TechinfloorInnovative technologies for flooring
TENSIOPAV
Joint-lessNo CracksNo wavingEngineeredControlled
Guaranteed
Post-TensionedIndustrial Floors
With a posthumous10 Years Insurance
Policy coveringreplacement o the job
8/8/2019 Brochure Tech in Floor Ingles
2/16
ost-tension, applied to industrial oors represents a revolutionin the Market, a new concept o quality and proessional
approach.
Techinfoor is the exclusive Distributor in Europe o the Post-tension System, called TENSIOPAV, developed within anInternational partnership with ORI Martin Group, with SLM- Siderurgica Latina Martin -, manuacturing Company o steel
unbounded strands and cables, and with TT M, a leader Firm inplanning and application o the Post-tension System on majorbuilding jobs such as bridges, aqueducts, Interports, etc.
TT M provides complete consultancy support, rom theplanning phase to supply o the Post-tension Hard ware(accessories, electronics, stressing jacks), to the fnal
tensioning phases. Such innovative Technology consists on
replacing the traditional armor (electro-sealed nest, metallicfbers, synthetic fbers, glass fbers, etc.) with unbounded,
greased and sheathed, drowned in the concrete steel strands,
then Post-tensioned with hydraulic stressing jacks.TENSIOPAV System is guaranteed: rom the initial engineeredplanning which inuences the eects o all operation, to the
typical techniques o the oundation, up to resistance against
the loads, both static and dynamic; everything is engineered
and designed, rom the thickness o the plate, to the strand
disposition and the additional armor, as well as the specifc
characteristics o the concrete.
The concrete mix design, the pre-qualifed recipe veriyingthe characteristics o the mix in the concrete trucks, and the
constant control techniques applied directly on the job site, will
create a mapping o the constructive whole process.
A oor fnalized with the TENSIOPAV System will thereoreresult scientifcally projected, punctually checked and guar-anteed with a 10 Years Posthumous Policy Insurancecovering replacement o partial or total work.
P
Post-tension: from major buildings
The advantages
No more Joints
No more cracks
No more waving eects
No more gradient dierences among the edges o the plates
Thickness reduction o the plate
Flatness and improved link among the plates
Maintenance costs dramatically reduced
Better comort o use
Better image and aesthetical eect
Control o the whole building process (rom the steel strand
production to the nal foor nalization)
Posthumous 10 Years Insurance Policy
tension technologys.r.l.TTMPost tension anchor system
8/8/2019 Brochure Tech in Floor Ingles
3/16
o concrete industrial surfaces
TENSIOPAV is the solution to the traditional problems o each
industrial oor: it is now possible to create oors without joints,
without cracks, without waving, wide monolithic suraces, with
reduced thickness, which provide high atness and drastic reduction
o maintenance costs.
TENSIOPAV proves to be perect or all implants which are build
to have high shelves, highly concentrated and dynamic loads,
systematic circulation o vehicles with low wheels, oors with resin
coverings, and in general or all the highly unctional and industrial
suraces.
> Post-tensioning applied to radiant suraces
TENSIOPAV System is the perect solution where a heated oor
is planned: the post-compression o the concrete, in act, creates
a resistance to revealed cracks created by the continuous cycle o
cooling and heating o the radiant foor.
The linear expansions inducted by the thermal variations are
limited, so a perect efciency o the whole structure in terms o
global resistance and perormance is actually provided.
TENSIOPAV can provide absolute application exibility versus anytraditional system: irregular geometric shapes (triangles, trapezes,
narrow rectangles, etc.) and/or outdoor oors with complex con-
structive parameters can be built at ease.
8/8/2019 Brochure Tech in Floor Ingles
4/16
Techinoor
The revolutionary TENSIOPAV System conjugates thereore
Special steel Technology with a total process control, when it
comes to realization o concrete oors.
To assure the overall coverage, a constant assistance, and a
State-o-the-Art execution o any job, Techinfoor has selected
some o the most important Companies o the industrial
oorings on the European market, gathering all o them in
the TENSIOPAV Group: every member Company is active
since many years, with high skills and proessionalism, in the
industrial oorings Market, and represents a valid partner
within the Group and a reerence point or Engineers and Buyers
o their related area.
Techinfoor provides, ater a ollowing audit rom one o the
most important Insurance Groups, a 10 Years Posthumous
Insurance Policy covering partial or total replacement
o the Post-Tensioned job; this being a ormal result o the
punctual control o the whole productive process, that assures
the Customer or an exceptional State-o-the-Art realization.
