33
Botley Centre Supplementary Planning Document January 2016

Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

Botley Centre Supplementary Planning Document

January 2016

Page 2: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

NOVEMBER 2015 2 BOTLEY CENTRE SPD

3

VISION & OBJECTIVES

3.1 Local Vision for Botley Centre 213.2Objectives 22

1

INTRODUCTION

1.1 The Purpose of the SPD 41.2 Planning Status 41.3Consultation 41.4 The Study Area 6

2

BOTLEY CONTEXT

2.1 Regional Context 9 2.2ExistingBaseline 10 Socio-Economic 10 HistoricEnvironment 10 Connectivity 11 Setting 12 Building Quality and Heights 142.3IssuesandOpportunities 162.4 Policy Context 18

4

DEVELOPMENT PRINCIPLES

4.1BotleyLocalServiceCentre 244.2 Access, Linkages and Legibility 254.3 Public Space and Streetscape 264.4 Density, Scale and Massing 284.5 Design Quality and Character 294.6ParkingandServicing 314.7DevelopmentFramework 32

CONTENTS

Page 3: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

1

INTRODUCTION

Page 4: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

1.1.1 The Botley Centre SPD creates aflexiblestrategytoguidedevelopmentthatsupportstheexistingandfuturelocalcommunityandattractsinvestmenttoservethewiderdistrictandmeetlocalregenerationaspirations.

1.1.2 AplanningapplicationforthecomprehensiveredevelopmentoftheBotleyCentrewasmetwithasignificantleveloflocaloppositionandwasunanimouslyrefusedatcommitteeinDecember2014.

1.1.3 ItistheaspirationoftheValeLocalPlan2011toenhanceBotleyCentre’sofferingandrangeofusestobetterreflectitsstatusasaLocalServiceCentreinakeylocationonthewesternedgeofOxfordwithimmediateaccesstothestrategichighwaysnetwork(A34).

1.2.1 Inaccordancewithparagraph153oftheNationalPlanningPolicyFramework(NPPF)(March,2012)andregulations11–16ofTheTownandCountryPlanning(LocalPlanning)(England)Regulations2012,theSPDhasbeenpreparedinaccordancewithpolicyobjectivessetoutintheNPPFandtheVale’sLocalPlan2011(July,2006)(SavedPolicies).InparticulartheSPDbuildsuponLocalPlanSavedPolicies,including:GS1-DevelopmentinExistingSettlements,H10DevelopmentintheFiveMainSettlements,S1NewRetailProvisionand S12 Local Shopping Centres. The SPD is a materialconsiderationinassessingplanningapplicationswithintheSPDboundary.

1.2.2 The SPD is supported by the Botley Centre SPD Sustainability Appraisal Report (November,2015),whichconsidersthelikelyenvironmentalandsustainabilityeffectsofimplementingtheSPDandoutlinesmeasurestoreduceanysignificantadverseeffects.

1.2.3 The SPD has also considered and alignswithdraftpolicies,includingCorePolicy11:BotleyCentre,containedintheVale’semergingLocalPlan2031,whichisanticipatedforadoptionSeptember2016.FollowingadoptionoftheemergingLocalPlan,theValehascommittedtoreviewtheSPDandupdatewherenecessarytoensureconsistencywiththe more recent Local Plan policies.

1.3.1 TheValehaveproducedtheSPDthroughacollaborativeprocess.ThishasincludedconsultationtoensurethereisaclearunderstandingoftheissuesandopportunitiesfacingBotley,whichinturninformandunderpinanappropriateframeworktoguidedevelopment.

1.3.2 Theconsultationprocesshasconsistedofawiderangeofeventswithavarietyofdifferentorganisations,thesehaveincluded:

• IndividualmeetingswithlocalstakeholdersthroughoutthepreparationoftheSPD,including:WestWayCommunityConcern,North Hinksey Parish Council, Cumnor Parish Council,BotleyBaptistChurch,St.PeterandSt.PaulChurchandlandowners.

• PresentationtoNorthHinkseyParishCouncilon21May2015.

• Aworkshopwithlocalorganisationsonthe2June2015todevelopthevisionanddesignprinciples .

• PresentationtotheWestWayConcerneventon22June2015.

• Aworkshopwithlocalorganisationson28July2015todiscusstheviabilityanalysisforthe study area.

• ReviewofinformationpreparedbyWestWayCommunityConcern,includingtheWestWayDevelopmentSurvey(June,2015,AVisionforBotleyandWestWay,andBotleyCharacterStatement(March,2014).

1.3.3 The formal statutory public consultationwasundertakenforafiveweekperiodbetween21August2015tothe25September2015.ThisstageofconsultationsoughttocaptureawideraudiencefromacrossthecommunityaspartoftheVale’scommitment to undertake a statutory public consultationonthedraftSPD.FurtherdetailsofthisstatutorystageofconsultationarecontainedwithintheConsultationReport(November2015)whichaccompaniestheBotley Centre SPD.

NOVEMBER 2015 4

CHAPTER 1 INTRODUCTION

BOTLEY CENTRE SPD

1.1 PURPOSE 1.2PLANNINGSTATUS 1.3 CONSULTATION

Page 5: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

NOVEMBER 2015 5

CHAPTER 1 INTRODUCTION

BOTLEY CENTRE SPD

Figure 1 SPD Study Area Boundary (source: Microsoft Bing Maps 2015)

WEST WAY

A 34

ARTHRAY ROAD

ELMS ROAD

POPLAR ROAD

Page 6: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

NOVEMBER 2015 6

CHAPTER 1 INTRODUCTION

BOTLEY CENTRE SPD

1.4.1 The Botley Centre study area is situatedwithintheValeofWhiteHorseandformsaLocalServiceCentrefortheValeandOxfordfringearea,approximately2kmwestof the City of Oxford. Botley Centre is the area containedwithintheredlineboundaryinFigure2.

1.4.2 The three hectare study area comprisesarangeofretail,residential,officeandcommunityusesincludingtheWestWayShoppingCentre,twosupermarkets,offices,communityhalls,alibrary,BotleyBaptistChurch, the Church of St. Peter and St. Paul, Elms Parade, three public car parks, a post office,banks,cafesandrestaurants,daycentreand sheltered housing.

1.4.3 Thesouthernandwesternboundariesofthestudyareaareborderedbytwostoreyresidentialpropertiessetwithinmediumsizedgardens.ThenorthwestofthestudyareaisborderedbytheWestWaywithBotleyPrimarySchool and Seacourt Bridge Public House on the northern side of the road. To the east of the studyarealiesWestminsterWay,andtheraisedA34 Oxford bypass and the Botley interchange.

1.4.4 FurthertotheeasttheWestWayextendsintoBotleyRoadandprovidesdirectaccess to Oxford City Centre. In close proximity to the study area, Botley Road accommodates arangeofusesincludingSeacourtTowerbusinesses and Seacourt Retail Park.

