1 BTC/SCP and WREP Community Development Initiative Report for January March, 2014 , GEORGIA BP’s business activities in Georgia BP has been in Georgia since 1996. Our main business is all about the safe transportation and delivery of energy through our pipeline operations, where we are the lead investor and operator in three major oil and gas projects: Baku-Tbilisi-Ceyhan (BTC) pipeline The Baku-Tbilisi-Ceyhan (BTC) pipeline began operating in June 2006. With a total construction cost of circa $4 billion, the BTC pipeline is the first direct transportation link between the Caspian and the Mediterranean seas. At full capacity, it can deliver one million barrels of oil per day to market, generating important revenues for the Georgian government for decades to come. South Caucasus gas pipeline (SCP) The South Caucasus gas pipeline (SCP) started delivering gas from the Shah Deniz field in the Caspian to markets in Azerbaijan and Georgia from December 2006, and in Turkey from July 2007, representing an important new source of gas supply for the region. Western Route Export Pipeline (WREP) The Western Route Export Pipeline (WREP), also known as the Baku-Supsa pipeline, was our first investment in Georgia. This 830 km pipeline transports oil from the Chirag field in the Caspian Sea, via the Sangachal terminal in Azerbaijan, to the Supsa terminal in western Georgia, with just under half of the pipeline located in Georgia. WREP, which became fully operational in 1999, is capable of transporting up to 100,000 barrels of oil a day. BP Georgia Community Development Initiative (CDI) overview Community development along BTC/SCP pipelines CDI in Georgia was initiated in early 2003 in 77 communities along the SCP and BTC Pipeline route. Initially the program started with the title of Community Investment Program 1 (CIP 1). Later, in 2010 the title of the program changed into the Community Development Initiative (CDI).

BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

Embed Size (px)

Citation preview

Page 1: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

1

BTC/SCP and WREP Community Development Initiative

Report for January – March, 2014 ,

GEORGIA

BP’s business activities in Georgia

BP has been in Georgia since 1996. Our main business is all about the safe transportation and

delivery of energy through our pipeline operations, where we are the lead investor and operator

in three major oil and gas projects:

Baku-Tbilisi-Ceyhan (BTC) pipeline

The Baku-Tbilisi-Ceyhan (BTC) pipeline began operating in June 2006. With a total

construction cost of circa $4 billion, the BTC pipeline is the first direct transportation link

between the Caspian and the Mediterranean seas. At full capacity, it can deliver one million

barrels of oil per day to market, generating important revenues for the Georgian government for

decades to come.

South Caucasus gas pipeline (SCP)

The South Caucasus gas pipeline (SCP) started delivering gas from the Shah Deniz field in the

Caspian to markets in Azerbaijan and Georgia from December 2006, and in Turkey from July

2007, representing an important new source of gas supply for the region.

Western Route Export Pipeline (WREP)

The Western Route Export Pipeline (WREP), also known as the Baku-Supsa pipeline, was our

first investment in Georgia. This 830 km pipeline transports oil from the Chirag field in the

Caspian Sea, via the Sangachal terminal in Azerbaijan, to the Supsa terminal in western

Georgia, with just under half of the pipeline located in Georgia. WREP, which became fully

operational in 1999, is capable of transporting up to 100,000 barrels of oil a day.

BP Georgia Community Development Initiative (CDI) overview

Community development along BTC/SCP pipelines

CDI in Georgia was initiated in early 2003 in 77 communities along the SCP and BTC

Pipeline route. Initially the program started with the title of Community Investment Program 1

(CIP 1). Later, in 2010 the title of the program changed into the Community Development

Initiative (CDI).

Page 2: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

2

CDI 1

The goal of CDI 1 during the construction phase was to enhance positive relations between BP

and communities along the pipeline route through sustainable socio-economic development.

The overall program budget during pipeline construction phase was $8 million over a three-

year period (2003-2006). Similar program were created for Azerbaijan and Turkey.

After the completion of construction of BTC/SCP pipelines and moving into the operations

phase (2006), BP as operator of BTC and SCP, continued financing of the phase II of the

CDI for additional 3 years (2006-2009) with the aim to strengthen/solidify positive

relationships with communities along the route of the BTC/SCP pipelines .

CDI 2

The overall goal for Phase II of the CDI (CDI 2) was to enhance positive relations between

BP and communities along the BTC/SCP pipelines route by investing in communities that

demonstrate a commitment to become models for sustainable community development. The

aim is to support communities to become increasingly able to implement and sustain self–help

projects with minimal external support, and to thereby improve the livelihoods and

opportunities for the pipeline affected communities through a partnership relationship with BP.