In order to know details
o each dierent associated Company
member o Tensiopav Group,
please consult the sitewww.tensiopav.it
Engineered planning, punctual control, no crack, no control and expansion
joint, dramatic maintenance costs reduction, reduced thickness, resistance and
durability are the major highlights o this new technology, that represents the topo what the market o the Industrial foorings oers on a World Wide Base today.
TENSIOPAV Group is distinguished or:
quli tchnicl support crti n Tst ovrll Qulity
spcic n rlibl Know-how
consolit businss rrncs
constnt ssistnc to th Customr
srious n prossionl pproch
pculir comptncs
8/8/2019 Brochure Tech in Floor Ingles
5/16
The building process
Engineered PlanningThe concrete Post-Tensioned plate is dimensioned with anaccurate engineered planning o each single detail, beginning rom
the position o the steel strands, the evaluation o the distancebetween nest strands, the position o a low armor at the bottom
o the punctual and distributed loads, up to the organization and
the sequence o the concrete placements with respect to the
specifc requirements.
Verifcation and preparation o the oundationThe careul and accurate preparation o the oundation is a un-
damental must, when the use o the Post-tension System isplanned: it is mandatory to veriy the carrying ability, the planarity,
the degree o compact resistance and homogeneity o the ounda-
tion; a double layer o polyethylene is put on ground in order tocreate a layer that isolates the concrete plate rom the ground,
and to reduce attrition during Post-Tensioning operations.
Custom cut and position o the steel strandsPredisposition o the closing procedure with the easy-system,position o the slow armors around the pillarsand to the fxed
points o the structure, carrying out strand distribution, cut o the
strands and their position according to the original planning.
Throw and punctual control o the building process
During the distribution on ground, the strand nest is set on distancechairs to the appropriate level comparing to the thickness o
the plate. During the concrete placement, an integrated control
o the concrete and its technical characteristics is set in place
by collecting the samples on which a certifed Laboratory will do
the proper tests, and rom which it will extrapolate the minimum
tensioning values.
In order to enable the correct access o the stressing jacks or the
ollowing tensioning phases, a ree band is set up two sides o
the perimeter o the structure; this perimeter will be armed and
subsequently covered with concrete.
Partial and fnal TensioningThe frst stressing, or partial tension, will be applied usually ater
24 hours with a special hydraulic stressing jack, in order to oppose
the plastic micro-cracks o the concrete.
As soon as the ft resistance o concrete will be reached (usually
ater 72 hours), concrete will be fnally post-tensioned, so that this
will coner the plate the carrying ability required by the project,
and the construction joints will be compressing one against the
other the linked lots.
Superfcial fnish and closing o the perimeter bandAs soon as Post-tension System is applied, the ree perimeterband will be covered with concrete, and chemical surace
hardening fnishes will be applied.P
unctualcon
trolofthew
holeproduc
tiveprocess
8/8/2019 Brochure Tech in Floor Ingles
6/16
Engineered Planning
> Floor Engineering
The planning o the steel strand nest, with the evaluation
o the relative distance, is a mandatory step into the
realization o the work. It assures the correct evaluation
o all the constructive parameters and it guarantees that
the work is fnalized according to the engineering criteria
related to the Post-tension Technology.TT M always will guarantee an immediate answer tothe application requirements o the Customer, assuring
a exible and reliable approach during calculation, sizing
and planning o the TENSIOPAV system.
Last generation sotware application, allows to develop
the calculations in perect relationship to the loads that
the oor will have to bear, based on the use destination
o the property, and to where the structural loads may be
distributed in particular points o the structure.
The project comprehends constructive details, passive
armors location and slow armors placement along andaround the pillars.
The State-o-the-Art engineering o industrial foorings
8/8/2019 Brochure Tech in Floor Ingles
7/16
Preparation o the oundation
> Verifcations o the oundation material char-
acteristics and o ground conditions, through
plate tests
The Load Test on static plate with consequent calculation
o the Deormation Degree, is necessary to veriy that the
oundation will support perormance requirements imposed by
the specifcation o the engineered plan.
The resistance control Test on the job site, in correspondence
o the oundation, is in act o undamental importance in order
to be able to guarantee the minimum requirements o ground
mechanical resistance and stability against the loads that will
cover it. To veriy then the homogeneity degree o the ground
oundation, the device LIGHT FALLING will be used, and then
the WEIGHT DEFLECTOMETER as below specifed.
The 300 mms diameter and 20 mms thick galvanized steel plate,
can be considered sti as per the calculation targets o the plan
submitted to the test: the load assumes orm o a damped hit,
and the test is said to be dynamic.
