HAMILTONBOULEVARD, BREINIGSVILLE, PA 1803, RIGHT-OF-WAYUSE RESTRICTIONS SPECIFICATION, REVISION 6".

MINIMUM PIPELINE WORK RESTRICTIONS FROM BUCKEYE RIGHT-OF-WAYUSE RESTRICTIONS SPECIFICATION:

SECTION 1.5 When any construction activity is conducted in or around ourpipeline right-of-way, Buckeye's On-Site Inspector must be present at all times.NO WORK SHALL TAKE PLACE WITHOUT A BUCKEYE ON-SITE INSPECTORPRESENT. For this free-of-charge service, contact Buckeye local FieldOperations Manager at the Buckeye facility nearest to your proposed project.SECTION 1.6 The Crossing Party shall contact Buckeye for re-marking of apipeline if the existing markers are inadequate for any reason, includingdisturbance due to construction activities.SECTION 1.7 The Crossing Party shall not burn trash, brush, or other items orsubstances within 50 feet of the pipeline.SECTION 1.8 The Crossing Party shall not store any equipment or materials onthe right-of-way. Full access must be maintained to the pipeline(s) at all times.The stockpiling of items including soil, or topsoil over the pipeline(s) is notpermitted.SECTION 1.10 Depending on the type and nature of the encroachment, Buckeyemay require the pipeline(s) within the proposed encroachment to be exposed,visually inspected, and backfilled by a Buckeye representative at the full expenseof the Crossing Party. Buckeye will evaluate the pipeline(s) cathodic protectionsystem, including the coating type and condition, for suitability of service inrelation to the proposed encroachment. Should Buckeye deem that the cathodicprotection system and/or coating system is insufficient for any reason, Buckeyewill repair or upgrade the system at the Crossing Party's expense toaccommodate the proposed encroachment. Potential cathodic protectionmodifications can include, but are not limited to equipment such as rectifiers,anode systems, test stations, casing pipe, and coating.SECTION 2.5 When excavating within the right-of-way, the Crossing Party'sbackhoe shall have a plate welded over the teeth of the backhoe bucket, and theside cutters must be removed prior to excavation. However, if within 24 inches ofthe outer edge of the pipe (this “tolerance zone” extends on all sides of the pipe),only hand excavation, air cutting, and vacuum excavation are permitted.SECTION 3.4 Foreign Utility Crossingsh. Trenchless Excavations:[1] Utilities installed by a trenchless excavation method (directional drilling,jacking, slick boring, etc.) shall be reviewed by Buckeye on a case-by-casebasis.[2] Buckeye reserves the right to select the method of crossing for the proposedutility.[3] A minimum clearance of 60 inches (5 feet) below the pipeline is required.[4] For directional drilling operations, a tracking system is required to verify theexact location of the drill head.[5] For perpendicular crossings, a 4 feet by 4 feet excavation window, 24 inchesbelow the pipeline is required for visual inspection of the pipeline to ensure thedrill (or bore) does not impact the pipeline.[6] Blind boring is not permitted within Buckeye's right-of-way.[7] When trenchless excavations are authorized by Buckeye parallel to and within10 feet of an existing pipeline, observation holes shall be excavated at 25-footintervals to monitor the progress and horizontal/vertical location of the drill head.[8] Buckeye must be provided with an advance copy of the horizontal directionaldrill (HDD) plan for the trenchless excavation which specifies how the HDD willbe tracked, monitored and controlled at least two weeks before work is tocommence. The plan must detail preventative measures to prevent conflicts withBuckeye's existing facility. The plan must state the planned HDD bore diameters,rod lengths, ream diameters, method of guidance, method of drill head tracking,etc. Additionally, the plan needs to include procedures for continuous monitoringand reporting of the drill head location, and state the appropriate vertical andhorizontal deviation tolerances for the HDD operations in accordance with API RP1172 - “6 Final Design”. The procedure must include reporting requirements andprocedures to correct or shut down the HDD trajectory should the operationexceeds the established tolerances. Buckeye Operations must be notifiedimmediately if tolerances are compromised and should be involved in therecommencement of operations after tolerances are exceeded.SECTION 3.5 Temporary Access Roads and Heavy/Construction VehicleCrossings3.5.1 General Requirements:a. The Encroaching Party shall provide Buckeye information as to the type,model, size, and axle weight of construction equipment that will be used over orin the vicinity of the pipeline(s).b. Trucks carrying a maximum axle load up to 15,000 pounds may cross theright-of�way after Buckeye has confirmed a minimum cover of 48 inches overthe pipeline.c. For all other cases, earthen ramps (see Attachment 6), swamp mats, airbridges, reinforced-concrete slabs (see Attachment 5), or steel plates may berequired. Loading conditions and protection measures will be evaluated anddictated by Buckeye's Right of Way Department.d. When temporary fill must be added, colored sheets of plastic shall be placedunder the temporary fill at original grade so that the original grade will not bedisturbed when the temporary fill is removed.e. At all crossing locations, the Crossing Party will provide 12” of clean AASHTO 1stone over the pipeline right-of-way.f. During the use of an approved temporary construction road, Buckeye mayrequire that the Crossing Party provide additional protective measures deemednecessary to prevent damage to the pipeline.g. Buckeye will limit the number of temporary construction roads constructed bythe Crossing Party.SECTION 3.8 Construction-Induced Vibrations3.8.1 General Requirements:a. Construction activities that generate ground vibrations, including, but withoutlimitation, pile driving, sheet driving, soil compaction work, jackhammering, orramming, shall be reviewed by Buckeye on a case-by-case basis.b. If the Crossing Party anticipates such an activity within 10 feet of the pipeline,then continuous testing monitored by a seismograph located directly over thepipeline at its closest point to the activity must be conducted. The Crossing Partyshall provide, at their expense, the monitoring service which must be approvedby Buckeye.c. The particle velocity of any one component of a three-componentseismograph must not exceed 2.0 inches per second as recorded on theseismograph placed directly over the pipeline.