In the beginning of 2008 implementation of the marketing component of the CDI 2 -“Farmers

to Markets” project (FtM) has started in addition to on-going activities. The initiative to start

the project was prompted by the need to address and fill in a significant gap by assisting small

farmers in getting their goods to market. For this reason the project was named as Farmers to

Markets.

Implementation of project activities was scheduled for three year period (2008-2011) with the

total budget 520,000US$. Due to the saving in the project budget at the beginning of 2011,

No- cost extension of the project was approved. FtM project was prolonged by four months

until the end of July, 2011 to fulfill the planned activities with the funds remaining in the

project budget.

Recognizing commitment of BP and its co-venturers to support enhancement of the quality of

life of the communities in the countries of the three pipeline projects (BTC/SCP/WREP), and

based on the company stakeholder development strategy the decision was made to continue

supporting Community Development Initiative along the BTC/SCP and WREP pipelines in

Georgia beyond Y2009.

CDI 3

Third phase of the Community Development Initiative on BTC/SCP pipeline (CDI 3) started in

May 2010 with CARE international as the lead partner. Smooth transition between the CDI 2

and CDI 3 was achieved through extending some of the activities of CDI 2 until

commencement of the new phase.

The proposal submitted by CARE international for the CDI3 was reviewed both internally by

BTC/SCP team and externally by an Advisory Board made up of representatives of key donor

organizations active in the country - United Nations Development Program (UNDP), US

Page 3: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

3

Agency for International Development (USAID), the European Union (EU) and Swiss

Cooperation Office for the South Caucasus (SDC)

In May, 2010 formal agreement was signed with CARE international in the Caucasus to lead

the program implementation together with two local organizations: Center for training and

Consultancy (CTC) and Constanta Bank (micro loans). Program duration was planned till the

end of January 2012 with the total budget of US$ 1.865,081 million.

Due to the saving in the program budget, the program was prolonged within the no-cost

extension procedure by two months until the end of March’2012 to fulfill the planned activities

with the funds remaining in the project budget.

The goal of the third phase of the Community Program was to enhance and strengthen positive

and harmonious relationships with communities along the pipelines route through sustainable

social and economic development. Two main areas - agriculture and civil society capacity

building - have been identified as the most suitable areas for further intervention taking into

consideration country specifics and the results already achieved through the 1st and 2nd phases

of the Community Development Initiative.

During the first months of the project, CARE investigated alternative options for a local NGO

to pick up responsibility for significant components of the project during the second year of the

project implementation, in particular, rural infrastructure rehabilitation support, the agricultural

advisory services and small business development. CARE international announced tender for

selecting local NGOs to implement the field activities under the CARE supervision.

Regional Development Association was selected in the West section communities, Center for

Training and Consultancy was selected to implement activities in the East section communities.

After the 8 months of the start-up of CDI phase three, CARE started handover process to the

mentioned organizations, although CARE retained the oversight and guidance throughout the 2

year lifespan of the program.

To maintain the existing level of relationship and impact on the communities affected by the

business, as well as to ensure the business continuity and managing the reputation in the

country, the 4th phase of CDI implementation was initiated.

The Final External Evaluation of CDI 3, done by BP at the end of CDI 3, considered

nationalization strategy process as correct step for further operation, considered local NGOs

CTC and RDA capable to manage implementation of the next phase of the project and

recommended to request the proposals from them via tender for CDI4 implementation.

Community Development Initiative – phase 4 (CDI 4)

In March, 2012, BP Georgia announced Request for Proposals from CTC and RDA for the

three - year CDI implementation (CDI 4).

The proposals submitted for the CDI4 were reviewed both internally by BTC/SCP team and

externally by an Advisory Board made up of representatives of key donor organizations active

Page 4: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

4

in the country - the European Union (EU) and Swiss Cooperation Office for the South

Caucasus (SDC)

Both proposals were considered relevant to handle the implementation of CDI 4, CTC in the

Eastern part and RDA in the Western part communities. Program duration is May, 2012 – May

2015 with total budget of the program 3,318, 975 US$

The main goal of the 4th

phase of the project is to deepen the positive relations between BP

communities along the BTC/SCP pipelines route, by investing in communities to provide

positive contribution for sustainable improvement in communities and maintain and enhance

sustainability of social-economic development. Main areas of the program include agricultural

support, business development as well as community development through capacity building

and sustainable activities, such as rehabilitation of rural infrastructure as well as Social

enterprise establishment by Community Based Organizations.

The specific objectives of the CDI 4 are to promote sustainable forms of social cooperation

and initiatives for community sustainable development and to enable economic opportunities

for the pipeline communities to develop regional agro-business and provide public goods and

services through established small and medium scale businesses.

In December, 2013 it was decided to extend the CDI agricultural component scale and start

piloting agricultural cooperative establishment.

