68
3 / 20 / 2019 BREAKERS AVENUE : PUBLIC WORKSHOP # 1

BREAKERS AVENUE: PUBLIC WORKSHOP #1

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BREAKERS AVENUE: PUBLIC WORKSHOP #1

3/20/2019

B R E A K E R S AV E N U E : P U B L I C W O R K S H O P # 1

Page 2: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SFRTA COMMUTER BUS COMPREHENSIVE ANALYSIS & OPERATIONS PLAN

Agenda

▪ Intro

▪ Street Design: Basic Principles

▪ Breakers Avenue: Starter Ideas

▪ Next Steps

▪ Open House Walk Through

2

Page 3: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SFRTA COMMUTER BUS COMPREHENSIVE ANALYSIS & OPERATIONS PLAN

Scope of Work

3

To develop an implementable concept design using existing

Breakers District Streetscape vision for transportation and

infrastructure improvements as a base while addressing

stakeholders’ priorities and meeting City’s construction/design

budget constraints.

Project Goal

Page 4: BREAKERS AVENUE: PUBLIC WORKSHOP #1

D O V E R K O H L . C O M

Page 5: BREAKERS AVENUE: PUBLIC WORKSHOP #1

BEFORE-AND-AFTER

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 95

Page 6: BREAKERS AVENUE: PUBLIC WORKSHOP #1

Kenneth GarciaBEFORE-AND-AFTER

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 96

Page 7: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 97

Page 8: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 9: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 10: BREAKERS AVENUE: PUBLIC WORKSHOP #1

E X I S T I N G C O N D I T I O N S – C L E M A T I S S T R E E T , W E S T P A L M B E A C H F L

CREATING BETTER STREETS

© Dover, Kohl & Partners

Page 11: BREAKERS AVENUE: PUBLIC WORKSHOP #1

P R O P O S E D S C E N A R I O – C L E M A T I S S T R E E T , W E S T P A L M B E A C H F L

CREATING BETTER STREETS

© Dover, Kohl & Partners

Page 12: BREAKERS AVENUE: PUBLIC WORKSHOP #1

E X I S T I N G C O N D I T I O N S – C L E M A T I S S T R E E T , W E S T P A L M B E A C H F L

CREATING BETTER STREETS

© Dover, Kohl & Partners

Page 13: BREAKERS AVENUE: PUBLIC WORKSHOP #1

P R O P O S E D S C E N A R I O – C L E M A T I S S T R E E T , W E S T P A L M B E A C H F L

CREATING BETTER STREETS

© Dover, Kohl & Partners

Page 14: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 15: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 16: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 17: BREAKERS AVENUE: PUBLIC WORKSHOP #1

FIVE BASIC CHARACTERISTICS

(YOU CAN DEMAND)

Page 18: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SHAPED

COMFORTABLE

CONNECTED

SAFE

MEMORABLE

Page 19: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 20: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 21: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 22: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SHAPED

COMFORTABLE

CONNECTED

SAFE

MEMORABLE

Page 23: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 24: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SHAPED

COMFORTABLE

CONNECTED

SAFE

MEMORABLE

Page 25: BREAKERS AVENUE: PUBLIC WORKSHOP #1

Make a town, not “pods.” 8 x 8 grid yields 12,870 routes

THE POWER OF CONNECTED STREETS

Page 26: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SHAPED

COMFORTABLE

CONNECTED

SAFE

MEMORABLE

Page 27: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 28: BREAKERS AVENUE: PUBLIC WORKSHOP #1

Rick Hall

0

10

20

30

40

50

60

70

80

90

100

20 mph 30 mph 40 mph

% F

ata

l to

Pe

de

str

ian

s

Speed

Over 50% fatal

5% fatal

Over 80% fatal

20mph

30mph

40mph

THE THING ABOUT SPEED IS… SPEED KILLS

P L A N P U N T A G O R D A | M A R C H 1 1 , 2 0 1 931

Page 29: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SMALL IS BEAUTIFULSLOW IS SAFE

Page 30: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SHAPED

COMFORTABLE

CONNECTED

SAFE

MEMORABLE

Page 31: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 32: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 33: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 34: BREAKERS AVENUE: PUBLIC WORKSHOP #1

HUMAN CREATIVITY, ON DISPLAY

Page 35: BREAKERS AVENUE: PUBLIC WORKSHOP #1

STREET TREES, YES.