RA

ILRO

AD

GENERAL HORIZONTAL DIRECTIONAL DRILLING SPECIFICATION

1.01 DESCRIPTIONThe work specified in this section consists of furnishing and installingunderground utilities using the horizontal directional drilling (HDD) method ofinstallation, also commonly referred to as directional boring or guided horizontalboring.

1.02 REFERENCESSpecifications for High Density Polyethylene DR9 PE3408, 200 PSIpressure-rating Piping shall be used as a reference.

1.03 QUALITY ASSURANCEThe requirements set forth in this document specify a wide range of proceduralprecautions necessary to insure that the very basic, essential aspects of a properdirectional bore installation are adequately controlled. Strict adherence shall berequired under specifically covered conditions outlined in this specification.Adherence to the specifications contained herein, or the Contracting Officer'sapproval of any aspect of any directional bore operation covered by thisspecification, shall in no way relieve the Contractor of their ultimate responsibilityfor the satisfactory completion of the work authorized under the Contract.

1.04 SUBMITTALSA. Work Plan:Prior to beginning work, the Contractor must submit to the Owner'srepresentative a general work plan outlining the procedure and schedule to beused to execute the project. Plan should document the thoughtful planning ofequipment, materials and personnel required to successfully complete theproject.

B. Equipment:Contractor will submit specifications on directional drilling equipment andmaterials to be used to ensure that the equipment will be adequate to completethe project.

C. Boring Plan:Prior to beginning work the Contractor must submit a Boring Plan to the Owner'srepresentative. The Boring Plan shall include the length of rods, distance fromthe drilling machine, drilling fluid specifications, depth below grade andhorizontal and vertical orientation in tabular format. A sketch of the bore pathshall also be provided.

D. As-Built Record:The Contractor shall submit a plan, profile and tabular record of the position ofthe HEF supply line. The record data shall be similar to that shown on the boringplan.

PART 2.00 PRODUCTS2.01 EQUIPMENTThe directional drilling equipment shall consist of a directional drilling rig ofsufficient capacity to perform the bore and pullback the pipe, a drilling fluidmixing and delivery system of sufficient capacity to successfully complete thecrossing, a guidance system to accurately guide boring operations and trainedand competent personnel to operate the system. All equipment shall be in good,safe operation condition with sufficient supplies, materials and spare parts onhand to maintain the system in good working order for the duration of thisproject.

2.02 DRILLING SYSTEMA. Drilling Rig:The directional drilling machine shall consist of a hydraulically powered systemto rotate, push and pull hollow drill pipe into the ground at a variable angle whiledelivering pressurized fluid mixture to a guidable drill (bore) head. The machineshall be anchored to the ground to withstand the pulling, pushing and rotatingpressure required to complete the crossing. The hydraulic power system shallbe self-contained with sufficient pressure and volume to power drillingoperations. Hydraulic system shall be free of leaks. Rig shall have a system tomonitor and record maximum pull-back pressure during pull-back operations.

B. Drill Head:The drill head shall be steerable by changing its rotation and shall provide thenecessary cutting surfaces and drilling fluid jets.

