23
Scala When vet competin in both ca requireme business a When cho Simpl ensur meet A con and te requir worki enter Enter suppo large mobil An ex autom system progr devel The Micro extensible organizat interface 2010, it is adoption familiar a value from Project Se shopping that (proj able, Co tting project a g products fr ategories to b ents, aligns w applications. oosing a comp lified adminis re that they ca custom repo nnected work eams will use re a PPM solu ng in their pr prise resourc prise scalabil ort deployme volumes of d le workforce. xtensible and mate their un ms to mainta amming inter opment activ osoft® Enterp e platform th ion’s enterpr in Microsoft® s even easier f and satisfact nd unified wo m their Micro erver 2010 sim for both proj ect managem onnecte and portfolio om a busines be successful, with the organ prehensive P stration and f an easily be c orting require k managemen e a variety of p ution that can referred envir ce manageme lity and perfo nts at the de ata; perform programmab ique requirem in data integr rface (API) in vities. prise Project M at has the fle ise architectu ® Project Serv for users to g ion. The EPM ork managem osoft platform mplifies admi ect and portf ment offices (P ed, and Managemen ss perspective to help ensu nization’s IT re PM solution, flexibility. Or configured to ments. nt platform. D productivity t n connect wit ronment, and ent and repor ormance. Org partmental a across wide ble platform. ments or to e rity. Leading P addition to d Management xibility to me ure standards ver 2010 and get started, an M Solution con ment platform m investments nistration thr folio manage PMOs) can sp d Progr t (PPM) solut e, and throug re that the pr equirements, organizations rganizations n automate th Depending on tools to receiv h common pr d so they can ting. ganizations re nd enterprise area network . Often organ ffectively inte PPM solution developer too (EPM) Soluti eet most busin s. With the fa the Ribbon in nd thereby re nnects with re m, helping to e s. rough an imp ment capabil pend less time ramma tions, evaluat gh an IT lens. roduct’s func , and integrat s look for the need PPM pla he organizatio n their roles a ve and comp roductivity to easily provid equire a PPM e level; meet ks (WANs); an nizations custo egrate with th ns need to pro ols and resour on provides a ness requirem miliar Micros nterface in M educe training elated Micros ensure that o proved consol ities. Improve e managing t ble Pla tion committe PPM solution ctionality mee tes seamlessl e following: atforms to be on’s unique p and preferenc lete work. Or ools so that u e updates to solution that peak use sce nd support an omize their P hirdparty or ovide an open rces to suppo a scalable, co ments and ali soft® SharePo icrosoft® Pro g requiremen soft technolo rganizations g le that provid ed administra he PPM syste atform ees assess ns must score ets business y with lineof flexible to he rocesses and ces, employe rganizations sers can cont facilitate t can scale an enarios; handl nd empower t PPM solution homegrown n application ort custom nnected, and gn with the oint® user oject Professio nts, and drive gies to provid gain addition des onestopation helps en em and instea well felp es tinue nd le the to d onal dea nal nsure ad

ble, Connected, and Programmable Platformdownload.microsoft.com/download/E/4/3/E432C64B-6682-47C1-99B8... · om a busines e successful, ... e, helping to). Like Share rogramming

Embed Size (px)

Citation preview

 

ScalaWhen vet

competin

in both ca

requireme

business a

When cho

Simpl

ensur

meet 

A con

and te

requir

worki

enter

Enter

suppo

large 

mobil

An ex

autom

system

progr

devel

The Micro

extensible

organizat

interface 

2010, it is

adoption 

familiar a

value from

Project Se

shopping 

that (proj

able, Cotting project a

g products fr

ategories to b

ents, aligns w

applications. 

oosing a comp

lified adminis

re that they ca

custom repo

nnected work

eams will use

re a PPM solu

ng in their pr

prise resourc

prise scalabil

ort deployme

volumes of d

le workforce.

