1
B ARUP Olympic Park Infrastructure London 2012 1:5000 SBH-OAP-ZZ-ZZZ-DR-C-1-E5-0011 A .. This drawing supersedes drawing no. PK 09 06 08 2DD-OAP-CB-ZZZ-ZZZ-XXX-X-0001 Issued For Information P Kirk 18.08.08 Bridge Nomenclature ODA/SCD S2 MK U04 now T15 - E15/E16/U08 added \ g l ob a l\l ondon \ OL Y\ 4_ I n t e r n a l _ Pr o j ec t _ Da t a \ 4 - 03_ CAD\ 4 - 03 - 01_ Dr a wi ng_ F il e s \ C_ Ci v il\ CB_ Br i dg e s \ Ge n e r a l\ SBH- OAP- ZZ - ZZZ - DR- C- 1 - E5 - 0011 . dgn .. B 18 08 08 PK BD Issued For Information E36 added, F05 removed. E34, F14, B Dasgupta U03 & U07 modified. Rivers modified. M Kirk FROMRI CHMOND TOSTRATFORD TOCHANNELSEA B2 0 B18 B16 B2 2 B 24 B 26 B28 A27 A 25 A2 3 A21 A19 A17 A15 A13 A11 A09 A07 A05 A03 B14 B12 B10 B08 B04 B02 C01 C03 C05 C07 C09 C11 C13 C15 C17 C19 C21 C23 C 25 C27 D28 D26 A 01 D02 D04 D06 D08 D10 D2 4 D22 D20 D18 D16 D14 D12 B06 C H A N N E L S E A R I V E R P R E S C O T T C H A N N E L T H R E E M I L L S R I V E R R I V E R L E A This map is based upon Ordnance Survey Material with the permission of Ordnance Survey on behalf of the controller of Her Majesty’s Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. All rights reserved. Licence No. ODA 100046062 N Leyton Maryland Stratford Regional Stratford High Street Abbey Road West Ham Pudding Mill Lane Hackney Wick Stratford International CHANNEL SEA RI VER RI VER LEA H10 17 8 9C 9B 9A 12 1 2 20 3 L01 U05 H01 F02 F03 F13 T08 H14 T09 H16 T10 H17 F17 F07 F08 F09 F11 H04 H05 F14 U02 H06 H07 U03 T12 F10B F10A F06 H08 L03B L03A 13 14 E28 T13 U01 E31 E06 E13 4 CI T Y M I LL RI VER W A T E R W ORK S RI V E R R I V E R LE A BOW BACK RI VER W ATERW ORKS RI VER RI VER LEA LEA NAVI GAT I ON HACKNEY CUT RI VER LEA NAVI GAT I ON HACKNEY CUT RI VER L EA RI VER LEA A 12 GRE A T E A S TE RN RA I L W AY G R EE N W AY E09 E27 E30 E44 E43 E39 E37 E45 E54 E55 E49 E59 E60 E61 E52 E62 E63 E42 E38 E33 E22 E23 E21 E20 E25 E24 E10 E11 E12 E14 E29 E26 E51 E46 E47 E35 E34 E19 E17 E41 H23 T02 T03 T04 T05 T07 U06 U07 E48 ACCREDITATION CHECKING G R EE N WAY ACCREDITATION CHECKING ACCREDITATION CHECKING ACCREDITATION CHECKING ACCREDITATION CHECKING L OO PR OAD WARM-UP AREA BOW SUBSTATION ATHLETE LINK MAIN OLYMPIC STADIUM AQUATICS CENTRE SPONSORS HOSPITALITY OLYMPIC FAMILY TRANSPORT MALL HANDBALL ARENA SATELLITE COMPOUND MAIN PRESS CENTRE INTERNATIONAL BROADCAST CENTRE ACCREDITATION CHECKING HOCKEY BASKETBALL ARENA OLYMPIC VILLAGE VELODROME BMX L OO PR OA D OLYMPIC TRAINING AREA WIND TURBINE ACCREDITATION CHECKING ACCREDITATION CHECKING NORTHERN SPECTATOR TRANSPORT MALL SOUTHERN SPECTATOR TRANSPORT MALL WATERPOLO CCHP STRATFORD CITY MIXED-USE TOWN CENTRE HACKNEY MARSHES STRATFORD TOWN CENTRE PERMANENT STRUCTURES TEMPORARY OLYMPIC STRUCTURES EXISTING STRUCTURES TEMPORARY CONSTRUCTION STRUCTURES STRUCTURES BY OTHERS (SCD) RAIL NETWORK GREENWAY RIVER WEST HAM RAMP E50 T15 U08 E15 E16 E56 E57 E58 E64 E65 E66 E36 T HREE M I LL S RI VER PRESCOTT CHANNEL CAD F I LE REF : - Rev Description Drawn Chk’d Date NOTES DO NOT SCALE THIS DRAWING. ' Olympic Delivery Authority ("ODA"), 2006. All rights reserved. Except as permitted by the Copyright, Designs and Patents Act 1998, no part of this document may be reproduced, stored, transmitted or distributed in any form or by any means, whether electronic, mechanical, by photocopy, recording or otherwise, without the prior written permission of a director.Except where otherwise expressly agreed in writing, the ODA shall have no responsibility or liability for any loss (direct, consequential or otherwise) which may arise from reliance on or use of this document or the information contained in it. Client Organisation OLYMPIC DELIVERY AUTHORITY 23rd Floor, 1 Churchill Place, Canary Wharf, E14 5LN Drawing No. Rev. Checked Drawn Date Approved Status Scale (A1) Drawing Title Project Title