C. Mud Motors (if required):Mud motors shall be of adequate power to turn the required drilling tools.

D. Drill Pipe:Shall be constructed of high quality 4130 seamless tubing, grade D or better,with threaded box and pins. Tool joints should be hardened to 32-36 RC.

2.03 GUIDANCE SYSTEMThe Guidance System shall be of a proven type and shall be set up and operatedby personnel trained and experienced with this system. The Operator shall beaware of any magnetic anomalies and shall consider such influences in theoperation of the guidance system if using a magnetic system.

2.04 DRILLING FLUID (MUD) SYSTEMA. A self-contained, closed, drilling fluid mixing system shall be of sufficientsize to mix and deliver drilling fluid composed of bentonite clay, potable waterand appropriate additives. Mixing system shall be able to molecularly shearindividual bentonite particles from the dry power to avoid clumping and ensurethorough mixing. The drilling fluid reservoir tank shall be sized for adequatestorage of the mud. Mixing system shall continually agitate the drilling fluidduring drilling operations.B. Drilling Fluids:Drilling fluid shall be composed of clean water and an appropriate additive.Water shall be from a clean source with a pH of 8.5 B 10 and/or as per mixingrequirements of the manufacturer. Water of a lower pH or with excessive calciumshall be treated with the appropriate amount of sodium carbonate of equal. Thewater and additives shall be mixed thoroughly and be absent of any clumps orclods. No hazardous additives may be used. Drilling fluid shall be maintained ata viscosity sufficient to suspend cuttings and maintain the integrity of bore wall.C. Delivery System:The mud pumping system shall have a minimum capacity to supply mud inaccordance with the drilling equipment pull-back rating at a constant requiredpressure. The delivery system shall have filters in-line to prevent solids frombeing pumped into the drill pipe. Connections between the pump and drill pipeshall be relatively leak-free. Used drilling fluid and drilling fluid spilled duringdrilling operations shall be contained and properly disposed of. A berm,minimum of 12” high, shall be maintained around drill rigs, drilling fluid mixingsystem, entry and exit pits and drilling fluid recycling system (if used) to preventspills into the surrounding environment. Pumps and or vacuum truck(s) ofsufficient size shall be in place to convey excess drilling fluid from containmentareas to storage facilities.PART 3.00 EXECUTION

3.01 GENERALThe Owner and Engineer must be notified at least 48 hours in advance of startingwork. The directional bore shall not begin until the Owner's representative ispresent at the job site and agrees that proper preparations for the operation havebeen made. The Owner' representative approval for beginning the installationshall in no way relieve the Contractor of the ultimate responsibility for thesatisfactory completion of the work as authorized under the Contract.

3.02 PERSONNEL REQUIREMENTSA. Use only experienced installers, equipment operators, supervisors andengineer designers.B. Contractor's experience shall include:1) A minimum of 5 years experience in Horizontal Directional Drilling.2) Upon request, Directional Drill Contractors shall provide references forprevious projects completed in the area.

3.03 DRILLING PROCEDUREA. Site Preparation:1) Prior to any alterations to worksite, Contractor shall photograph orvideotape entire work area, including entry and exit points. One copy of whichshall be given to the Owner and one copy to remain with Contractor for a periodof one year following the completion of the project. The Contractor shallcoordinate with the Owner's representative and obtain permission beforephotography or video taping the work area.2) Worksite as indicated on drawings, with right-of-way, shall be graded orfilled to provide a level working area. No alterations beyond what is required foroperations are to be made. Contractor shall confine all activities to designatedwork areas.B. Drill Path Survey:Entire drill path shall be accurately surveyed with entry and exit stakes placed inthe appropriate locations within the areas indicated on drawings. If contractor isusing a magnetic guidance system, drill path will be surveyed for any surfacegeomagnetic variations or anomalies.C. Safety:Contractor shall adhere to all applicable state, federal and local safetyregulations and all operations shall be conducted in a safe manner. Safetymeetings shall be conducted at least weekly with a written record of attendanceand topic submitted to Engineer.D. Pipe:Pipe shall be heat welded/fused together in one length, if space permits.E. Pilot Hole:1) Pilot hole shall be drilled on bore path with no deviations greater than 5%of depth per a length of 100'. In the event that pilot does deviate from bore pathmore than 5% of depth in 100', Contractor will notify the contracting Owner'srepresentative and the Owner's representative may require Contractor topull-back and re-drill from the location along bore path before the deviation.2) In the event that a drilling fluid fracture, inadvertent returns or returns lossoccurs during pilot hole drilling operations, Contractor shall cease drilling, wait atleast 30 minutes, inject a quantity of drilling fluid with a viscosity exceeding 120seconds as measured by a March funnel and then wait another 30 minutes. Ifmud fracture or return loss continues, Contractor shall cease operations andnotify the Owner's representative. The Contractor shall be responsible for therestoration of any area heaved or damaged by the escape of drilling mud.F. Reaming:Upon successful completion of pilot hole, Contractor will ream bore hole to aminimum of 25% greater than outside diameter of pipe using the appropriatetools. Contractor shall not attempt to ream at one time more than the drillingequipment and mud system are designed to safely handle.G. Pull-Back:1) After successfully reaming borehole to the required diameter, Contractorwill pull the pipe and tracer wire through the borehole. In front of the pipe will bea swivel. Once pull-back operations have commenced, operations mustcontinue without interruption until pipe is completely pulled into bore hole.During pull-back operations Contractor shall not apply more than the maximumsafe pipe pull pressure at any time.2) In the event that pipe becomes stuck, Contractor will cease pullingoperations to allow any potential hydro-lock to subside and will commencepulling operations. If pipe remains stuck, Contractor shall notify the Owner'srepresentative. The contractor shall not be relieved of his responsibility tosatisfactory complete the work as authorized under the contract if a stuck pipecan not be pulled.

