AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
BRIEF INTRODUCTION OF COMPANY
With the increasing number of oil, gas & petrochemical plants in Malaysia,
AQEEL ENGINEERING & CONSTRUCTION SDN BHD (AQEEL)
take the opportunity to become one of the key players in providing its quality
maintenance and construction services.
Incorporated in 1995, AQEEL, has proven its capabilities in supporting
the construction of new plant facilities in Kerteh, Terengganu. Since then, the
company has been active in developing young and dynamic Terengganu
Bumiputra expertise through its various ranges of business activities.
To date, its main activities can be categorized into piping fabrication,
equipment installation, mechanical maintenance and minor civil construction.
AQEEL has expand its services into EPC businesses. Required changes will be
done in ensuring continuous quality services offered to the respectable clients
such as PETRONAS, TNB and others.
A careful expansion plan together with continuous improvement concept
adopted, AQEEL is confident of its future capacity in supporting the oil, gas
and petrochemical industry in Malaysia.
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
COMPANY PARTICULAR
Name of Company : Aqeel Engineering & Construction Sdn Bhd
Business / Registered : K-4528, 1st Floor, Jalan Jakar,Address : 24000 Kemaman, Terengganu Darul Iman.
Tel.: 09 - 859 3922Fax: 09 - 859 3923
Melaka Office : Lot No. ST 526, Jalan Tunas Baru, Seksyen ¼,78300, Melaka.Tel.: 06 - 384 6110Fax: 06 - 384 6110
E-mail Address : [email protected], [email protected]
Date of Incorporation : 8th October 1995
Business Registration No. : 362686-T
Status : 100 % Bumiputra
Board of Director : Nizan Binti AhmadArniza Binti Ahmad
Managing Director : Ismail Nasruddin Bin Hj Zubir
Authorized Capital : RM 1,000,000.00
Paid-up Capital : RM 800,000.00
Bankers : CIMB, Kerteh Branch CIMB, Kemaman Branch . RHB Bank Berhad, Kemaman Branch.
Banking Facility : Bank Pembangunan & Infrastruktur Malaysia Berhad RM 1,800,000.00 Credit Guarantee Corporation (M) Berhad RM 500,000.00 Bumiputra Commerce Bank Berhad RM 900,000.00
Company Secretary : MOF Management Sdn Bhd (287670 W)No. 666 A, Jalan Air Putih24000 Kemaman, Terengganu Darul Iman.
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
MISSION & CORPORATE PHILOSOPHY
To continuously improve to be a top qualitymaintenance, fabrication and constructioncontractor
To adequately train our workforce in ensuringquality services to all our clients
To establish a long term relationship that benefitsboth AQEEL and our clients
To form proper platform for the advancement ofcompetent Bumiputra companies especially inTerengganu
MOTTO
“YOUR RELIABLE PARTNER”.
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
QUALITY POLICY STATEMENT
AQEEL Engineering and Construction Sdn Bhd recognize the
essentiality of meeting client’s satisfaction, code and standard to an
agreed assured level of quality.
The quality of products and services are the responsibility of all
employees.
We are all committed to fully understand and adhere to the quality
procedures developed.
Audit and review shall be done in ensuring continuous
improvement of such procedures.
Operation Manager shall be responsible for the preparation and
implementation of the Quality Control System.
We are all committed to follow any additional requirements of such
procedures in achieving the agreed quality.
………………………………………. Date established: 16 June 2003
Managing Director First revision: 1 January 2007
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
OH&S POLICY
AQEEL Engineering and Construction Sdn Bhd recognizes the
requirements of the Occupational Safety and Health Act 1994
and Factories and Machinery Act 1967 and any relevant
Statutory Provisions.
We are all committed to fully understand and adhere to
the OH&S procedures developed.
Audit and review shall be done in ensuring continuous
improvement of such procedures.
Operation Manager shall be responsible for the
preparation and implementation of the HSE System.
We are all committed to follow any additional
requirements and any improvement of such OH&S
procedures in reducing the hazards at work.
