Trust Bank A Satt lu Fieaccicl lscltsioa BOQ FOR CONSTRUCTTON AND SUPPLY OF FTT.OUT ITEMS OF ATM BOOTH LOCATED AT NEAR 02 MP CHECK POST, MYMENSINGH CANTONMENT, MYMENSINGH

BOQ FOR CONSTRUCTTON AND SUPPLY OF … for Construction...100.00 cft 05 5" Thick Brick Works With First Glass Bricks: Sft Brickworks with first class bricks in cement sand (F.M. of

Embed Size (px)

Citation preview

Trust BankA Satt lu Fieaccicl lscltsioa

BOQ FOR CONSTRUCTTON AND SUPPLYOF FTT.OUT ITEMS OF ATM BOOTH

LOCATED AT NEAR 02 MP CHECK POST,MYMENSINGH CANTONMENT,

MYMENSINGH

Sl No Description Quantity Unit Rate Amount

01 Earth Work in Excavation:Earth work in excavation in all kinds of soil for foundation trenches includinglayout, providing center lines, local bench-mark pillars, leveling, rammingand preparing the base, fixing bamboo spikes and marking layout with chalkpowder, providing necessary tools and plants, protecting and maintainingthe trench dry etc., stacking, cleaning the excavated earth at a safedistance outside of the area enclosed by the layout etc. All completing asper direction of the Engineer- in-charge & full satisfaction of the BankAuthority.

250.00 cft

02 Earth Filling in Foundation Trenches :

Earth filling in foundation trenches & plinth, in 150 mm layer with earthavailable within 90 m of the building site minimum dry density of 90% withoptimum moisture content including carrying watering, leveling, dressingand compacting to a specified percentage each layer up to finished leveletc. All completing as per direction of the Engineer- in-charge & fullsatisfaction of the Bank Authority.

250.00 cft

03 Brick Flat Soting:One layer of brick flat soling in foundation or in floor or where necessarywith first class or picked jhama bricks including preparation of bed and fillingthe interstices with local sand, leveling etc. All completing as per directionof the Engineer- in-charge & full satisfaction of the Bank Authority.

60.00 Sft

B st ml04Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar(1 :6) in plinth and below Gread Beam, Stair,filling the joints/interstices fullywith mortar, racking out the joints, cleaning and soaking the bricks at leastfor 24 hours before use and curing at least for 7 days etc. All completing asper direction of the Engineer- in-charge & full satisfaction of the BankAuthority.

100.00 cft

05 5" Thick Brick Works With First Glass Bricks:

Sft

Brickworks with first class bricks in cement sand (F.M. of sand 1.2) mortar(1:4) in foundation, plinth and superstructure, filling the joints/interstices fullywith mortar, racking out the joints, cleaning and soaking the bricks at least

for 24 hours before use and curing at least for 7 days etc. All completing as

per direction of the Engineer- in-charge & full satisfaction of the BankAuthority..

320.00

06 Sand Filling in Plinth:

200.00 cfi

Sand Filling in Plinth with sand having F.M.0.5 to 0.8 in 150mm layers

including leveling, watering and compaction to achieve minimum dry density

of 90% with optimum moisture content (Modified proctor test) by ramming

each layer up to finished level as per design etc. All completing as per

direction of the Engineer- in-charge & full satisfaction of the Bank Authority.

07 Mass Concrete (1:3:6):

15.00 cft

Mass concrete (1:3:6) in floor and where necessary with cement sand (F.M.

1.2) and picked jhama chips including breaking chips, screening, mlxing,laying,compacting to levels and curing at least for 7 days including the

supply of water, electricity and other charges and costs of tools and plants

etc. All completing as per direction of the Engineer- in-charge & full

satisfaction of the Bank Authority.

r Sheet:08

90.00 Sft

,.J

Supplying and laying of double layer polythene sheet weighing one kilogramper 6.5 square meter in floor or where necessary below cement concrete

etc. All completing as per direction of the Engineer- in-charge & full

satisfaction of the Bank Authority..

