22
Box Burner L - Automatic INSTALLATION AND OPERATION GUIDE Before operating Bionova burner please read and follow instructions

Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Nova Vizantija ▪ Vlajkovićeva 5 ▪ Beograd ▪ Srbija

T/F: +381 11 334 6151 ▪ E: [email protected]

www.bionova.com

Box Burner L - Automatic

INSTALLATION AND OPERATION GUIDE

Before operating Bionova burner please read and follow instructions

Page 2: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Compliance Statement and Testing ENGLISH

Box Burner L Automatic – Installation and Operation Guide 1

The BIONOVA Box Burner L – Automatic bioethanol fireplace

burner is designed and produced accorded to new DIN 4734-1 standard.

Dangerous goods

Bioethanol fuel is classified as a flammable liquid Class 3, PG II and is regulated

by various standards. Please follow regulations in order to legally and safely

store, handle and use that sort of fuel. Please inform yourself about regulations

in your country.

Page 3: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Contents

2 Box Burner L Automatic – Installation and Operation Guide

Conditions of use …………………………………………………… 3

Warnings …………………………………………………… 4

Standard equipment received …………………………………………………… 6

Installation …………………………………………………… 7

Connecting, ventilation …………………………………………………… 10

Thermal efficiency, burning time …………………………………………………… 11

How to operate BIONOVA burner …………………………………………………… 12

Maintenance …………………………………………………… 16

Warranty …………………………………………………… 17

Dimensions and data …………………………………………………… 18

Technology …………………………………………………… 19

Page 4: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Conditions of Use ENGLISH

Box Burner L Automatic – Installation and Operation Guide 3

NOVA VIZANTIJA is safety conscious company. We have taken a great care in

designing, manufacturing and assembling your BIONOVA burner to be sure

that it operates safely, efficiently and visually effectively. To insure that you can enjoy our product for a long time, in comfort, please

operate the product with care and follow these instructions:

1. Before using BIONOVA burner please read manual carefully. This is the

way to use the product safely and efficiently.

Not following instructions could result in property damage, injury or

even death.

2. Keep children away from operating burner or handling it.

3. Please use only specified fuel – bioethanol. Do not attempt to use any

other flammable fluids (as gasoline for example). BIONOVA Burner is

specifically designed for use with bioethanol and use of any other fuel

would be extremely dangerous.

4. Approval from building authorities may be required. Please contact

appropriate authorities before installing BIONOVA burner.

5. Possession of fire extinguisher - AMMONIUM PHOSPHATE AB:E type,

or appropriate for extinguishing burning ethanol vapors is required.

6. It is a great security asset and it could be tied with insurance issues to

install smoke alarm.

7. Pebbles or other decorative items should not be placed on the burner

top in a way that they detaining normal operation and handling.

If using decorative items, please be sure that they do not:

- Interfere with sliding mechanism

- Emit carbon monoxide

- Fall into opening of the burner in any time

Page 5: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Warnings

4 Box Burner L Automatic – Installation and Operation Guide

Please honor following warnings:

1. Risk of explosion:

a) NEVER use any other fuel then specified for use with

bioethanol fireplaces ;

b) NEVER fill the fuel when burner operating or still hot ;

c) NEVER fill the fuel in burner reservoir in areas where

flammable vapors or gas may be present ;

d) NEVER store or transport the fuel in other than metal or plastic

container which is:

- Acceptable for use with specific fuel

- Fuel is in the original container

2. Never store fuel in the living space where the fire is situated ;

3. Keep children, pets, clothing, and furniture away. Temperature of

the burner surface can be very high – may cause serious burns ;

4. Never put flammable objects on the burner. Burner surface

becomes intensively hot during burning and stays hot after

burning for a long time.

5. Indoor pollution – BIONOVA burner have to be used in well

ventilated areas – product of bioethanol vapor burning is carbon

dioxide (can be dangerous in high saturations). Persons with

breathing problems should consult physician before installing

BIONOVA burner.

6. Do not use BIONOVA burner as a cooking appliance or throw any

sort of waste materials or paper in burner opening.