xtensible and

mate their un

ms to mainta

amming inter

opment activ

osoft® Enterp

e platform th

ion’s enterpr

in Microsoft®

s even easier f

and satisfact

nd unified wo

m their Micro

erver 2010 sim

for both proj

ect managem

onnecteand portfolio 

om a busines

be successful, 

with the organ

prehensive P

stration and f

an easily be c

orting require

k managemen

e a variety of p

ution that can

referred envir

ce manageme

lity and perfo

nts at the de

ata; perform

 

 programmab

ique requirem

in data integr

rface (API) in 

vities. 

prise Project M

at has the fle

ise architectu

® Project Serv

for users to g

ion. The EPM

ork managem

osoft platform

mplifies admi

ect and portf

ment offices (P

ed, andManagemen

ss perspective

to help ensu

nization’s IT re

PM solution, 

flexibility. Or

configured to 

ments. 

nt platform. D

productivity t

n connect wit

ronment, and

ent and repor

ormance. Org

partmental a

across wide 

ble platform.

ments or to e

rity. Leading P

addition to d

Management 

xibility to me

ure standards

ver 2010 and 

get started, an

M Solution con

ment platform

m investments

nistration thr

folio manage

PMOs) can sp

d Progrt (PPM) solut

e, and throug

re that the pr

equirements,

organizations

rganizations n

automate th

Depending on

tools to receiv

h common pr

d so they can 

ting. 

ganizations re

nd enterprise

area network

. Often organ

ffectively inte

PPM solution

developer too

(EPM) Soluti

eet most busin

s. With the fa

the Ribbon in

nd thereby re

nnects with re

m, helping to e

s. 

rough an imp

ment capabil

pend less time

rammations, evaluat

gh an IT lens. 

roduct’s func

, and integrat

s look for the

need PPM pla

he organizatio

n their roles a

ve and comp

roductivity to

easily provid

equire a PPM 

e level; meet 

ks (WANs); an

nizations custo

egrate with th

ns need to pro

ols and resour

on provides a

ness requirem

miliar Micros

nterface in M

educe training

elated Micros

ensure that o

proved consol

ities. Improve

e managing t

ble Plation committe

PPM solution

ctionality mee

tes seamlessl

e following: 

atforms to be

on’s unique p

and preferenc

lete work. Or

ools so that u

e updates to 

solution that

peak use sce

nd support an

omize their P

hird‐party or 

ovide an open

rces to suppo

a scalable, co

ments and ali

soft® SharePo

icrosoft® Pro

g requiremen

soft technolo

rganizations g

le that provid

ed administra

he PPM syste

atformees assess 

ns must score

ets business 

y with line‐of

 flexible to he

rocesses and

ces, employe

rganizations 

sers can cont

facilitate 

t can scale an

enarios; handl

nd empower t

PPM solution 

homegrown 

n application 

ort custom 

nnected, and

gn with the 

oint® user 

oject Professio

nts, and drive

gies to provid

gain addition

des one‐stop‐

ation helps en

em and instea

 

 well 

f‐

elp 

 

es 

tinue 

nd 

le 

the 

to 

onal 

de a 

nal 

nsure 

ad 

 

focus on m

interface 

and Visua

third‐part

scalability

distribute

FamiliThe Micro

2010 and 

adoption 

Because P

modules i

experienc

Server use

Englis

Arabi

Brazil

Chine

Chine

Czech

Danis

Dutch

Finnis

Frenc

Germ

Greek

Hebre

Hunga

Italian

Japan

Korea

Norw

Polish

Portu

Russia

Spani

Swed

Turkis

monitoring th

(API), Project

al Studio® 201

ty systems an

y and perform

ed organizatio

iar User osoft EPM Sol

Project Profe

and satisfact

Project Server

in Project Ser

ce across bott

er interface s

sh 

ian 

ese (Simplified

ese (Tradition

sh 

ch 

an 

ew (Enabled) 

arian 

nese 

an 

egian (Bokma

guese (Europ

an 

sh 

ish 

sh 

he PPM proce

t Server Interf

10 provide de

d successfully

mance improv

ons. 

