Blue H: The World’s FirstFloating Wind Turbine
“Essential Innovations”Den Helder
12 February 2009
Neal BastickChief Executive Officer
Mission Statement
By owning and continually creating innovative offshore technology, Blue H intends to become a leading developer of deep water offshore wind
farms dependent on its technology
NREL predicts the future
NREL: National Renewable Energy Laboratory, Department of Energy USA
NREL: National Renewable Energy Laboratory, Department of Energy USA
NREL predicts Tension Legged Platformsfor floating wind turbines
Submerged Deepwater Platform Prototype
Primary Purpose:Test concept, design, assembly, transportation and positioning methods
Note: Prototype is not designed to be connected to the grid
Legend: L.A.T. Lowest Astronomical Tide
Construction of Prototype – BrindisiSubmerged Deepwater Platform – nears completion
Construction of Prototype – BrindisiTower seen from below
Prototype – LaunchingThe unit is in 4 meters of water
Towed Out with 2 Simple Tug Boats
Blue H SkysaverTricase Prototype Position
Construction of Prototype – BrindisiCounterweight: being towed out to sea before lowering to seabed
Construction of Prototype – BrindisiCounterweight: waiting to be towed out to sea and lowered to seabed
Decompression Chamber being made ready“the bell”
During installation in 113 meter deep waterPrior to removing fenders
Prototype in its final position:11.5 NM (21.3 kms) from shore
Blue H SkysaverTricase Wind Farm
Pôle MecaTech PartnersWHICH Consortium
Industria 2015 PartnersGEOMA Consortium
/Sky Saver/
ETI PartnersDiwet5 Consortium
Blue H Goal
To install deepwater offshore wind farms that are built economically
which will ultimately be competitive with other forms of power generation
Blue H Solution is designed to be more Economicthan Current Shallow Water Installations
Source: RMT, Inc.
Blue H:
has no assembly out at sea
does not use expensive marine servicesequipment
does not need to prepare seabed
does not have high decommissioning costs
BBC headline above picture to the right:“Work on Offshore Winds Farms delayedby late arrival of the jack-up barge”
Closing Remarks
Thank you for your attention
Questions & Answers
Inquiries: [email protected]
+31 162 424 952