    BSC6900

    V900R011C00

    N68E-22 Cabinet Installation Guide

    Issue 01

    Date 2009-04-30

    Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    2/118

    Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any

    assistance, please contact our local office or company headquarters.

    Huawei Technologies Co., Ltd.

    Address: Huawei Industrial Base

    Bantian, Longgang

    Shenzhen 518129

    People's Republic of China

    Website: http://www.huawei.com

    Email: [email protected]

    Copyright Huawei Technologies Co., Ltd. 2009. All rights reserved.

    No part of this document may be reproduced or transmitted in any form or by any means without prior written

    consent of Huawei Technologies Co., Ltd.

    Trademarks and Permissions

    and other Huawei trademarks are the property of Huawei Technologies Co., Ltd.

    All other trademarks and trade names mentioned in this document are the property of their respective holders.

    Notice

    The information in this document is subject to change without notice. Every effort has been made in the

    preparation of this document to ensure accuracy of the contents, but the statements, information, and

    recommendations in this document do not constitute a warranty of any kind, express or implied.

    Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    http://www.huawei.com/
  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    3/118

    Contents

    About This Document.....................................................................................................................1

    1 Changes in BSC6900 N68E-22 Cabinet Installation Guide................................................1-1

    2 Overview of the N68E-22 Cabinet...........................................................................................2-1

    3 Preparing for the N68E-22 Cabinet Installation...................................................................3-1

    3.1 Unpacking the Cases and Checking the Items................................................................................................3-2

    3.2 Tools Required for Installing the N68E-22 Cabinet.......................................................................................3-8

    4 Installing the N68E-22 Cabinet................................................................................................4-1

    5 Installing the N68E-22 Cabinet on the Concrete Floor.......................................................5-1

    5.1 Materials for Installing the N68E-22 Cabinet on the Concrete Floor.............................................................5-3

    5.2 Template Files for Installing the N68E-22 Cabinet........................................................................................5-3

    5.3 Positioning the N68E-22 Cabinet on the Concrete Floor................................................................................5-5

    5.4 Securing the N68E-22 Cabinet on the Concrete Floor..................................................................................5-10

    5.5 Testing the Insulation of the N68E-22 Cabinet.............................................................................................5-15

    5.6 Combining the N68E-22 Cabinets................................................................................................................5-17

    6 Installing the N68E-22 Cabinet on the ESD Floor...............................................................6-1

    6.1 Materials for Installing the N68E-22 Cabinet on the ESD Floor....................................................................6-3

    6.2 Template Files for Installing the N68E-22 Cabinet........................................................................................6-3

    6.3 N6X Series Support Assembly........................................................................................................................6-5

    6.4 Positioning the N68E-22 Cabinet on the ESD Floor.......................................................................................6-7

    6.5 Installing the N6X Series Support and the Guide Rails................................................................................6-12

    6.6 Securing the N68E-22 Cabinet on the ESD Floor.........................................................................................6-16

    6.7 Testing the Insulation of the N68E-22 Cabinet.............................................................................................6-21

    6.8 Combining the N68E-22 Cabinets................................................................................................................6-23

    6.9 Placing the ESD Floor in the Original Position............................................................................................6-27

    7 Installing the Power Cables and PGND Cables for the N68E-22 Cabinet......................7-1

    7.1 Power Cables and PGND Cables to Be Installed............................................................................................7-3

    7.1.1 Power Cables..........................................................................................................................................7-3

    7.1.2 PGND Cables.........................................................................................................................................7-4

    7.2 Connections of the Power Cables and PGND Cables.....................................................................................7-6

    7.3 Principles of Routing and Binding the Power Cables and PGND Cables......................................................7-7

    BSC6900

    N68E-22 Cabinet Installation Guide Contents

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    i

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    4/118

    7.4 Installing the Power Cables and PGND Cables Between the N68E-22 Cabinet and the PDF.......................7-7

    7.4.1 Overhead and Underfloor Cabling Modes.............................................................................................7-8

    7.4.2 Installing the Power Cables and PGND Cables Between the N68E-22 Cabinet and the PDF in Overhead

    Cabling Mode................................................................................................................................................7-10

    7.4.3 Installing the Power Cables and PGND Cables Between the N68E-22 Cabinet and the PDF in UnderfloorCabling Mode................................................................................................................................................7-13

    7.5 Installing the PGND Cables Between the Adjacent N68E-22 Cabinets.......................................................7-16

    7.6 Checking the Power-on Status......................................................................................................................7-17

    8 Installing the Accessories for the N68E-22 Cabinet............................................................ 8-1

    8.1 Accessories to Be Installed for the N68E-22 Cabinet.....................................................................................8-3

    8.2 Installing the Side Panels for the N68E-22 Cabinet........................................................................................8-3

    8.3 Installing the Front and Back Doors for the N68E-22 Cabinet.......................................................................8-5

    8.4 Installing the PGND Cables for the Doors and Side Panels of the N68E-22 Cabinet....................................8-6

    9 Attaching the Engineering Labels to the Cabinets..............................................................9-1

    10 Attaching the Engineering Labels to the Power Cables and PGND Cables..............10-1

    11 Checklist for the Cabinet Installation................................................................................11-1

    Contents

    BSC6900

    N68E-22 Cabinet Installation Guide

    ii Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    5/118

    Figures

    Figure 2-1 Appearance of the single-door N68E-22 cabinet ...............................................................................2-2

    Figure 2-2 Appearance of the double-door N68E-22 cabinet .............................................................................2-3

    Figure 3-1 Straightening the tongue.....................................................................................................................3-4

    Figure 3-2 Removing the cover............................................................................................................................3-5

    Figure 3-3 Removing side boards........................................................................................................................3-6

    Figure 3-4 Unpacking a carton.............................................................................................................................3-7

    Figure 5-1 Equipment room floor plan (unit: mm)..............................................................................................5-4

    Figure 5-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)....................5-5

    Figure 5-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)..........................5-5

    Figure 5-4 Installation holes for one cabinet (unit: mm)......................................................................................5-7

    Figure 5-5 Installation holes for a row of cabinets (unit: mm).............................................................................5-7

    Figure 5-6 Digging a pit.......................................................................................................................................5-8

    Figure 5-7 Drilling a hole.....................................................................................................................................5-8

    Figure 5-8 Expansion bolt assembly............................................................................................ ........................5-9Figure 5-9 Installing the expansion bolt assembly (1).........................................................................................5-9

    Figure 5-10 Installing the expansion bolt assembly (2).....................................................................................5-10

    Figure 5-11 Removing the wooden protection boards.......................................................................................5-11

    Figure 5-12 State of the lock of each door.........................................................................................................5-11

    Figure 5-13 Removing the reinforced plate and short supporting beams..........................................................5-12

    Figure 5-14 Removing the air filter....................................................................................................................5-13

    Figure 5-15 Securing the cabinet........................................................................................................................5-14

    Figure 5-16 Leveling the cabinet........................................................................................................................5-14

    Figure 5-17 Insulation test..................................................................................................................................5-16

    Figure 5-18 Placing the air filter in the original position...................................................................................5-17

    Figure 5-19 Special connecting pieces for combining cabinets...................................................... ...................5-18

    Figure 5-20 Combining two N68E-22 cabinets.................................................................................................5-19

    Figure 5-21 Using a level bar to check the horizontal and vertical deviations..................................................5-20