Community Development Initiative for the South Caucasus Pipeline Expansion (CDI

SCPX)

The South Caucasus Pipeline expansion (SCPX) is being proposed by BP, on behalf of a

consortium of partners, as BP is the operator of the South Caucuses Pipeline (SCP). Project is

developed to expand the capacity of the existing SCP system to allow additional gas throughout

from the Shah Deniz Full Field Development in the Caspian Sea.

BP, on behalf of a consortium of partners, engaged with communities along SCPX construction

areas and started implementation of Community Development Initiative (CDI SCPX) in the

new communities, affected by SCPX project.

CDI SCPX program resembles the model of earlier phases of CDI with main strategy of the

program to provide the area with a powerful social and economic platform and give

opportunity for gradual development into strong independent communities as well as

promoting BP Georgia public image in the affected areas.

CDI SCPX started in May, 2013 and is due to end in May, 2015. East Section of project

interaction includes Gardabani, Tetritskaro, Tsalka districts, covering twelve (12) new villages.

West section includes Akhaltikhe, Adigeni districts covering five (5) villages, and Rustavi

town 18, 19 Districts are CDI SCPX target area as well. Implementing partner of CDI SCPX

is Center for Training and Consultancy in the East section, Regional Development

Association in the West section and Georgian Organization of the Scouts Movement in Rustavi

micro Districts. Total budget of CDI SCPX for new communities is 687,000 US$

Page 5: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

5

Community Development Initiative Management and Coordination

The CDI programs are managed by the Social Responsibility team in BP Georgia Tbilisi

office.

Community Development Initiative Adviser is dedicated full time to monitoring and

evaluating the work of the NGOs through regular participation in field activities and review

of monthly, quarterly, annual and final reports, tracing the expenditure of the projects

contracts’ budget and other social sub-contracts through the recording of corresponding

invoices, ensuring, that implementing partners’ practices and procedures are aligned with

those of BP, that, those partners adhere to the principles of company Code of Conduct,

including a contractual requirement to act consistently with the code when working on

company behalf.

The CDI Adviser reports to Social Responsibility Manager

The NGOs that implement programs send monthly reports to BP, which provide a brief

summary of activities for the month and outlines any issues or actions. Quarterly reports that

are provided each calendar quarter, go into more depth focusing on outcomes, on summary of

activities, progress to date, challenges and the ways they are addressed. Quarterly financial

reports contain financial expenditure against the approved budget. An annual report focuses

on results, monitoring and evaluation, programmatic changes, etc. Final report describes

achievement and their resulting impacts, program overview and impact assessment, strength

and weaknesses, lessons learned.

Community Development Initiative for BTC/SCP – 4th

phase

Objectives and key components

Social / Institutional Objective and its components complementing the overall

goal

­ Sustainable forms of social cooperation and initiatives for sustainable community

development are promoted

­ 31 community infrastructure projects are implemented

­ 11 Community Based Organizations (CBO’s) establish Social enterprises to generate

income to deliver services to their communities

­ More than 25,000 residents benefit from improved infrastructure and social

enterprises

Economic Objective and its components complementing the overall goal

­ Enabled economic opportunities for development of agro businesses in the

communities and public goods and services are provided through established of small

and medium scale businesses

­ 105 small and medium scale business are established with participation of at least

40% of women

Page 6: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

6

­ 70% of funded start-up businesses achieve the profitability in 12 month from the

start

­ 3 Financial and legal Service Groups are established in Adigeni , Akhaltsikhe and

Borjomi districts

­ 36 services are rendered by each Financial and Legal Service Group to project

beneficiaries

­ 100 on farm demonstration are established

­ At least 150 farmers /producers ( 30% of women) linked to the urban channels to sell

their products

­ 1800 farming households achieved higher production margins as a result of use of

modern technologies

­ Project target community members and 6 target municipalities rise awareness about law on cooperation and its advantages for farmers unions

­ 6 Agricultural Cooperatives established ­ Agricultural Cooperative component delivers benefit to 155 pipeline households ­ 470 Subsidized agro loans are provided to the pipeline farmers

­ 20% increase is achieved in target household income

Project Specific examples of summarized outcomes include:

External evaluation of the project

At the end of 2013 company invited three international independent evaluators via tender,

to conduct CDI 4 midterm evaluation with the aim to assess the effectiveness of the whole

CDI 4 , provide critical review of the project achievements and make recommendations for

activities , approach and strategies for the remaining period.

Main findings of the evaluation are following:

There have been multiple increases in productivity and rates of return for the

initiatives in the communities, while significant forms of social networking have been

created. The nationalization policy for the programme partners has been a success.

There is a strong potential in scaling up some of the investments.

The modalities for the management of the programme are optimal, creating a good

balance between on-the-ground expertise, and coordination with the authorities and

international organizations. There is a strong grasp and commonality of strategy and

of relevant techniques amongst all partners.