BOQ FOR CONSTRUCTION AND INTERIORYEXTERIOR DECORATIONWORKS OF ATM BOOTH NEAR 02 MP CHECK POST, MYMENSINGH

CANTONMENT, MYMENSINGH

Page 1 of6

Sl No Description Quantity Unit Rate Amount

09 Neat Cement Finishing to Plinth WallMinimum 12 mm thick cement sand (F.M. '1 .2) plaster ('t:4) with neatcement finishing using black oxide (1 :2) in plinth wall up to 150 mm belowground level with neat cement finishing including washing of sand, finishingthe edges and corners and curing at least for 7 days, including the cost ofwater, electricity and other charges etc. All completing as per direction ofthe Engineer- in-charge & full satisfaction of the Bank Authority.

70.00 Sft

10 RCC Works:Supplying, fitting & fixing of Reinforced cement concrete with Deformed Bar60 Grade to details as per design works (1:'1 .5:3) including supply & placing

of reinforcement in position of specified compressive strength, fc 21 Mpa at28 days on standard cylinder with cement conforming to BDS 232 & ASTMstandards, best quality of Sylhet sand or coarse sand of equivalent F.M. 2.5and 20 mm down well graded picked jhama brick chips including breakingchips and screening, making, placing in position, making shutter water-tightproperly, ; mixing with mixer machine, casting in forms, compacting byvibrator machine and curing at least for 21 days, removingcenteringishuttering including cost of water, electricity, & other charges allcomplete as per direction of Project Consultant

210.00 Cft

11 Plastering Works: (For ExternalWall & lnternalsurfaces

360.00 Sft

Minimum 12 mm thick (lnternal wall) & minimum 19 mm thick (External

wall) cement sand ( F.M.1.2) plaster (1 :6) with best quality cement to wallboth inner and outer surface, finishing the corner and edges includingwashing of sand cleaning the surface, scaffolding and curing at least for 7

days, including the cost of water, electricity and other charges etc. Allcompleting as per direction of the Engineer in-charge & full satisfaction ofthe Bank Authority.

12 Weather Coat Paint:

200.00 Sft

Weather CoaUPlastic Painting on exterior/interior surface as per

manufacturer instructions 03 coats of weather coaUPlastic Painting ofapproved quality and colour delivered from authorized local agent of themanufacturer in a sealed container . All completing as per direction of theEngineer- in-charge & full satisfaction of the Bank Authority.(Light gray upto bottom of lintel, French gray from lintel up to parapet, Deep grayinside the groove, moulding & cilling)

13 Horizontal Border Line by Jet Black Tiles (4"/3" Width) ( 7'-0" & 3'-6" Height)

70.00 Rft

Horixontal border line by Jet black tiles as per side elevation drawing exceptback side including supplying of all materials and tools as required, finishing

the edges / corner etc. All completing as per direction of the Engineer- in-

charge & full satisfaction of the Bank Authority.

14 Paraphet Copinq Works: ( Size:3"x2")

Rft36.00

Making paraphet works (3"X 2) with cement & sand ( F.M.l.2) moroter(1:4) with best quality cement to border wall above lintel level including

supplying of all materials as require, finishing the corner and edges

including washing of sand cleaning the surface, scaffolding and curing at

least for 07 days, including the cost of water, electricity and other charges

etc. all complete in all respect as per drawing and accepted by the Bank

Authority.

15 Semi-Full Height Aluminum Partition With Swing Door:

40.00 Sft

,<6

Supply, fitting & fixing of ATM Machine both side partition with one Swing

doo(6'-0" Height) made of aluminum section, 6 mm thick lmported clearglass and necessary hardware including 12" height top level

louver,matching with partition etc. All completing as per direction of the

Engineer- in-charge & full satisfaction of the Bank Authority.

Page 2 of 6

Sl No Description Quantity Unit Rate Amount

16 US lnternal FloorSupplying, fitting & fixing of (RAK/Star/Akiz/Great Wall) 16" X 16"Hommogeneous mat tiles on floor with 18 mm thick cement morter (1:2)including cutting and grinding the tile, chipping the surfaces, setting In

position keeping horizontal & vertical alignment with care and finish thepointing work including the cost of all materials and tools as require etc. Allcompleting as per direction of the Engineer- in-charge & full satisfaction olthe Bank Authority.