Page 36: BREAKERS AVENUE: PUBLIC WORKSHOP #1

Downtown Atlanta

IMAGINE LIFE AFTER THE PARKING BUBBLE BURSTS

Page 37: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 38: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 941

Page 39: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 942

Page 40: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 943

Page 41: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 944

Page 42: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 945

Page 43: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 946

Page 44: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 947

Page 45: BREAKERS AVENUE: PUBLIC WORKSHOP #1

Residential

Boutique Hotel

Hotel

Undeveloped Parcel

Private Parking

Public On-Street Parking

Privately Owned Open Space

Art in Intersection

Cafe Dining & Seating

Service Entrance/Blank Wall

Front Entry

Breakers Avenue: Existing Conditions

Vis

tam

arSt

.

Terr

amar

St.

Vir

amar

St.

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 948

Rio

mar

St.

Win

dam

arSt

.

Au

ram

arSt

.

Bel

mar

St.

Page 46: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 950

Two-Way Street

Center Diagonal Parking Island

No Shade Trees

Curbed

EXISTING STREETNorth

South

5’ 5’15’20’15’

Page 47: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 951

CONCEPT 1ATwo-Way Street

On-Street Parallel Parking

Street Trees

Wider Sidewalks

Curbed Design

Pros:• Accommodates more

parking

• Adds shade trees and room

for bioswales

• Wider sidewalks than

currently available

Cons:• Less space for outdoor

dining, festivals, art, and

public furnishing

• Less flexibility in the future

due to curbs

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

North

South

12’ 12’8’20’8’

Page 48: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 952

CONCEPT 1A Pros:• Accommodates more

parking

• Adds shade trees and room

for bioswales

• Wider sidewalks than

currently available

Cons:• Less space for outdoor

dining, festivals, art, and

public furnishing

• Less flexibility in the future

due to curbs

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

Page 49: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 953

CONCEPT 1ATwo-Way Street

On-Street Parallel Parking

Street Trees

Wider Sidewalks

Curbed Design

Pros:• Accommodates more

parking

• Adds shade trees and room

for bioswales

• Wider sidewalks than

currently available

Cons:• Less space for outdoor

dining, festivals, art, and

public furnishing

• Less flexibility in the future

due to curbs

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

North

South

12’ 12’8’20’8’

Page 50: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 954

CONCEPT 1BTwo-Way Street

On-Street Parallel Parking

Street Trees

Wider Sidewalks

Curbless Design

Pros:• Accommodates some

parking

• Adds shade trees and room

for bioswales

• Wide sidewalks with

separated spaces for

dining/seating and walking

• More flexibility due to

curbless design

Cons:• Less parking

accommodated compared

to Option 1A

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

North

South

12’ 12’8’20’8’

Page 51: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 955

CONCEPT 1B Pros:• Accommodates some

parking

• Adds shade trees and room

for bioswales

• Wide sidewalks with

separated spaces for

dining/seating and walking

• More flexibility due to

curbless design

Cons:• Less parking

accommodated compared

to Option 1A

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

Page 52: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 956

CONCEPT 1BTwo-Way Street

On-Street Parallel Parking

Street Trees

Wider Sidewalks

Curbless Design

Pros:• Accommodates some

parking

• Adds shade trees and room

for bioswales

• Wide sidewalks with

separated spaces for

dining/seating and walking

• More flexibility due to

curbless design

Cons:• Less parking

accommodated compared

to Option 1A

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

North

South

12’ 12’8’20’8’

Page 53: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 957

CONCEPT 2Two-Way Street

No or Very-Limited Parking

Center Rambla Design

Center Allee of Street Trees

Low Curb (with option to go curbless)

Pros:• Adds shade trees and room

for bioswales

• Large central area for

public gathering, furnishing,

dining space, and art

• Better accommodates

existing head-in parking

along the west side, as

pedestrians are

encouraged to use the

central Rambla

Cons:• No parking – though a few

handicapped spaces could

be added

North

South

4’ 11’’11’ 4’30’

Page 54: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 958

CONCEPT 2 Pros:• Adds shade trees and room

for bioswales

• Large central area for

public gathering, furnishing,

dining space, and art

• Better accommodates

existing head-in parking

along the west side, as

pedestrians are

encouraged to use the

central Rambla

Cons:• No parking – though a few

handicapped spaces could

be added

Page 55: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 56: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 960

CONCEPT 2Two-Way Street

No or Very-Limited Parking

Center Rambla Design

Center Allee of Street Trees

Low Curb (with option to go curbless)

Pros:• Adds shade trees and room

for bioswales

• Large central area for

public gathering, furnishing,

dining space, and art

• Better accommodates

existing head-in parking

along the west side, as

pedestrians are

encouraged to use the

central Rambla

Cons:• No parking – though a few

handicapped spaces could

be added

North

South

4’ 11’’11’ 4’30’

