    BTS3902E Exterior and Dimensions

    BTS3902E

    ExteriorBTS3902E has two exteriors.

    (1) Upper housing (2) Camouflage shell (3an

    Dimensionse s o s

    Module Dimensions (H1 x WModule(Without the Housi

    BTS3902E working at the 1.9 GHz, 2.1 GHz or AWS frequency band

    300 mm120 mm270

    BTS3902E working at the 850MHz frequency band 300 mm127 mm270

    1

    V200R013C00 and later versions / V100R008C00 and mapping to V100R008C00 is: NodeB V200R015C00).is document.

    3) BTS3902E with built-in ntenna

    (4) BTS3902E with external antennas

    W1 x D) Dimensions (H2 x W2 x D) ng) (with the Housing)

    0 mm 400 mm145 mm277 mm

    0 mm 400 mm170 mm277 mm

    1 Copyright Huawei Technologies Co., Ltd. 2014. All rights reserved.

  • BTS3902E Installation OptionszOn a Metal Pole with zOn a Metal Pole with thezOn a Metal Pole with the Diameter Ranging from 60 mm to 114 mm

    zOn a Metal Pole with theDiameter Ranging from 114 mm to 400 mm

    BTS3902E Installation Clearance RequzRecommended clearance for installing a single BTS3902

    z

    zRecommended clearance for installing two BTS3902E side by side

    zRecommended clearance for installing two BTS3902E in a vertical line

    2

    e zOn a Wall zOn a Wood Pole with thee zOn a Wall zOn a Wood Pole with the Diameter Ranging from 200 mm to 400 mm

    uirementszMinimum clearance for installing a single BTS3902E

    zMinimum clearance for installing two BTS3902E side by side

    zMinimum clearance for installing two BTS3902E in a vertical line

    2

  • SPD60D

    Two AC surge protection boxes (SPD60D and SPM60A

    (Optional) AC Surge Protec

    zExterior and Dimensions zRecommendclearance

    The outdoor BTS3902E working at the 1.9 GHz or 2.1 GH

    Dimensions and Installation Clearance

    SPD60D

    zOn a Metal Pole with the Diameter Ranging from 60 mm to 114 mm

    Installation Options

    zOn a Wall

    3

    A) are available for the BTS3902E.

    ction Box

    ded installation zMinimum installation clearance

    Hz frequency band can use the SPD60D.

    Requirements

    zOn a Metal Pole with the Diameter Ranging from 114 mm to 400 mm

    zOn a Wood Pole with the Diameter Ranging from 200 mm to 400 mm

    3

  • The outdoor BTS3902E working at the 850 MHz frequenc

    SPM60A

    zExterior and Dimensions zRecommendclearance

    The outdoor BTS3902E working at the 850 MHz frequenc

    Dimensions and Installation Clearance

    zOn a PoleInstallation Options

    4

    cy band can use the SPM60A

    ded installation zMinimum installation clearance

    cy band can use the SPM60A.

    Requirements

    zOn a Wall

    4

  • Installing on a Pole with the1 Installing the angle-adjustable mount

    The composing of angle-adjustable mountinLifting eyeAttachment plate Lifting eye

    Traction eye

    Main mounting bracket

    Auxiliary mounting

    dhTraction eye

    2. Installing the auxiliary mounting bra

    Double-headed nutHoist clamp

    Ensure that the arrow on the auxiliary bracket points up.

    2 Installing the BTS3902E

    Tighten the two double-headed nuts synchronously and soand auxiliary brackets are the same.

    Upper positioning pin

    Lower positioning pin

    Put the upper positioning pin through the hole on the ahole on the main mounting bracket.

    5

    3 Adjusting the installation angle of th

    The procedures of adjusting the installation angle

    e Diameter of 60 mm to 114 mmting kits

    g kits 1. Installing the main mounting bracket

    g bracket

    double-headed nut

    Long bolt

    Rubber washerDouble-headed nut

    ackets

    o that the distances between the two sides of the main

    Positioning screw

    attachment plate and the lower positioning pin through the

    5

    he BTS3902E

    e, see the page 8.

  • Installing on a Pole with the1 Installing the mounting brackets

    Adapting plate(1) Mounting hole group A

    Ad

    1. Inst( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate

    Mabra

    Ada

    2. Installing the Hose clamp

    Mounting hole group B LeHose clamp

    2 Installing the BTS3902E

    Upper positioning pin

    Lower positioning pin

    Put the upper positioning pin through the hole on the ahole on the main mounting bracket.

    6

    3 Adjusting the installation angle of th

    The procedures of adjusting the installation angle

    e Diameter of 114 mm to 400 mm

    ti l t

    talling the adapting plate assembly

    ain mounting acket

    apting plateScrew

    Hose clampevel

    Positioning screw

    attachment plate and the lower positioning pin through the

    6

    he BTS3902E

    e, see the page 8.