70.00 Sft

17 Jet Black Homogeneous Tales I 16" X 15"): (For Front Lobby,Stair Floor Area & Outside Dado)

80.00 Sft

Supplying, fitting & fixing of (R.A.K /StariAkiz Brand) 16" X 16"Hommogeneous tiles on floor with 18 mm thick cement morter (1:2)including cutting and grinding the tile, chipping the surfaces, setting in

position keeping horizontal & vertical alignment with care and finish thepointing work including the cost of all materials and tools as require etc. allcomplete as per full satisfaction of the Bank Authourity.

1B GIazed Wall Tiles:(13"x20") (For lnternal Wall Area Full Hight)Supplyig, fitting and fixing glazed wall tiles (330x500mm)(RAK/Star/Akiz/Great Wall Ceramics) approved by the bank autherity with20 mm thick cement sand (F.M. 1.2) morter (1 :3) base and raking out thejoints with white cement including cutting, laying and hire charge of machineand finishing with care etc. including water, electricity and other charges. Allcompleting as per direction of the Engineer- in-charge & full satisfaction ofthe Bank Authority. (20" side will be fitted horizontally) (

lncluding Lintel two side & bottom)

250.00 Sft

19 Rustic Wall Tiles:(13"x20"XFor Front Lobby Wall Area)

90.00 Sft

Supplyig, fitting and fixing glazed wall tiles (300x500mm)(RAK/Star/Akiz/Great Wall) approved by the bank autherity with 20 mm

thick cement sand (F.M. 1.2) morter (1:3) base and raking out the joints with

white cement including cutting, laying and hire charge of machine and

finishing with care etc. including water, electricity and other charges

complete all respect accepted by the Bank Authority. (20" side will be fitted

horizontally) (lncluding Lintel two side & bottom)

20 Panaflex Sign Board (8'-0") Long :

20.00 Sft

Supplying fitting & fixing Panaflex sign board (2'-6"width) including

aluminium profile light box, panaflex with digital print, electric light set up ( 4'Philips tube light,starter, ATCO Australia ballast, Gl wire , Electric power

cable for connection, MS angle with 02 coat of emamel paint & other

equipments etc. All completing as per direction of the Engineer- in-charge

& full satisfaction of the Bank Authority.(Area of one side to be measured

for payment)

21 FACING BRICK (9.5" X2.75"): (For Outer Two Side Long WallWithout Back Wi4e Wf

250.00 Sft

Supply, fitting & fixing of facing brick (Mirpur Ceramics Ltd) with 20 mm

thick cement sand (F.M. 1.2) morter (1:3) base and raking out the joints with

white cement including cutting, laying and hire charge of machine and

finishing with care etc. including water, electricity and other charges. All

completing as per direction of the Engineer- in-charge & full satisfaction ofthe Bank Authority.

lf Needed) :22 Perforated Metal Ceiling t

Sft

,,

80.00

Supplying, fitting & fixing of minimum 0.70 mm thick perforated metal false

ceiling hanging with G.l runner over powder coated L angle of section 1"X1"

at edges, at 2-0"X2'-0" grid suspended from ceiling by rowel plug, iron

angles, 12 SWG G.l wire, screws, hooks, nails etc. maintaining straight

lines and desired finished level at bottom face with vertical or beams by

electric drill machine and mending damage if any during execution including

the cost of all materials, accessories, scafolding, labour for installation etc.

All completing as per direction of the Engineer- in-charge & full satisfaction

of the Bank Authority.

Page 3 of 6

Sl No Description QuantiW Unit Rate Amount

23 Tempered Glass Door : (3'-0"X7'-0")Supplying, fitting & fixing of frameless '1Omm thick Tempered glass doorwith best quality WP brand (Thailand) all hardwares, SS handle, stoppers,locking arrangement etc. All completing as per direction of the Engineer- incharge & full satisfaction of the Bank Authority.