Page 57: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 961

CONCEPT 3One-Way Street

On-Street Parallel Parking (One-Side)

Asymmetrical Rambla

Three Rows of Street Trees

Low Curb (with option to go curbless)

Pros:• Includes on-street parking

• Adds many shade trees

and room for bioswales

• Large area for public

gathering, furnishing,

dining, and art

• Better accommodates

existing head-in parking

along west side, as

pedestrians are

encouraged to use the

eastern Rambla

Cons:• One-way design limits

traffic flow (though low-

volume suggests this may

not be a big issue)

North

South

30’8’12’10’

Page 58: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 962

CONCEPT 3 Pros:• Includes on-street parking

• Adds many shade trees

and room for bioswales

• Large area for public

gathering, furnishing,

dining, and art

• Better accommodates

existing head-in parking

along west side, as

pedestrians are

encouraged to use the

eastern Rambla

Cons:• One-way design limits

traffic flow (though low-

volume suggests this may

not be a big issue)

Page 59: BREAKERS AVENUE: PUBLIC WORKSHOP #1
Page 60: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 964

HYBRID OPTIONS

Option 4: Windamar to Auramar Street Option 1a: All other blocks

Page 61: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 965

HYBRID OPTIONS Pros:• Includes some on-street

parking

• Adds shade trees and room

for bioswales

• Large area for public

gathering, furnishing,

dining, and art

• Better accommodates

existing head-in parking

along west side between

Windamar and Auramar

Streets, as pedestrians are

encouraged to use the

central Rambla

Page 62: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 966

CONCEPT 1ATwo-Way Street

On-Street Parallel Parking

Street Trees

Wider Sidewalks

Curbed Design

Pros:• Accommodates more

parking

• Adds shade trees and room

for bioswales

• Wider sidewalks than

currently available

Cons:• Less space for outdoor

dining, festivals, art, and

public furnishing

• Less flexibility in the future

due to curbs

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

North

South

12’ 12’8’20’8’

Page 63: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 967

CONCEPT 1BTwo-Way Street

On-Street Parallel Parking

Street Trees

Wider Sidewalks

Curbless Design

Pros:• Accommodates some

parking

• Adds shade trees and room

for bioswales

• Wide sidewalks with

separated spaces for

dining/seating and walking

• More flexibility due to

curbless design

Cons:• Less parking

accommodated compared

to Option 1A

• Creates conflicts between

designated parking, dining,

and pedestrian space and

the existing head-in parking

along the west side

North

South

12’ 12’8’20’8’

Page 64: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 968

CONCEPT 2Two-Way Street

No or Very-Limited Parking

Center Rambla Design

Center Allee of Street Trees

Low Curb (with option to go curbless)

Pros:• Adds shade trees and room

for bioswales

• Large central area for

public gathering, furnishing,

dining space, and art

• Better accommodates

existing head-in parking

along the west side, as

pedestrians are

encouraged to use the

central Rambla

Cons:• No parking – though a few

handicapped spaces could

be added

North

South

4’ 11’’11’ 4’30’

Page 65: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 969

CONCEPT 3One-Way Street

On-Street Parallel Parking (One-Side)

Asymmetrical Rambla

Three Rows of Street Trees

Low Curb (with option to go curbless)

Pros:• Includes on-street parking

• Adds many shade trees

and room for bioswales

• Large area for public

gathering, furnishing,

dining, and art

• Better accommodates

existing head-in parking

along west side, as

pedestrians are

encouraged to use the

eastern Rambla

Cons:• One-way design limits

traffic flow (though low-

volume suggests this may

not be a big issue)

North

South

30’8’12’10’

Page 66: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 970

HYBRID OPTIONS

Option 4: Windamar to Auramar Street Option 1a: All other blocks

Page 67: BREAKERS AVENUE: PUBLIC WORKSHOP #1

B R E A K E R S A V E N U E | I N I T I A L C O N C E P T S 3 / 2 0 / 1 971

ADDITIONAL CONSIDERATIONSLet Us Know What Design Elements Are Most Important To You!

Public ArtEV Charging StationsGreen Infrastructure Plaza Space

Street Vendors Bike/Scooter Share Options Raised Intersections & Other

Traffic Calming Elements

Markets & Festivals

Page 68: BREAKERS AVENUE: PUBLIC WORKSHOP #1

SFRTA COMMUTER BUS COMPREHENSIVE ANALYSIS & OPERATIONS PLAN

Agenda

Immediate Next Steps:

▪ Synthesize input & establish community priorities

▪ Discuss design concepts with city staff

▪ Refine the preferred design options

▪ Present draft plans back to the community

72