22
Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview Mr. Flavio Leo Manager Of Aviation Planning NEXTOR Workshop NEXTOR Workshop June 6 June 6 - - 8, 2007 8, 2007

Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

  • Upload
    vuhanh

  • View
    231

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview

Mr. Flavio LeoManager Of Aviation PlanningNEXTOR Workshop NEXTOR Workshop –– June 6June 6--8, 20078, 2007

Page 2: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

1

Logan Has Been One of the Most Delayed Airports in the U.S.

Source: FAA OPSNET System and DOT Bureau of Transportation Statistics Office of Airline Information

1991 3rd1992 3rd1993 2nd1994 2nd1995 4th1996 6th1997 5th1998 2nd1999 4th2000 4th2001 6th

DOT Delayed Arrival RankingsAir Travel

Consumer Report

2006 7th

Page 3: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

2

Numerous Studies Have Been Conducted to Address Logan’s Delay Problem

Program for Airfield Capacity Efficiency (PACE), Massport (1988)

Second Major Airport Site Selection Study, MAC (1991)

Boston Logan International Airport, Airport Capacity Enhancement Plan, FAA (1992)

Strategic Assessment Report, MAC (1993)

New England Regional Airports, Air Passenger Service Study, Phase 1, NEC/FAA (1994)

Logan Airside Improvements Feasibility Study, Massport (1995)

New England Regional Airports, Air Passenger Service Study, Phase 2 NEC/FAA (1997)

Logan Airside Improvements Planning Project EIS/EIR, FAA/Massport (1996-2002)

New England Regional Airport System Plan – Phase 1 & 2, FAA/MAC/Massport (2002-ongoing)

Page 4: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

3

In 1988, Massport Instituted the Program for Airfield Capacity Efficiency (PACE)

Changed Logan’s Landing Fee Structure:– Previously aircraft were charged based on weight (with a $25 minimum fee)

– PACE added a $91.00 charge per landing with a lower weight-based fee

– The PACE fee structure applied across the full day – not just during peak periods

– Total landing fee revenues were unchanged (revenue neutral)

Significantly increased landing fees for small commuter and GA aircraft, and lowered landing fees for jet carriers

Challenged by small aircraft users in U.S. District Court and before the U.S. Department of Transportation

Implemented in July 1988 and was in effect for six months prior to being overturned

Page 5: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

4

While PACE was in Effect, Flight Activity at Logan Declined

Overall Flight Volume at Logan was down by 5.5% during the six month period with PACE:– General Aviation flights dropped by 34% from prior year

– Regional Carrier Flights declined by 6 % from prior year

While PACE coincided with a drop in Logan flights, the causality is less clear:– GA also declined at other Boston area facilities (Hanscom,

Beverly, and Norwood)

– Logan GA traffic did not recover after PACE was rescinded

– Regional carrier flight levels were impacted by carrier consolidation

Page 6: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

5

PACE was Overturned by the U.S. Department of Transportation

The U.S. DOT Found that PACE was: – Unjustly discriminatory to small aircraft users;

– Based on an inappropriate cost allocation methodology; and

– The higher fees for small aircraft were unrelated to actual periods of congestion

In the PACE decision, the DOT did protect the airport’s right to change the landing fee structure:– The DOT Order stated that “there is nothing inherently sacrosanct

about weight-based fees, and nothing in the law that precludes Massport from changing its method of cost allocation.”

The PACE decision guided Massport’s efforts to design a peak period pricing program in 1992-1993

Page 7: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

6

In Response, Massport Developed a Comprehensive Program to Reduce Delays at Logan Airport

Physical Improvements

Demand Management

Increase use of Regional Airports

High Speed Rail to Top O&D Markets(NYC and WAS)

Page 8: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

7

The Airside Study Identified a Package of Physical Improvements and Administrative Options for Minimizing Delays

Page 9: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

8

In 1993 Overscheduling was a Concern

0102030405060708090

100110120130

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour

1993 (3 Hour Average)August WeekdayLogan

Operations

Page 10: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

9

0102030405060708090

100110120130

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Post 9/11 Logan Flight Activity Dropped to Well Below the Levels Present in 1993 (Logan’s Historical High)

Hour

LoganOperations

Page 11: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

10

While Peak Period Pricing was Ineffective in the Near-Term, Analysis Showed that It Offered Delay Reduction Benefits at Higher Activity Levels

Delay Reduction Attributable to Peak Period Pricing

Logan at510,000 Annual

Operations

4%Lower

4%Lower

Logan at552,000 Annual

Operations

19%Lower19%

LowerLogan Flights in Logan Flights in 2006 = 410,0002006 = 410,000

Page 12: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

11

The Peak Period Surcharge Program is a Condition of the Administrative and Judicial Approvals for Runway 14-32

“FAA is directing Massport to develop and submit a detailed plan or draft proposal for Peak Period Pricing, or other comparable Demand Management Program, before commencing construction of Runway 14-32”

Massport will begin a rulemaking process prior to beginning construction of Runway 14-32

Massport is not to operate Runway 14-32 until a demand management program has been enacted by the Board

Final Judgment in Suffolk Superior Court(Business Litigation Section)

FAA Record of Decision

Page 13: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

12

Goals of Massport’s Peak Period Surcharge Program

Early Identification of Overscheduling and Potential Delays

Provide a Signal to All Airport Users Regarding Future OperatingEnvironment at Logan