1.00 Nos

24 Fixed Glazed PartitionSupplying, fitting & fixing aluminium partition made by Chung Hua brandprotector bit OCI silicon, 1Omm clear glass with all other hardware etc. Allcompleting as per direction of the Engineer- in-charge & full satisfaction ofthe Bank Authority.

30.00 Sft

25 Panaflex Both Side Sign Board:Supply, fitting & fixing both sided vertical panaflex sign board fixed with 2"dia 2mm thick (3'in foundation with 1'Xl'cc1'.2'.4 and 12 ft above groundlevel) M.S vertical post for road side made of Aluminum profile light box,panaflex with computer cut vinyel, electric light setup and seftingequipments, fixing with MS angle, nut-bolt, flexible pipe, PVC pipe, drillingwhere necessary, providing electric power cable and connection, 02 coatsof enamel paint, as per bank standard and instruction by the BankAuthority.(Area to be measured both side for payment ). All completing asper direction of the Engineer- in-charge & full satisfaction of the BankAuthority.

24.00 sft

26 lniect printSupply, fitting & fixing graphics of approved design over glass door and

partition (lnside pasting) etc. all complete as per bank standard and

instruction by the Engineer- in-charge & Bank Authority. 48.00 Sft

27 Drip Course:Making drip course for protecting rain water of size 38mmx19mm andfinishing the surface by plastering with cement morter (1:4) including. Allcompleting as per direction of the Engineer- in-charge & full satisfaction olthe Bank Authority.

40.00 Rft

28 Rain water discharqe pipe (4" dia UPVC):Supply and installation of conceal rain water discharge pipe from top of roofhaving a C P Gratings and extended up to G L at least 1'-0" from the wall

with a UPVC bend . All completing as per direction of the Engineer- in-

charge & full satisfaction of the Bank Authority.

20.00 Rft

29 Apron for ATM Out Side Wall: ('l'- 6" width)Earth cutting up to require depth,compact sand filling - 6" thick, layingpolythene sheet, brick flat soling (15" width), brick edging 10" depth and 3"width filling the interstics with cement moter (1 :4) and artificial patent stone(minimum 3" thick) with neat cement finishing using black oxide (1:2), etc.All completing as per direction of the Engineer- in-charge & full satisfaction

of the Bank Authority.

50.00 Sft

30 Footh works ,{r.

Layout of footh path, earth cutting up to require depth, dressing, leveling,]

sand filling minimum 6" thick, compacting, laying polythene sheet, brick flatsoling, 3" thick cement concrete works (1 :3:6) and finishing with l" thickpavement tiles (size - 12"X12"and 1" thick) in cement morter (1:3),providing guide wall around and / both side of the foot path made of 1st

class brick wall (10" width and minimum 12" depth) in cement morter (1:4)

etc. All completing as per direction of the Engineer- in-charge & full

satisfaction of the Bank Authority. (Top level of footh path to be of samelevel with existing connecting road and width to be maintainedstrickly). 150.00 Sft

Page 4 of 6

Sl No Description Quantity Unit Rate Amount

31 Artificial Patent Stone on Roof :

Avarage 25 mm thick artificial patent stone (1 :2:4) flooring with cement,best quality coarse sand (50% guantity of sylhet sand or coarse sand ofequivalent FM2.2 and 50 % best quality local sand of F M 1.2 and 12 mmdown well graded brick chips including breaking chips, screening, laying theconcrete in alternative panels, compacting and finishing the top with neatcement and curing at least for 7 days including cost of water, electricity and

other charges etc. All completing as per direction of the Engineer- in-charge & full satisfaction of the Bank Authority.

96.00 Sft

32 CG Block for Fixing Network Attenna :

Supplyig, fitting and fixing of Block made of 1.2.4 propotion and size (1'-6"x1'-6"x0'-5"). All completing as per direction of the Engineer- in-charge &full satisfaction of the Bank Authority.

1.00 No

33 Guard Tool :

Supplying a guard tool plastic body (RFL i Partex brand as approved by theBank authority. All completing as per direction of the Engineer- in-charge &full satisfaction of the Bank Authority.