Interfaclution provide

essional 2010

ion. 

r 2010 is built

rver 2010 hav

tom‐up and to

upports the f

d) 

al) 

al) 

pean) 

ess. The enha

face (PSI), an

evelopers with

y build and d

vements of Pr

e Improes users with

0 to help enha

t on SharePoi

ve a consisten

op‐down PPM

following lang

nced Project 

d connection

h the require

eploy custom

roject 2007 to

ves Ado a familiar an

ance producti

int Server 201

nt SharePoint 

M capabilities

guages: 

Server 2010 

n with Microso

d tools and re

m solutions. Th

o continue to 

option annd consistent 

ivity, reduce t

10, the portfo

 user interfac

s (see Figure 1

application p

oft® SharePo

esources to in

he EPM Solut

 meet the ne

nd Satisfinterface acr

training costs

olio selection 

ce, helping to

1). Like Share

programming 

int® Server 2

ntegrate with

tion builds on

eds of large, 

faction oss Project Se

s, and drive 

and analytica

o ensure a uni

ePoint, the Pr

 

010 

n the 

erver 

al 

iform 

oject 

 

Figure 1. Pro

The Ribbo

familiar ex

using the 

Figure 2. Pro

The simpl

that they 

reveal pow

 

oject Server 201

on interface in

xperience, w

powerful des

oject Professiona

e and intuitiv

need to plan

werful featur

0 – Built on Shar

n both Projec

hether they a

sktop schedu

al 2010 – The Ri

ve Ribbon hel

and manage

res, so it is ea

rePoint Server 2

ct Server 2010

access Project

ling tool. 

bbon interface f

ps users quic

 their project

sier to get sta

010

0 and Project 

t capabilities 

for Web‐based e

ckly realize re

ts are always 

arted and to r

 Professional

through the 

diting

sults and wo

at their finge

reduce trainin

 

 2010 provide

browser (see

rk more effici

ertips. Contex

ng costs (see 

es users with

e Figure 2) or 

iently; the too

xtual menu gr

Figure 3). 

 

 a 

by 

 

ols 

roups 

 

Figure 3. Pro

The Proje

enhanced

Figure 4. Pro

ConneMicrosoft

productiv

size‐fits‐a

provide a 

productiv

minimal e

that proje

and resou

customer

SharePAs mentio

together p

provide fl

oject Professiona

ct Server 201

d user experie

oject Server 201

ected Wt recognizes t

vity tools they

ll PPM solutio

familiar work

vity tools, and

effort and adm

ect managers 

urce managem

s can connec

Point Servoned through

powerful bus

exible work m

al 2010 – The Ri

10 left menu b

ence (see Figu

0 – New left me

ork Manhat user pref

y choose to us

on. The Micro

k managemen

d easily receiv

ministrative o

and PMOs ca

ment. Connec

t disparate te

ver 2010 hout this guide

siness collabo

management 

bbon interface

bar has been 

ure 4). 

enu bar

nagemenferences and 

se to complet

osoft EPM So

nt platform. T

ve tasks and p

overhead. Thi

an effectively

cting with the

eams and gain

e, Project Ser

ration platfor

solutions. Th

redesigned t

nt Solutiroles within t

te tasks. We k

lution connec

This ensures t

provide status

s flexibility he

y gather the re

e following re

n additional v

rver 2010 is b

rm services a

his connection

o better grou

on the organizat

know that the

cts with relat

that teams ca

s updates to p

elps drive tea

equired data 

elated Microso

value from th

built on Share

nd structured

n provides org

up related cap

ion will direct

ere is no such

ed Microsoft 

an choose the

project stake

am productivi

to drive ente

oft technolog

e Microsoft p

ePoint Server 

d execution c

ganizations w

pabilities, for 

tly affect the 

h thing as a o

technologies

eir preferred 

holders, with

ity and ensur

erprise report

gies ensures t

platform. 