Figure 2 Botley Centre Study Area Boundary

STUDY AREA

EXISTINGBUILDINGS

WESTWA

Y

WESTM

INSTERWAY

ARTHRAY ROAD

A34

Vale House & FieldHouseday centre and sheltered housing

WestwayHouse

WestwayCentre

BaptistChurch

Elms Parade

St. Peter & Paul’sChurch

Library

OfficeCourt

Seacourt Hall

1.4 THE STUDY AREA

0 50 100 150 m

GREENSPACE

EXISTINGTREESWITHINTHE SITE

Page 7: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

NOVEMBER 2015 7

CHAPTER 1 INTRODUCTION

BOTLEY CENTRE SPD

Figure 3 Mature Site Trees

Figure 7 West Way Centre & West Way House

Figure 4 Elms Parade Car Park

Figure 8 Elms Parade Rear Elevation

Figure 5 St. Peter & St. Paul Church

Figure 9 West Way House

Figure 6 Elms Parade Frontage

Figure 10 West Way Centre

Page 8: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

2

BOTLEY CONTEXT

Page 9: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD 9

2.1.1 Botley Centre is situated in the north east of the Vale. Botley is designated as one ofthefivemainLocalServiceCentresintheVale’sLocalPlan2011(July,2006),alongwithAbingdon,Faringdon,GroveandWantage.IntermsofretailprovisionBotleyisdesignatedas a Local Shopping Centre, second in the retail hierarchytothedesignatedTownCentres,theclosestofwhichisAbingdonapproximately8km to the south.

2.1.2 BotleyCentreservesanumberofsmallersettlementsacrosstheVale,includingNorthHinksey,Cumnor,Wytham,Farmoor,AppletonandEaton,andprovidesagoodleveloflocalfacilities,servicesandemploymenttothis catchment.

2.1.3 Botley Centre is located approximately2kmwestofOxfordCityCentre.BotleyiswellconnectedbyroadlinksregionallyandacrossthecountryviatheadjacentA420,A34andtheM4tothesouthandtheM40tothenorth.OxfordRailwayStationislocatedasevenminutebusjourneyfromBotleyCentreandprovidesdirecttrainlinkstoLondon,Hereford,Worcester,Reading,Bicester,Manchester,NewcastleandBirmingham, and also enables accessible rail connectionstoallmajorcitiesacrossEngland,WalesandScotland.

2.1REGIONALCONTEXT

2.1.4 InparalleltoBotleyCentre’sfunctionasaLocalServiceCentrewithintheVale,italsofunctionsasacentreontheoutskirtsofOxfordCityCentre(RetailandTownCentreStudy;March2013).Inthisregard,ahighlevelofBotley’sretailandleisuredemandisbeingmet in Oxford City Centre.

2.1.5 Botley’spositionintheregionalandlocalcontextpresentsopportunitiestocapitaliseonconnectionstosurroundingcentres, to retain and encourage commerce to supportlocaleconomicgrowth,andimprovefacilitiesandservicestomeettheneedsoftheexistingandfuturecommunity.Inachievingthis, it is important that a careful balance is struckbetweentheprovisionofimprovedandexpandedretailandleisureusesandBotley’sroleasaLocalServiceCentre.

Figure 11 Regional Context

Oxford City

MainSettlements

BotleyLocalServiceCentre

Oxford Suburban Centres

SmallerSettlements

A Roads

Motorways

RailConnections

Page 10: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD10

2.2EXISTINGBASELINE

2.2.1 The SPD is underpinned by a thoroughunderstandingoftheexistingphysical,socialandeconomicpositionof Botley Centre. This ensures the SPD is asrelevantandrealisticaspossible.Thisunderstanding has been informed through sitevisits,anurbandesignanalysis,atransportandmovementanalysis,areviewofthesurroundingdevelopmentcontextandviability,andacomprehensivereviewofbaselineinformation,includingcensusdata,InterdepartmentalBusinessRegister(IDBR),environmentalrecords,basemappingdataandstatutory records.

2.2.2 Thissectionprovidesanoverviewof the key messages to emerge from the baseline analysis undertaken in preparing the SPD and Sustainability Appraisal. The baseline analysis has also been informed by a transport andmovementanalysis,andareviewofthesurroundingdevelopmentcontextandviability.

Socio-Economic

2.2.4 Botley and the surrounding area are experiencingpopulationgrowth.ThelocalpopulationoftheBotleyAreagrewby4.5percentfrom10,849to11,341between2001and2011,whichiscomparabletothepopulationgrowthintheVale(Census,2001&2011).Thecharacteristicsare:

•An age structure of the Botley Area similar tothatoftheVale(Census,2011).

• Ahighlevelofeducationalattainmentwith50.7percentoftheBotleyCatchmentAreapopulationhavingattainedaLevel4qualificationorabove(i.e.ordinaryorhigherdegrees, higher diplomas and professional qualifications),comparedto37.2percentfortheVale(Census,2011).

• AsimilarlevelofpopulationwithalongtermhealthproblemordisabilitytotheValeat10percent(Census,2011).

• AlowlevelofdeprivationwithinBotley,contributingtotheVale’srankingonthetop20leastdeprivedlocalauthoritiesinEngland(IndexofMultipleDeprivation,2010).

2.2.5 Botleybenefitsfromastrongeconomy,supportedbyaneconomicallyactiveworkforceandawiderangeofbusinesses.Thisconsistsofthefollowingkeycharacteristics:

• AstablelevelofactivebusinessesoverthepastfiveyearsintheBotleyArea(IDBR,2010-2014).

• In the Botley Area 86 per cent of businesses are definedasmicrobusinesseswithnineorlessemployeesin2014(IDBR,2014).

• Thereiswidevarietyofindustriespresentintheareawiththelargestsectorbeing‘professional,scientificandtechnical’at21percent(IDBR,2014).

• ThepopulationcontainsahighlyskilledworkforcewithahigherthanaverageproportionofmanagersandprofessionalsthantheVale(Census,2011).

• Lowlevelofunemploymentat2percentcompared to 2.5 per cent for the Vale and 3.4percentforthewiderSouthEastregion,indicatingBotley’spositivecontributiontotheVale’srankingwithinthetop10percentinthecountryintheUKCompetitivenessIndex(Census,2011).

Historic Environment

2.2.6 ThedevelopmentofBotleysuburbbeganintheearly20thCenturywithfurtherexpansioninthemid20th Century.

2.2.7 There are no listed buildings, scheduled monumentsorhistoricparksandgardenswithinthestudyarea.TherearealsonoConservationAreaswithinornearthearea.ElmsParade(1937),St.PeterandSt.Paul’sChurch(1958)andSeacourtBridgePublicHouse(1936)arewithinoradjacent to the study area and are considered to contributetotheidentityandcharacterofBotley.

2.2.3 Toprovideanindicationofthesocio-economiccharacteristicsofBotley,censusdatawascollectedforthetwowardswithinwhichBotley is located being the North Hinksey and WythamWardandtheAppletonandCumnorWard.ForeaseofreferencewerefertothisareaastheBotleyAreainthefollowingtext.As a comparison and to broadly align to the areacoveredbytheWestWayDevelopmentSurvey(June,2015)undertakenbyWestWayCommunity Concern, an area referenced as theBotleyCatchmentAreawhichincludestheNorthHinkseyandWythamWard,theAppletonandCumnorWard,andOxfordCityCouncil’sJerichoandOsneyWardhasalsobeen considered.

Botley Area

Botley Catchment Area

Botley Centre Study Area

Figure 12 Botley Area and Botley Catchment Area

Page 11: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD 11

0 50 100 150 m

A-Road(A34) Vehicular and pedestrian linkwithinthestudyareaPedestrianlinkwithinthestudy areaVehicular entrance to the study area

Primaryroad(B4044)

Secondary road

TertiaryroadStudy area

Connectivity

2.2.8 Thestudyareaiswellconnectedtothelocalandstrategicroadnetwork,withtheA34trunkroadtotheeastprovidinggood,ifsometimescongested,accessbetweentheM4tothesouthandtheM40tothenorth.TheB4044WestWayactsasaprimaryvehicularrouteofferingconnectionstothewiderareaincludingOxford City Centre.