7. It is recommended that BIONOVA burner should be fixed into a

position to avoid displacement ;

8. Do not try to disassemble BIONOVA burner ;

9. Do not try to attach any other fuel tank to BIONOVA burner;

10. BIONOVA burner should be used only with authorized accessories

and equipment ;

11. Do not, in any case, obstruct sliding mechanism for

closing/opening ;

Page 6: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Warnings ENGLISH

Box Burner L Automatic – Installation and Operation Guide 5

12. Do not try to start BIONOVA burner if you suspect fault or any

damage to the housing or mechanism of the burner.

13. The NOVA VIZANTIJA Company does not accept any responsibility

for any damage or injury which accrues if the BIONOVA burner is

used for purposes other than intended; is used incorrectly or

repaired by unqualified persons or has been changed or altered in

any way.

14. BIONOVA burner is not intended to be a sole continues heating

source and to be used longer than 8 hours per session. To avoid

heat expansion and potential spilling please ensure that the burner

is allowed to cool down completely on a regular basis.

15. Using more than one Burner in the same space or a room or with

other appliances that are burning bioethanol please consult with

the manufacturer of the appliances.

16. Minimum safe distance to combustible materials should be 2m.

Please store these warnings in a safe place for future reference

Page 7: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Standard Equipment Received

6 Box Burner L Automatic – Installation and Operation Guide

The BIONOVA burner is supplied with following standard equipment:

1. BIONOVA Box Burner L Automatic - 1pc.

2. Installation and operation guide - 1pc.

3. Electronic control unit - 1pc.

4. Remote controle - 1pc.

Page 8: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Ventilation, thermal efficiency, burning time ENGLISH

Box Burner L Automatic – Installation and Operation Guide 7

Please find following installation instructions:

BIONOVA burner is primarily intended for indoor use. For outdoor use please

contact manufacturer or sales personal for specific terms of services.

There are many different variations available for installing BIONOVA burner but

in every case BIONOVA burner must:

- Be installed in non-combustible material only (stainless steel,

concrete, brick, stone) ;

- Insure that burner is positioned on the edges of the upper plate

– this is the only correct way of positioning.

INCORRECT

CORRECT

- Avoid positioning a burner in the area of the room (space) with

cross ventilation or a strong air flow – this could result in

irregular burning and fire hazard.

- Plate on which burner is positioned must be rigid enough to

withstand load of at least 10 Kg.

- Do not install burner near any gas connections or pipe lines. If

do, please make it safe by a professional prior to burner

installation ;

- Be installed in fixed, leveled and secure position before filling,

lighting and operating ;

- Be installed in position that limits relocation – it is not suitable

for frequent relocation ;

- Be installed in leveled platform ;

Page 9: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Installation

8 Box Burner L Automatic – Installation and Operation Guide

- Do not install directly beside wallpaper or laminate or any other

non-fire proof surface or material ;

- Be installed into a setting that has square back – corners can

influence aerodynamics and cause flame to behave irregularly.

As a general guide we recommending:

- Any furniture, items or fittings placed directly above or beside

BIONOVA burner should be suitable for heat tolerance ;

- Heat reflective panels (ideally stainless steel) should be installed

as surrounding and top to assist heat distribution ;

- Glass or mirrored surfaces near BIONOVA burner must be

toughened.

- Closed volumes in the proximity of the burner must be kept

ventilated.

Page 10: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Ventilation, thermal efficiency, burning time ENGLISH

Box Burner L Automatic – Installation and Operation Guide 9

Please find required installation dimensions:

Page 11: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Connecting, ventilation

10 Box Burner L Automatic – Installation and Operation Guide

Connecting:

BIONOVA BBL Automatic burner must be connected to the 220V grounded

power supply.

How to connect:

1. Connect cables (1) and (2) from electronic driver unit to burner

terminals (1) and (2)

2. Connect power cable (3) from electronic driver unit to the grounded

power supply (220V).

3. Place the burner and test the functionally.

Ventilation:

When proper fuel is used BIONOVA burner do not need any permanent fixture

or fitting, chimney, gas line, or any utility or supply.