2010, and br

capabilities to

with all the to

 

 

an 

ne‐

s to 

ting 

that 

ings 

ools 

 

and servic

the produ

project m

calling on

into Proje

continue t

2010) to f

Figure 5. Pro

Sync PProject 20

2010 (form

be centra

Project te

Profession

2010 task

team. Tea

assignme

Team me

2010 to sy

members

resolve an

ces they need

ucts also prov

anagers can 

 the full rigor

ect Server 201

to execute th

facilitate ente

oject Server 201

roject Pr010 facilitates

merly Window

lly managed f

eams can imp

nal 2010 and 

k list, and then

am members 

nts when the

mbers can di

ync with Proj

 into their pro

ny conflicts in

d to fully auto

vides addition

use SharePoi

r of Project Se

10 at any time

he project in S

erprise resour

0 – Lightweight

ofessionas synchroniza

ws® SharePoi

for enterprise

rove product

SharePoint p

n map resour

can choose t

y visit the Sh

rectly update

ect Professio

oject plans—

n task informa

omate their P

nal benefits fo

nt Server 201

erver 2010. H

e if the team 

SharePoint Se

rce managem

project visibility

al 2010 wation between

int Services) o

e visibility at t

tivity by autom

products. Man

rce assignmen

o receive e‐m

arePoint Fou

e their progre

nal 2010. Pro

on demand o

ation that are

PM processe

or small team

10 task lists to

owever, a Sh

requires add

erver 2010 an

ment and repo

 

y and tracking us

with Sharen Project Prof

or SharePoint

the program,

mating bidire

nagers can sa

nts on project

mail notificatio

ndation 2010

ss and other 

oject manager

or at regularly

e identified du

s (see Figure 

s that run lig

o manage sim

arePoint task

itional capab

nd sync status

orting. 

sing a SharePoin

ePoint 20fessional 201

t Server 2010

, project, and

ectional status

ave projects to

t tasks to Sha

ons of assign

0 task list. 

task informat

rs choose wh

y scheduled in

uring synchro

5). The conn

htweight proj

mple projects 

k list can easil

ilities, or the 

s updates (wit

nt task list

010 0 and ShareP

0 so that proje

 resource lev

s updates bet

o a SharePoin

arePoint users

ments, or see

tion in Share

hen to sync up

ntervals. Proj

onization. 

ection betwe

jects. Occasio

and tasks, wi

ly be importe

manager can

th Project Se

Point® Founda

ect schedules

vel. 

tween Projec

nt Foundation

s on their pro

e their 

Point Founda

pdates from t

ect 2010 help

 

een 

onal 

ithout 

ed 

rver 

ation 

s can 

ct 

oject 

ation 

team 

ps 

 

You can n

bidirectio

Figure 6. Sh

Figure 7. Pro

Syncing te

and effort

team mem

to be. 

now open any

nal synchron

arePoint Founda

oject Professiona

eam task stat

t—some of th

mbers, and m

y SharePoint t

ization is auto

ation Server 201

al 2010 – Sync to

us updates th

heir most valu

makes that com

task list in Pro

omatically cre

0 – Open task lis

o task list

hrough Share

uable resourc

mmunication

oject Professi

eated betwee

st in Microsoft P

Point Founda

ces. It enhanc

 flexible and 

onal 2010 (se

en the client 

Project

ation 2010 sa

ces communic

as frequent a

ee Figures 6 a

and the Share

ves organizat

cation betwe

as the project

and 7), and a 

ePoint task lis

 

 

tions money, 

en managers

t manager ne

 

st. 

time, 

s and 

eds it 

 