Continuity and focus within the programme has created a high degree of value for

money. There are easy gains available to BP in show-casing the programme, in terms

of the constraints it has overcome, but especially in the profound shifts achieved in

public perception over the years, and the rural development models it has launched.

Main challenges during the reporting quarter

The reporting month was quite busy for the project due to grants competition in infrastructure

rehabilitation and small start-up business components. The main activities of the project were

to continue with informational campaign in the target villages spreading application forms

and arranging consultation meetings with population.

Page 7: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

7

During the reporting month the project conducted informational visits to new appointed local

government representatives in the villages. The project management introduced CDI

activities in the target villages describing all the components and upcoming activities.

Strategic Management

In the beginning of the reporting quarter, project Implementing partners conducted internal

audit, sue to the budget saving, they made budget reallocation and provided revised proposal.

Based on leassons learned and external evaluation finding some components are proposed be

scaled up, more rehabilitation projects will be implemented and more small businesses will

be established, than it was envisaged in the initial proposal.

CDI-government relations entered into new phase for CDI West. In response active

facilitation by RDA and through CBOs, the local governments of Borjomi and Akhaltsikhe

created additional line in municipality budget for implementing mutual Infrastructure

Rehabilitation projects with donor organizations. This is a significant achievement of

cooperation among local government, communities and donors, which will enable more

organized approach to mutual activities, better planning by all sides and most importantly the

efficiency in terms of time and finances.

As for the relations with central government, RDA and CTC in close coordination with BP,

prepared and signed Memorandum of Cooperation (MOC) with Ministry for Regional

Development and Infrastructure in April. The MOC envisages exchange of information with

the purpose of better coordination and avoidance of work duplication during implementation

of infrastructure projects.

Strengthen institutional capacity in the community, CBO activities

Community infrastructure projects

During the reporting quarter the project has announced the third round of community

infrastructure rehabilitation grants competition among the target communities. The

community mobilization staff members have assisted CBOs to conduct community meetings

in order to inform about the upcoming projects. Besides, the project has conducted

consultation meetings with interested CBOs giving technical recommendations on proposal

writing.

Total of 30 proposals were submitted from the target villages.

The project had conducted first stage review of the technical proposals and preliminary

selected 20 projects. Consequently engineers started on-site monitoring visits to ensure the

project implementation feasibility. After the monitoring visits are completed, the project

selection committee will conduct final selection of proposals by the selection committee.

As of the reporting period 30 infrastructure rehabilitation projects are implemented. All of

them are operational delivering benefits to more than 7,000 families.

Social Enterprise (SE)

Page 8: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

8

12 social enterprises, established within the project, are operational. In total more than 500

different type of services are provided by SEs to the communities, particularly, assistance for

land cultivation, or providing support during the harvest. During the reporting quarter all SEs

managed to provide 30 services about to 50 households. In total more than 300 servisces are

provided to 335 Households.

Agricultural support, new business start-up activities and subsidized agricultural loans

will support the communities to improve their livelihoods

Agriculture

In the east the main activities of the project agricultural extensionists were monitoring visits

to demo farmers, conducting group trainings and individual consultations, assisting farmers

in purchasing agricultural inputs. January-February was busy with monitoring of stored

agricultural goods to ensure proper temperature and ventilation in warehouses. In March,

farmers seeded carrot, beet, and onion rush in lower zone villages, while mountainous areas

have still been covered by snow.

Total of 47 group trainings were conducted for 49 demo and 188 other farmers in the target

communities.

Total of 508 individual consultations were given to farmers on various issues.

Cross visits represent another important part of successful demonstration through which

farmers are given opportunity to learn and share experience with others as well as visit

agricultural input supplier's to get introduced to preparations and methods of safe usage.

Case study

A greenhouse in Minadze village established initially to farm vegetables for demonstration

and sale, followed advice of project agricultural experts to convert into a local nursery, due to

high demand for quality seedlings in the area.

Gia Zedginidze, the demo farmer running the nursery greenhouse says he started greenhouse

Page 9: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

9

farming 15 years ago, but was able to commercialize production only after participation in

CDI4 On-Farm Demonstration program. “The value of information and advice I received

from project exceeds by thousand times the monetary value of equipment and inputs I was

granted. Now I can switch on the drip irrigation system that does job itself, unattended,

allowing me to do other important things in the same time”, says the farmer, joking, that he

even learned how to set alarm on his mobile phone to time irrigation periods.

Development of Agricultural cooperatives

In January the project had arranged informational meeting with Head of the Agricultural

Cooperatives Development Agency, which operates under the Ministry of Agriculture of

Georgia.

The parties agreed on the approximate schedule of joint meetings with interested groups.

public awareness raising workshop together with the head of Agency, was conducted with

several village representatives on essence of cooperatives, its benefits, legislation issues and

support from Georgian Government.