Products of burning bioethanol vapors are CO2, water steam and heat.

Optimum room volume per a burner is 70m3. If used in smaller spaces, please

leave the door of the adjacent rooms or corridor open, or a window slightly

open.

Page 12: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Ventilation, thermal efficiency, burning time ENGLISH

Box Burner L Automatic – Installation and Operation Guide 11

Minimum room volume Air exchange (1/h) Explanation

350m3

0.2 Air exchange due to

leakage in the building

140m3

0.5

Normal air exchange

rate in the leak proof

buildings

70m3

1

Complete air exchange

in installation room

during one hour

Air exchange *(n/h) Comments

0 – 0.5 Windows/doors closed

0.3-1.5 Window slightly open-no shutters

0.5-1 Window open

* n/h refers to ratio of air circulation in the room – example 0.5/h means that half of the air in

the room is replaced every hour

Efficiency:

BIONOVA burner is efficient since all the heat stays in the room rather than be

wasted to residual emissions.

You may turn burner on and off at any time or control flame output.

Volume – Burning time:

One full tank will burn up to 6 hours *. By using flame output regulation you

may significantly increase burning time. You may turn burner on and off at any

time.

* The efficiency data has approximate value depending on the model purchased, weather conditions,

installation point and bioethanol used

Page 13: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH How to operate BIONOVA burner

12 Box Burner L Automatic – Installation and Operation Guide

It is important to follow the procedure described to ensure that you are operating

and using BIONOVA burner safely:

Only fuel to be used in BIONOVA burner is bioethanol fuel – no other fuel is

allowed. Recommended fuel : NOVAFUEL.

All actions with managing bioethanol should be performed in well-ventilated

area and to be sure that all spillage is easily contained and away from any

ignition source.

Volume:

In the center of the burner (inside of perforated area) is a tube. When you see

fuel at the top of the tube the tank is full – 2.95 liters of fuel.

Also, you will be able to see level of fuel inside of the tube when the tank is not

full, and to have approximate insight to what level the tank is filled - what is

the level of the fuel.

Page 14: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

How to operate BIONOVA burner ENGLISH

Box Burner L Automatic – Installation and Operation Guide 13

Filling the burner:

Before filling the burner with bioethanol fuel please insure following:

1. That the burner is standing in leveled position fixed from moving and

properly installed ;

2. That the burner is not hot from previous use ;

3. That the burner and the sliding mechanism are free from obstacles of

any kind ;

4. Keep your hands and face away from the burner at all times during

filling or igniting.

5. At all times pure the fuel on the perforated area of the burner moving

from one side of the opening to another – avoid spilling or purring

fuel between upper plate and down plate.

6. If spilling occurs please wipe it dry before any attempt to ignite a

burner.

7. You may use appropriate funnel to avoid spilling.

BIONOVA burner is filled through perforated area inside the burner opening.

Open slider to maximum position (push button (A) on remote control) – this

will show the perforated area. Fill the burner with bioethanol fuel, slowly, not

causing spillage, moving from side to side of the burner opening.

You can fill the tank with any desired amount of fuel (recommended minimal

amount is 0,7l), but be careful for the level in center tube – you will see fuel on

top of it when tank is full.

Do not, in any case, put more fuel then maximum level, when fuel is at the top

of tube in the center of the burner.

Page 15: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH How to operate BIONOVA burner

14 Box Burner L Automatic – Installation and Operation Guide

Igniting BIONOVA burner:

Keep your hands and face away from BIONOVA burner at all-time especially

when igniting.

Before igniting, make sure that the burner is clear and ready for use.

1. Put slider in full open position, to have enough ventilation for ignition,

by pressing push button (A) on a remote control.

2. From safe distance, (at least 1m) press push button (B) on a remote

control and hold for few seconds. If ignition is not achieved please

press and hold push button (B) again for few seconds. Do not hold

push button (B) for more than 10 seconds continuously.

3. When strong and stable flames are achieved (approximately 1-2

minutes from the moment of ignition) press push button (C) for flame

output regulation.

4. You may stop burning process by pressing push button (D) and put

out the flame.

