20
BOMBAY AMUSEMENT RIDE (P) LIMITED STEEL FABRICATION DIVISION

BOMBAY AMUSEMENT RIDE (P) LIMITED

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BOMBAY AMUSEMENT RIDE (P) LIMITED

BOMBAY AMUSEMENT RIDE (P) LIMITED

STEEL FABRICATION DIVISION

Page 2: BOMBAY AMUSEMENT RIDE (P) LIMITED

Bombay Amusement Ride

(P) Limited-BARPL - A Background

• BARPL was established in India with the primary objective of design and manufacturing world class amusement rides and steel fabrication projects as per International Safety Norms (EIN, TUV, ASTM and BIS) & as per AWS D1.1 welding standards.

• With over 30 years of experience in Amusement Parks and FEC's in India and abroad, we are proud to offer "custom made" amusement rides and steel fabrication projects as per client’s requirements.

• Our worldwide clientele includes clients in the USA, France, Italy, UK, India, KSA, Indonesia, Mauritius, South Africa, Mexico, Spain etc.

• We are an ISO 9001-2015 accredited company, having AWS certified fabrication team and provide TUV certification on request.

• BARPL has signed with International companies in US, Canada, Italy and UK.

Page 3: BOMBAY AMUSEMENT RIDE (P) LIMITED

LEADERSHIP TEAM

Pradeep Sharma

Chairman & Managing Director Sanjiv Mehta

President

Viraj Apte

Head-Sales :Fabrication and New Projects Sandeep Sharma

Head-Design & Manufacturing

Page 4: BOMBAY AMUSEMENT RIDE (P) LIMITED

Highlights • 53 employees

• 3D/CAD engineers for designing & shop drawings

• Skilled fitters

• AWS Certified Tack Welders

• AWS Certified Welders

• AWS Certified Welding Inspector

• Current production capacity: 120 tons/month

• Maximum production capacity: 500 tons/month with additional manpower

• Hot Dip Galvanizing as per ASTM A123

• Painting Facility

• 11 acre factory at Ahmedabad

TEAM BARPL 15 Years of Success

Page 5: BOMBAY AMUSEMENT RIDE (P) LIMITED

Lines of Business

Steel Fabrication

Projects

International Projects

Domestic Projects

Page 6: BOMBAY AMUSEMENT RIDE (P) LIMITED

STEEL FABRICATION PROJECTS -INTERNATIONAL

Page 7: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : MSC – VISTA (CRUISE SHIP) COUNTRY : FRANCE INSTALLATION : FABRICATION PROJECT STEEL FABRICATION :36 TONNES

CLIENT NAME : WEST HILLS YMCA- YMCA LANGFORD AQUATIC CENTER COUNTRY : CANADA CITY : VICTORIA INSTALLATION : FABRICATION PROJECT

STEEL FABRICATION PROJECTS *Through Whitewater West, CANADA

Page 8: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : WASHINGTON PARK POOL COUNTRY : UNITED STATES CITY : CHICAGO INSTALLATION : FABRICATION PROJECT STEEL FABRICATION :6 TONNES

CLIENT NAME : PARQUE AQUATICO IMBURSIA COUNTRY : MEXICO CITY : VERACRUZ INSTALLATION : FABRICATION PROJECT

STEEL FABRICATION :12 TONNES

STEEL FABRICATION PROJECTS *Through Whitewater West, CANADA

Page 9: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : PIRATES BAY EXPANSION COUNTRY : UNITED STATES CITY : BAY TOWN,TEXAS INSTALLATION : FABRICATION

PROJECT STEEL FABRICATION : 35 TONNES

STEEL FABRICATION PROJECTS

*Through Whitewater West, CANADA

Page 10: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : NRH2O WATER PARK COUNTRY : UNITED STATES CITY : NORTH RICHLAND HILLS,TEXAS INSTALLATION : FABRICATION PROJECT STEEL FABRICATION : 55 TONNES

STEEL FABRICATION PROJECTS

*Through Whitewater West, CANADA

Page 11: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : MIKE CEDAR POOL COUNTRY : UNITES STATES CITY : CASPER,WIOMING INSTALLATION : FABRICATION PROJECT STEEL FABRICATION : 18 TONNES

CLIENT NAME : EATON AQUATIC CENTER COUNTRY : UNITED STATES CITY : EATON,OHIO INSTALLATION : FABRICATION PROJECT

STEEL FABRICATION : 8 TONNES

STEEL FABRICATION PROJECTS *Through Whitewater West, CANADA

Page 12: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : KINGHTDALE YMCA COUNTRY : UNITED STATES CITY : KNIGHTDALE INSTALLATION : FABRICATION PROJECT STEEL FABRICATION : 4 TONNES

CLIENT NAME : STAR CITY SHORES AQUATIC CENTER COUNTRY : UNITED STATES CITY : LINCOLN INSTALLATION : FABRICATION PROJECT

STEEL FABRICATION :22 TONNES

STEEL FABRICATION PROJECTS *Through Whitewater West, CANADA

Page 13: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : THE FUNFLEX COUNTRY : UNITED STATES CITY : MOUNT LAURREN, NEW JERSEY INSTALLATION : FABRICATION PROJECT STEEL FABRICATION : 24 TONNES

STEEL FABRICATION PROJECTS

*Through Whitewater West, CANADA

Page 14: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : ATLANTIS ANCOL COUNTRY : INDONESIA CITY : KOTA JKT UTARA,JAKARTA INSTALLATION : FABRICATION PROJECT STEEL FABRICATION : 44 TONNES

*Through Whitewater West, CANADA

Page 15: BOMBAY AMUSEMENT RIDE (P) LIMITED

CLIENT NAME : MALPANI GROUP COUNTRY : INDIA CITY : MUMBAI INSTALLATION : FABRICATION PROJECT STEEL FABRICATION : 215 TONNES

CLIENT NAME : AQUA IMAGICA COUNTRY : INDIA CITY : MUMBAI INSTALLATION : FABRICATION PROJECT

STEEL FABRICATION :73 TONNES

STEEL FABRICATION PROJECTS *Through Whitewater West, CANADA

Page 16: BOMBAY AMUSEMENT RIDE (P) LIMITED

Jobs we Undertake

• Apart from the various Amusement Park Rides we supply, we also undertake job work for amusement rides.

• High Precision heavy fabrication projects

• Rail Bridges, rail coach chassis and other structures

• Metro Lines / Bridges

• High Quality Steel Projects for onshore ship building fabrication

• Installation of heavy structures including prefabricated buildings

• High Mast poles and structures including HDG and painting

Page 17: BOMBAY AMUSEMENT RIDE (P) LIMITED

Industrial Fabrication /Heavy Fabrication Work

Page 18: BOMBAY AMUSEMENT RIDE (P) LIMITED

Quality means, doing right when no one is

looking!

Reliable. Affordable. Scalable

YOUR TRUSTED PARTNER

Contact : Viraj R Apte -Head Sales Fabrication Division and New Projects Mob : 9820334228 Email ID : [email protected]

Page 19: BOMBAY AMUSEMENT RIDE (P) LIMITED

AMUSEMENT RIDES WORLD WIDE

PIF /Format 01 / Rev 01

www.bombayamusement.com

PROJECT INFORMATION FORM FOR THE FABRICATION DIVISION – A BARPL VENTURE Please provide us with the below stated information to understand your expectations better:

PROJECT LOCATION (Locality, City/Town Name) NAME OF THE PROJECT PROJECT DETAILS: STRUCTURE TYPE AND PURPOSE IN BRIEF

SHOP DRAWINGS AVAILABLE, OR TO BE DONE BY US

DRAWINGS FORMAT SOLID WORKS/CAD/CATIA IS THIS A GOVERNMENT OR PRIVATE PROJECT? Please specify.

PROPOSED REQUIREMENT STEEL TYPE/EN GRADE WELDING STANDARDS (D1.1) OR OTHER 3RD PARTY INPECTION REQUIRED? NDT REQUIREMENTS IF ANY ANY SPECIFIC REPORTS REQUIRED? HDG/PAINTING

ANY OTHER EQUIREMENT? WHAT SERVICES ARE REQUIRED FROM BARPL?

PROJECT CONSULTANCY (YES / NO) DESIGN AND SHOP DRAWINGS INSTALLATION SERVICE OTHERS

ESTIMATED BUDGET OF THE ENTIRE PROJECT PLEASE PROVIDE/ATTACH ANY OTHER INFORMATION ABOUT THE PROJECT?

NAME OF THE ORGANISATION NAME OF THE MD / OWNER CONTACT NUMBER OF MD / OWNER EMAIL ID OF MD / OWNER NAME OF POINT OF CONTACT (POC) FOR THIS PROJECT

CONTACT NUMBER OF POC EMAIL OF POC POSTAL ADDRESS OF THE ORGANISATION WEBSITE ADDRESS OF THE ORGANISATION

Page 20: BOMBAY AMUSEMENT RIDE (P) LIMITED

AMUSEMENT RIDES WORLD WIDE

PIF /Format 01 / Rev 01

www.bombayamusement.com

*By receiving this Project info form we accept and agree for our mutual non-disclosure agreement