The test LFWD is a unctional beta methodology: efcient, rapid
and representative.
It will be necessary to compare results o the deormation orm
versus the dynamic Evd values, and with the middle values Md
o the test o load statics.
> Barrier to Moist and double slide layer
The sheet o polyethylene, in double layer, is put above the
compacted oundation material, and it develops the double
unction o barrier to the moist, and o layer o slide that
allows the Post-Tensioned plate to stir without rigid ties in
the tensioning phase or during longitudinal movements.
In act, as quoted by the norm UNI 11146, the sheet o
polyethylene in double layer introduces the lowest attrition
coefcient among the plate and the oundation and it resultsideal or the post-tensioned applications.
reparation o the oundation represents the frst operational and undamental step into the construction
o a Post-Tensionedsurace using theTENSIOPAVSystem.The interventions particularly to be taken care o, are the ones related to the ollowings essential
requirements:Compact pressure in order to avoid yeldings when the oor is in exercise phase;
Leveling, in order to allow the ree slide o the plate.
It results thereore undamental, to perorm technical surveys ocusing on the Deormation Degree o
the oundation, applying tests on the plate, both static and dynamic.P
8/8/2019 Brochure Tech in Floor Ingles
8/16
Easy-system Closing Procedure
> Assemblage o the perimetral closing bends
The easy-system is projected or this particular job, and is
constituted o two symmetrical metal stirrup and by one closing
wooden band.
The upper stirrup closes on the wooden band and fxes the
closing in a rigid way so that it is possible to regulate the plate
thickness determined by the project requirements.
On the wooden band are subsequently fxed the active heads, or
the heads rom which the entrance stressing jacks are set up or
the ollowing phases o partial and total tensioning.
he closing procedure o the assembly plates
has been optimized with the defnition o
the Easy-system Closing Procedure, that
guarantees rapidity and precision while in thephase o concrete placement preparation: the
ollowing phases result rapid and secure and
the construction joints are properly sealed
and proteceted.T
8/8/2019 Brochure Tech in Floor Ingles
9/16
Strands
> Cut o the strands
The strand goes out rom the wheel along a metallic line, and once
fxed the desired length, the strand is cut to measure coherent
with the project.
The repeated operation creates the set o strand necessary to the
job in an easy, sae and ast way.
> Carrying out on the job site the strand
placement
The carrying out o the steel strands takes place on the job
site thanks to a system patented by TTM, our Partner inPost-tensioning: the spool is loaded on a base with
a particular cone connected to a pushing system controlled
by an hydraulic device. The particular mechanism allows
to develop the spool in simple way and in ull saety,
paying particular attention to the ree end o the spool,
that can result dangerous even i engaged into the conic
base.
The spool is pushed out beginning rom the cone, which
controls the carrying out process and allows the correct
placement o the long strands all over the oor.
8/8/2019 Brochure Tech in Floor Ingles
10/16
Strand nest Placement and Heads fxing
> Installation o the wedges in the headings and bindingo the intersections o the strand nest
The heads anchorage is done fxing the wedges in the heads at the end o
the strand, through the ollowing operations:
cut o PVC cover, approximately or 5 cms, rom the end o the strand;
positioning o the heads on the strand and insertion o the wedge in
order to assure its fxing; this operation is necessary in order to fx, in
a total sae environment, the passive head which, drowned into the
concrete, will be highly solicited during the Post-tension action.
The consequent consists o putting to strands on a network design,
distancing them correctly in both directions, and sealing each single
intersection in a way that can guarantee the correct positioning ater the
concrete trucks have delivered the cements.
8/8/2019 Brochure Tech in Floor Ingles
11/16
Additional passive armors
> Installation o passive additional non pre-tensioned
armors
In order to better distribute loads along the perimeter dedicated to the
heads, additional metal bars are put along the closing ends, so active
heads will not mode while concrete will be stressed.
To absorb tensions in elevation and close to the pillars, additional armors
are positioned as per engineered planning.
The vertical structures englobed in the concrete placement throws
(pillars, grits, walls,etc) will become isolated with compressed but thick
materialproven to to guarantee the slide o the plates while in post-
tensioning phase.
8/8/2019 Brochure Tech in Floor Ingles
12/16
Laser Screed-based concrete Placement
> Concrete Placement on the job site
The Concrete Placement is usually done with Laser Screed
technology, the laser controlled Machine with vibrating control
that guarantees highly compact pressure o the concrete, together
with a atness degree: the vibro-placement o the upper part o
the concrete allows air molecules to evaporate, so the oor will
be ree o micro-cracks and nests.