Page 16: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

How to operate BIONOVA burner ENGLISH

Box Burner L Automatic – Installation and Operation Guide 15

Turing BIONOVA burner off and restarting:

1. If fuel in the burner tank is not entirely used up it can be used again. In

order to supply more fuel, please wait until burner cools down to room

temperature and then, only then, it is safe to fill burner tank ;

2. When all fuel is used up, there is no need to clean anything, just wait

for the burner to cool down, then refill and restart.

Note: When you see that the flame is small and reduced – in the perforated area

you can see flame only from the tube (which is used to show fuel level) that

means that fuel level is at absolute minimum.

Reigniting BIONOVA burner:

1. Check if the burner is on room temperature. It takes from 15-30 min.

to cool down depending on how long it has been used before ;

2. Pressing push button (A) on a remote control to open the slider in full

open position ;

3. Allow for any residual fumes to evaporate. It takes few moments ;

4. If needed refill the fuel and reignite by pressing button (B) on a remote

control

DO NOT REFILL:

1. When burner is operating or hot from previous use ;

Page 17: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Maintenance

16 Box Burner L Automatic – Installation and Operation Guide

Maintenance:

Should be performed when BIONOVA burner is off, completely empty of fuel,

dry and at a room temperature.

The surface of the burner will change color on very hot spots over time. This is

normal “hot stainless steel” ageing process.

2. Use a vacuum cleaner after approximately 50 liters of burned fuel to

clean inside of the burner opening ;

3. Use a mild detergent to clean burner surface. If the surface is highly

stained, apply mild polishing aperient.

4. Do not let the detergent or polishing aperient to get into a burner

opening especially perforated part since it can cause even more

staining and smell during next use.

5. After cleaning, all surfaces should be without any residue and

completely dry.

Page 18: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Warranty ENGLISH

Box Burner L Automatic – Installation and Operation Guide 17

Warranty terms:

1. Your BIONOVA burner is covered by 2 years warranty from moment of

purchase.

2. Please note - in order to warranty be applied, instructions for installing,

use and maintenance must be followed.

3. Do not try to fix burner by yourself or by unprofessional service and

persons – we do not except responsibility for operating the burner in

these cases.

This warranty certificate along with the invoice or receipt must be presented

when making any claim.

MODEL No.

SERIAL No.

PURCHASER

DISTRIBUTOR

Distributor stamp here

DATE OF PURCHASE

By signing I, upper mentioned purchaser, declare that:

I understand and will follow the terms of use presented in

INSTALATION AND OPERETAIN GUIDE and taking the full

responsibility for using the product within it.

Understand the terms of warranty.

Purchaser signature: ……………………………………...................................................................

Page 19: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH Dimensions and data

18 Box Burner L Automatic – Installation and Operation Guide

* The efficiency data has approximate value depending on the model purchased, weather conditions,

installation point and bioethanol used.

Main

material:

Stainless Steel

( 1.4301)

Evaporator: Ceramic fibers

Tank Size: 2,95 l

Weight : 6 kg

Thermal

output :

Up to 3 Kw *

Req. room

volume:

70m3

Burning

Time:

Continuously

Up to 6 h *

Page 20: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Technology ENGLISH

Box Burner L Automatic – Installation and Operation Guide 19

EECT – Evaporated Ethanol Combustion Technology

BIONOVA fireplace burners bringing to you unique technology of ethanol

combustion - EECT.

Our burner’s combusting only ethanol vapors distributed from ceramic

evaporator (no loose fuel) trough burning pit calibrated grill providing precise

and odorless process of burning.

Page 21: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

ENGLISH NOTES

20 Box Burner L Automatic – Installation and Operation Guide

Page 22: Box Burner L - Automatic INSTALLATION AND OPERATION … and Operation Guide Box Burner L Automatic English.pdfNova Vizantija Vlajkovićeva 5 Beograd Srbija T/F: +381 11 334 6151 E:

Nova Vizantija ▪ Vlajkovićeva 5 ▪ Belgrade ▪ SerbiaT/ +381 11 334 6151 ▪ @ .comF: E: info bionovawww.bionova.com