  • Installing a BTS3902E on a 1 Installing the adapting plate assembl

    Adapting plate(1) Mounting hole group A

    Ada( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate

    Mabra

    2 Installing the mounting brackets on t1. Drilling holes and install expansion bolt assembliesp

    (1) M10x80 b(2) Nut(3) Spring wa(4) Flat wash(5) Expansio

    3 Installing the BTS3902E

    Upper positioni

    Lower positioning pin

    Put the upper positioning pin through the hole on the attac

    7

    pp p g p ghole on the main mounting bracket.

    4 Adjusting the installation angle of thThe procedures of adjusting the installation angle

    7

    Wallly

    apting plateScrew

    ain mounting acket

    Screw

    the Wall2. Fitting the mounting piece onto the expansion boltsp

    bolt

    asherhern tube

    (1) Insulation washer(2) Flat washer( )(3) Spring washer(4) Nut

    ng pin Positioning screw

    chment plate and the lower positioning pin through the

    7

    p p g p g

    e BTS3902Ee, see the page 8.

    7

  • Installing on a Wood Pole wto 400 mm

    1 Installing the adapting plate assembl

    Adapting plate(1) Mounting hole group A

    Ada( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate

    Mabra

    2 Installing the mounting piece

    Mounting hole group C

    BoltSpacer

    CMountinghole grou

    3 Installing the BTS3902EUpper positioning p

    Lower positioning pin

    Put the upper positioning pin through the hole on the attachole on the main mounting bracket.

    8

    4 Adjusting the installation angle of thThe procedures of adjusting the installation angle

    with the Diameter of 200 mm

    ly

    apting plateScrew

    ain mounting acket

    Screw

    Nut

    Spacer

    g up C

    pinPositioning screw

    chment plate and the lower positioning pin through the

    8

    e BTS3902Ee, see the page 8.

  • Adjusting the installation an

    Horizontal angle 30, vertical angle 10.If the positioning pin is tightened too hard, the installatiopositioning screw first

    1 Adjusting the horizontal angle

    positioning screw first.The horizontal angle and vertical angle can be adjusted either from the plan or elevation view.Ensure that the positioning screws both in the vertical d

    2 Adjusting the vertical angle

    9

    ngle of the BTS3902E

    on angle cannot be adjusted. In this case, loosen the

    simultaneously. The vertical angle can be determined

    irection and horizontal direction have been secured.

    P iti iPositioning screw

    Positioning screw

    9

  • (Optional) Installing the AC

    I t ll SPD60D l

    Install an SPD60D

    When the diain. to 4.49 in.)protection boxWhen the dia(4.49 in. to 15

    Install an SPD60D on a pole

    (If the diametesmall, cut the

    Install an SPD60D on a wall1. Marking the anchor points 2. Installing an e

    (1) M10x65 bolt(2) Spring washer 10(3) Plastic tube(4) Flat washer 10(5) Expansion tube

    1. Drilling holes 2. Installing t

    Install an SPD60D on a wood pole

    1

    Surge Protection Box

    ameter of the pole ranges from 60 mm to 114 mm (2.36 ), the hose clamps delivered with the AC surge x is used.ameter of the pole ranges from 114 mm to 400 mm 5.75 in.), the hose clamps purchased locally is used.) p p yer of the pole around which the clamp is installed is extra part of the clamp.

    expansion bolt 3. Installing the SPD60D

    0

    he AC surge protection box on the wood pole

    0

  • Install an SPM60A on a pole

    Install an SPM60A

    Install an SPM60A on a pole

    1. Marking the anchor points 2. Installing an e

    Install an SPM60A on a wall

    (1) M10x65 bolt(2) Spring washer 10(3) Plastic tube(4) Flat washer 10(5) Expansion tube

    1

    expansion bolt 3. Installing the SPD60D

    0

    1

  • Installing a PGND Cable

    The cross-sectional area of the PGND cable of the BTS

    1 Without AC Surge Protection Box

    frequency band is 1.5 mm2 .The cross-sectional area of the PGND cable of the BTS

    PGND cablePGND cable

    External ground bar

    2 With AC Surge Protection Box

    Equipotential cable

    PGND cable

    External ground bar

    1

    S3902 working at the 1.9 GHz, 2.1 GHz, or AWS

    Installing an OT terminal in the correct manner

    g , ,

    S3902 working at the 850MHz frequency band is 6 mm2 .

    Installing an OT terminal in the correct manner

    Installing an OT terminal in the correct manner

    2

  • Installing the Power Cable o1 Installing the AC Power Cable of BTS

    GHz or 850MHZ Frequency Band)q y )

    Without AC Surge Protection Box

    Power

    With AC Surge Protection Box1.Installing the AC Power Cable of the ACWith AC Surge Protection Box

    zInstalling the SPD60D Cable

    BTS390

    Thread-lock sealing nuof the PG connector

    PG connector

    Waterproof blockBTS390Blue----Brown-Yellow/zInstalling the SPM60A Cable

    Surge protector

    Ground

    Ca

    Waterproof

    BTS3902E poBlue----NoutBrown----Lou

    1

    Waterproof block Yellow/Green

    of BTS3902ES3902E(Working at The 1.9 GHz, 2.1

    r cable

    C Surge Protection Box

    02E power cable

    External power cableBrown----LinBiue Nin

    Insulation layerClip

    ut

    02E power cable-Nout---Lout/Green ----GND

    Biue----NinYellow/Green----GND

    terminal

    able hole

    ower cable

    ut

    External power cableBrown----LinBiue----Nin

    3

    n ----GND Yellow/Green----GND

  • 1.Installing the AC Power Cable of the BT

    The cross-sectional area of the AC Power cable betwAWS frequency band and an SPD60D is 4.0 mm2 .The cross-sectional area of the AC Power cable betwband and an SPM60A is 2.5 mm2 .There are two types of the AC surge protection box (procedure is the same. The following part uses SPD6

    External power cableExternal power cable

    BTS3902E power cable

    2 Installing the DC Power Cable of BTSBand)

    1

    TS3902E

    ween a BTS3902E working at the 1.9 GHz, 2.1 GHz, or

    ween a BTS3902E working at the 850MHz frequency

    SPD60D and SPM60A), for which the installing 60D as an example to describe.

    S3902E(Working at The AWS Frequency

    Power cable

    4

  • Installing the signal Cable1 Installing an FE/GE Fiber Optic Cable

    1. Installing the optical module

    A fast Ethernet or gigabit Ethernet (FE/GE) cable or fiber

    1. R

    2.Preparing the FE/GE Optic Cable

    1. Rst

    2. Tuth

    DLC connector

    Traction cablescables

    3. Installing FE/GE Optic Cable

    Clamping jaw

    Socket

    Clamping jaw

    1

    e

    r optic cable must be installed for BTS3902E as required.

    emove the dustproof cap of the optical module andemove the dustproof cap of the optical module and tore it properly for future use.urn the puller of an optical module outwards and insert

    he optical module into the OPT0 port on the BTS3902E.

    Inner gasket e gas et

    1. Sort the optical fibers, remove the dustproof cap from the optical fiber connector, and insert the DLC connector into the optical module.

    2. Align the clamping jaw on the inner gasket with thethe inner gasket with the socket of the OPT0 port on the BTS3902E. Insert and fit the clamping jaw into the socket.

    3. Push the outer gasket of the round connector upwards and tighten the outer gasket until you hear a click sound

    5

    until you hear a click sound.

  • 2 Installing an FE/GE Cable

    A fast Ethernet or gigabit Ethernet (FE/GE) cable or fiberequired.

    3 Installing a Cascading FE/GE Fiber O

    When multiple BTS3902Es implement transmission oveinterconnected using a cascading FE/GE fiber optic cablThe OPT1 and ETH ports cannot be both enabled for th

    1

    er optic cable must be installed for BTS3902E as

    Optic Cable

    er FE/GE optical ports, the BTS3902Es are le.he same BTS3902E.

    6

  • 4 Installing a Cascading FE/GE Cable

    When multiple BTS3902Es implement transmission oveinterconnected using a cascading FE/GE cable.The OPT1 and ETH ports cannot be both enabled for th

    5 (Optional) Installing the Alarm Cable

    1

    er FE/GE electrical ports, the BTS3902Es are

    he same BTS3902E.

    MON port

    DB15 male connector

    7

  • (Optional) Installing a BTS3

    You must install a radio frequency (RF) jumper when a B

    1. Installing the BTS3902E RF jumper

    Type N connector

    2. Wrap the connector of the BTS3902E

    PVCinsulation

    Waterproof tapePVCinsulation tape

    a. Wrap a layer of PVC insulation tape around the cb. Tightly wrap three layers of waterproof tape aroun

    up, the second layer from top down, and the thirdc. Tightly wrap three layers of PVC insulation tape a

    bottom up the second layer from top down and tbottom up, the second layer from top down, and td. Bundle cable ties 3 mm to 5 mm away from the e

    When wrapping waterproof tape, stretch the tape ev When wrapping insulating tape , do not stretch it. Wrap each layer of tape around the connector tightlyoverlaps more than 50% of the preceding layer.

    E th t th id ith dh i t i d

    1

    Ensure that the side with adhesive tape is covered o When cutting off the cable tie, reserve a surplus leng

    3902E RF Jumper

    BTS3902E uses an external antenna.

    E RF jumper

    tape

    onnector from bottom up. nd the connector, with the first layer from bottom layer from bottom up.

    around the connector with the first layer from the third layer from bottom upthe third layer from bottom up. nd of insulating tape.

    enly until it is twice of the original length.

    y and neatly, and ensure that each layer of tape

    th d t

    8

    on the wrapped tape.gth of 3 mm to 5 mm.

  • (Optional) Installing a Camo

    There are two types of the BTS3902E. This documen

    1. Moving the upper housing

    ypinstall the housing.

    U

    2 Installing the camouflage shell2. Installing the camouflage shell

    3. Installing the upper housing

    (1) Camouflage shell(2) Slots(3) Tabs

    3. Installing the upper housing

    HU

    1

    ouflage Shell

    nt uses one type as the example to describe how to yp p

    Upper housing

    UAWEI TECHNOLOGIES CO., LTD.

    9

    Huawei Industrial Base Bantian Longgang Shenzhen 518129

    Peoples Republic of Chinawww.huawei.com