BRV Anti condensation recirculaBRV Anti-condensation recircula
Aubigny, 15.10.2012
Lab tests 120531
ating and distribution unit ating and distribution unit
Objective and measuremeObjective and measureme
Objective : simulate the operation of theObjective : simulate the operation of theflow .The anti-condensation thermostati
Measurement : - check flow.- check behaviour and noise of the th
BRV 151012 test order 1205312
ent ent
e system by ensuring the conditions of e system by ensuring the conditions of ic device of the unit is not functional
hermostatic parts.
Bench for the simulationBench for the simulation
Objective : simulate the operation of the system by e
The bench is operate by the computer through electronic valves
Static pressure sensor
Outlet Inlet
BRV 151012 test order 1205313
Outlet
ensuring the conditions of flow
Measurements : Flow – consumption -
efficiency efficiency
Data acquisition
Operating principleOperating principle
For failing to put the system in heating, we have tFor failing to put the system in heating, we have tthermostatic device : A & BWe have to change device to ensure the different
B
AB
BRV 151012 test order 1205314
two prototypes sample of anti-condensation two prototypes sample of anti condensation
mode of operation
AAB
Hydraulic test : B AB
Head
Hydraulic test : B AB
7
8
Y
6
Y
Y
Y
4
5
mC
E)
3
H (m
1
2
00 500 1000 1500 200
Q (L/h)Q (L/h)
BRV 151012 test order 1205315
RS 15/7-3p Max speed
RS 15/7-3p Medium speed
RS15/7-3p Min speed
YONOS PARA */7 RKC W Max speedYONOS PARA */7 RKC W Max speed
YONOS PARA */7 RKC W Medium speed
YONOS PARA */7 RKC W Min speed
BB
00 2500 3000AB
Hydraulic test : A ABHydraulic test : A AB
Head
8
9YONOS YONOS YONOS
7
YONOS RS15/7RS15/7RS15/7
5
6
H (m
CE)
3
4
2
0
1
0 500 1000 1500 2000Q (L/h)
BRV 151012 test order 1205316
Q (L/h)
PARA */7 RKC W Max speedPARA */7 RKC W Medium speedPARA */7 RKC W Min speedPARA /7 RKC W Min speed
-3p Max speed-3p Medium speed-3p Min speed
AAB0 2500 3000
Consumption and EfficienConsumption and EfficienPower
B
100
120
140
W)
40
60
80
P1 (W
AB 0
20
0 500 1000 1500 2000 2500
Q (L/h)
120
140Power
60
80
100
P1 (W
)
0
20
40
Q (L/h)AAB
BRV 151012 test order 1205317
0 500 1000 1500 2000 2500
cycy
40%Efficiency
25%
30%
35%
40%
%)
10%
15%
20%
25%
effic
ienc
y(%
0%
5%
10%
0 500 1000 1500 2000 2500 3000
Q (L/h)0 3000
30%
35%
40%Efficiency
15%
20%
25%
30%
ffici
ency
(%)
0%
5%
10%
0 500 1000 1500 2000 2500 3000
efQ (L/h)
30000 500 1000 1500 2000 2500 3000
Unit behaviour and ConcluUnit behaviour and Conclu
BB
AB
During the 2 modes of operation tested, wspecific noise .
The operation of the kit was check and thPARA */7 RKC W is validatedPARA */7 RKC W is validated.
BRV 151012 test order 1205318
usionusion
AAB
we had no malfunctions and no
he use of RS15/7-3 and Yonos