Announcement for cooperation grant was launched by the project during the reporting

quarter. 86 applications were submitted from the east villages

Most applications received were about cattle farming and machinery services.

Grant evaluation committee assessed all applications by criteria indicated in the application

form. Short listed projects were inspected on site and applicants were allowed for trainings.

The groups were trained in fundraising (grant proposal writing and grant project

management) by end of March and encouraged to resubmit full applications in April.

Farmers Association "Samtskhe"

During the reporting period, Association “Samtskhe” prepared soil for spring seeding of

stored inputs. In total 20 t. (10t Elite class, 20 t A class) of potato seed were prepared for

seeding on 9ha, which will ensure average of 280 tons of yield in autumn. This is 12% more

than production of the last year. Increase of production is largely stimulated by the

Association’s sales contract with urban suppliers arranged with help of RDA.

Business start-up

During the reporting quarter the project has announced the third round of small start-up

business grants competition.

Project had received 462 application forms from interested small entrepreneurs.

The selection committee had reviewed all the applications according to the preliminary set

criteria and selected 176 proposals as first round winners who will participate in the Business

Administration Training.

Page 10: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

10

As monitoring showed some businesses require extended consultations on food safety.

Consequently, project invited a specialist and conducted on-site consultations to grantees who

own markets or bakeries.

During the reporting quarter, 80 existed businesses provided service to more than 2000

beneficiaries, 86 existed businesses created 46 full time jobs. All existed businesses generated

31,134 GEL profit. In total within the whole timeframe of the project, cumulative profit

generated by the businesses is 223,891 GEL.

Service Group

Financial and legal Service Groups ( FLSG)

The reporting quarter turned out to be quite productive for all three FLSGs of Akhaltsikhe,

Adigeni and Borjomi. The groups rendered 35 services to external customers and 11 services

to CDI beneficiaries earning 3,760 GEL profit.

Borjomi FLSG conducted trainings in financial bookkeeping and audit for five trainees.

Adigeni FLSG participated in two tenders announced by local government and secured both

competitive biddings enabling 27,413 GEL revenue.

Next Quarter

CDI 4 East

The following activities are planned for the next quarter:

Selection of winners CBOs and Sign agreements to launch rehabilitation activities

Finance New Social enterprise and follow-up with activities

Conduct Business Administration trainings for small entrepreneurs

Sign agreements with new small entrepreneurs

Conduct Business Administration Training for agricultural Cooperatives to farmers

groups

CDI 4 West

Third round winner Infrastructure rehabilitation projects shall be funded and

implementations shall start;

Third round winner Small business projects shall be funded and implementations

shall start;

Agricultural cooperative winner projects shall be funded and implementations shall

start;

Professional consultations shall be provided for Start-up businesses and agri-

cooperatives.

Page 11: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

11

CBO capacity building, trainings shall be conducted;

All seeding procedures shall be finalized at all spring demos;

Community Development Initiative for SCPX (CDI SCPX)

CDI SCPX project envisages assistance to 18 communities located along the SCPX

construction sites.

The overall goal of the project is to create harmonious and secure environment for sustained

socio-economic development of target communities affected by SCPX activities and promoting

BP Georgia's public image in the affected areas.

In order to fulfil overall goal project focuses on two specific objectives reflecting social and

economic agenda of the community development.

Support gradual development of civil society institutions in target communities via

building the capacity of communities to implement and sustain self-help projects with

minimal external support

Strengthen livelihood security for the affected communities via enabling the

economic opportunities for rural development.

Objectives and key components:

Social / Institutional Objective and its components complementing the overall

goal

­ 31 community infrastructure projects are implemented

­ 17 Community Based Organizations (CBO’s) established to implement

infrastructure rehabilitation

­ More than 3,000 households benefit from the project interaction

­ 40 youth participate in youth group and implement 4 environmental projects and 30

small scale environmental activities

­ 40 youth take part in summer camp organized by the project

Economic Objective and its components complementing the overall goal

­ 16 demonstration farms arranged and 40 combined fodder demonstration for 80 heads

of cattle established

­ 2 service groups and 1 milk collecting center arranged

­ 34 small businesses established

­ 76 potential entrepreneurs improved skills

Page 12: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

12

Project Specific examples of summarized outcomes include:

Main challenges during the reporting quarter

Weather conditions prolonged rehabilitation and some other activities were postponed in the

communities.

Capacity building

All CBOs were trained, main topics of the training were: decision making, self-control in

critical situations, influence of information, initiative, self-positioning, personal and functional

competence, opinion settlement, and behavioral characteristics of adults. The participants were

introduced to essence of community based organizations, its development, and importance of

community contribution, CBO mission and vision.