2.2.9 AlthoughthereisnorailwaystationintheBotleyarea,OxfordStationiswalkablefromBotleyofferingregionalandnationalrailconnections.BotleyalsobenefitsfromgoodbusconnectionswithbusstopslocatedalongWestWayandWestminsterWay.TheseofferaccesstoAbingdon,Carterton,Oxford,Swindon,WantageandWitney.InadditionopportunitiesforaBusRapidTransitrouteconnectingBotleytoOxfordaresetoutinConnectingOxfordshire:LocalTransportPlan2015-2031andtheOxfordTransportStrategyadoptedSeptember2015.

2.2.10 Pedestrianroutesthroughthe study area generally lack natural surveillanceandarenotwellusedbeyondworkinghours,leadingtopersonalsecurityconcernsandattractinganti-socialbehaviour.

2.2.11 ThepopulationofthewiderBotley Area places considerable reliance oncarusewith35percentofhouseholdsowningonecar/vanand55percentofhouseholdsowningtwoormorecars,whichiscomparabletocarownershipwithintheVale(Census,2011).

2.2.12 The frontages of the study area are vehicledominatedandpresentagenerallyunfriendlypedestrianenvironmentwiththewideWestWaycarriageway,largecarpark,fenced footpaths, pedestrian guardrailing andelevatedA34roadincloseproximity.Ingeneralaccessiscircuitousandofvariablequality.TheWestWayjunctionsaresubjecttocongestionatpeaktimesbutgenerallyoperatesatisfactorily.

2.2.13 CyclistshavethebenefitofsharedbuslaneuseeastboundonWestWay,though a short length of cycle lane is their onlyprovisionwestwards.Thiseast-westaxisoffersaccesstomostofOxfordcitycentrewithin10minutescycleride.TheBotleyCentreisalsothereforeanattractivepropositionforsustainableaccessonfootandcyclefromthesurroundingresidentialhinterland.

Figure 13 Transport and Access PlanPublic car park

Pedestrian crossing

Buslanesharedwithcycleuse

Bus stop

Privatecarpark

Servicing

Bus lane

Page 12: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD12

2.2EXISTINGBASELINE

Setting

2.2.14 The study area predominantly consistsofdevelopedlandorhardstanding,howeverthereareanumberofmaturetreesand fragmented open green spaces.

2.2.15 Botley Centre is surrounded by Oxford GreenBeltwithareasofancientwoodland,includingMarleyWood,CammoorCopseandHiggins’sCopse,locatedtothenorthandnorth-west.TheseareasprovideahighqualitylandscapesettingtoBotley.

2.2.16 Thereareseveralprotectednatureconservationsitesincloseproximitytothestudyarea,twoSitesofSpecialScientificInterest(SSSIs)intheVale(WythamWoods650mnorthandHurstHill1.6kmsoutheast)andtheOxfordMeadowsSSSIinOxford(1.7kmnortheast)whichisalsoaSpecialAreaforConservation,partofwhichincludesPortMeadowwithWolvercoteCommonandGreenSSSI.TheHutchcombeCopseLocalWildlifeSiteisalsoincloseproximity(450msouth).Thesedesignatedareasarerichinbiodiversityandare of ecological importance.

2.2.17 The majority of the study area is locatedatapproximately65mAboveOrdnanceDatum(AOD),withgroundlevelsrisingtoover100mAODinMarleyWoodtothenorthandCumnor Hill and Harcourt Hill in the south. This variationintopographymeansthestudyareaispartiallyvisiblefromanumberofelevatedlongrangeviews.Theseviewshavebeenselectedprimarilyduetotheirpotentialsensitivity

tochangewithredevelopment,takingintoconsiderationthenatureoftheview,theconditionoftheexistingviewandthepotentialnumberofviewers.

2.2.18 The study area is prominent in local streetscapeviews,particularlythosefromtheWestWay,theA34andsurroundingresidentialstreetstothesouthandeastanditwillalsobeimportant to carefully consider the impact on localviews.

2.2.19 Due to the proximity of Oxford City Centre,itisalsoimportanttoconsiderviewsoverOxfordCityCentre,includingtheviewconefromSouthParkinwhichSeaCourtTowerappearsinthebackground(OxfordCityCouncil,AssessmentoftheOxfordViewCones,2015).

2.2.20 Thestudyareadoesnotliewithinfloodzone2or3asdefinedintheEnvironmentAgency’sFloodMapForPlanning(RiversandSea,2015)buthasexperiencedsurfacefloodinginthepastduetoextremeweatherconditions.

2.2.21 TherearetwoAirQualityManagementAreas(AQMA)incloseproximitytothestudyarea.Thefirstisapproximately260msoutheast,neartheA34duetotrafficemissions.ThesecondisablanketAQMAcoveringtheentireOxfordCityarea,approximately300meastofthestudyarea.

2.2.22 There is a moderately high baseline noiseenvironmentinthestudyarea,specificallyinrelationtotheareasincloseproximitytotheA34andWestWay.

Figure 14 Topography and Views Plan

Indicativeviewingarea

Study Area

70

70

80

90

100

80

65

HARCOURT HILL

CUMNOR HILL

MARLEY WOOD

OXFORD

80 metresAboveOrdnanceDatum(AOD)

110

90

100

Page 13: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD 13

Figure 15 View from the tower of the University Church of St. Mary the Virgin (Oxford)

Figure 16 View north from Crabtree Road (Harcourt Hill)

Figure 17 View north from Louie Memorial Field on Arnold’s Way (Cumnor Hill)

*Figures15,16and17areverifiedexistingviewsfromtheMacgregorSmith,LandscapeandVisualImpactAssessment(May,2014)submittedinsupportofplanningapplicationP13/V2733andhavebeenagreedwiththeValeasimportantlocationstoassessthevisualimpactonlongrangeviewssurroundingthesite.Theseviewshavebeenselectedprimarilyduetotheirsensitivitytochange,takingintoconsiderationthenatureoftheview,theconditionoftheexistingviewandthepotentialnumberofviewers.

Study Area

Study Area

Study Area

Page 14: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD14

Building Quality and Heights

2.2.23 PiecemealdevelopmenthasledtoavariedandgenerallylowqualityenvironmentacrosstheSPDarea,consistingofamixofarchitecturalstylesandpoorrelationshipsbetweenbuildingsandpublicspaces.Muchofthestudyareaisinwardfacing,withapoorqualitypublicrealmandahighproportionofdead spaces and surface car parking.

2.2.24 Manyofthebuildings,includingtheWestWayShoppingCentreandHinkseyCourt,haveagedinrecentyearsandareinneedofredevelopmentorrefurbishmenttomeetexistingandfuturecommunityneeds.However,therearealsoanumberofbuildingswhichplayaroleindefiningthecharacterandidentityofBotley,includingElm’sParade,St.Peterand St. Paul Church and the Seacourt Bridge Public HouselocatedonthenorthernsideoftheWestWay.

2.2.25 Theexistingbuildingsinthestudyareavaryinscale,withElmsCourtandWestWayHousestandingat17metresand20metresrespectively.Themajorityoftherestofthestudyareavariesbetweenfour to eight metres.

