Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Stoney Trail SE
106th Ave SE
VIEW ONLINE
Specifications
Accelerating success.
AERIAL VIEW
$14.00 PSF NET
(±25% Office Build Out Included)
*Lease rate to vary depending on size.
Starting from:
collierscanada.com/23749
Brand New Small Bay Industrial FOR LEASE | 7307 - 106th Avenue SE | Calgary | AB
Point Trotter sub-division is a new comprehensively planned 292-acre fully serviced industrial park, strategically located close to Stoney Trail making it easily accessible from any part of the city. This is a great opportunity to lease brand new “A” class industrial space with tenant fixturing starting spring 2019.
COLE WESTERSUNDAssociate 403 571 [email protected]
EVAN TRUMANVice President | Partner403 215 [email protected]
MICHAEL MASSINGVice President403 298 [email protected]
PATRICK SAILERSenior Associate 403 538 [email protected]
District Point Trotter Industrial Park
Zoning I-G (Industrial General)
Construction Type Precast Concrete
Available Area 3,200 - 22,655 square feet
Loading One (1) - 12’w x 14’h Drive-in door per bay
Ceiling Height 22’ clear
Sprinklered ESFR
Lighting LED
Sumps Yes (25 ft to underside of deck)
Power 100 Amps, 600 Volts, 120/208 (TBV)
Operating Costs TBD
Delivery Spring 2019 for tenant fixturing
Accelerating success.
FOR LEASE 7307 - 106TH AVENUE SE
SITE PLAN - PHASE I & PHASE I I
collierscanada.com/23749
VIEW ONLINE
Contact us:
N
Phase I
Phase II
100’
30’
120’
32’
COLE WESTERSUNDAssociate 403 571 [email protected]
EVAN TRUMANVice President | Partner403 215 [email protected]
MICHAEL MASSINGVice President403 298 [email protected]
PATRICK SAILERSenior Associate 403 538 [email protected]
VIEW ONLINE
Accelerating success.
collierscanada.com/23749
Contact us:
CLOCKWISE FROM TOP: East View: Building 1 and 2 // West View: Loading
COLE WESTERSUNDAssociate 403 571 [email protected]
EVAN TRUMANVice President | Partner403 215 [email protected]
MICHAEL MASSINGVice President403 298 [email protected]
PATRICK SAILERSenior Associate 403 538 [email protected]
Accelerating success.
Contact us:
Stoney Trail SE
52 St SE
Glenmore Trail
Barlow Trail SE
114 Ave SE
Glenmore Trail
Deerfoot Trail
Downtown Calgary
68 St SE
Glenmore Trail and 68th Street upgrade (including bridge) to be complete by 2019.
POINT TROTTER INDUSTRIAL PARK
Deer
foot
Tra
il
Peigan Trail
Stoney Trail SE
COLE WESTERSUNDAssociate 403 571 [email protected]
EVAN TRUMANVice President | Partner403 215 [email protected]
MICHAEL MASSINGVice President403 298 [email protected]
PATRICK SAILERSenior Associate 403 538 [email protected]