1.00 No

ElectricalWorks34 PVC Pipe Works:

Supply, fitting & fixing water grade PVC (National polymar/RFl/Aziz Brand)rigiU flexible conduit of following sizes through brick-wAll, RCC slab, falseceiling, etc including groove cutting, necessary binding wire & fixing circularboxes, junction boxes, M.K steel box, saddle, bends, sockets, fish wire, Allother accessories and including mending good All damages etc. Allcompleting as per direction of the Engineer- in-charge & full satisfaction ofthe Bank Authority.

a. 314" dia Pvc pipe 80.00 Rft

b. 1" dia Pvc pipe 60.00 Rft

c. 3/4" dia flexible pipe 40.00 Rft

d. MK steel box ( size 3" x 3') 9.00 Nos

35 Cable WorksSupply, fitting & fixing of PVC insulated or PVC sheathed cable(BRB/PARADISE Brand ) through PVC conduit in concealed, underground, surface etc including All necessary fitting fixing PVC tape, fish wire,soldering, connection etc. All completing as per direction of the Engineer- in

charge & full satisfaction of the Bank Authority.

a. 1 x 1.5 rm (3-w) BYA (For light iFan point) 300.00 Rft

b. 2.5 rm ( BYA) (For ATM Power point) 150.00 Rft

c. 1 x 3.0 rm (7-w) BYA (For AC power line) 150.00 Rft

d. 2.5 re ( BYA) Green (Earthing line) 150.00 Rft

e. 2 x 6rm ( 7- W) NYY (including earth/road cutting, boring, filling, coveredwith PVC/Flexible pipe etc. as require to complete the work).

230.00 Rft

36 Distribution Board /MCB, MCCB.Supply & installation of Sub-Distribution Board (SDB) which made with

UPVC, incomming option DP MCB/TP MCB, outgoing ways 08 ways, 125 ABus bar, (KAWAMURA, JAPAN, SUPER STAR BRAND) ( Circuit breakerwill be Legrand-Energypac/Kawamura- Japan Super Star Brand). All

completing as per direction of the Engineer- in-charge & full satisfaction ofthe Bank Authority.

a. SDB Board.(zs4mm X 254mm X 89mm) 1.00 Nos

b. 63A. SP MCB (Main Circuit breaker, Legrand) 1.00 Nos

c. 20A. SP MCB ( Legrand) for A C 3.00 Nos

d. 16A. SP MCB ( Legrand) for light and sign board. 2.00 Nos

e. 16A. SP MCB ( Legrand) for ATM Machine 1.00 Nos

37 ht Shade to be connected with UPS:Supply, fitting & fixing PL Down Light shade SS galvanise colour with (6"

Dia) 09/1 1 Watt LED light. (Energypac /Super Star/Sids brand) to be

connected with UPS through power strip using separate wire & plug so thatthis light point to be used during failure of electricity. All completing as per

direction of the Engineer- in-charge & full satisfaction of the Bank Authority.

6.00 Nos

Page 5 of 6

Sl No Description Quantity Unit Rate Amount

38 Switch & SocketSupply and installation of following switch & socket of (Legrand,Energypac brand). All completing as per direction of the Engineer- in-

charge & full satisfaction of the Bank Authority.

a. DP switch for sign board ( Legrand) 1.00 Nos

b. 5A. 3 gang switch ( Legrand) 4.00 Nos

c. 54.2 pin socket ( Legrand) besides the gang switch 2.00 Nos

d. 13A. 3 pin socket ( Legrand) forATM 3.00 Nos

e. 15A. 3 pin socket ( Legrand) for A C machine over the ceiling 2.00 Nos

39 Power Strip :

Supplying power strip (Tec Advanch / Energypac Brand) consisting 5 points

. All completing as per direction of the Engineer- in-charge & full satisfactionof the Bank Authority.

1.00 Nos

40 Diqital Sinqle Phase Meter:Supply, fitting, fixing digital energy meter single phase, 220 volts completein all respect up to 60 Amps SP (Hosaf /Electro Brand), All completing asper direction of the Engineer- in-charge & full satisfaction of the BankAuthority.