2.2.26 The surrounding area consists of mainly residentialdevelopment,rangingbetweenfourtoeightmetres,howeverthereareacollectionofcommercialbuildingstothenortheast,whicharetallerwithSeacourtTowerrisingtoapproximately55metresabovegroundlevel.

Figure 18 Building Heights Plan

>16.0m

≥10-16.0m

≥8.0-10.0m

0-4.0m

Study area

≥4.0-8.0m

0 50 100 150 m

2.2EXISTINGBASELINE

Page 15: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD 15

Figure 20 Architectural roof detail of St. Paul and Peter Church

Figure 21 Juxtaposition of architectural styles

Figure 22 Degraded and aging West Way Centre

Figure 19 Existing building heights

Page 16: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD16

Main busy road

Elevatedmainbusyroad(A34)

Poor frontage

Poorqualityexistingbuildings

Riskofsurfacewaterflooding

Residentialstreet

Residentialgardens

Back of Elms Parade

Poor quality pedestrian routes

Poor quality streetscape

Study area Figure 23 Issues Diagram

Poor quality pedestrian crossing

NarrowStreet

Issues

2.3.1 The urban design analysis has identifiedthefollowingmainissuesfacingthefuturedevelopmentofBotley:

• Piecemealdevelopmenthascreatedadisjointedenvironmentdominatedbycarparks, poor pedestrian routes and dead spaces.

• Theexistingbuildingsinthestudyareaaregenerallyoflowarchitecturalqualityandhaveapoorrelationshipwiththeirsurroundings,lackingactivefrontages.

• Pedestrian routes are of poor quality and sufferfromalackofactivefrontagesandnaturalsurveillance.

• Circuitousvehicleroutesandmultiplesurfacecarparkscontributetoavehicledominatedenvironmentwithinthestudyarea.

• TheelevatedA34roadformsavisualandphysicalbarriertotheeast,whichnegativelyeffectsthecharacteroftheWestminsterWayStreetscape.

• TheA34andWestWayareasourceofnoiseandairpollution.

•WestWaytothenorthisawide,busyroadwhichinhibitssafepedestrianmovementandresultsinseverancetothenorth.

• TheBotleyCentreispartiallyvisiblefromsurrounding hills and Oxford and any redevelopmentwillneedtoconsiderthepotentialforimpactsontheseviews.

• Limitedretailofferandlackofcafes,restaurantsandaneveningeconomy.

• ThepositionofElmsParadecreatesalargeinactivefacadefacingthecentreofthesite.

• TheleveldifferencebetweenSt.PeterandStPaulsChurchandtheexistingsurfacecarparkformsabarriertopedestrianmovement.

• Lowrisesurroundingresidentialdevelopmentrequiressensitivetreatmentofboundaries.

• There is a lack of public open space.

Differenceinlevel

0 50 100m

2.3 ISSUES AND OPPORTUNITIES

Page 17: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD 17

Figure 24 Opportunities Diagram

0 50 100mOpportunities

2.3.2 The urban design analysis has identifiedthefollowingmainopportunitiesforthefuturedevelopmentofBotley:

• Previouslydevelopedlandprovidesanopportunity to re-use land in a more efficientandsustainableway.

• ThestudyareaisasevenminutebusjourneyfromOxfordtrainstation,whichoffersawidevarietyoftransportservicesand links.

• TheexistingElmsParadeandSt.PeterandSt.PaulsChurchcontributetotheidentityand character of Botley.

• There is a mix of uses in Botley Centre, includingarangeofcommunityfacilitiesandbusinesses,howeverthereisanopportunitytoimprovethediversityofusesandextendactivityintotheevening.

•Opportunity to retain and enhance the activeretailfrontagealongtheWestWay.

• Theexistingmaturetreesprovidesoftlandscape elements and contribute to the attractivenessofthestudyarea.

SCHOOL

• The east of the study area is a suitable locationforincreasedbuildingheightsduetoitslocationonalargeopenjunctionandthe adjacent A34.

• Thesizeofthestudyareaisofascalewhichcanhelpthedeliveryofregenerationprinciples.

• Improvepermeabilitythroughthestudyarea,andprovidepedestrianandcyclelinkswhichfollowdesirelinesandaresupportedbyactivefrontages.

• Createnewandimprovedpublicspacesacrossthestudyarea,creatingamoreusableandattractiveenvironment.

• Createahighqualitybuiltenvironment.

• ImprovepedestrianenvironmentandcrossingsontheWestWaytoreduceseveranceandcardominance.

Largeareaforpotentialre-development

Opportunity for landmark building

Vehicular routes

Buildingscontributingtotheidentityandcharacter of Botley

Existingmaturetrees

Existingbusstop

Potentialtocreatenewfrontagesalongexistingroutes

Create pedestrian permeability through the site

Potentialforpublicrealmimprovements

Study area Opportunity for increasing heights

Page 18: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD18

2.4PLANNINGCONTEXT

2.4.1 Thepolicyreviewprovidesahigh-leveloverviewofthekeypolicythemeswhichinformtheBotleyCentreSPD.ThereviewdoesnotformanexhaustivecatalogueofpoliciesbutfocusesonthemesmostrelevanttothedevelopmentofBotleyCentre.

Adopted Planning Policy Framework

2.4.2 TheplanningpolicyframeworkofrelevancetotheBotleyCentreSPDconsistsoftwotiers.AtthenationalleveltheNationalPlanningPolicyFramework(NPPF)(March,2012)andtheNationalPlanningPracticeGuidance(NPPG)(March,2014)whichsetoutoverarchingnationalplanningpolicy.Thelocallevel,comprisestheVale’sLocalPlan2011(July,2006)(SavedPolicies).

2.4.3 TheVale’sLocalPlanissupportedbyanumberofSPDs,whichprovidefurtherguidance on policies contained in the Local Plan.OfparticularrelevancetotheSPDaretheDesignGuideSPD(March,2015)andtheSustainableDesignandConstructionSPD(December,2009).

Supporting Growth

2.4.4 Paragraph18oftheNPPFhighlightstheGovernment’scommitmenttoensuringeconomicgrowthinordertocreatejobsandprosperity and tackle the challenges of climate changeandglobalcompetition.

2.4.5 SavedPolicyGS1DevelopmentsinExistingSettlementsestablishesthespatialstrategyfordevelopmentacrosstheValeanddesignatesBotleyLocalServiceCentreasoneofthefivemainsettlementsinwhichtoconcentratedevelopmentandcontributetothegrowthoftheVale.

Encouraging a High Quality Retail Offer Supported by Leisure Facilities and Employment Space

2.4.6 TheNPPFrecognisestowncentresare at the heart of the community and their developmentshouldsupporttheviabilityandvitalityofsurroundingcommunities.TheNPPFidentifiestheimportantrolearangeofusesplayincontributingtowardstowncentres and states sites should be allocated tomeetthedevelopmentneeded,includingretail,leisure,commercial,office,tourism,cultural,communityandresidentialandpromotecompetitivetowncentresthatprovidecustomerchoiceandadiverseretailoffer,whichreflectindividuality.

2.4.7 Inordertopromotecompetitivetowncentreslocalplanningpolicyshouldidentifyprimaryshoppingareas.SavedPolicyS1HierarchyofRetailProvision,setsoutastrategyforlocatingretaildevelopmentacrosstheVale.The allocated Local Shopping Centre at Botley comprisesofWestWayShoppingCentre,ElmsParade,WestWayHouse,theLibrary,SeacourtHallandtheofficecourtandsurroundingpubliccar parks.