............................................... Date established: 16 June 2003
Managing Director First revision: 1 January 2007
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
SCOPE OF SERVICES
AQEEL has started its business activities by getting contract from reputable companies such asSukwon Idche (M) Sdn Bhd, Samsung Engineering Co. Ltd, Daelim (M) Sdn Bhd and few otherlocal companies.
With the “win-win” concept applied, AQEEL experienced management and execution team hasproven its quality services and gained clients’ trust in the following areas:
a) Steel Structure Works
Project Involved1. Replacement / repair work on platform at Export Terminal (PGB)2. Installation New Platform of EMSB.3. Installation of Platform & Stepladders for various places at GPP B4. To fabricate and install access walkway and platforms at CUF,
Gebeng.5. To fabricate and install two units of STL/STR 23m height each
17MT with foundation
b) Piping Works
Project Involved1. Fabrication at 16” Spool for T2-151 at GPP22. To Replace 16” pipe of FW-16 #-1000 B11013. 80,000 dia inch field piping installation at GPP
5 & 6 project4. To fabricate, install and commission piping for Lawit,
Jerneh Line and Resak Line mixing station GPP 45. Underground piping works for Malaysia Olefin project
c) Storage Tank Works
Project Involved1. D-903 Floating Root Restoration Work for PP(T)SB.2. Repair Water Fire Tank Q-701 GPP A.3. Fabricate and install Ethylene tank4. Floating tank repair work for KR-2, T-292095. Fabricate and install storage tank for Shell, Gebeng.
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
d) EPCC and Modification Works
Project Involved1. EPCC for KR-2 plant modification works2. PCC of GPP4 Ethane Extraction Improvement Project3. GPP 5 & 6 AMIN flush drum pipeline modification works4. Procurement, Construction and Commissioning (PCC) of AGRU
Backflow Protection Project for GPP 3 & 45. Procurement, Construction and Commissioning (PCC) of Block
Valve for Dehydrator Project at GPP B.
e) Civil Construction Works
Project Involved1. Rectification Work underground Amine Drain, Firewater and
waste water line at GPP B2. Provision to excavate & Reinstate Underground Fire Water Line
& other Buried Pipeline at GPP B3. Extension covered loading bay to PEMSB4. Civil work for underground piping for mixing station GPP45. Interior work for Samsung site office at M.O.P site
f) Blasting & Painting Works
Project Involved1. Hydro Blasting, Painting & repair Corroded Staircase at KMC2. Completed Painting for Fire Water work (Q801)3. Blast and paint bottom plate of storage tank at KR-2, T-292094. Fire Water tank at Export Terminal, Petronas Gas Bhd5. Blast and paint structures and piping at workshop
g) Manpower Supply
Project Involved1. Manpower for Blinding and Deblinding works at V6-0202
(LP Flash Drum) GPP62. Supply General Worker to work in Confined Space at
CUF Gebeng3. Manpower to Replacement at Heat Exchanger at Export Terminal.4. Manpower to execute piping installation and hydrotest at
GPP 5 & 6 project5. Manpower for commissioning and maintenance at
GPP 5 & 6 Project
AQEEL ENGINEERING & CONSTRUCTION SDN. BHD._____________________________________________________________________
h) Cooling Tower Works
Project Involved1. To perform and complete Refurbishment of Marley Cooling
Tower at GPP 2.2. To perform and complete Refurbishment of Marley Cooling
Tower at Export Terminal and GPP 3/4
The new management team has joined AQEEL and thus expands its scope of servicesas per followings:
6. Plant Turnaround Works
Team Experience
1. Plan and execute turnaround for oil, gas and petrochemical plantsfor more than ten (10) years. Projects include TA at ExportTerminal, DPCU-3, MTBE etc.
2. Services cover all plant equipments such as columns, vessels,drums, exchangers etc. for DOSH inspection.
7. Loading Arm Maintenance
Team Experience
1. The same team has more than ten (10) years experience inMaintaining loading arm especially at Export Terminal.
2. Services cover all aspect of required maintenance for loading armssuch as hydraulic cylinder and swivel joints overhaul and majoroverhaul.