1.00 Nos

41 Earthing works :

Boring work for earthing,1.5" dia 200 feet long perforated G.l pipe

(Basundhara Gold) lagged with copper conductor 4 SWG by welding, 240rft copper rod, screw, nut, bolts and other related goods etc. All completingas per direction of the Engineer- in-charge & full satisfaction of the BankAuthority.(Rating of earthinS 0.5 - .08 ohm to be ensured by thecontractor).

1.00 Job.

42 NOTICE BOARD:Supply, fitting and fixing of notice board made of 8mm clear glass withdigital Printwith SS Knob. All completing as perdirection of the Engineer- in

charge & full satisfaction of the Bank Authority.1.00 No

43 MS LOW HEIGHT CABINET (lf Needed) :

Supply, fitting & fixing MS cabinet (3'-6"x1'-8"x5'-0")t = (LxBxH)t made of20 SWG MS sheet With MS Angle, 03t unit, 3t nos lock, 04 nos heavy duty

wheel, Duco paint(Spray), other standard hardware, etc as per direction and

full satisfaction of the Bank authority. (FOR UPS & Battery)1.00 No

Total Tk.

lnwords Taka

Signature with seal of contractor & Date

Page 6 of 6

_l

N)Io

,,0 l,

ce

u9',2

-+

,0-,6,,0 l,

,L

,g

L

I

J--,,I

L'eEreqcstp Jel€./r\ uIsJ loJ

s8urlerS qtr^\ adrd )lrdflA,ft

dO *,,81

,0-,0

,L ,,Ol

),,9

L

N-

NtIo,

.\

!t-z.o'Tt

-{

@oo-{-

-{o-Umz.U)-U

c)mcn.UmC)

t-t-'T1

ov

odn +,,9

Idfl +,,2I o

dn +,,8I

uZ-,L

@I

,tu-,,

E=frczrfl

IuL ,NI

=

IUoFxr!t1 a() H

UTEtr!, E>o

V)5Ho. EE

$5r+Boa)odra?

ta

(o

..l-t'

.tI l-

4 ll2 " Rcc slab2 Nos 4X2'X4" CC Blockfor fitting extemal unit of A/C

11'. - 4"

SIGNBOARD2'-6'WIDTH

=rlN(f)

irl-Iilr

f+=(o

Super StructureBrick WallOut Line

P.L

(oI

{

Average 1" CC with NCF Roof slope ltr ---#

<'azli i.l '1 .l ,t

i o :.-. 'a;

I

!i;v I +

12" (oFalse ceiling

8',-s"Roling Shutter

oo

c)o()a(dIrr

l0mmthickglass partition =rlN

1r)

@3 I1

1u2

oI

lt-I

12'.-0"

, att

0" 0"+ 5" Thick RCC Slab (l:2:4) 3"

At f I d q..1,. .a'r.,t .a

Sand FillingN.B. 10" Brick Work Below Gread Beam Both side

+,

Foot Path

SECTIONAL ELEVATION (A-A')

G.L

-l=

.l

A

3

1

tt'

+

<

10mm O Ring @ 6" C/C

2Nos l6mmOMainTopBar3 Nos 16mm O Main Bott. Bar

Floor BEAM (10"X10")

=(o_tO)

=@-t@

Column (10"X10")

10mm O Ring @ 6" C/C

2 Nos 16mm O Main Top Bar3 Nos 16mm O Main Bott. Bar

5"P.L

=or GREAD BEAM lO''XIO'' o(r)

lOmm O Ring @ 8" C/C

G.L

=or4 Nos 16mm O Main vertical Rod

3'-6'

3r-6rrx3r-6?' RCC Col F1.2mm0bar @ 6" C/C both way

3" Thick CC work

12'.-0"1

-:i ---+o

o

=

3I

-{*.I

I

I

I

I

=oI

O.t

I

@

-iJ\-

I F-

=O)_t

I

.l

:l=b\

z'.-6. 3'-8u 2',-6 ---+0"+

A T M BOOTHa: 10mm Abar @ 5" CIC alt. ckd.