2.4.8 SavedPolicyL6:MajorCommercialLeisureFacilitiesandT1:TourismidentifyBotleyCentreasasuitablelocationforhotelandcinemadevelopment.

2.4.9 SavedPolicyE2Economy:BotleyAreaseekstoconcentratebusinessdevelopmentinthe Cumnor Hill and Minns Business Park areas ofBotley.However,paragraph23oftheNPPFandSavedPolicyGS1DevelopmentsinExistingSettlementsrecognisesthebenefitsoflocatingofficeandemploymentusesintowncentrelocations,toimproveviabilityandreducetheneedtotravel.SavedPolicyS12identifiestheallocated Local Shopping Centre as a suitable locationforofficedevelopmentonupperfloors.

Botley: a Place to Live

2.4.10 SavedPolicyH10DevelopmentintheFiveMainSettlementsrecognisesBotleywillcontributetodeliveringtheVale’shousingneed,subjecttowardstheretentionoffacilitiesimportant to the local community, including areasofinformalopenspace;efficientuseofland;andalayout,massanddesignwhichwouldnotharmthecharacterofthelocalarea.

2.4.11 SavedPolicyH16SizeofDwellingandLifetimeHomesseekstoprovideavarietyofdwellingsizestenuresandtypesthatwillmeettheneedsofexistingandfutureresidents.Paragraph173oftheNPPF(March,2012)states policy requirements should not threaten theviabilityofdevelopment.Onthisbasisanalternativehousingmix,supportedbyarobustviabilityappraisalcouldbeconsidered.

2.4.12 LocalPlanSavedPolicyH17AffordableHousingsupportsdevelopmentof40percentaffordablehousing.TheNPPF(March,2012)includesalevelofflexibilitywithregardtothemixofdwellingsandlevelofaffordablehousing,statinganalternativemixmaybeconsidered,whereitcanbedemonstratedthatthelevelrequiredthroughtheLocalPlanisunviable.

2.4.13 SavedPolicyH19:HousingtoMeettheNeedsoftheElderlyandotherDefinedGroups,identifiestheBotleyCentreasasuitablelocationforelderly,disabledand

Page 19: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 2 BOTLEY CONTEXT

NOVEMBER 2015 BOTLEY CENTRE SPD 19

studentaccommodation,amongstothergroups.FurthermoretheNPPGclarifiesstudenthousing contributes to local housing need, basedontheamountofaccommodationitreleases in the housing market.

Supporting a Healthy Community

2.4.14 SavedPolicyDC8InfrastructureandServicesseekstoensurenewdevelopmentprovidesthenecessaryphysicalandsocialinfrastructuretomeettheneedsofexistingandfuturecommunities,throughonsiteprovisionoranappropriatefinancialcontribution.Inordertoachievethis,SavedPolicyCF1ProtectionofExistingServicesandFacilitiesresiststhelossofcommunityfacilitiesandseeks to encourage their enhancement unlessalternativeprovisionexistsorismadeavailableelsewhere.Furthermore,SavedPolicyCF2ProvisionofNewCommunityServicesandFacilitiesstatesthatprovisionofnewcommunityfacilitiesandserviceswillbepermittedwheretheymaximiseaccessanddonothaveanadverseeffectontheexistingcharacter and scale of the area.

Movement, Access and Parking

2.4.15 TheNPPFstatesthepresumptioninfavourofsustainabledevelopmentandtheactivemanagementofgrowthpatternssuchthatthefullestusemaybemadeoflocationsintermsofwalking,cyclingandpublictransport,maximisingaccesstosustainabletraveloptions

andminimisingtheneedforprivatevehiclesand major transport infrastructure.

2.4.16 The Oxfordshire County Council Local TransportPlan,2011–2030supportsthesustainabletransportimperativealongwiththeobjectiveofsupportingthelocaleconomy,accesstojobsandservicesandreducingtheenvironmentalimpactoftransport.

2.4.17 SavedPolicyTR5NationalCycleNetworkprotectstheexistingfootpathandcyclenetworkfromanydevelopmentproposals that may compromise their use and effectivenessunlessalternativeequivalentprovisioncanbemade.SavedPolicyTR6PublicCarParkinginMainSettlementsresiststhelossof public car parking should it be considered toadverselyimpactthecentre’svitalityandviability.

2.4.18 Thisindicatestheneedtosensitivelybalancetheprovisionandpromotionofsustainabletransportmodeswithsufficientparkingsupplyinprovidingcomprehensivesiteaccessibility.

Design and Heritage

2.4.19 Paragraph56oftheNPPFplacesgreat importance on the design of the built environmentandstatesgooddesignisakeyaspectofsustainabledevelopment,isindivisiblefromgoodplanningandshouldcontributepositivelytomakingplacesfor

people.SavedPolicyDC1Designseekstoensure proposals are of an appropriate layout, scale, mass, height, detailing and materials that donotadverselyimpactthecharacterandlocaldistinctivenessofthesurroundingarea.ThisissupportedbytheDesignGuideSPDwhichsetsoutclearprinciplesbasedonbestpracticeinorder to encourage a design-led approach to developmentandachievehighqualitydesign.

2.4.20 TallerbuildingscouldsupportthegrowthofBotleyCentre.Welldesignedtallerbuildings can create landmarks and help to optimisethestudyareabyachievinghigherdensities.TheLocalPlanseekstoensurebuildings are of an appropriate height and scale tothesiteandsurroundingarea(PolicyDC1).

2.4.21 BotleyCentreisnotincludedwithinanydesignatedviewsintheVale’sLocalPlanalthoughitisvisibleinthebackgroundoftheOxfordCityCouncilSouthParkViewConeidentifiedinOxfordCityCouncil,AssessmentoftheOxfordViewCones,2015.Duetothelocationofthestudyareaandthesurroundingtopography,thestudyareaisalsopartiallyvisibleinanumberofviewswhichareconsideredtobesensitivetochangeasaresultoftheredevelopmentofthestudyarea.

2.4.22 WhilstBotleyCentreisnotlocatedwithinaconservationareaanddoesnotinclude any listed buildings, Elms Parade and St. Peter and Pauls Church are considered to

contribute to the built heritage and character of Botley.

Natural Environment and Open Spaces

2.4.23 Botley Centre does not include any protecteddesignations.However,thereareseveralprotectednatureconservationsiteswithin2kmofBotleyCentre,twoSitesofSpecialScientificInterest(SSSIs)includingtwointheVale(WythamWoods650mnorthandHurstHill1.6kmsoutheast)andaSpecialAreaforConservation,whichembodiesaSSSIinOxford(OxfordMeadows1.7kmnortheast).Thesedesignatedassetsarerichinbiodiversityandecologicalimportanceandconsiderationshouldbegiventotheirconservationandenhancement, bearing in mind the distance and potentialforimpact.

2.4.24 SavedPolicyH23seekstodeliveradequateprovisionofsuitableopenspace,includingoutdoorplayandinformalrecreationspaceinnewhousingdevelopment.Theamountandtypeofprovisionwilldependon the nature and the scale of the scheme, althoughdevelopmentswillusuallyberequiredtoprovide15percentoftheresidentialarea laid out as public open space, along withsuitablearrangementsforitsfuturemanagement and maintenance.