If all other pipe pulling and/or boring methods fail, the contractor officermay direct the contractor to complete the electric lines via overhead methods.Payment for the work to that point shall be as dictated by the Contract betweenthe Owner and Contractor. The Contractor shall submit revised pricing for reviewand approval before proceeding with overhead electric work. No such work shallbe commenced before it is confirmed that all necessary permits are in place.

APPROXIMATE LOCATION OF EXISTING BUCKEYEPARTNERS PETROLEUM PIPELINE, SEE NOTE ON PLAN

SCHEMATIC CROSS SECTION OF OF CONDUIT GROUPING

INSTALLED BY HORIZONTAL DIRECTION DRILLING METHODS

NOT TO SCALE

34.5Kv

POWER

CABLE AND

GROUND

(TYPICAL)

HDPE

INNERDUCT

FOR FIBER

OPTIC

CABLE

(TYPICAL)

SEE P

LA

N FO

R M

IN

IM

UM

CO

VER

D

EP

TH

10' (TYP.) 10' (TYP.) 10' (TYP.)

10" DIAMETER HDPE

CONDUITS, SEE NOTE ON PLAN

EXISTING

GROUND

SURFACE

OVERALL BORE LENGTH = ±1,090'

APPROXIMATERAILROADLOCATION

600' RADIUS

35' MIN. 25' MIN.

TP-119 (Sta. 0+00,197' RT)

GZ-102 (Sta, 2+1.37,72' L)

GZ-101 (Sta. 3+80.0,434' RT)

GZ-104 (Sta. 10+65.97,42' RT)

GZ-103 (Sta. 11+95.87,38' RT)

BU

CK

EYE

PE

TRO

LEU

M P

IPE

LINE

BU

CK

EY

E P

ETR

OLE

UM

PIP

ELIN

E

NOTE: CONTRACTOR SHALL MONITOR TRACK ELEVATIONS AT ALL TIMES DURING DRILLING. METHOD

OF MONITORING MUST BE PRE-APPROVED BY RR REPRESENTATIVE.

RR FLAGMAN ANDBUCKEYE PIPELINEON-SITEINSPECTOR MUSTBE PRESENTDURING ACTIVEDRILLING. SEEPROFILE VIEW FORNOTES

Gravel Pit Solar

Apothecaries Hall Road,

Windsorville Road, Wapping Road

and Plantation Road

East Windsor, Connecticut

C-1.04

40'0' 80' 160' 240'

0" 1" 2" 3"

CTDOT Application January 15, 2021

164 Main Street, Suite 201 P: (802) 878-0375

Colchester, Vermont 05446 www.krebsandlansing.com

STANDARD GRAPHIC SCALE (1" = 80')

VALID WHEN PLOTTED ON 24" BY 36" MEDIA

CIVIL ENGINEERING:

Krebs and Lansing Consulting Engineers, Inc.

164 Main Street, Suite 201

Colchester, Vermont 05446

VHB (Engineer of Record)

100 Great Meadow Road, Suite 200

Weathersfield, Connecticut 06109

PLAN AND PROFILE

HORIZONTAL DIRECTION DRILL

(HDD)

Not Approved for Construction

REFER TO VHBDRAWINGS FOR

CONFLITS

REFER TO VHBDRAWINGS FOR

CONFLITS