b: 10mm @bar @ 6" CIC alt. ckd.c: 1 - lOmm A extp. inbetween2 ckd.Slab thickness: 5"

c

l-)--+

a

C)

o-LUFU>

-o-r

++

-|-

o6u

io

lI

I

o_uJF(D

c

SLAB REINFORCEMENT DETAIL AT PLINTH LEVEL

t..,l

-+

L1'-8'+*L-

I

Ito

6

b

c

-t

C

O)

,Lr l'rll.ltlrlIIIII

-4"I

-1

h-

-LN)r-

O)

)

-l

at

9'-6"

wl,1+

N)(o

=

\-

sr-

@

\-

N)I(o

I

I

I

I+-JTo-r_

-'t_-

I

I

o)

I

-.1

F.i

wooFl

v)a d tD

Fl rr tlq)t:t-ur.+

IIJY-X' r.- iJ 51+38 36BaS7,6E Si8CIe=:.qt

Eoor--gP Eoi-t+g**-NJ+PoPfP'

orrEd

FrdzEoFotn

tnz,-lUtnFl

rr

HFooEFrd

rnrr

01 '-9"10'+1 '-g

I

II-t--i

II

I

10'+- 5" -+j-

(o

t2 Nos 16mm bTopbar+3-16mm O Bott. bar &l0mmOring @6 ClC.

12 Nos 12mm O bar at bottom& top, 10mmO rng@6" C/C.

2 Nos 12mm Abar al bottom2 Nos l0mm Obar altop &l0mmO itg@6" UC.+

*1',-0 y CROSS SECTION OF LINTEL OVER THE

FIXED GLASS PARTITION & DOORCROSS SECTION OF GRADE AND FLOOF BEAM

CROSS SECTION OF CANTILEVER LINTEL (MrD SECTTON)UNDER SIGNBOARD

10\'-r0tt40n +

Ilr)

P.L. Rcc slab

(oI

G.L.+

I

=II+

2 Nos l6mm OTopbar+l-16mm OExtp.3-16mm OBotl.bar &10mm O ing@6" ClC-

@xtra top need not forshort span).

G.L. 3',C.C (l:3

oI

B.F.S3" C.C (l:3:6)

-B.F.S

f 1'-3" -nt- FOUNDATION DETAILS

OF STEP AND RISER

SECTION OF BRICK FOUNDATION

FOR FRONT SIDE WALL & STEPS

CROSS SECTION OF GRADE AND FLOOR BEAM

(suPPoRT ZONE)

DETAIL OF FOUNDATION AND LINTEL OF A T M BOOTH

IIII

fiffiH

+I

=

PI

-1.

1-10" --r

o(o

3" Fixed Top Side with Plain Cover6mm thick Clear Glass with Inject Print

3" Fixed Bottom

Aluminium Hinge

3ttx1.5tt Box

Sliding LockNet Handle

Aluminium Swing Door (Outside Swing)

6mm thick Clear Glass with Inject Print3ttx1.5tt Box

Inter Lock

=O)_t$

TMA

1',-7"

PLAN OF ALUMINlUM PARTITION

PARAPET COPING(4"X2")

RUSTIC TILES( 13"x20")

FACING BRICK (9 .5"X2.7 5")

JET BLACK TILES BORDER(3" WIDTH)

FACING BRICK (9.5"X2.7 5")

JET BLACK TILES BORDER(3" WIDTH)

FACING BRICK (9.5"X2.7 5")

JET BLACK FLOOR TILES( I 6"X 16")

OUT SIDE LONG WALL ELEVATION

ATMTrusf Bfrnk

.L

a

PL=(o_tr

GLNOTE : SIGN BOARD & BRANDING ETC.TO BE APPROVED BY CBMC DEPARTMENT

I.ttoNT ELEVATION (NEAR 02 MP CHECK POST, MYMENSIhIGHCANTONMENT, MYME,N SINGH)

FIXED GLASSPARTITION

.r *il

GLASS DOOR

.) - r..,j

AMPERED