Page 20: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

3

VISION&OBJECTIVES

Page 21: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 3 LOCAL VISION & OBJECTIVES

NOVEMBER 2015 21BOTLEY CENTRE SPD

3.1LOCALVISIONFORBOTLEYCENTRE

‘The regeneration of Botley will create a thriving and welcoming centre, which is recognisably ‘Botley’, and responds to the existing local character and surrounding scale. Botley will provide a heart for the existing and future community which includes human scale buildings and spaces that are distinctive, flexible and sustainable. Above all, Botley will be: • A good place to meet.• A good place to do business.• A good place to shop and eat.• A good place to live, grow up and

grow old.• A safe and attractive place.’

3.1.1 WestWayCommunityConcernhavepreparedtheirownvisionforBotleyCentre.ThecommunityaspirationsreflectedintheWestWayCommunityConcernvisionhaveinformed the Local Vision for the Botley Centresetoutabove.

Figure 25 Vision Sketch, view from north

Page 22: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 3 LOCAL VISION & OBJECTIVES

NOVEMBER 201522 BOTLEY CENTRE SPD

3.2OBJECTIVES

02. Respect the Character and Identity Of Botley

03. A Distinctive Place

04. Appropriate Scale & Massing

05. Strengthen the Retail Centre

06. Transforming the Public Realm

07. Improve Access, Permeability and Parking

08. Enhance Community Facilities

09. A Vibrant Mix Of Uses

Provideadiverserangeoflandusesthatmeet the needs of people of all ages from the existingandfuturecommunity.

RecogniseandreflecttheexistingcharacterofBotley,andwherepossiblebetterintegratebuildingswhichcontributetothearea’sidentity,suchasElmsParadeandSt.Peterand St. Paul Church. The character and appearanceofnewdevelopmentshouldreferencetheexistinglocalvernacular,whilstnotlimitinghighqualitycontemporarydesign.

Encouragedevelopmentofthehighestarchitecturalqualitycreatingbuildings,spacesandstreetswhichmeetpeople’sneedsandincludedistinctivelandmarksandgatewaysforBotleyCentre.

Developmentshouldrelatetothescaleandmassingoftheareaandcreateavariedandintegratedroofscape,whichcontributespositivelytothevisualamenity.

Improvetheretailofferbycreatingretailcircuits that incorporate a range of unit sizes,avarietyofretailtypesincludingcafes/restaurantsandpromoteaneveningeconomy.

Createanattractiveunifiedpublicrealmwitharangeofsocialspacesforavarietyofactivitiesandprovidefriendly,activeandsaferoutes and streets.

Createahighlypermeablearea,whichencouragespedestrianmovement,improvesaccess to and from the study area and providesappropriatelevelsofcarparking.

Rationaliseandenhancecommunityfacilitiesacrossthestudyareatobetterservetheneedsoftheexistingandfuturecommunity.

01. Deliverable Improvements

Adoptapragmaticapproachtoredevelopment,whichencouragestheeffectiveuseoflandandanappropriatebalanceoflandusesthatdeliversmaximumcommunitybenefitandensuresaviableanddeliverabledevelopment.

3.2.1 Thevisionisunderpinnedbynineoverarchingobjectives,whichseektoaddressissues,embraceopportunitiesanddeliverthevisionforBotleyCentre.

a place to growold

a place to

meet

a place to do

business

a place to

shop and eat

a safe and attractive

place

A vibrant mix of uses

BOTLEY CENTRE

Respect character

and identity

A distinctive place

Appropriate scale and massing

Strengthen the retail

centreTransforming

the public realm

Improving access,

permeability, parking

Enhance community

facilities

Deliverable improvements

Page 23: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

4

DEVELOPMENT PRINCIPLES

Page 24: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 24 BOTLEY CENTRE SPD

4.1BotleyLocalServiceCentre

4.1.1DevelopmentshouldsupportBotley’sroleasaLocalServiceCentrewithintheValeandasanimportantlocationtoconcentratedevelopmentwithinthecontextof the Vale and Oxford. This could beachievedthroughtheprovisionofimprovedfacilitiesandservices,anupgradedenvironmenttomeettheneedsoftheexistingandfuturecommunities,andattractpeopletosupportaviableandsuccessfuldevelopment.

4.1.2 Based on adopted planning policy, anassessmentofviablelanduses,transport impacts and community aspirations,amixoflanduseswhichmaybeappropriatecouldinclude:

• a range of retail units including food stores;

• businessandofficespaces;

• a hotel;

• avarietyofresidentialunits,includingon-siteaffordablehousing;

• studentaccommodation;

• accommodationforolderpeople;

• a nursery;

• anewcommunityhubincludingfor example a library;

• leisure uses such as a cinema;

• cafes and restaurants; and

• placesofworship.

4.1.3 Focuslanduseswithhigherlevelsofactivityintermsofnumbersofpeoplevisitingandmovingthrough the area, such as retail, leisure, cafes and restaurants in the east of the study area, in linewiththeroleoftheexistingallocated Local Shopping Centre. Moreprivateloweractivitylanduseswhichattractfewervisitors,suchasresidentialandcommunityuses,shouldbelocatedinthewestof the study area, as illustrated on the adjacent diagram.

4.1.4Thenatureoftheexistingbuildingswithintheeasternpartofthestudyareaandtheanticipatedhigheractivitylandusesaresuchthat a piecemeal approach to developmentisunlikelytorealisethevision.However,thewesternpart of the study area is not a priorityforredevelopment,andanyfuturedevelopmentshouldjustifyanylossoffacilitieswithinFieldHouse.

Figure 28 Activity Diagram

WestW

ay

Westm

insterWay

A34

Arthray Road

study area

mainactivityzone loweractivityzone

loweractivityzonewithactivefrontage

0 50 100m

Policy S12 Local Shopping Centre

Page 25: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 25BOTLEY CENTRE SPD

4.2.1 Pedestrian permeability across the study areashouldbeimprovedthroughclearlydefinednorth/southandeast/westroutesenhancingconnectionsbetweenWestWay,WestminsterWayandArthrayRoad.

4.2.2 Thelayoutofdevelopmentshouldencouragemovementalongkeyretailroutesbycreatingcircuitsthroughstrategicallylocatinganchoruses,carparks and bus stops.

4.2.3 Reducetheexistingnorth-southseveranceacrossWestWay,throughimprovementstopedestriancrossingsandremovalofstreetclutter.

4.2.4 Encourageuseoftheexistinglocalcycleroutes,notablyNationalCycleRoute57.ImprovementtothecycleenvironmentonWestWayshouldbeconsideredintermsofmaximisingeast-westcyclistprovisionwhetherthroughcontinueduseofthesharedbuslane(eastbound)onthenorthernsideofWestWay,orthediscontinuouscyclelane(westbound)onthe south side.

4.2.5 Bus access and use should be encouraged through the alignment of pedestrian routesthroughthearea,withbusstoplocationsonWestWayandWestminsterWayfacilitatingappropriateandconvenientroadcrossings.

4.2.6OpportunitiesshouldbesoughttoimprovethequalityofbusstopfacilitiesonWestminsterWayandoptimisebusstoplocationinrelationtothedevelopmentrelateduseandthewiderresidentialarea.

