BPR CASE- PUNJAB STATE ELECTRICTY BOARD
PRESENTED BY :- NARENDRA PREET SINGH50803022
NISHEETH SRIVASTAVA50803023 PANKAJ PATYAL50803024
POINTS TO BE DISCUSSED• Identify major events• Develop vision • Action report• Scope and scale of the project• Process map• Critical process – Re-engineered• Recommendations• Result• Role of IT.
PSEB OVERVIEW• Statutory body formed on 1-2-1959 under the Electricity Supply
Act.1948• Started with the modest installed capacity of 62 MW• generating capacity 6841 MW as on 31-3-2009• gross generation during the year2008-09 was 38880 Million Units• PSEB operated its own Generation Power Plants , also constructed
and maintained its Transmission and Distribution system• serves more than 66.31 lakhs consumers comprising of
approximate – 54.86 lakhs – General– 1.12 lakhs - Industrial – 10.33 lakhs - Agricultural connections
Reasons for Reforms
• Investment requirements exceed the national capacities
• The performance of the infrastructure sector has not met the international standards
• The managerial and the technical resources were inadequate
• Innovations in technology have been enormous• New approaches of economy (privatisation and
independent regulation) were ignored
Reasons for Reforms
• Limited coverage and quality of infrastructure sector has not been able to catch the global competitiveness
• Power deficit• Inefficient Staff• High T&D losses• Unaccounted theft
Vision - PSEB
• To provide quantitative and qualitative un-interruptive supply of electricity to consumers at an economical price with effective and efficient use of resources.
Action Report • Introduction of competition
– Competitive bidding– PPP(Public Private Partnership)– Delicensed generation– Promotion of competition in distribution sector
• Unbundelling- Transmission,Distribution and Generation• Reduction in T&D losses
– Complete Metering– MIS,SCADA
• Open Acess• Encourage IPP and CPP• Energy Security – Renewable Source of energy
Scope and Scale of Project
• Project has its impact on – Generation – Transmission– Distribution
• Development through investments, technology and manpower of the foreign investors
• Elimination of Cross-Subsidy• Encouraging Private Players• Improvement of Plant load Efficiency
Process Map• Two new entites formed– POWERCOM – TRANSCO
• Easing the Power Purchase Agreement for the industries
• NOCs to IPPs and CPPs• Uniformity in pricing the electricity rates• Preparing the Supply codes and Grid codes• Promoting the use of Renewable Source of
Energy – Solar,Mini-Hydro,Small-Hydro,Bio-gas.
Critical Process- to be re-engineered
• Restructuring and Accountability of Distribution sector.
• Efficient Generation• Change Management• Awareness
Use of IT
• MIS• SCADA• Energy Accountability • Customer Mapping• Load Prediction and Load Determination• Demand Side Management• Supply Side Management
USE OF IT•Online bill enquiry
Online billing detailsOnline bill payment
MODERNISATION OF PSEB
• Spanco Ltd. has won the IT modernization project of (PSEB)
• focus to bring in actual, demonstrable performance in terms of sustained energy loss reduction.
• strengthening of the Electricity Distribution system
• Size of current order-284 crore