Besides that, the Laser-Screed sensitively reduces execution
times, allows to compact suraces much better than with the
traditional manual placement.
Contextually to the concrete placement, the needle vibratingoperations take place, while the distance chairs are set up on the
crossing, ollowing project specifcations.
8/8/2019 Brochure Tech in Floor Ingles
13/16
Punctual control o the concrete
> Punctual control o the concrete
The technological building process o the TENSIOPAV System includesalso a pre-qualifcation o the concrete implant, in order to make sure
that the optimal prescriptions o the mix-design and the punctual control
o the mixture o urnished concrete are guaranteed: on the job site
specifc tests are perormed according to normative, and according to
the Pavical requirements to comply to the project applications in terms
o resistance and composition that the concrete must guarantee or a
proper application o the Post-tension System.The samples collected in square dice are submitted to crushing in
certifed laboratories so that the resistance matured rom the concreteater 24 and 72 hours are defned and inspected and thereore, once
extrapolated, the relative pressure levels will be applied rom the
stressing jacks during post-tensioning operations, both partial and fnal.
8/8/2019 Brochure Tech in Floor Ingles
14/16
Partial and fnal Tensioning operations
The wooden band is removed the ollowing day ater the
concrete placement, only i concrete has reached the correct
strength in order not to be damaged.Cleaning o the anchorage hollow takes place, then it is
important that the stressing jack does not have any obstacle,
and that the wedges are perectly installed in the headings.
Integrity o the concrete is checked, both along vertical and
the longitudinal parts o the surace, and that there are not
cracks, or nest eects, or micro-caves.
A deep check is dedicated that strands are perpendicular to
the anchorages and that the anchorages parallel to the ace o
concrete, then the stressing jack is set or operation.
The stressing jack has a designed device that exactly covers
the taking o the strand in the exact end point o the concreteplacement.
Introducing a small pressure on the jack, it is able to com-
pensate, partially or totally, the traction stress nduced by the
spontaneous withdrawal o the concrete.
Strand Extension
Piston excursion
Fixing wedges are perectly positioned to avoid their separation
during the positioning o the stressing jack.A specialized operator o TTM is there to properly apply the
Post-tensionprocedures, coherent with the recommendations
on saety operations defned by the same TTM.
Ater the Tensioning operations, actual extensions o the
strands are noticed, comparing them with the theorical onesexpected by the project requirements, and veriying the
perect equipment efciency.
> First partial tensioning
> Final Tensioning
8/8/2019 Brochure Tech in Floor Ingles
15/16
Post-tensioned Floor
> The Concrete Industrial Flooring revolution
Having a monolithic continuous Post-Tensioned surace is o
paramount importance or a Logistics and Great Distribution
Company, with electronic management systems o automated
carts, which wont suer anymore the problems caused by
waving oor plates or by broken joints.
TENSIOPAV System is the absolutely best solution or Firms
that need extremely high cleaning standard, because by
eliminating the joints, the primary cause o dust and degrade
o any kind is simply eliminated.
TENSIOPAV System satisfes, thereore, the most demandingrequirements, proving to be the ideal investment or sensitive
Buyers who ocus on high qualitative standard.
TENSIOPAV System oers ideal support or potential super-
fcial treatments, chemical hardeners, polishings, resin fnish-
es based on the specifc techniques might come out rom the
Customers requirements.
TENSIOPAV: the beginning o a new Era.
8/8/2019 Brochure Tech in Floor Ingles
16/16
TechinfloorInnovative technologies for flooring
Head OFFICe
Str Polo VI nr. 15
91022 Cstlvtrno (TP)
CONTaCTS
Trapani
Tl xx39 - 0924 92 20 66
Fx xx39 - 0924 92 25 52
Bergamo
Tl xx39 - 035 44 90 412
Milano
Tl xx39 - 02 97 48 02 17
www.tchinfoor.com
tension technologys.r.l.TTMPost tension anchor system
exclusiv distributors or foor Systms
Th nw erao Industrial foorings
The ideal solution or
Logistics n Grt distribution Compnis
Highly moving Hr wr Cntrs
automt Whrhouss
dposits
Inustril Sits o ny kin
Mlls
Multi foor prking lots
elctronics Cntrs
Foo Cntrs
Frozn Foo Cntrs
Phrmcuticl n Micl Cntrs airport Runwys n Txiwys
airport Trminl
Ht Floors
Mmbrs o