ExchanProject Se

Microsoft

and updat

Outlook a

notificatio

automatic

organizat

connected

Figure 8. Pro

Visual Unifying P

2010 Team

Connectin

own meth

remain se

Project Pr

ensure th

Planner fe

assignme

Profession

nge Serveerver 2010 inc

t Exchange 20

te their tasks

as tasks and a

ons and quick

cally sync the

ions no longe

d and can rec

oject Server 201

Studio TeProject Server

m Foundation

ng these dispa

hodologies (fo

eamlessly con

rofessional 20

at developme

eatures to he

nts. Manager

nal 2010, and

er cludes native

007 with Serv

 in Microsoft 

re convenien

kly update pe

e updates with

er have to inst

ceive tasks in 

0 – Users can co

eam Systr 2010 and Pr

n Server help

arate worlds 

or example, a

nnected throu

010 provides 

ent managers

lp plan devel

rs can simply 

d then amend

 interoperabi

ice Pack 2) to

Outlook® (se

ntly grouped b

rcent comple

h Project Serv

tall an Outloo

Outlook or O

onveniently recei

tem 2010roject Profess

s to better co

empowers pr

agile versus w

ughout the de

native conne

s can take adv

opment sprin

extract and v

d and sync up

ility with Exch

o help ensure

ee Figure 8). P

by project nam

ete, work don

ver 2010. Exc

ok add‐in; this

Outlook Web A

ive tasks and up

0 Team Fosional 2010 w

onnect the wo

roject manag

waterfall) and 

evelopment li

ectivity with T

vantage of th

nts and better

view all develo

dates back to

hange Server 

 that team m

Project Serve

me. Team me

ne, and remai

change Server

s helps ensur

App. 

pdate their task s

oundationwith Microsoft

orlds of PPM 

gers and deve

to select opt

ife cycle. 

Team Foundat

he new user‐c

r visualize an

opment activ

o Team Found

(Microsoft Ex

members can c

r 2010 tasks a

embers can e

ning work va

r connection 

re that team m

status in Outlook

n Server t Visual Studi

and applicati

elopment team

timal product

tion Server 20

controlled sch

d amend reso

vities as tasks

dation Server

xchange 2010

choose to rec

are displayed

easily receive 

lues for tasks

means that 

members stay

k

o Team Syste

ion developm

ms to follow t

tivity tools, an

010, and help

heduling and 

ource 

 in Project 

r 2010. Manag

 

0 or 

ceive 

d in 

s, and 

em 

ment. 

their 

nd yet 

ps to 

Team 

gers 

 

control th

Ribbon (se

Figure 9. Pro

For all dev

with Proje

applicatio

Figure 10. P

Microsoft

Studio Te

after the 

SimpliProject Se

Solution w

that admi

managing

Project Se

he data excha

ee Figure 9). 

oject Professiona

velopment ac

ect Server 20

on developme

Project Profession

t is currently w

am Foundatio

Microsoft Off

ified Admerver 2010 he

with simplifie

inistrators can

g the PPM sys

erver 2010 en

nge through 

al 2010 – Team m

ctivities captu

10 to better c

ent (see Figur

nal 2010 and Vis

working on p

on Server 201

fice 2010 laun

ministratelps PMOs an

d and stream

n better mee

stem, and inst

nhancements 

the intuitive 

menu

ured in Projec

connect the w

re 10). 

sual Studio Team

roviding direc

10. More info

nch. 

tion andd IT pros mor

mlined admini

t their organi

tead focus on

include the f

Team menu o

ct Professiona

worlds of proj

m Foundation Ser

ct connectivit

ormation abou

d Ease ofre effectively 

stration capa

ization’s busi

n the successf

following: 

option in the 

al 2010, a pro

ject and portf

rver 2010 conne

ty between P

ut this integra

f Use configure, de

abilities. These

ness requirem

ful delivery of

Project Profe

oject manage

folio manage

ectivity

Project Server

ation will be 

eploy, and ma

e enhanceme

ments and sp

f projects and

essional 2010

r can simply s

ement and 

r 2010 and Vis

available sho

anage the EP

ents help ens

pend less time

d portfolios. 