    Figure 5-22 Combining N68E-22 and N68-22 cabinets....................................................................................5-20

    Figure 6-1 Equipment room floor plan (unit: mm)..............................................................................................6-4

    Figure 6-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)....................6-5

    Figure 6-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)..........................6-5

    Figure 6-4 N6X series support.............................................................................................................................6-6

    Figure 6-5 Guide rail............................................................................................................................................6-7

    BSC6900

    N68E-22 Cabinet Installation Guide Figures

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    iii

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    6/118

    Figure 6-6 Front pallet..........................................................................................................................................6-7

    Figure 6-7 Installation holes for one cabinet (unit: mm)......................................................................................6-9

    Figure 6-8 Installation holes for a row of cabinets (unit: mm).............................................................................6-9

    Figure 6-9 Digging a pit.....................................................................................................................................6-10

    Figure 6-10 Drilling a hole.................................................................................................................................6-10

    Figure 6-11 Expansion bolt assembly................................................................................................................6-11

    Figure 6-12 Installing the expansion bolt assembly (1).....................................................................................6-11

    Figure 6-13 Installing the expansion bolt assembly (2).....................................................................................6-12

    Figure 6-14 Adjusting the depth of the support.................................................................................................6-13

    Figure 6-15 Installing the guide rails.................................................................................................................6-14

    Figure 6-16 Securing the support.......................................................................................................................6-15

    Figure 6-17 Insulating spacer.............................................................................................................................6-15

    Figure 6-18 Connecting the supports.................................................................................................................6-16

    Figure 6-19 Removing the wooden protection boards.......................................................................................6-17

    Figure 6-20 State of the lock of each door.........................................................................................................6-17

    Figure 6-21 Removing the short supporting beam.............................................................................................6-18

    Figure 6-22 Removing the air filter....................................................................................................................6-19

    Figure 6-23 Installing the cabinet.......................................................................................................................6-20

    Figure 6-24 Leveling the cabinet........................................................................................................................6-21

    Figure 6-25 Insulation test..................................................................................................................................6-22

    Figure 6-26 Placing the air filter in the original position...................................................................................6-23

    Figure 6-27 Special connecting pieces for combining cabinets...................................................... ...................6-24

    Figure 6-28 Combining two N68E-22 cabinets.................................................................................................6-25Figure 6-29 Using a level bar to check the horizontal and vertical deviations..................................................6-26

    Figure 6-30 Combining N68E-22 and N68-22 cabinets....................................................................................6-26

    Figure 6-31 Installing the front pallet.................................................................................................................6-28

    Figure 6-32 Placing the ESD floor in the original position................................................................................6-28

    Figure 7-1 External/Internal power cable.............................................................................................................7-4

    Figure 7-2 PGND cable........................................................................................................................................7-5

    Figure 7-3 Connections of the power cables and PGND cables.......................................................................... 7-6

    Figure 7-4 Cable holes of the cabinet...................................................................................................................7-8

    Figure 7-5 Overhead cabling mode......................................................................................................................7-9

    Figure 7-6 Underfloor cabling mode..................................................................................................................7-10

    Figure 7-7 Installing the power cables and PGND cables between the N68E-22 cabinet and the PDF in overhead

    cabling mode.......................................................................................................................................................7-11

    Figure 7-8 Installing the power cables and PGND cables between the N68E-22 cabinet and the PDF in underfloor

    cabling mode.......................................................................................................................................................7-14

    Figure 7-9 PGND cables between adjacent N68E-22 cabinets..........................................................................7-17

    Figure 8-1 Installing the side panels for the N68E-22 cabinet.............................................................................8-4

    Figure 8-2 Installing the front and back doors for the N68E-22 cabinet..............................................................8-5

    Figure 8-3 Installing the PGND cables for the doors and side panels of the N68E-22 cabinet...........................8-7

    Figure 9-1 Row label............................................................................................................................................9-1

    Figure 9-2 Column label.......................................................................................................................................9-1

    Figures

    BSC6900

    N68E-22 Cabinet Installation Guide

    iv Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    7/118

    Figure 9-3 Position for attaching the product label..............................................................................................9-2

    BSC6900

    N68E-22 Cabinet Installation Guide Figures

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    v

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    8/118

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    9/118

    Tables

    Table 2-1 Technical specifications of the N68E-22 cabinet.................................................................................2-3

    Table 3-1 Common tools required for installing the N68E-22 cabinet................................................................3-9

    Table 6-1 Materials required for installing the N68E-22 cabinet on the ESD floor.............................................6-3

    Table 6-2 Two types of N6X series support.........................................................................................................6-6

    Table 7-1 External power cables..........................................................................................................................7-3

    Table 7-2 Internal power cables...........................................................................................................................7-4

    Table 7-3 PGND cables........................................................................................................................................7-5

    Table 8-1 Accessories to be installed for the N68E-22 cabinet............................................................................8-3

    Table 11-1 Checklist for the cabinet installation................................................................................................11-1

    BSC6900

    N68E-22 Cabinet Installation Guide Tables

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    vii

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    10/118

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    11/118

    About This Document

    Overview

    This provides the related information about the installation of the BSC6900 N68E-22 cabinet.

    The information consists of how to install the cabinet, how to install the accessories, how to

    install the external power cables and PGND cables, how to attach engineering labels to the power

    cables and PGND cables, and other reference information.

    Product Version

    The following table lists the product version related to this document.

    Product Name Product Version Product Application Mode

    BSC6900 V900R011C00 BSC6900 GSM

    BSC6900 UMTS

    BSC6900 GU

    Intended Audience

    This document is intended for the installation personnel.

    Organization

    1 Changes in BSC6900 N68E-22 Cabinet Installation Guide

    This provides the changes in the BSC6900 N68E-22 Cabinet Installation Guide.

    2 Overview of the N68E-22 Cabinet

    The N68E-22 cabinet features a modular design. It provides sufficient space for installing

    devices such as subracks and power distribution box so as to facilitate capacity expansion and

    maintenance.

    3 Preparing for the N68E-22 Cabinet Installation

    Before installing the N68E-22 cabinet, you need to unpack the cases and check the items in the

    cases. Ensure that all the tools required for the installation are available.

    4 Installing the N68E-22 Cabinet

    Installing the N68E-22 cabinet involves installing the cabinet, accessories, external powercables, and PGND cables. It also involves checking the power-on status of the cabinet, attaching

    BSC6900

    N68E-22 Cabinet Installation Guide About This Document

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    12/118

    engineering labels to the cabinet, and attaching engineering labels to the external power cables

    and PGND cables.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    This describes how to install the N68E-22 cabinet on the concrete floor.

    6 Installing the N68E-22 Cabinet on the ESD Floor

    This describes how to install the N68E-22 cabinet on the ESD floor by using the N6X series

    support assembly.

    7 Installing the Power Cables and PGND Cables for the N68E-22 Cabinet

    This describes how to install the power cables and PGND cables between the N68E-22 cabinet

    and the power distribution frame (PDF). When the N68E-22 cabinets are combined, you also

    need to install the PGND cables between the adjacent cabinets.

    8 Installing the Accessories for the N68E-22 Cabinet

    This describes how to install the front and back doors as well as side panels for the N68E-22

    cabinet and how to install the PGND cables for the doors and side panels.

    9 Attaching the Engineering Labels to the Cabinets

    This describes how to attach the engineering labels to the cabinets, including the row labels,

    column labels, and product labels.

    10 Attaching the Engineering Labels to the Power Cables and PGND Cables

    After installing the power cables and PGND cables, you should remove the temporary labels

    from them and then attach the engineering labels to them.

    11 Checklist for the Cabinet Installation

    This describes the items and specifications for checking the cabinet installation.

    Conventions

    Symbol Conventions

    The symbols that may be found in this document are defined as follows.

    Symbol Description

    Indicates a hazard with a high level of risk, which if not

    avoided,will result in death or serious injury.

    Indicates a hazard with a medium or low level of risk, which

    if not avoided, could result in minor or moderate injury.

    Indicates a potentially hazardous situation, which if not

    avoided,could result in equipment damage, data loss,

    performance degradation, or unexpected results.

    Indicates a tip that may help you solve a problem or save

    time.

    About This Document

    BSC6900

    N68E-22 Cabinet Installation Guide

    2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    13/118

    Symbol Description

    Provides additional information to emphasize or supplement

    important points of the main text.

    General Conventions

    The general conventions that may be found in this document are defined as follows.

    Convention Description

    Times New Roman Normal paragraphs are in Times New Roman.

    Boldface Names of files, directories, folders, and users are in

    boldface. For example, log in as userroot.

    Italic Book titles are in italics.

    Courier New Examples of information displayed on the screen are in

    Courier New.

    Command Conventions

    The command conventions that may be found in this document are defined as follows.

    Convention Description

    Boldface The keywords of a command line are in boldface.

    Italic Command arguments are in italics.

    [ ] Items (keywords or arguments) in brackets [ ] are optional.

    { x | y | ... } Optional items are grouped in braces and separated by

    vertical bars. One item is selected.

    [ x | y | ... ] Optional items are grouped in brackets and separated by

    vertical bars. One item is selected or no item is selected.

    { x | y | ... }* Optional items are grouped in braces and separated by

    vertical bars. A minimum of one item or a maximum of all

    items can be selected.

    [ x | y | ... ]* Optional items are grouped in brackets and separated by

    vertical bars. Several items or no item can be selected.

    GUI Conventions

    The GUI conventions that may be found in this document are defined as follows.

    BSC6900

    N68E-22 Cabinet Installation Guide About This Document

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    14/118

    Convention Description

    Boldface Buttons, menus, parameters, tabs, window, and dialog titles

    are in boldface. For example, clickOK.

    > Multi-level menus are in boldface and separated by the ">"signs. For example, choose File > Create > Folder .

    Keyboard Operations

    The keyboard operations that may be found in this document are defined as follows.

    Format Description

    Key Press the key. For example, press Enter and press Tab.

    Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt+A means the three keys should be pressed concurrently.

    Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means

    the two keys should be pressed in turn.

    Mouse Operations

    The mouse operations that may be found in this document are defined as follows.

    Action Description

    Click Select and release the primary mouse button without movingthe pointer.

    Double-click Press the primary mouse button twice continuously and

    quickly without moving the pointer.

    Drag Press and hold the primary mouse button and move the

    pointer to a certain position.

    About This Document

    BSC6900

    N68E-22 Cabinet Installation Guide

    4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    15/118

    1 Changes in BSC6900 N68E-22 CabinetInstallation Guide

    This provides the changes in the BSC6900 N68E-22 Cabinet Installation Guide.

    Issue 01 (2009-04-30)

    This is the initial field trial release.

    BSC6900

    N68E-22 Cabinet Installation Guide 1 Changes in BSC6900 N68E-22 Cabinet Installation Guide

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    1-1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    16/118

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    17/118

    2 Overview of the N68E-22 CabinetThe N68E-22 cabinet features a modular design. It provides sufficient space for installing

    devices such as subracks and power distribution box so as to facilitate capacity expansion and

    maintenance.

    Appearance of the N68E-22 Cabinet

    The color of the N68E-22 cabinet surface is purple and gray. The N68E-22 cabinet can be

    categorized into two types: the single-door cabinet and the double-door cabinet. Figure 2-1

    shows the single-door N68E-22 cabinet. Figure 2-2 shows the double-door N68E-22 cabinet.

    BSC6900

    N68E-22 Cabinet Installation Guide 2 Overview of the N68E-22 Cabinet

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    18/118

    Figure 2-1 Appearance of the single-door N68E-22 cabinet

    2 Overview of the N68E-22 Cabinet

    BSC6900

    N68E-22 Cabinet Installation Guide

    2-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    19/118

    Figure 2-2 Appearance of the double-door N68E-22 cabinet

    Technical Specifications of the N68E-22 Cabinet

    Table 2-1 describes the technical specifications of the N68E-22 cabinet.

    Table 2-1 Technical specifications of the N68E-22 cabinet

    Item Value

    Dimension (H x W x D) 2,200 mm (height) x 600 mm (width) x 800 mm(depth)

    Height of the available space 46 U

    Weight Rack: 59 kg; empty cabinet: 100 kg; full

    configuration: 350 kg

    Power supply Four routes of -48 V DC power supply

    EMC l Meets the requirements of ETSI EN300 386

    l Meets the requirements of Council directive

    89/336/EEC

    BSC6900

    N68E-22 Cabinet Installation Guide 2 Overview of the N68E-22 Cabinet

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-3

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    20/118

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    21/118

    3 Preparing for the N68E-22 CabinetInstallation

    About This Chapter

    Before installing the N68E-22 cabinet, you need to unpack the cases and check the items in the

    cases. Ensure that all the tools required for the installation are available.

    3.1 Unpacking the Cases and Checking the Items

    This describes how to unpack the cases and check the items in the cases for the convenience of

    subsequent cabinet installation.

    3.2 Tools Required for Installing the N68E-22 Cabinet

    The tools required for installing the N68E-22 cabinet are the measuring tools, marking tools,

    drilling tools, fastening tools, small tools, auxiliary tools, meters, and some special tools.

    BSC6900

    N68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    22/118

    3.1 Unpacking the Cases and Checking the Items

    This describes how to unpack the cases and check the items in the cases for the convenience of

    subsequent cabinet installation.

    Prerequisite

    l Site preparation for the installation is complete.

    l The cases that contain the cabinets and components are delivered to the site.

    Context

    l When carrying or placing the equipment, you should ensure that it does not collide with

    doors, walls, shelves, or other objects.

    l When transporting or installing the equipment, components, or parts, you should avoid

    touching their uncoated metal surfaces with sweaty or dirty gloves.

    Procedure

    Step 1 Unload the cases.

    CAUTION

    When unloading the cases, you should place the cases in sequence. Ensure that the labels on thecases face the same direction.

    Step 2 Check whether the number of cases on site is the same as is mentioned in the Packing List andwhether the place of delivery is the same as the actual installation place.

    If... Then...

    The number of cases on site matches that in the Packing List, Go to Step 4.

    The number of cases on site does not match that in the Packing List, Go to Step 3.

    Step 3 Stop unpacking the cases. Ask the project supervisor to send the Cargo Problems Reportthat issigned by the customer to the local Huawei office within three days.

    Step 4 Check whether the cases are intact.

    If... Then...

    Any case is seriously damaged or soaked, Go to Step 5.

    The cases are intact, Go to Step 6.

    3 Preparing for the N68E-22 Cabinet Installation

    BSC6900

    N68E-22 Cabinet Installation Guide

    3-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    23/118

    Step 5 Stop unpacking the cases, find out the causes, and contact the local Huawei office to furtherhandle the problem.

    CAUTION

    To protect the equipment and find out the causes, perform the following actions: Move the

    unpacked equipment indoors for proper storage, take photos of the storage environment, the

    rusted or corroded equipment, packing cases, and packing materials. Keep these photos for future

    verification. Store the packing cases and materials properly.

    Step 6 Unpack the wooden cases.

    CAUTION

    l Before the unpacking, move the wooden cases into or close to the equipment room if enough

    space is available. This prevents damage to the cabinets during the transportation.

    l When you unpack the wooden cases, find the one containing the packing list first. Then, you

    can find items rapidly according to the names, codes, positions, and quantities in the Packing

    List.

    l The following description takes the wooden case that contains the cabinet as an example.

    The methods of unpacking other types of wooden cases are similar.

    1. Place the wooden case on the ground. Ensure that the side with the wooden frame faces the

    bottom.

    2. Use a wrench, a flat-head screwdriver, or a claw hammer to straighten the tongues on the

    four sides of the cover, as shown in Figure 3-1.

    BSC6900

    N68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-3

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    24/118

    Figure 3-1 Straightening the tongue

    3. Remove the cover. If the wooden case contains a carton, take out the carton and then open

    it according to Step 7. If the wooden case contains a cabinet, go to the next step. See Figure

    3-2.

    3 Preparing for the N68E-22 Cabinet Installation

    BSC6900

    N68E-22 Cabinet Installation Guide

    3-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    25/118

    Figure 3-2 Removing the cover

    4. Use the same method to remove the side boards from the wooden case, as shown in Figure

    3-3.

    BSC6900

    N68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-5

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    26/118

    Figure 3-3 Removing side boards

    5. Erect the cabinet with the BOTTOM side down.

    CAUTION

    This operation needs three to five installers. Prevent the cabinet from falling during the

    erection to avoid personnel injury.

    6. Remove the bottom of the case, that is, the side with the wooden frame.

    7. Remove the foamed wrap angles.8. Remove the vacuum plastic bag.

    Step 7 Unpack the carton, as shown in Figure 3-4.

    3 Preparing for the N68E-22 Cabinet Installation

    BSC6900

    N68E-22 Cabinet Installation Guide

    3-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    27/118

    Figure 3-4 Unpacking a carton

    1 Carton label 2 Strap 3 Pressure-sensitive tape

    4 Foam plate 5 Board label 6 Board

    1. Check the types and quantities of the items in the carton according to the carton label.

    2. Use diagonal pliers to cut the straps.

    3. Rip the tape along the joint seams by using the paper knife. Do not insert the knife too deep,

    or else the items may be damaged.

    4. Unpack the carton and take out the items.

    Step 8 Unpack boards.

    CAUTION

    l Electronic components are extremely sensitive to static electricity. When unpacking the

    boards, wear an ESD wrist strap or a pair of ESD gloves properly.

    l The ESD bag contains the desiccant to keep the bag dry. When taking the board from a cold

    dry place to a hot damp place, wait at least 30 minutes before the unpacking. Otherwise,

    moisture condensed on the board surface may damage the board.

    1. Check that no evident damage is on the board packages.

    2. Open the packages and ensure that the boards are in good condition. For any board problem,

    contact the order management engineer at the local Huawei office.

    Step 9 Check whether the unpacked boards need to be installed immediately, and then proceedaccordingly.

    If... Then...

    The unpacked boards need to be installed

    immediately,

    Place the boards on an ESD surface and

    discharge the static electricity.

    The unpacked boards need not be installed

    immediately,

    Pack the boards with the original materials and

    place them in a cool dry place away from direct

    sunlight or strong electromagnetic radiation.

    BSC6900

    N68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-7

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    28/118

    Step 10 Check the items. Check the items one by one according to the names, types, and quantitiesdescribed in thePacking List.

    The acceptance of items covers the following aspects:

    l Appearance: Check whether there is any visible defect, looseness, distortion, or damage;

    check whether the labels are legible and whether the nameplates and decorating plates areavailable and meet the requirements.

    l Integrity: Ensure that all the parts and accessories required for the installation of cabinets are

    available.

    l Computer: Check whether the monitor, keyboard, and mouse are intact and in good condition.

    l Board: Ensure that the type and quantity of the boards are consistent with those in thePacking

    List. Ensure that no printed circuit board is broken and no component is detached from the

    board.

    NOTE

    The project supervisor should take the major role in the inspection of equipment and components whose

    electric characteristics are likely to have been affected.

    If... Then...

    The item saying "shortage of articles" is

    described in thePacking List,

    Inform the order management engineer at the

    local office. Then, sign thePacking Listtogether

    with the customer.

    There is any short, wrong, or extra

    shipment, or any damaged items,

    Note the following points: Representatives of

    Huawei and the customer must sign the

    Unpacking Inspection Memo andPacking List.The installation supervisor must fill in the Cargo

    Problems Reportand inform the order

    management engineer at the local office in three

    days. The installation supervisormust keep the

    problematic items intact and the inner and outer

    packing intact for future investigation and

    verification.

    The shipment is intact, Place the inspected items by type. Then,

    representatives of Huawei and the customer sign

    thePacking List.

    ----End

    3.2 Tools Required for Installing the N68E-22 Cabinet

    The tools required for installing the N68E-22 cabinet are the measuring tools, marking tools,

    drilling tools, fastening tools, small tools, auxiliary tools, meters, and some special tools.

    Common Tools

    Table 3-1 lists the common tools required for installing the N68E-22 cabinet.

    3 Preparing for the N68E-22 Cabinet Installation

    BSC6900

    N68E-22 Cabinet Installation Guide

    3-8 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    29/118

    Table 3-1 Common tools required for installing the N68E-22 cabinet

    Type Tool

    Measuring tools Long tape, 50 m ribbon tape, 5 m tape measure, 400 mm level bar, and

    level instrument

    Marking tools Marking pen and pencil

    Drilling tools Percussion drill with matching bits of 6, 8, 10, 12, 14, and 16,

    and vacuum cleaner

    Fastening tools Flat-head screwdrivers (M3 to M6)

    Phillips screwdrivers (M3 to M6)

    Adjustable wrench

    Socket wrenches (M6, M8, M10, M12, M14, M17, M19)

    Double offset ring wrenches (M6, M8, M10, M12, M14, M17, M19)

    Combination wrenches (M17 and M19)

    Long-arm wrench

    Small tools Sharp-nose pliers, diagonal pliers, pliers, hand-held electric drill, file,

    handsaw, crowbar, rubber hammer, and claw hammer

    Auxiliary tools Paper knife, bellows, plumb, fork, ladder, heat blower, and insulating tape

    Special Tools

    The special tools required for installing the N68E-22 cabinet are the earth resistance meter, ESD

    wrist strap, ESD gloves, cable peeler, safety knife, and multi-purpose crimping pliers.

    Meters

    The meters required for installing the N68E-22 cabinet are the multimeter and 500 V

    megohmmeter (for testing insulation resistance).

    NOTE

    The meters must be checked and certified.

    BSC6900

    N68E-22 Cabinet Installation Guide 3 Preparing for the N68E-22 Cabinet Installation

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-9

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    30/118

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    31/118

    4 Installing the N68E-22 CabinetInstalling the N68E-22 cabinet involves installing the cabinet, accessories, external power

    cables, and PGND cables. It also involves checking the power-on status of the cabinet, attaching

    engineering labels to the cabinet, and attaching engineering labels to the external power cables

    and PGND cables.

    Prerequisite

    l The equipment is unpacked and accepted.

    l The cabinet is delivered to the site.

    l The tools required for the installation are available.

    Procedure

    Step 1 Install the N68E-22 cabinet.

    If... Then...

    You install the N68E-22 cabinet on the ESD

    floor,

    See 6 Installing the N68E-22 Cabinet on the

    ESD Floor.

    You install the N68E-22 cabinet on the

    concrete floor,

    See 5 Installing the N68E-22 Cabinet on the

    Concrete Floor.

    You install the N68E-22 cabinet on other

    types of floors,

    Contact Huawei for technical support.

    Step 2 Install the power cables and PGND cables for the N68E-22 cabinet by referring to 7 Installingthe Power Cables and PGND Cables for the N68E-22 Cabinet.

    Step 3 Install the accessories for the N68E-22 cabinet by referring to 8 Installing the Accessories forthe N68E-22 Cabinet.

    Step 4 Attach the engineering labels to the cabinet by referring to 9 Attaching the Engineering Labels

    to the Cabinets.

    BSC6900

    N68E-22 Cabinet Installation Guide 4 Installing the N68E-22 Cabinet

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    32/118

    Step 5 Attach the engineering labels to the external power cables and PGND cables by referring to 10Attaching the Engineering Labels to the Power Cables and PGND Cables .

    ----End

    4 Installing the N68E-22 Cabinet

    BSC6900

    N68E-22 Cabinet Installation Guide

    4-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    33/118

    5 Installing the N68E-22 Cabinet on theConcrete Floor

    About This Chapter

    This describes how to install the N68E-22 cabinet on the concrete floor.

    Prerequisite

    The materials required for installing the N68E-22 cabinet are available, as specified in 5.1

    Materials for Installing the N68E-22 Cabinet on the Concrete Floor.

    Procedure

    Step 1 Position the N68E-22 cabinet on the concrete floor by referring to 5.3 Positioning the N68E-22Cabinet on the Concrete Floor.

    Step 2 Secure the N68E-22 cabinet on the concrete floor by referring to 5.4 Securing the N68E-22Cabinet on the Concrete Floor.

    Step 3 Test the insulation of the N68E-22 cabinet by referring to 5.5 Testing the Insulation of theN68E-22 Cabinet.

    Step 4 Combine the N68E-22 cabinets by referring to 5.6 Combining the N68E-22 Cabinets.

    ----End

    5.1 Materials for Installing the N68E-22 Cabinet on the Concrete Floor

    The N68E-22 cabinet can be directly installed on the concrete floor, so other types of materials

    are not required. Ensure that you have arranged sufficient N68E-22 cabinets as required.

    5.2 Template Files for Installing the N68E-22 Cabinet

    The template files for installing the N68E-22 cabinet consist of the equipment room floor plan

    and the marking template. The equipment room floor plan is used to determine the installation

    position of the N68E-22 cabinet in the equipment room. The marking template is used to

    determine the drilling positions. The installation of the N68E-22 cabinet on the concrete floor

    and that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan butdifferent marking templates.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    34/118

    5.3 Positioning the N68E-22 Cabinet on the Concrete Floor

    Positioning the N68E-22 cabinet on the concrete floor involves the following steps: determining

    cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

    5.4 Securing the N68E-22 Cabinet on the Concrete Floor

    This describes how to secure the N68E-22 cabinet on the concrete floor.

    5.5 Testing the Insulation of the N68E-22 Cabinet

    This describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the

    ground.

    5.6 Combining the N68E-22 Cabinets

    This describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet

    with another cabinet, you should use connecting plates to secure them. The combining of

    N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets and

    combining of N68E-22 and N68-22 cabinets.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    35/118

    5.1 Materials for Installing the N68E-22 Cabinet on theConcrete Floor

    The N68E-22 cabinet can be directly installed on the concrete floor, so other types of materials

    are not required. Ensure that you have arranged sufficient N68E-22 cabinets as required.

    5.2 Template Files for Installing the N68E-22 Cabinet

    The template files for installing the N68E-22 cabinet consist of the equipment room floor plan

    and the marking template. The equipment room floor plan is used to determine the installation

    position of the N68E-22 cabinet in the equipment room. The marking template is used to

    determine the drilling positions. The installation of the N68E-22 cabinet on the concrete floor

    and that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan butdifferent marking templates.

    Equipment Room Floor Plan

    TheEquipment Room Floor Plan is provided by the customer or the site survey personnel.

    Figure 5-1 shows an example of theEquipment Room Floor Plan.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-3

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    36/118

    Figure 5-1 Equipment room floor plan (unit: mm)

    NOTE

    See Figure 5-1. The requirements for the installation position of the N68E-22 cabinet are as follows:

    l The distance between two rows of cabinets should be at least 1,000 mm.

    l The distance between the wall and the cabinet side that is the closest to the wall should be at least

    800 mm.

    l The distance between the wall and the row that is the closest to the wall should be at least 800 mm

    (for double-door cabinets) and 1,000 mm (for single-door cabinets).l The width of the aisles in the equipment room should be at least 1,000 mm.

    Marking Template

    The marking template is delivered with the cabinet. The marking template for installing the

    N68E-22 cabinet on the concrete floor is different from the marking template for installing the

    N68E-22 cabinet on the ESD floor. See Figure 5-2 and Figure 5-3.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    37/118

    Figure 5-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)

    Figure 5-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)

    5.3 Positioning the N68E-22 Cabinet on the Concrete Floor

    Positioning the N68E-22 cabinet on the concrete floor involves the following steps: determining

    cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

    Prerequisite

    l The components required for the positioning are available. The required component is the

    M12x60 expansion bolt assembly.

    l The materials required for the positioning are available. The required materials are the

    marking template andEquipment Room Floor Plan.

    l The tools required for the positioning are available. The required tools are the tape measure,

    marking pen, percussion drill with 16 drill bit, vacuum cleaner, and hammer (for example,

    claw hammer).

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-5

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    38/118

    Context

    l Line drawing and hole drilling are the primary tasks for cabinet installation as imprecise

    drawing or drilling may hamper the installation. Therefore, it is important to ensure their

    quality.

    l Before marking cabinet positions and drilling holes, check the installation position of the

    equipment, such as cable racks, in the equipment room for easy cabling.

    l TheEquipment Room Floor Plan is provided by the customer or the site survey personnel.

    Procedure

    Step 1 Ensure that theEquipment Room Floor Plan is in accordance with the requirements for installingthe N68E-22 cabinet by referring to 5.2 Template Files for Installing the N68E-22 Cabinet.

    Step 2 Use a tape measure to determine the cabinet positions based on the dimensions specified in theEquipment Room Floor Plan.

    Step 3 Determine the positions of the holes for the expansion bolt assemblies on the concrete floorbased on the installation position of the cabinet.

    You can use the marking template or tape measure to determine the positions of the holes for

    the expansion bolt assemblies on the concrete floor. The marking template is made of paper and

    is prone to deformation. Before using the marking template, check whether it is deformed based

    on the dimensions of marking template specified in 5.2 Template Files for Installing the

    N68E-22 Cabinet.

    If... Then...

    The marking template is one of the accessories delivered on site and is not

    deformed,

    Go to Step 4.

    The marking template is not one of the accessories delivered on site or is

    deformed,

    Go to Step 5.

    Step 4 Use the marking plate to determine the positions of the holes for the expansion bolt assemblies.

    1. As shown in Figure 5-4 orFigure 5-5, use measuring and marking instruments to measure

    and mark the start points for the front of a row of cabinets. From each start point, mark the

    benchmark lines in the cabinet arrangement direction.

    2. Place the marking template on the floor. Ensure that the semicircle notch of the template

    indicates the front of the cabinet and the edges of the template align with the benchmarklines.

    3. Mark the positions of the holes (four holes for each cabinet) for expansion bolts on the floor

    by using the template.

    4. After all the hole positions are marked, ensure that the distance between the holes is

    accurate.

    5. Go to Step 6.

    Step 5 If the marking template cannot be used on site, use the tape measure to determine the positionsof the holes for the expansion bolt assemblies.

    1. As shown in Figure 5-4 orFigure 5-5, use measuring and marking instruments to measure

    and mark two straight lines with 687 mm wide spacing, and ensure that the lines are parallelwith the front of the cabinet.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    39/118

    Figure 5-4 Installation holes for one cabinet (unit: mm)

    Figure 5-5 Installation holes for a row of cabinets (unit: mm)

    2. As shown in Figure 5-4 orFigure 5-5, determine the position of hole for the first expansion

    bolt assembly on each of the straight lines. Taking the hole as the benchmark point, mark

    the installation holes for other expansion bolt assemblies in succession.3. After all the hole positions are marked, ensure that the distance between the holes is

    accurate.

    Step 6 Drill the holes.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-7

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    40/118

    CAUTION

    l The concrete floor should not be penetrated. Therefore, you should confirm the thickness of

    the concrete floor before drilling holes. For some types of concrete floors on which the drillingis not suitable, you should consult the architectural engineers and get their permission before

    drilling holes.

    l Before drilling holes, you should take dustproof measures on the electronic equipment in the

    equipment room. You should use a vacuum cleaner to remove the dust during the drilling.

    Before removing the dustproof cover from the electronic equipment, you should clean up the

    pieces of concrete that have accumulated during the drilling.

    l You must wear safety goggles during the drilling to protect your eyes from the dust.

    l While drilling holes, you must hold the drill stock firmly. You must keep the drill bit vertical

    to the floor to protect the floor from being damaged or the holes from being slanted.

    1. Dig a pit by using a chisel to help hold the drill bit to the floor, as shown in Figure 5-6.

    Figure 5-6 Digging a pit

    2. Use a percussion drill to drill holes at the marked places on the concrete floor. The depth

    of each hole must range from 52 mm to 60 mm. All the holes must have the same depth.

    Select a 16 drill bit in appropriate length. See Figure 5-7.

    Figure 5-7 Drilling a hole

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-8 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    41/118

    3. Ensure that the depth of each hole ranges from 52 mm to 60 mm and that the holes are not

    slanting. If the depth of the hole is not appropriate or if the hole is slanting, re-drill the hole.

    If the slanting hole cannot be corrected, stop using the hole.

    4. Remove the dust inside and outside the holes by using a vacuum cleaner.

    Step 7 Install the expansion bolt assemblies.

    Figure 5-8 shows an expansion bolt assembly.

    Figure 5-8 Expansion bolt assembly

    1 Bolt 2 Spring washer 3 Flat washer 4 Expansion tube

    5 Nut 6 Guiding slot 7 Guiding rib

    1. Measure the distance between the holes. If the distance does not meet the specifications,

    reposition and drill new holes.

    2. Insert the guiding rib on the nut into the guiding slot on the expansion tube, and then screw

    the bolt slightly to ensure that the guiding rib does not move out from the guiding slot. See

    Figure 5-9.

    3. Insert the expansion tube and the nut into the hole vertically, and then use a rubber hammer

    to strike the expansion tube until it is completely buried in the hole, as shown in Figure

    5-9.

    Figure 5-9 Installing the expansion bolt assembly (1)

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-9

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    42/118

    4. Pre-tighten the expansion bolt clockwise so that the nut and the expansion tube do not get

    loose easily. See Figure 5-10.

    5. Unscrew the expansion bolt counterclockwise and then remove the spring washer and flat

    washer. Keep them for future use. See Figure 5-10.

    Figure 5-10 Installing the expansion bolt assembly (2)

    ----End

    5.4 Securing the N68E-22 Cabinet on the Concrete FloorThis describes how to secure the N68E-22 cabinet on the concrete floor.

    Prerequisite

    l The components required for the installation are available. The required component is the

    N68E-22 cabinet.

    l The materials required for the installation are available. The required materials are the

    insulating pads, flat washers 12, spring washers 12, adjusting pads (optional), and M12x60

    expansion bolt assemblies.

    l The tools required for the installation are available. The required tools are the forklift, levelbar, torque wrench, socket wrench, and Phillips screwdriver.

    Context

    CAUTION

    The gravity center of the cabinet is high. Therefore, do not lift or push the cabinet alone. Moving

    a cabinet requires at least two persons and a forklift, so as to ensure personnel safety and

    equipment safety.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-10 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    43/118

    Procedure

    Step 1 Remove the wooden protection boards from the front and back of the cabinet.

    Step 2 Remove the four wooden protection boards from both the left and right parts of the rack. Pull

    down the hook pin at the upper part of both the front and back doors of the cabinet, and thenremove both doors. Store the doors for future use. See Figure 5-11.

    Figure 5-11 Removing the wooden protection boards

    NOTE

    When storing the doors, you should ensure that they are unlocked. Therefore, the lock rod at the lower part

    of each door does not protrude, thus preventing the lock rod from deformation. See Figure 5-12.

    Figure 5-12 State of the lock of each door

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-11

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    44/118

    Step 3 Remove the reinforced plate from the cabinet front and two short supporting beams from theleft and right. See Figure 5-13.

    Figure 5-13 Removing the reinforced plate and short supporting beams

    Step 4 Unscrew the two M6x12 screws from the air filter, as shown in Figure 5-14. Remove the airfilter, as shown in Figure 5-14.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-12 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    45/118

    Figure 5-14 Removing the air filter

    Step 5 Place the cabinet in the specified position. Align the installation holes in the cabinet with theholes on the floor.

    Step 6 Add the spring washer, flat washer, and insulating tube to each of the four expansion bolts. Then,insert each expansion bolt into the expansion tube and pretighten the expansion tube and the nut.

    See Figure 5-15.

    Step 7 Below the cabinet, push two insulating spacers from both the front and back sides. Ensure thatthe notch faces the inner side and is wedged in the expansion bolt. Align the installation holes

    of each insulating spacer with the corresponding expansion bolt holes. See Figure 5-15.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-13

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    46/118

    Figure 5-15 Securing the cabinet

    1 M12x60 bolt 2 Spring washer 12 3 Flat washer

    4 Insulating tube 5 Insulating spacer

    Step 8 Level the cabinet. Use a level bar to check the levelness of the cabinet. If the cabinet is not level,use a socket wrench to adjust the anchor bolt (adjustable range: 0-10 mm) of the cabinet and

    ensure that the cabinet is level. See Figure 5-16.

    Figure 5-16 Leveling the cabinet

    1 Anchor bolt 2 Fixing bolt

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-14 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    47/118

    Step 9 Use the torque wrench to fix the four fixing bolts and tighten them to 45 Nm.

    ----End

    5.5 Testing the Insulation of the N68E-22 Cabinet

    This describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the

    ground.

    Prerequisite

    The tool required for the insulation test is available. The required tool is the multimeter.

    Procedure

    Step 1 Set the multimeter to the megohm scale.

    Step 2 Measure the resistance between the M12x60 expansion bolt and the cabinet.

    If... Then...

    The resistance is greater than or equal to five

    megohms,

    Go to Step 7.

    The resistance is smaller than five megohms, The cabinet is not insulated from the ground.

    Go to Step 3.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-15

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    48/118

    Figure 5-17 Insulation test

    Step 3 Remove all the installation parts between the N68E-22 cabinet and the ground.

    Step 4 Ensure that the insulation parts are not missing or damaged.

    Step 5 Secure the cabinet again.

    Step 6 Repeat Step 1 to test the insulation again.

    Step 7 Use two M6x12 screws to fix the air filter and ensure that it is in the original position. See Figure5-18.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-16 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    49/118

    Figure 5-18 Placing the air filter in the original position

    ----End

    5.6 Combining the N68E-22 Cabinets

    This describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet

    with another cabinet, you should use connecting plates to secure them. The combining of

    N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets and

    combining of N68E-22 and N68-22 cabinets.

    Prerequisite

    The tools required for the installation are available. The required tools are the wrench andclimbing ladder.

    Context

    If two N68E-22 cabinets are to be combined, the connecting plates are already installed on top

    of the cabinets and are delivered with the cabinets. If N68E-22 and N68-22 cabinets are to be

    combined, special connecting pieces for combining cabinets are required. Figure 5-19 shows

    the special connecting pieces for combining cabinets.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-17

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    50/118

    Figure 5-19 Special connecting pieces for combining cabinets

    Procedure

    l Combining Two N68E-22 Cabinets

    1. Remove the connecting plates from the column inside the N68E-22 cabinet, rotate

    each of them by 180 degrees, and then reinstall them. Use M8x30 bolts to connect the

    connecting plates of the adjacent cabinets together. See Figure 5-20.

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-18 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    51/118

    Figure 5-20 Combining two N68E-22 cabinets

    2. Remove the two connecting plates from the front and back doorheads of the adjacent

    cabinets. Then, reinstall the connecting plates, as shown in Figure 5-20.

    3. At the bottom of the combined cabinets and in front of the column, use a level bar to

    check whether the horizontal and vertical deviations of the row of cabinets meet the

    specifications, as shown in Figure 5-21. If the cabinet is not level, use a socket wrench

    to adjust the leveling foot.

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-19

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    52/118

    Figure 5-21 Using a level bar to check the horizontal and vertical deviations

    l Combining N68E-22 and N68-22 Cabinets

    1. Remove the connecting plates from the column inside the N68E-22 cabinet, rotate

    each of them by 180 degrees, and then reinstall them, as shown in Figure 5-22.

    Figure 5-22 Combining N68E-22 and N68-22 cabinets

    5 Installing the N68E-22 Cabinet on the Concrete Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    5-20 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    53/118

    2. Remove the connecting plate from the middle top of the N68-22 cabinet, as shown in

    Figure 5-22. Keep the removed M6x16 screws for future use.

    3. Fix the special connecting pieces to the N68-22 cabinet, as shown in Figure 5-22

    .

    4. Use M8x30 bolts to fix the special connecting pieces of the N68-22 cabinet and the

    connecting plates at the column in the N68E-22 cabinet, as shown in Figure 5-22

    .

    5. Remove the two connecting plates from the front and back doorheads of the adjacent

    cabinets. Then, reinstall the connecting plates, as shown in Figure 5-22.

    6. At the bottom of the combined cabinets and in front of the column, use a level bar to

    check whether the horizontal and vertical deviations of the row of cabinets meet the

    specifications. If the cabinet is not level, use a socket wrench to adjust the leveling

    foot of the N68E-22 cabinet.

    ----End

    BSC6900

    N68E-22 Cabinet Installation Guide 5 Installing the N68E-22 Cabinet on the Concrete Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-21

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    54/118

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    55/118

    6 Installing the N68E-22 Cabinet on the ESDFloor

    About This Chapter

    This describes how to install the N68E-22 cabinet on the ESD floor by using the N6X series

    support assembly.

    Prerequisite

    The materials required for installing the N68E-22 cabinet are available, as specified in 6.1

    Materials for Installing the N68E-22 Cabinet on the ESD Floor.

    Procedure

    Step 1 Position the N68E-22 cabinet on the ESD floor by referring to 6.4 Positioning the N68E-22Cabinet on the ESD Floor.

    Step 2 Install the N6X series support and the guide rail by referring to 6.5 Installing the N6X SeriesSupport and the Guide Rails.

    Step 3 Secure the N68E-22 cabinet on the ESD floor by referring to 6.6 Securing the N68E-22 Cabineton the ESD Floor.

    Step 4 Test the insulation of the N68E-22 cabinet by referring to 6.7 Testing the Insulation of theN68E-22 Cabinet.

    Step 5 Combine the N68E-22 cabinets by referring to 6.8 Combining the N68E-22 Cabinets.

    Step 6 Place the ESD floor in the original position by referring to 6.9 Placing the ESD Floor in theOriginal Position.

    ----End

    6.1 Materials for Installing the N68E-22 Cabinet on the ESD Floor

    The materials for installing the N68E-22 cabinet on the ESD floor consist of the N68E-22 cabinet

    and N6X series support assembly.

    6.2 Template Files for Installing the N68E-22 Cabinet

    BSC6900

    N68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    6-1

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    56/118

    The template files for installing the N68E-22 cabinet consist of the equipment room floor plan

    and the marking template. The equipment room floor plan is used to determine the installation

    position of the N68E-22 cabinet in the equipment room. The marking template is used to

    determine the drilling positions. The installation of the N68E-22 cabinet on the concrete floor

    and that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan but

    different marking templates.

    6.3 N6X Series Support Assembly

    The N6X series support assembly consists of N6X series support, guide rail, and front pallet.

    To support and secure the cabinet, you need to use bolts to fix the guide rail, support, and cabinet

    together and use the front pallet to support the ESD floor before and after the cabinet.

    6.4 Positioning the N68E-22 Cabinet on the ESD Floor

    Positioning the N68E-22 cabinet on the ESD floor involves the following steps: determining

    cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

    6.5 Installing the N6X Series Support and the Guide Rails

    This describes how to install the N6X series support and the guide rails.6.6 Securing the N68E-22 Cabinet on the ESD Floor

    Upon delivery, the N68E-22 cabinet is equipped with the front and back doors. Therefore, you

    should remove the doors first and then secure the cabinet on the N6X series support.

    6.7 Testing the Insulation of the N68E-22 Cabinet

    This describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the

    ground.

    6.8 Combining the N68E-22 Cabinets

    This describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet

    with anothercabinet, you should use connecting plates to secure them. The combining of

    N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets andcombining ofN68E-22 and N68-22 cabinets.

    6.9 Placing the ESD Floor in the Original Position

    After securing the N68E-22 cabinet on the ESD floor, you need to install the front pallet to

    support the ESD floor around the cabinet and place the ESD floor around the cabinet in the

    original position.

    6 Installing the N68E-22 Cabinet on the ESD Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    6-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    57/118

    6.1 Materials for Installing the N68E-22 Cabinet on the ESDFloor

    The materials for installing the N68E-22 cabinet on the ESD floor consist of the N68E-22 cabinet

    and N6X series support assembly.