Bridge Nomenclature Drawing

  • Upload
    i3works

  • View
    76

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Bridge Nomenclature Drawing

B

ARUP

Olympic Park Infrastructure

London 20121:5000

SBH-OAP-ZZ-ZZZ-DR-C-1-E5-0011

A . .This drawing supersedes drawing no.PK 090608

2DD-OAP-CB-ZZZ-ZZZ-XXX-X-0001

Issued For Information

P Kirk

18.08.08

Bridge Nomenclature

ODA/SCD

S2MK

U04 now T15 - E15/E16/U08 added

\glo

bal\lo

ndon\O

LY\4

_Intern

al_

Project_

Data\4-0

3_

CA

D\4-0

3-0

1_

Dra

win

g_Files\C

_Civil\C

B_

Bridges\G

eneral\S

BH-O

AP-Z

Z-Z

ZZ-D

R-C-1-E

5-0

011.d

gn

. .B 180808PK BD

Issued For Information

E36 added, F05 removed. E34, F14,B DasguptaU03 & U07 modified. Rivers modified.

M Kirk

600.000

700.000

600.000

R = -500.0

00

R = -500.000

L = 7

2.3

20

L = 129.675

Lt = 25.000

Lt = 25.000

L = 97.600

L = 3

0.0

00

L = 42.634

L = 3

0.4

67

2

4

IN

5

5

12

OUT

3

12

11

4

5

2

22

8

4

14

5

5

1

3.5

2

1.5

3

1

33

3

716

11

14

3

5

9

14

2

1

FROM RICHMOND

Down (40mph)

Up (40mph)

Down (15mph)

Up (15mph)

TO STRATFORD

TO CHANNELSEA

B26

B25

B24

B23

B22

B21

B20

B19

B18

B17

B16

B15

B14

B13

B12

B11

B10

B09

B08

B07

B06

B05

B04

B03

B02

B01

C01

C02

C03

C04

C05

C06

C07

C08

C09

C10

C11

C12

C13

C14

C15

C16

C17

C18

C19

C20

C21

C22

C23

C24

C25

C26C27

C28D28D27

D26

D25

D24

D23

D22

D21

D20

D19

D18

D17

D16

D15

D14

D13

D12

D11

D10

D09

D08

D07

D06

D05

D04

D03

D02

D01

A01

A02

A03

A04

A05

A06

A07

A08

A09

A10

A11

A12

A13

A14

A15

A16

A17

A18

A19

A20

A21

A22

A23

A24

A25

A26A27

A28 B28B27

12345678910

1

2

3

4

5

6

78

9

10

10

10

7

7

11

11

12

12

88 9 9

B20

B18

B16

B22

B24

B26B28A27

A25

A23

A21

A19

A17

A15

A13

A11

A09

A07

A05

A03

B14

B12

B10

B08

B04

B02

C01

C03

C05

C07

C09

C11

C13

C15

C17

C19

C21

C23

C25

C27D28D26

A01

D02

D04

D06

D08

D10

D24

D22

D20

D18

D16

D14

D12

B06

D-Z

ONE 1

D-Z

ONE 2

1 0 0 m

1 1 0 m

8 7 6 5 4 3 2 1

CH

AN

NE

LS

EA

RI

V

ER

PR

ES

CO

TT

CH

AN

NE

L

TH

RE

EM

IL

LS

RI

VE

R

RI

VE

R

LE

A

CV

1:9.25

1:9.25

BS

BB

BB

B

Up (15mph)