Infrastructure rehabilitation

The reporting period was mainly dedicated to conducting informational meetings with the

community members and CBOs with regards to the announced second round of grants

competition of the community infrastructure rehabilitation.

8 CBOs submitted applications, which were reviewed and the project started on-site

monitoring visits to ensure the feasibility and relevance of the projects.

First round 10 rehabilitation projects are finalized bringing benefits to 3,057 HHs. 7 more

project are on-going and will be finalized as soon as weather conditions allow continuation of

the activities.

In general there is the big motivation from the community members to participate in

community rehabilitation project activities, which resulted in increased community

contribution, which is up to 36% instead of requested 25%.

Case Study

School teachers of Gantiadi Public School, located in Tsalka Municipality, along with students’

parents and with Educational Department Lead, unanimously decided to eliminate existing

unbearable and intolerable conditions, which damaged the health of students and administrative

staff of the school.

Some of them decided to give in their savings, some tried to sell their personal belongings in

order to pull enough funds together for the rehabilitation of classroom floors at school, which

were covered in 1982 and overtime became the big threat for student’s and teacher’s health.

“At that time, CTC representatives held meeting between the local population, where we

discovered, that BP would financially support the priority infrastructure project, which seemed

like a gift, sent from the God” – gratefully declares Educational Department Lead of Gantiadi

Public School, Mr. Alexander Markoidze.

The majority of gathered local population at the meeting, voted for the Gantiadi School Floor

Page 13: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

13

Rehabilitation project. As a result of great effort, put by Community Based Organization,

preferred project has been approved.

As a result of project implementation, 15 classrooms were rehabilitated in a comprehensive

way; new concrete pavement has been installed along with the latest laminate flooring.

Grateful and content with clean and healthy learning environment, the Educational Department

Lead says, that attitude of students towards the learning process has completely changed and

became more positive; they take care of rehabilitated classrooms and try to maintain the result

of common work,

Agriculture

Project continues working with 6 individual demo farmers and with 11 group demonstration

farms, which unites 47 farmers.

Reporting quarter was busy with visiting demonstration farmers and conducting

trainings/consultations about upcoming spring preparatory works

Seeding and planting season is approaching and all spring season demo farm owners are

preparing seed materials and other agricultural inputs. Agricultural experts conducted

individual sessions of emergency consultations to help farmers regulate temperature and

ventilation.

In the reporting period, 35 farmers purchased combined feed with subsidized rate. Total

number of beneficiary farmers as of the end of March is 49.

Service groups

The project announced grants competition to support the process for creation of service groups

in the target communities

At the end of the reporting quarter five potential service groups presented business plans for

reviewing. The selection was done according to the preliminary set criteria such as feasibility,

relevance, profitability, service volume, target beneficiaries and etc.

The selection committee has reviewed the applications and made decision of admitting all the

applicants to participate in the training on "Business Administration for Service Groups". Total

of 10 members participated in the training. After the training, applicants provided full scale

business proposals for farther revision. Four projects were selected by the selection committee

for farther on site monitoring to ensure proposed activity relevance to the demonstrated

business plan.

Milk collecting cooperative “Khareba" from the village Ude, Increased Milk collection and

already calculated its first revenues. Cooperative collected 38,289 l of milk from 44 farmers of

village Ude and Arali. Cumulative revenue for cooperative is 37,890Gel and profit is

2,696GEL.

Page 14: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

14

Each of the 44 milk suppliers, supplied 870 liters of milk during the reporting period. Total

amount of earned money for all suppliers is 31,601 GEL revenues on average.

Small business startup

During the reporting quarter the second round of small start-up business grants competition had

been announced in the East. Project had received 33 applications. The selection committee had

reviewed all the applications according to the preliminary set criteria and selected the first

round winners- 18 entrepreneurs, who will participate in the Business Administration Training.

The data with regards the financed start-up businesses is as follows: 17 businesses are financed.

There are total 18 grantees, which run all these businesses. Total of 10 people are employed

within the established businesses from which 3 are women. The businesses have generated

profit with total amount of 1,180 gel providing services to 133 community households.

All necessary consultations were provided to beneficiary entrepreneurs including financial

bookkeeping. Project agricultural specialist continues providing individual extension service

for agricultural businesses in all villages.

Case study

Ude Milk Collection Center Becomes Top Supplier for HACCP Certified Enterprise

Ude cooperative farm Khareba, established with help of SCPX intervention in 2014, became top

single supplier of Tsini dairy plant in three months after launching operations. The plant is ISO

and HACCP certified and is practicing highest international standards of food safety.

Milk collection started in January and by end of March, Khareba collected up to 40 tons of milk

from 44 local farmers who also received combined feed at subsidized rates, also covered by

CDI SCPX program. Each of these suppliers earned up to 300.00 GEL income per month

through sales of raw milk.

Cooperative Khareba collects milk daily from locals and returns them whey, remained after

cheese production, which is used to feed piglets. During the same shift, Khareba truck also

distributes combined feed subsidized under CDI SCPX program.

Pavle Merabishvili, Director of Khareba Cooperative, reports about high satisfaction of locals

with the service offered by collection centre. According to him, Ude is a large village, with one

of the highest per farmer count of cattle in the region, but locals never sold their milk. Instead,

they made cheese and sold on local farm markets, earning much less, than we offer.

“I am paid cash bi-monthly, on set dates, which means my family receives income at home,

without wasting time and energy on production and sales of dairy”, says Kulijanishvili Vano,

one of the suppliers of Ude milk collection center.

Page 15: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

15

Rustavi 18,19 district community continues co-operation with the project. Second business-

grant project competition has been announced in the target districts. Deadline for submitting

the business project proposals is April.

Youth groups activities started in Rustavi 19th district target schoolls, # 10 and # 28.

Micro grant competition launched for the school youth groups. Proposals were submitted.

Both groups managed to gain the grant and get funding to implement the projects: the school

#10 project is “Let’s give the school a new look” and is about creating recreational area

inside the school building. Project of the school #28 is called “Live in a better environment”

and is about creating recreational area around the school.

17 small scale environmental activities have been organized by the youth groups: "Nature

disaster stories", “My carbon footprint", "Creatures conference"; "What have I done today?",

"Which natural disaster am I?", "Life of a river" and "Quick energy debates".

Page 16: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

16

Next Quarter

CDI SCPX West

CBO capacity trainings shall be conducted;

All second round winner IR projects shall be funded;

All start up projects shall enter operations phase;

All spring demos shall be seeded;

Quarterly progress survey shall be conducted;

CDI SCPX East

Sign agreements with CBOs for implementing economic infrastructure rehabilitation

projects

Finalize on –going infrastructure rehabilitation project implementation

Sign agreement with selected service groups

Conduct Business Administration Training to winner entrepreneurs

CDI SCPX Rustavi

Second round of small business component, revision of the submitted proposals

Proposal writing training for the shortlisted applicants;

Implementation of environment programme activities;

Implementation of the micro-grant projects.

Community Development Initiative in the villages along WREP

In 2009 the decision was made to bring WREP Georgia community Development initiative

under the same management framework as for the BTC/SCP, which resulted in engaging local

NGO in project implementation through the Request for Proposal (RFP) process, with focus on

youth capacity building component defined as a target area for investment.

Page 17: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

17

“The Youth Capacity Building Project” was launched in May, 2010. Georgian Organization of

the Scout Movement (GOSM) was selected as the project implementing partner through the

tender process. Georgia organization of the Scouts Movement, co-operating with local NGO,

Center for Training and Consultancy within the project framework.

The project was due to May, 2012. Total budget was 482, 013 US$ out of which the amount

requested from BP for the implementation of the proposed project was 299,923 US$. 173, 490

US$ was contributed by GOSM and its partner NGO - Center for Training and Consultancy

(CTC) as well as by the project with the Swiss Guide and Scout Movement.

During the implementation of the project additional 55,500 US$ was allocated for the

additional activities, which included establishment of the second summer camp, and civic

education training course for the teachers in target schools. All mentioned activities were

included into the project scope based of the need assessment of the target schools and youth

group members. To fulfill the new activities, project was extended till the end of June 2012.

The project ended within the reporting period.

To continue the project interaction in the communities along WREP, company announced A

new RFP in the 3Q 2012 to identify the IP for the new CDI along the WREP.

Georgian organization of the Scout Movement was selected to implement the project – Small

Business development Project (SBDP) along the entire length of WREP. The project started in

October, 2012 and was due to end in December, 2015. During the implementation process, a

lot of issues turned out as challenging. Particularly: i) Some business started later, due to

seasonal character, which reduced one year monitoring period, necessary to observe, consult

and follow up their development to ensure sustainability of the interaction. ii) Vocational and

agricultural trainings/consultations, not planned, turned out obviously required for the success

of the supported businesses; Specific trainings and consultation were permanency in demand

from the beneficiaries. iii) High demand from the IDP population to support settlements’ youth

to participate at least one more summer camp to help them to strengthen their knowledge in

environmental disciplines and establish networks among each other

Total budget of the project is 1,538,008 US$ out of which the amount requested from BP is

1,448,473 US$. Leveraged amount from Scouts Movement is 89,535 US$.

The project is intended to implement small business start-up activities in the communities

along WREP pipeline located within 2 km corridor (1km from each side) also, in communities

located within 4 km corridor (2km from each side) along the Access Roads to the BP above

ground facilities as well as affected due to some increased company operational activities.

In addition to the target villages, the project will be also implemented in 4 IDP camps, located

along WREP pipeline within 2 km corridor (1km from each side). The main initiatives

conducted at IDP camps should be focused only on empowering the youth at IDP camps.

Description of the Key objectives and main themes of Small Business Development Project

are represented in below paragraphs/chapters.

Page 18: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

18

“Small Business development Project (SBDP)” - Objectives and key

components:

Enable the opportunity-driven process for the pipeline communities to develop

small scale agro and off farm-businesses through equipping them with necessary

skills, knowledge and tools.

Support the environmental educational achievements of the secondary school

students only in 4 target IDP settlements by enabling life – long learning and

influence on behavior of youth towards natural environment.

Increase GOSM capacity to diversify the portfolio of quality service provision.

Some of the key achievements of the program will be:

Creating opportunities for 275 start-up businesses to emerge and at least

75% of them become financially sustainable, reinvesting the profits for

expansion and further development;

At least 275 new jobs created;

50% of the disbursed grants managed by women;

IDP settlements further prioritized and supported by working closely

with schools and introducing a World Environmental Programme.

Project Specific examples of summarized outcomes include:

Main challenges

It was impossible to reach some of the villages in Imereti and Shida Kartli because of the

heavy snow.

The following section provides detailed overview of the project activities and describes

major accomplishments, impact and outcomes:

260 startup businesses received the grants during the reporting quarter. The rest of the

businesses will be launched in the upcoming quarter.

According to the information taken from the account books kept by the beneficiaries, all

financed businesses have had about 6734 customers during the reporting period (locally as

well as from surrounding towns and villages).

52 new services are created in the villages that are deprived of basic social and economic

services. Shops, beauty salons, sewing workshops, bakeries, cafes, mills and veterinary

services will serve the village population on the spot at reasonable prices. Some of the

services are even attracting neighbor villages being the only option in the community.

Page 19: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

19

435 individuals have been employed by the beneficiaries during the reporting period: 336 out

of this are family members helping the beneficiaries to run the business, 99 are outsiders: 23

out of them are permanently employed, while 76 have been employed part time for the

seasonal works.

136 businesses are already profitable, totally about 77 000 GEL net profit has been generated

by the supported businesses during the reporting quarter.

2nd micro-grant competition has been announced in the youth groups in target IDPs. 4

project proposals have been submitted by the youth groups and all of them were selected by

the selection committee.

In total 4 micro-grant projects have been awarded to the IDP youth groups as a result of the

second micro-grant competition.

13 small scale environmental activities have been implemented by the youth groups. These

educational activities from the World Scout Environment Programme address key

environmental challenges facing the planet; encouraging the youth to connect with nature,

think about how we interact with the environment and take action to protect it. Some of them

are presented indoors and some in outdoors, allowing the youth to explore and discover the

natural world.

Case study

Family reunion thanks to the SBDP project

Khatuna Kverenchkhiladze, inhabitant of project target village Khajalia in Lanchkhuti

district, has started up a store business with the support of the SBDP small business grant

programme. Whole family worked a lot to build and equip very attractive small shop. This is

a first shop opened in the village and the inhabitants are very happy that they don’t walk long

distance any more to purchase convenience goods.

Before Khatuna started a business, her husband Ilia Tevzadze had to leave to Turkey as a

migrant laborer, thanks to this business, he has returned to his family and village. At present

he is actively helping his wife to run the business, makes provisions and serves the village

Page 20: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

20

population.

“We are both so occupied with this business; hopefully the store assortment and income will

increase with time. Our neighbors are also very happy that there is a store in the village and

what is the most important for me and my family, my husband is back home” – Khatuna

Kverenchkhiladze is telling when asked about her new business.

Next Quarter

Monitoring business implementation activities, consultancy;

Taxation trainings for the beneficiaries;

Implementation of the Environmental Programme Activities;

Implementation of the Micro-Grant Environmental Projects;

Page 21: BTC/SCP and WREP Community Development … BTC/SCP and WREP Community Development Initiative Report for January – March, 2014 , GEORGIA BP’s business activities in Georgia BP has

21

List of acronyms

BTC/SCP

SCPX

Baku Tbilisi Ceyhan/South Caucasus Pipeline

South Caucasus Pipeline Expansion

WREP

Western Rout Export Pipeline

CDI

Community Development Initiative

CIP

Community Investment Program

FtM

YCBP

SBDP

Farmers to Market

Youth capacity Building Project

Small Business development project

NGO

Non-Governmental Organization

RDA

Regional Development Association

CTC

Center for Training and Consultancy

RFP

Request for Proposal

CBO

Community Based Organization

FLSG

Financial and Legal Service Group

IDP Internally Displaced Person

END