PROJECT STATUS REPORTSTRICTLY CONFIDENTIAL
PROJECT SUMMARYREPORT DATECLIENT NAMEPROJECT NAMEDURATIONTEAM LEADER
22-08-2015PETRONASWater Injection01-09-2015 to 01-01-2015Alexander K.
STATUS SUMMARYLorem ipsum dolor sit amet, lorem phasellus mi, consectetuer tellus vivamus sollicitudin nonummy. Vehicula ipsum orci aliquet, magna in. Lorem ipsum dolor sit amet, lorem phasellus mi, consectetuer tellus vivamus sollicitudin nonummy. Vehicula ipsum orci aliquet, magna in.
PROJECT StatusGuntt Chart
Milestone
TASKWEIGHT (%)DONE (%)DRIVERNOTES
Advanced Geophysics300Tanaskumar K.Behind schedule
Streamline Simulation701Alexander K.Behind schedule
OVERALL PROGRESS (%)0.8 %
RISK AND ISSUEISSUENOTES
Insufficient dataHas requested client to expedite the process of data collection. The issue has caused the delay of the project.
Time constraintTeam leader will closely monitor the project and requested the management to approve the multicore parallel for simulator.
CONCLUSIONS/RECOMMENDATIONSLorem ipsum dolor sit amet, lorem phasellus mi, consectetuer tellus vivamus sollicitudin nonummy. Vehicula ipsum orci aliquet, magna in. Lorem ipsum dolor sit amet, lorem phasellus mi, consectetuer tellus vivamus sollicitudin nonummy. Vehicula ipsum orci aliquet, magna in.
Prepared by:Reviewed and Agreed by:
.Alexander KulapaevDr Zuhar Zahir bin Tuan HarithReservoir EngineerTechnical DirectorBeicipTecsolBeicipTecsol
Date:Date: