Zervas Elementary School  – Newton, MANovember 12, 2014 

BOARD OF ALDERMEN 5‐58 Site Plan Approval Hearing 

Page 2: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

A2.4A2.2b A2.3b

2.3b‐2

2.3b‐3

2.3b‐4

A2.2c‐drive

A2.2c‐loop

A2.2c‐lane

A1.2b

Elbow2‐Story

Elbow3‐StorySouth

Elbow3‐StoryNorth

Multi‐Wing

Multi‐Wing Pinwheel Add/Reno Box

Elbow 2‐Story

Elbow 3‐Story

Preferred Schematic Option

Existing Site Studies Expanded Site Studies

A1.2A1.1 A1.3 A1.4 A2.1 A2.2

A2.3

A2.3c

A1.2cA1.2bA1.1b A1.3b A1.4b A2.1b A2.3b‐1

Refined Plan

Overview of Design Studies

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 3: BOARD OF ALDERMEN MA

EXISTING SITE + EXPANSION PROPERTIES

Zervas Elementary School  – Newton, MA

5.3 Acres (3.5 Useable)35k SF Building

43k SF Play Areas+ Outdoor Classroom+ Outdoor Gardens

Plaza/Gathering on Lawn8+ Bike StorageDumpsters/Service

44 Parking Spaces (lined)1 Bus Drop‐Off (lined)0 Car Drop‐Off(on‐site totals listed)

SF Over 100’ Setback*(including 3 Beacon properties)4.9k Building20.4k Impervious Paving25.3k Total in SetbacksSchool is Outside of 50’ BufferPaving is Within 25’ Buffer*Per 2014 Flagged Wetlands

2014 FLAGGED WETLANDS

100’ SETBA

CK

50’ SETBA

CK

1330 BEACON

1338 BEACON

1316 BEACON

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 4: BOARD OF ALDERMEN MA

EXISTING SITE + EXPANSION PROPERTIES

Zervas Elementary School  – Newton, MA5‐58 Site Plan Approval Hearing – November 12, 2014 

1330 BEACON STREET 1338 BEACON STREET1316 BEACON STREET

30 BEETHOVEN AVENUE

HISTORICAL COMMISSION:

30 Beethoven (listed 1954)Preferably Preserved, Delay of Demolition Expires 11/26/14

1338 Beacon (listed 1953)Not Preferably Preserved

1130 Beacon (listed 1952)Not Preferably Preserved

1316 Beacon (listed 1780)Preferably PreservedRecords Indicate it was Built in 1840, relocated on site in 1897

Page 5: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA5‐58 Site Plan Approval Hearing – November 12, 2014 

6.0 Acres (4.2 Useable)78.8k SF Building

60k SF Play Areas+ Outdoor Classroom+ Outdoor Gardens

8k SF Plaza/Gathering36+ Bike StorageDumpsters/Service

72 Parking Spaces4 Bus Drop‐Off20 Car Drop‐Off(added drop‐off lane)

SF Over 100’ Setback*10.9k Building (vs. 4.9k)+7.9k Imperv. (vs. 20.4k)+8.0k Porous Pavement26.8k Total+4.1k Porous PlaygroundBuilding is Out side 50’ BufferAll Paving is Outside 25’ Buffer*Per 2014 Flagged Wetlands

SCHEMATIC DESIGN – SITE PLAN

2014 FLAGGED WETLANDSMaintains 25’ wetland buffer

Page 6: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA5‐58 Site Plan Approval Hearing – November 12, 2014 

SCHEMATIC DESIGN – SITE PLAN

2014 FLAGGED WETLANDS Maintains 25’ wetland buffer

Consolidates play space in buffers to meet program

Many mature trees planned to be saved

Main façade is  120’ from homes 

Snow storage

Bioswales/ rain gardendrainage

Life trail connection and outdoor learning

Page 7: BOARD OF ALDERMEN MA

SCHEMATIC DESIGN – SITE PLAN

2014 FLAGGED WETLANDS Maintains 25’ wetland buffer

Consolidates play space in buffers to meet program

Many mature trees planned to be saved

Main façade is  120’ from homes 

Life trail connection and outdoor learning

5‐58 Site Plan Approval Hearing – November 12, 2014 Zervas Elementary School  – Newton, MA