4.2.7 Developmentshouldrespondtotheconstraintsofthelocalroadnetwork,including complementary land uses and themaximisationofsustainabletravelmodes. Thetrafficandtransportimpactsofthedevelopmentproposalswillneedtoberobustlyassessedandmitigationreviewed.ThescopeofthisworktobeagreedwithOxfordshireCountyCouncilasHighway’sAuthorityinconsultationwithHighwaysEnglandwhereappropriate.

4.2.8 Proposalsforvehicleaccessshouldseektominimiseaccesspointswiththe number and scale similar to those presentlyinuse.Wherepossible,effortsshouldbemadetoimproveroadcrossingconditionsforpedestriansandcyclistsinrelationtomovementgeneratedfromandthrough the study area.

4.2.9VehicleaccesstocarparkingandserviceareasshouldbeviaWestWayandWestminsterWaywithArthrayRoadprovidingaccessforlowlevelresidentialaccesstrafficonly.

study area

improvedpedestrianandcycleexperience

improvedpavements

improvedpedestriancrossings,trafficslowingdownmeasures

Space in front of the Elms Parade, potentiallocationforcycleparking

carparkingandservicing

Figure 29 Access Diagram

WestW

ay

Westm

insterWay A34

Arthray Road

5 mins drivingtoOxford

main pedestrian access to the study area

improvedprimarypermeabilityacross the study area

improvedbusstopsettings

improvedgateway

4.2 Access, Linkages and Legibility

vehicularaccess(leftin,leftout)

vehicularentranceandegress

0 50 100m

Page 26: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 26 BOTLEY CENTRE SPD

4.3.1 Theopportunityexiststoprovideaseriesofpublicopenspacesvariedincharactertoformthe‘heart’ofthedevelopment,thesecouldincludea commercially focused space and a community orientated space. These spaces could be designed to accommodatearangeofactivitiessuchasamarketandevents.

4.3.2 Aunifiedandcohesivedesignlanguageshould be applied throughout the publicrealmwithinthestudyareaandextendingalongWestWayandWestminsterWay.

4.3.3 Any public open spaces and key routesshouldbedelineatedbyactivefrontagesandusesatgroundlevel,such as retail, restaurants, cafes, communityfacilities,andleisureandresidentialentrances.

4.3.4 Public open spaces should be supportedbyarangeofopportunitiesforformalandinformalseating,suchasoutdooreatingareasandbenches.

4.3.5 Public open spaces should be proportionedtobehumaninscaleandtakeintoconsiderationsolarorientationtoavoidovershadowingofspaces.

4.3.6 Landscaping proposals should integrate retained buildings and enhance their settings.

4.3.7 A shared surface to the north of Elms Paradecouldprovideawelcomingpedestrianenvironment,whichretainsitsfunctionasalocalcarparkandimprovesthesettingofElmsParade.

4.3.8Developmentshouldretainexistingmaturetreeswherepossibleandenhance green infrastructure through anetincreaseintreesandplanting,and green landscape elements such as permeablepavingandgreenroofs.

4.3.9DevelopmentshouldincorporateSustainableUrbanDrainage(SUDs).

4.3.10Publicopenspaceshouldrelatewellto context including building height in order to form a sense of enclosure whilstretainingpermeability,asillustrated by the sketches on page 28.

WestW

ay

Westm

insterWay

A34

Arthray Road

Figure 30 Spaces Diagram

study area

high quality pedestrian linkages

residentialcourtyardsarea

streetscape and pedestrian crossingimprovements

social space

townsquare

existingmemorialgarden

potentialforlandscapedspacemixedwithfewcarparkingspaces

primary frontages

secondary frontages

4.3 Public Space and Streetscape

newfrontages

back gardens boundary

existingtrees

0 50 100m

Page 27: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 27BOTLEY CENTRE SPD

4.3 Public Space and Streetscape

Figure 31 Enclosure Sketches

Page 28: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 28 BOTLEY CENTRE SPD

study area

up to 8 storeys

up to 5 storeys

up to 4 storeys

up to 3 storeys

heights going up

streetscapeviews

viewsfromhighersurroundings

landmark

Figure 32 Scale and Massing Diagram

4.4.1Developmentshouldrespondtotheexistingscale and massing of the study area and surrounding area as stated in Principle DG51:ScaleoftheVale’sDesignGuide(March2015).

4.4.2 Aframeworkforheightsasshownonthe Scale and Massing Diagram has been establishedthroughconsiderationofurbandesignprinciples,townscapecontext,localviewsandcharacter,thesurroundingcontext,sensitivesiteboundariesandvisualgatewaystothestudyarea.Howeverthese heights are subject to the detailed buildingdesignsmeetingalloftherelevantDevelopmentPrinciplescontainedwithinSection4.4Density,ScaleandMassingandSection4.5DesignQualityandCharacterinordertoachievedevelopmentofthehighestquality.

4.4.3 The north east corner of the study area providestheopportunityforavisuallandmarkthatsignalsarrival,invitespeopleintothestudyareaandcreatesapositivefirstimpression.Thiscouldbeachievedthrough a high quality taller building, distinctivearchitecture,anopenspaceorthe use of public art.

4.4.4 Thedensityofdevelopmentshouldbecarefullyconsideredandjustifiedtoavoidoverdevelopmentwithinthestudyareawhichcouldresultinexcessivedemandsoninfrastructureandservices,and/or

WestW

ay

Westm

insterWay

A34

Arthray Road

4.4 Density, Scale and Massing

inappropriate impact on local amenity, character and placemaking.

4.4.5 Considerationshouldbegiventotheappearance of the study area from surroundingsensitiveviews,comprisingcloserangeviews,elevatedlongrangeviewsandthosefromOxfordCityCentreincludingtheviewconefromSouthPark.Developmentproposalswillberequiredtobe subject to a Visual Impact Assessment inaccordancewithcurrentindustryguidelines.

4.4.6Developmentshouldincludeamixofbuilding forms, and buildings should break upmassing,toavoidthecreationoflargeoroverbearingsinglevolumesandensureavariedandvisuallyinterestingroofscape.

4.4.7 Scaleandmassingofdevelopmentshouldconsidereffectsonsurroundingdevelopment,specificallyovershadowingof public spaces, sunlight and daylight impacts,windmicro-climateandresidentialamenity.

4.4.8 BuildingsfrontingWestminsterWayshouldseektolimitthelevelofnoiseandairpollutionenteringthestudyareafromtheadjacent A34.

0 50 100m

Page 29: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 29BOTLEY CENTRE SPD

4.5.1DevelopmentshouldfollowthedesignapproachsetoutintheVale’sDesignGuide(March,2015)to ensure proposals respond to the surroundings andseektodeliversustainabledevelopment.

4.5.2 Buildingandpublicrealmmaterialsandfinishesshould be of the highest quality to create a cohesiveenvironmentandenhancetheexistingcharacterandidentityofBotley.

4.5.3 Elms Parade is considered to contribute to the characterandidentityofBotleyandshouldwherepossibleberetainedaspartoftheregenerationofBotley.HoweverthereisaneedtoimprovetherelationshipbetweenthesouthernelevationofElmsParadeandtherestofthestudyarea,thiscouldbeachievedthroughanappropriateextensionincorporatingasouthfacingactivefrontage.

4.5.4 RefurbishmentworksorachangeofuseswithinElmsParadeshouldbeencouragedwherethiswillensurethelongtermviabilityofthebuilding.