Reduce Delays by Aligning Flight Demand with Logan’s VFR Capacity

Maintain Access from Small Communities Dependent on Logan

Build on Lessons Learned from PACE:– Established a methodology to define the peak period

– Used a cost allocation model to establish the peak period fee level

– Trigger the Peak Fee based on Airfield Delays

Page 14: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

13

Elements of Massport’s Peak Period Surcharge Program

Trigger Program When Projected VFR Delays Reach 15 Minutes per OperationTrigger ProgramTrigger Program When Projected VFR When Projected VFR Delays Reach 15 Minutes per OperationDelays Reach 15 Minutes per Operation

Provide Early-Warning to Users and FAA for Voluntary ResponseProvide EarlyProvide Early--WarningWarning to Users to Users

and FAA for Voluntary Responseand FAA for Voluntary Response

Monitor Schedules to Identify Overscheduling Conditions 6 Months in Advance

Monitor SchedulesMonitor Schedules to Identify to Identify Overscheduling Conditions Overscheduling Conditions 6 Months in Advance6 Months in Advance

Impose Peak Period Surcharges ($150 near-term) for Arrivals and Departures (Revenue Neutral)Impose Peak Period SurchargesImpose Peak Period Surcharges ($150 near($150 near--term) for term) for Arrivals and Departures Arrivals and Departures (Revenue Neutral)(Revenue Neutral)

Small Community Exemptions at August 2003 Service LevelsSmall Community ExemptionsSmall Community Exemptions at August 2003 Service at August 2003 Service LevelsLevels

All Key Levers Are Adjustable to Address Future

Conditions

Page 15: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

14

The Monitoring Program is Designed to Provide Advanced Notification to Airport Users

The program will forecast Logan activity, up to six months in advance, to identify the emergence of overscheduling conditions

A simulation model, identified in consultation with FAA, will estimate the levels of runway-related delays during VFR conditions based on:

Advance notice will be given to airport users and FAA to providean opportunity for voluntary schedule adjustments and/or FAA intervention

Page 16: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

15

The $150 Fee Level is a Starting Point, Intended to Affect Demand in Small Increments

The peak period fee is designed to stimulate a shift of some operations from peak to off peak periods, to better align demandwith capacity

The regulation specifically allows for adjustment to the peak period fee, if required, to balance flight demand with Logan’s available capacity

The rate structure will be revenue neutral to the extent required by Federal law– Increased revenues from peak period surcharges will be offset

through a reduction in off peak landing fees

Page 17: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

16

An Exemption Program Protects Small Community Air Service

BOS

Lebanon

Martha'sVineyard

Nantucket

Provincetown*

Presque Isle

Bangor

Portland

Bar Harbor

Rutland

Manchester

Keene

Laconia

New HavenBridgeport

Small Community Exemptions

Logan Flights (Aug. 2003)

Community Daily4:00pm-7:59pm

Illustrative Exemptions

Nantucket 64 17 17

Augusta 4 0 4

Bangor 22 4 4

Bar Harbor 9 3 4

Hyannis 14 4 4

Martha's Vineyard 47 13 13

Presque Is le 6 2 4

Provincetown 30 9 9

Portland 14 4 4

Rockland 7 1 4

Rutland 6 1 4

T otal 223 58 71

* Special circumstances exemption for Provincetown

Page 18: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

17

Massport’s Peak Period Surcharge Program is Consistent with Federal Law

Properly Structured“A properly structured peak pricing system that allocates limitedresources using price during periods of congestion will not be considered to be unjustly discriminatory.”

Revenue Neutral“These provisions do not exempt airport proprietors from the requirement that total airfield revenues not exceed total airfield costs as determined in accordance with the Final Policy.”

Exempt from Part 161“Noise or access restrictions…do[es] not include peak-period pricing programs where the objective is to align the number aircraft operations with airport capacity.”

Airport Noise and Capacity Act of 1990:

DOT/FAA Rates and Charges Policy:

Page 19: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

18

Massport’s Peak Period Surcharge Program Is Designed to fit Logan’s Operating Profile

Peak periods during discrete periods of the day/year

Only need to shift a limited number of flights outside of peak period

Program is launched well in advance of the delay condition so that air carriers have substantial advance notice and opportunity adjust Logan schedules and aircraft fleet mix– Monitoring program provides further opportunity for users to adjust their

schedules

Page 20: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

19

What is the Airport Role in the Demand Management Process?

USDOT/FAA have recognized the right of airports to address airfield congestion through a tailored pricing program

Airports can and should be proactive, not reactive, in addressing congestion management

Airports need to design a program that fits their unique operating profile and circumstances.

One size does not fit all.

Page 21: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

20

Page 22: Boston Logan International Airport’s Peak Period … · Boston Logan International Airport’s Peak Period Surcharge Regulation - Overview ... Environment at Logan Reduce Delays

21

In 2000, Congestion and Delay Were the Watch Words in the U.S. Aviation Industry. Today, Demand is Recovering and Flight Delays are Also Growing Again…

22%

28%31%

34% 35%37%

39%

21%17%

28%31%

37%

23%

28%32%

29%

36%

25%22%

43%

0%

10%

20%

30%

40%

50%

DFW

STL

ATL

JFK

EWR

LAX

BOS

ORD

SFO

LGA

20002006

Percentage of Arrivals Delayed by 15 Minutes or More Ten U.S. Airports in 2000 and 2006

Source: U.S. DOT, Air Travel Consumer Report