Walkable pedestrian approach set within open/green space

Safe pedestrian approaches with no traffic crossings

Single point of entry

Bioswales/ rain gardendrainage

Snow storage

Page 8: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – SITE PLAN

2014 FLAGGED WETLANDS

Consolidates parking; reduces site circulation

Study traffic flow

Bus traffic separate from cars w/access to/from Beacon

Study Beethoven for Blue Zone

Roads aligned for safety

5‐58 Site Plan Approval Hearing – November 12, 2014 

Walkable pedestrian approach set within open/green space

Safe pedestrian approaches with no traffic crossings

Single point of entry

Maintains 25’ wetland buffer

Consolidates play space in buffers to meet program

Many mature trees planned to be saved

Main façade is  120’ from homes 

Bioswales/ rain gardendrainage

Life trail connection and outdoor learning

Snow storage

Page 9: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA5‐58 Site Plan Approval Hearing – November 12, 2014 

SCHEMATIC DESIGN – FLOOR PLANS

General ClassroomsSPED/Support AreasArt/Music SpacesActivity/CommunityAdmin Areas

GYMCAF.

LIBR.ADMN.

Page 10: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – AERIAL VIEW

5‐58 Site Plan Approval Hearing – November 12, 2014 

PERSPECTIVES and ELEVATION STUDIES

Page 11: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – VIEW FROM BEACON/BEETHOVEN CORNER

SUMMER

WINTER

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 12: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – VIEW FROM BEACON EXIT (EAST) 

SUMMER

WINTER

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 13: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – VIEW FROM BEETHOVEN TOWARD BEACON

SUMMER

WINTER

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 14: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – END ELEVATION STUDY

Lower Veneer + Colonnade

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 15: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

SCHEMATIC DESIGN – MATERIALS/PRECEDENT

5‐58 Site Plan Approval Hearing – November 12, 2014 

Brick / Metal Panel (high) Solar Trellis

Stone & Split‐face Masonry

EXISTING ZERVAS SCHOOL

Beige/Red Brick

Page 16: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

Budget: Construction Cost Estimate Update 

Construction costs for the Zervas ES project are on budget per current estimates

Two full independent cost estimates were developed based on the detailed Schematic Design documents: one by the Designer’s Cost Consultant and one by the Construction Manager

The Construction Manager, WT Rich, is also working on the Angier project so their cost and scope data is informed by the most current relevant precedent

The two estimates were reconciled to a variance of less than 0.25% ($74 K) indicating a consistent understanding of design intent and scope

The higher of the two estimates was within 0.6% ($170 K) of the $29 M construction budget, which is negligible at this phase because the estimates include $2.75 M in contingencies

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 17: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

The estimates include the full scope of work on the expanded Zervas site The estimates include all work on the three adjacent residential properties 

(which will be incorporated into the Zervas site)

The potential work to develop and improve the Blue Zone (or any related Traffic work) will be covered in the $3 M Off‐Site Improvements line item within the $40 M Total Project Budget 

No Value Engineering adjustments were required at this phase to align the project design with the construction budget, all program elements are included

Additional Cost Estimates will be developed at 3 key future project milestones

Two sets of estimates will be reconciled to budget at the end of the Design Development, 60% Construction Documents and 90% Construction Documents phases

The project team will deliver the Zervas school on schedule and on budget

Budget: Construction Cost Estimate Update (cont.) 

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 18: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

Budget & Categories of Expenses for the New Zervas School Project

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 19: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

Project Milestone Schedule

5‐58 Site Plan Approval Hearing – November 12, 2014 

Page 20: BOARD OF ALDERMEN MA

Zervas Elementary School  – Newton, MA

Community, Safety and Logisitcs

5‐58 Site Plan Approval Hearing – November 12, 2014 

OUR COMMITMENTTo assure the health and safety of the general public while minimizing disruption to the local community and enabling cost‐effective progression of the work

Building Demolition ‐ February 2016

Site‐specific safety plan Erosion control plan / order 

of conditions SWPPP planDewatering planWorksite egress and access Barricades and signageDust controlNoise controlDelivery blackout periods Parking and traffic 

managementNeighborhood 

Management plan