4.5.5 St Peter and St Paul Church is considered to contributetothecharacterandidentityofBotleyandshouldwherepossibleberetainedaspartoftheregenerationofBotley.Developmentshouldcarefullyconsidertheleveldifferencesandseektobetterintegratethebuildingintothesurrounding area.

4.5.6 Thelayoutofdevelopmentandthedesignofbuildingsshouldbeflexibletoallowthemtobeadaptedtoaccommodatedifferentuseswhereappropriateandpracticable.

Figure 33 Character Diagram

Elms P

arade

St Peter a

nd

Paul’sC

hurch

WestW

ay

Westm

insterWay

A34

Arthray Road

Poplar Road

study area

existingbuildingcontributingtothecharacterandidentityof Botley

character area A

character area B

landmark opportunity

4.5 Design Quality and Character

0 50 100m4.5.7Thelossofbuildingscurrentlyidentifiedto

contributetothecharacterofBotleywillneedtobejustified,includingthroughahighlevelof architectural quality that enhances the characterandidentityofBotley.

4.5.8Developmentshouldseektoincorporateclimatechangeadaptationandmitigationmeasurestocombattheeffectsofchangingweatherpatterns.Thiscouldincludemeasuressuchas:• plantingandglazingtoregulateheat;• sustainablematerialsincludinggreenwalls

androofstoreduceheatpenetrationandflooding;

• maximisingnaturalventilation;• buildingandwindowlocationand

orientation;and• SustainableUrbanDrainage.

4.5.9Whereappropriateandpracticabledevelopmentshouldseektominimiseenergyconsumptionandcarbonemissionsthroughsensitivedesignandtheincorporationofrenewableenergyandheatingsources.Whereappropriate proposals could consider solar orientation,lowenergymaterials,photovoltalcs,solarandthermalheatingandimplementationorfutureconnectiontoawiderdistrictheatingnetwork.

4.5.10AssetoutintheVale’sDesignGuidetheCouncilaspirestonewnon-residentialdevelopmentachievingalevelofperformanceequivalenttoBREEAMexcellent.

Page 30: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 30 BOTLEY CENTRE SPD

Character Area A Character Area B4.5.12 Mixedusecommercialcharacter,benefitingfromcontemporarydesignwithreferences

to retained architectural styles and materials.4.5.11 Predominatelyresidentialcharacter,whichincorporatessensitivecontemporary

architectureandreflectsexistingresidentialtypologies.

4.5 Design Quality and Character

Figure 34 Quiet attractive open spaces and pedestrian routes supported by natural surveillance and planting

Figure 35 Low rise contemporary residential architecture reinterpreting local features

Figure 36 Sensitive contemporary architecture incorporating traditional local styles and materials

Figure 38 Mixed use development incorporating retail at the ground floor and residential units above

Figure 39 Architecture reflecting existing architectural features such as pitched roofs

Figure 40 High quality public realm to attract people into the site and support activity

Figure 41 Inviting entrance to retail loop or street drawing footfall through the site

Figure 37 Sensitive architectural treatment to incorporate new development and enhance retained buildings

Page 31: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 31BOTLEY CENTRE SPD

4.6.1 Cycle parking should be in accordance withtheOxfordshireCountyCouncilcycleparking standards. Proposals should also reflectsitespecificparkingdemandwithflexibilitytoincreaseprovisioninrelationtomonitoredcycleparkinguptakewithinanagreedpost-completiontimescale.

4.6.2 Cycleparkingfacilitiesshouldbeconvenientlysitedanddistributedthroughthesitetoprovideparkingatallkeyarrivalpointsanddestinations.

4.6.3 Vehicle parking should support the variousdevelopmentusesdemandwhilstrecognisingtheneedtoprovideahighquality public realm. Sharing of parking betweenlandusesistobeencouragedthroughsensitivesiteplanningandactivesitemanagementinordertominimisedemand.Considerationshouldbegiventothepossibilityofoverspillparking on surrounding streets and the needtoresolvesuchimpactthroughimplementationofmeasuressuchasacontrolledparkingzone(CPZ).

4.6.4 ServicevehicletrafficshouldbedirectedtoadedicatedaccessandservicingfacilityaccessedfromWestminsterWaythusavoidingpublicareasandminimisingservicevehiclemovementsonresidentialstreets.SecondaryservicevehicleaccessmaybemadefromWestWay,thoughlimitedtosmallerservicevehicles.

4.6ParkingandServicing

Figure 42 Cycle parking Facilities

Figure 43 Shared surfaces

Figure 44 High quality bus stop and pavements

Figure 45 Permeable parking surfaces

4.6.5 AServiceandDeliveryManagementPlanwillberequiredtoaccompanyanyplanningapplicationtominimiseimpactsonthepublichighwayandsurroundingresidentialarea.

4.6.6 ConsiderationshouldbegiventoanybenefitsaccruingfrompossiblelocalisedwideningofWestWayadjacenttotheeasterndevelopmentsiteboundarysuchas it may further facilitate access for servicevehicles,carparkingandbuses,aswellasfacilitatingapossibleimprovementinpedestrianfootwayandroadcrossingconditions.

4.6.7 AlldevelopmentproposalsshouldbeaccompaniedbyaTravelPlanwhichshould set sustainable mode share transfer targets and indicate the means for monitoring performance and managing performancegoaldelivery.TravelPlansshouldbeimplementedtoactivelyencourage all using the site to consider andtakeopportunitiestotravelbysustainabletravelmodesratherthanbyprivatecar.Thisisparticularlyimportantfor any Student Housing proposals wheretravelplanningwillplayakeyroleinmanagingtravelbehaviourandensuringcar-freestudentdevelopmentissuccessfullydelivered.IntheeventofcomprehensivedevelopmentofthestudyareaaFrameworkTravelPlanshouldbedeveloped.

Page 32: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

CHAPTER 4 DEVELOPMENT PRINCIPLES

NOVEMBER 2015 32 BOTLEY CENTRE SPD

4.7DEVELOPMENTFRAMEWORK

Figure 46 Development framework

Westm

insterWay

Arthray Road

Elms P

arade

St Peter and

Paul’sC

hurch

mainactivityzone

preferred space for car parking andservicing

heights going up

landmark marking study area gateway

streetscapeviews

4.7.1 ThedevelopmentframeworkprovidesanoverarchingstrategyforthefuturedevelopmentofBotleythattiestogetherthedevelopmentprinciplesandsetsoutthekeyspatialpriorities.Thedevelopmentframeworkwillplayanimportantroleinshapingfuturedevelopmentproposalsforthestudyareaandprovidesaflexiblestrategywhichallowsvariousformsofdevelopmenttocomeforward,whilstensuringthevisionandobjectivesarestillachieved.

WestW

ay

social space

townsquareBotley Centre study area

potentialforlandscapedspacemixedwithcarparkingspaces

main pedestrian access to the study area

vehicularaccesstothestudyarea

main frontage

secondary frontage

pedestrianactivityfrontage

sensitiveedgeofthestudyareafacingexistinggardens

primarynewroutesthroughthe study area

existingbuildingcontributingtothecharacterandidentityofBotley

streetscape and pedestrian crossingimprovements

loweractivityzone

loweractivityzonewithactivefrontage

0 50 100m

Page 33: Botley Centre Supplementary Planning Document...Local Plan 2011 (July, 2006) (Saved Policies). ... Elms Parade, three public car parks, a post office, banks, cafes and restaurants,

16 Brewhouse Yard

London EC1V 4LJ

020 7812 8000