    Table 6-1 lists the materials required for installing the N68E-22 cabinet on the ESD floor.

    Table 6-1 Materials required for installing the N68E-22 cabinet on the ESD floor

    Name Sub-Item Quantity

    N68E-22 cabinet - Depends on the site

    requirements

    N6X series support assembly Support Twice the number of cabinets

    Guide rail Twice the number of cabinets

    Front pallet Twice the number of cabinets

    6.2 Template Files for Installing the N68E-22 Cabinet

    The template files for installing the N68E-22 cabinet consist of the equipment room floor plan

    and the marking template. The equipment room floor plan is used to determine the installation

    position of the N68E-22 cabinet in the equipment room. The marking template is used to

    determine the drilling positions. The installation of the N68E-22 cabinet on the concrete floorand that of the N68E-22 cabinet on the ESD floor use the same equipment room floor plan but

    different marking templates.

    Equipment Room Floor Plan

    TheEquipment Room Floor Plan is provided by the customer or the site survey personnel.

    Figure 6-1 shows an example of theEquipment Room Floor Plan.

    BSC6900

    N68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    6-3

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    58/118

    Figure 6-1 Equipment room floor plan (unit: mm)

    NOTE

    See Figure 6-1. The requirements for the installation position of the N68E-22 cabinet are as follows:

    l The distance between two rows of cabinets should be at least 1,000 mm.

    l The distance between the wall and the cabinet side that is the closest to the wall should be at least

    800 mm.

    l The distance between the wall and the row that is the closest to the wall should be at least 800 mm

    (for double-door cabinets) and 1,000 mm (for single-door cabinets).l The width of the aisles in the equipment room should be at least 1,000 mm.

    Marking Template

    The marking template is delivered with the cabinet. The marking template for installing the

    N68E-22 cabinet on the concrete floor is different from the marking template for installing the

    N68E-22 cabinet on the ESD floor. See Figure 6-2 and Figure 6-3.

    6 Installing the N68E-22 Cabinet on the ESD Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    6-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    59/118

    Figure 6-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)

    Figure 6-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)

    6.3 N6X Series Support Assembly

    The N6X series support assembly consists of N6X series support, guide rail, and front pallet.

    To support and secure the cabinet, you need to use bolts to fix the guide rail, support, and cabinet

    together and use the front pallet to support the ESD floor before and after the cabinet.

    N6X Series Support

    The support is used to raise the cabinets so that the installation personnel can easily lay the floor

    and route the cables in the equipment room. Figure 6-4 shows the N6X series support.

    BSC6900

    N68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    6-5

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    60/118

    Figure 6-4 N6X series support

    1 Half support 2 Expansion lever 3 M8 screw assembly connecting the

    half support and the expansion lever

    4 Holes for connecting the support

    and the guide rail

    5 Holes for connecting the support

    and the front pallet

    6 Height scale of the ESD floor

    7 Height locking bolt 8 Hole for connecting the support

    and the ground

    The length of the N6X series support can be adjusted by adjusting the length of the expansion

    lever.

    There are two types of N6X series support: height-adjustable and height-fixed. For details, see

    Table 6-2.

    Table 6-2 Two types of N6X series support

    Type ESD Floor Height Remarks

    I Height-

    adjustable

    296-465 mm l Stepless regulation of height can

    be performed within the range.

    l The height of the ESD floor

    refers to the distance between the

    concrete floor and the upper

    surface of the ESD floor.

    Height-fixed Customized according to the heightof the ESD floorMainly applicable to the scenariowhere the floor is very high or very

    low, with the minimum floor height

    of 100 mm

    Guide Rail

    The guide rail is used to connect the cabinet and the support. Figure 6-5 shows the guide rail.

    6 Installing the N68E-22 Cabinet on the ESD Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    6-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    61/118

    Figure 6-5 Guide rail

    1 Holes for connecting the cabinet 2 Holes for connecting the support

    Front Pallet

    The front pallet is used to support the floor around the cabinet. Figure 6-6 shows the front pallet.

    Figure 6-6 Front pallet

    1 Holes for connecting the support

    6.4 Positioning the N68E-22 Cabinet on the ESD Floor

    Positioning the N68E-22 cabinet on the ESD floor involves the following steps: determining

    cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

    Prerequisite

    l The components required for the positioning are available. The required component are the

    M12x60 expansion bolt assemblies.

    l The materials required for the positioning are available. The required materials are the

    marking template andEquipment Room Floor Plan.

    l The tools required for the positioning are available. The required tools are the tape measure,

    panel lifter, electric saw, marking pen, percussion drill with 16 drill bit, vacuum cleaner,

    safety goggles, dustproof cover for electronic equipment, and rubber hammer.

    BSC6900

    N68E-22 Cabinet Installation Guide 6 Installing the N68E-22 Cabinet on the ESD Floor

    Issue 01 (2009-04-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    6-7

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    62/118

    Procedure

    Step 1 Ensure that theEquipment Room Floor Plan is in accordance with the requirements for installingthe N68E-22 cabinet by referring to 6.2 Template Files for Installing the N68E-22 Cabinet.

    Step 2 Use a tape measure to determine the cabinet positions based on the dimensions specified in theEquipment Room Floor Plan.

    Step 3 Use the panel lifter to remove the ESD floor in the installation area.

    Step 4 Remove the supporting pieces of the ESD floor.

    Step 5 Clean the installation area.

    Step 6 Choose a method of determining the positions of the holes for the expansion bolt assemblies onthe concrete floor.

    You can use the marking template or tape measure to determine the positions of the holes for

    the expansion bolt assemblies on the concrete floor. The marking template is made of paper and

    is prone to deformation. Before using the marking template, check whether it is deformed basedon the dimensions of marking template specified in 6.2 Template Files for Installing the

    N68E-22 Cabinet.

    If... Then...

    The marking template is one of the accessories delivered on site and is not

    deformed,

    Go to Step 7.

    The marking template is not one of the accessories delivered on site or is

    deformed,

    Go to Step 8.

    Step 7 Use the marking plate to determine the positions of the holes for the expansion bolt assemblies.

    1. As shown in Figure 6-7 orFigure 6-8, use measuring and marking instruments to measure

    and mark the start points for the front of a row of cabinets. From each start point, mark the

    benchmark lines in the cabinet arrangement direction.

    2. Place the marking template on the floor. Ensure that the semicircle notch of the template

    indicates the front of the cabinet and the edges of the template align with the benchmark

    lines.

    3. Mark the positions of the holes (four holes for each cabinet) for expansion bolts on the floor

    by using the template.

    4. After all the hole positions are marked, ensure that the distance between the holes isaccurate.

    5. Go to Step 9.

    Step 8 Use the tape measure to determine the positions of the holes for the expansion bolt assemblies.

    1. As shown in Figure 6-7 orFigure 6-8, use measuring and marking instruments to measure

    and mark two straight lines with 704 mm wide spacing, and ensure that the lines are parallel

    with the front of the cabinet.

    6 Installing the N68E-22 Cabinet on the ESD Floor

    BSC6900

    N68E-22 Cabinet Installation Guide

    6-8 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 01 (2009-04-30)

  • 7/22/2019 BSC6900 N68E-22 Cabinet Installation Guide

    63/118

    Figure 6-7 Installation holes for one cabinet (unit: mm)