This map is based upon Ordnance Survey Material with the permission of Ordnance Survey on behalf of the

controller of Her Majesty’s Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown

Copyright and may lead to prosecution or civil proceedings. All rights reserved. Licence No. ODA 100046062

N

Leyton

Maryland

Stratford Regional

Stratford High Street

Abbey Road

West Ham

Pudding

Mill Lane

Hackney Wick

Stratford International

CH

AN

NE

LS

EA

RIV

ER

RIV

ER L

EA

H10

17

89C

9B

9A

12

1

2

20

3

L01

U05H01

F02

F03

F13

T08

H14

T09

H16

T10

H17

F17

F07F08

F09

F11

H04

H05

F14

U02

H06

H07

U03

T12

F10B

F10A

F06

H08

L03B

L03A13

14E28

T13

U01

E31

E06

E13

4

CIT

Y M

ILL RIV

ER

WATE

R W

OR

KS

RIV

ER

RIVER

LEA

BO

W B

AC

K

RIV

ER

WATE

RW

OR

KS

RIV

ERRIV

ER L

EA

LE

A N

AVIG

ATIO

N

HA

CK

NE

Y C

UT

RIV

ER L

EA N

AVIG

ATIO

N

HAC

KNE

Y C

UT

RIV

ER L

EA

RIV

ER L

EA

A12

GREAT E

ASTER

N R

AIL

WAY

GREEN

WAY

E09

E27

E30

E44

E43

E39

E37

E45

E54

E55

E49

E59

E60

E61

E52

E62

E63

E42

E38

E33

E22 E23

E21E20E25E24

E10E11

E12

E14

E29

E26

E51

E46E47

E35

E34

E19

E17

E41

H23

T02

T03

T04

T05

T07

U06

U07

E48

ACCREDITATION

CHECKING

GREENWAY

ACCREDITATION

CHECKING

ACCREDITATION

CHECKING

ACCREDITATION

CHECKING

ACCREDITATION

CHECKING

LOOP ROAD

WARM-UP

AREA

BOW

SUBSTATION

ATHLETE

LINK

MAIN OLYMPIC

STADIUM

AQUATICS

CENTRE

SPONSORS

HOSPITALITY

OLYMPIC FAMILY

TRANSPORT MALL

HANDBALL

ARENA

SATELLITE

COMPOUND

MAIN PRESS

CENTRE

INTERNATIONAL

BROADCAST CENTRE

ACCREDITATION

CHECKING

HOCKEY

BASKETBALL

ARENA

OLYMPIC

VILLAGE

VELODROME

BMX

LOOP ROAD

OLYMPIC

TRAINING

AREA

WIND

TURBINE

ACCREDITATION

CHECKING

ACCREDITATION

CHECKING

NORTHERN SPECTATOR

TRANSPORT MALL

SOUTHERN SPECTATOR

TRANSPORT MALL

WATERPOLO

CCHP

STRATFORD CITY

MIXED-USE

TOWN CENTRE

HACKNEY MARSHES

STRATFORD TOWN CENTRE

PERMANENT STRUCTURES

TEMPORARY OLYMPIC STRUCTURES

EXISTING STRUCTURES

TEMPORARY CONSTRUCTION STRUCTURES

STRUCTURES BY OTHERS (SCD) RAIL NETWORK

GREENWAY

RIVER

WEST HAM RAMP

E50

T15

U08

E15

E16

E56

E57

E58E64

E65

E66

E36

TH

RE

E M

ILLS

RIV

ER

PR

ES

CO

TT C

HA

NN

EL

CA

D FIL

E R

EF:-

Rev Description Drawn Chk’d Date

NOTES

DO NOT SCALE THIS DRAWING.

' Olympic Delivery Authority ("ODA"), 2006. All rights reserved. Except as permitted by the Copyright, Designs and Patents Act 1998, no part of this document may be reproduced, stored, transmitted or distributed in any form or

by any means, whether electronic, mechanical, by photocopy, recording or otherwise, without the prior written permission of a director.Except where otherwise expressly agreed in writing, the ODA shall have no responsibility or

liability for any loss (direct, consequential or otherwise) which may arise from reliance on or use of this document or the information contained in it.

Client

Organisation

OLYMPIC

DELIVERY

AUTHORITY23rd Floor, 1 Churchill Place, Canary Wharf, E14 5LN

Drawing No. Rev.

CheckedDrawn

Date

Approved

StatusScale (A1)

Drawing Title

Project Title