 

 

sync 

 

sual 

ortly 

ure 

 

Centr

botto

admin

botto

Figure 11. P

Depa

admin

and c

admin

clutte

cubes

can u

share

are no

Using

fields 

where

to all 

ralized admin

m‐up project

nistration con

m‐up capabil

Project Server 20

rtmental field

nistrators can

ustom fields w

nistrators pro

er so that dep

s while ensuri

se its own set

 specified cus

ot assigned to

g Project Serve

in one depar

e they do not

custom fields

nistration: Pro

t managemen

nsole helps en

lities through

010 – Server Sett

ds: The new d

n associate an

with specific 

ovide busines

partments can

ing that PMO

t of enterpris

stom fields. In

o a departme

er 2010, adm

rtment from u

t have permis

s, although th

oject Server 2

nt capabilities

nsure that ad

 one intuitive

tings

departmenta

nd filter Enter

departments

s units with a

n focus on the

Os maintain en

se project, tas

n Project Serv

ent, so that us

ministrators ca

using Project 

ssion. In Proje

hey can filter 

2010 unifies t

s within a sing

ministrators 

e interface (se

l fields in Pro

rprise Project

s within the o

a substantial l

eir own data, 

nterprise stan

sk, and resour

ver 2010 adm

sers see only 

an restrict use

Web App to 

ect Profession

lists for a pro

op‐down por

gle server. Th

can effective

ee Figure 11)

oject Server 20

 Types (EPTs)

rganization. T

evel of auton

 and simplifie

ndardization a

rce custom fi

ministrators ca

custom fields

ers who have

edit the custo

nal 2010, adm

oject based on

rtfolio manag

he improved o

ly manage bo

010 help ensu

), business dr

This new feat

nomy, elimina

es the creatio

and control. E

elds; departm

an filter out c

s that are rele

 permission t

om fields of o

ministrators ca

n the departm

gement and 

one‐stop‐sho

oth top‐down

ure that 

ivers, resourc

ture helps 

ates unnecess

on of reportin

Each departm

ments can als

custom fields 

evant to them

to edit custom

other departm

an enable acc

ment. If you a

 

pping 

n and 

 

ces, 

sary 

ment 

that 

m. 

ments 

cess 

are 

 

not a 

depar

Admi

displa

admin

refres

by bu

 With 

Sl

C

 

Projec

localiz

the la

which

Projec

Autom

by de

 

Figure 12. P

Elimin

requir

Active

that b

member of a

rtmental field

nister report

aying the stat

nistrators to m

shing cubes. O

ilding smaller

multiple cube

lice the data i

onstrain acce

ct Server 201

zed field nam

nguage of th

h tasks are sh

ct Profession

matically Sche

fault, but you

Project Server 20

nation of Act

rements acro

eX controls he

block client‐si

a department

ds. 

ing cubes: Pr

us of and ma

manage all cu

Organizations

r, independen

es, you can ac

in cubes by p

ess to cubes b

0 also suppor

me aliases, so 

e locale wher

own as prope

al and Micros

eduled (the d

u can include 

010 – Improved r

iveX controls

oss the projec

elps improve 

de controls in

, you can fill i

roject Server 

naging availa

ube settings a

s can take adv

nt cubes. 

ccomplish the

icking groups

by departmen

rts localized d

you can build

re they are de

erties instead

soft® Project 

efault mode)

a dimension 

reporting admini

s: Project Serv

ct, portfolio, a

security and 

n their enviro

in only global

2010 includes

able cubes (se

and data, inclu

vantage of im

e following: 

s of data and 

nt. 

data in cubes,

d Project Deta

eployed. Cube

d of as a task d

Standard 201

) or as Manua

for task assig

istration

ver 2010 simp

and reporting

overcomes d

onments. The 

lly required fi

s an enhance

ee Figure 12).

uding adding

mproved perfo

adding fields

, by using tra

ail Pages (PDP

es support M

dimension. Ta

10; you can u

ally Scheduled

gnments and 

plifies deploy

g capabilities o

deployment c

 elimination o

ields, and not

ed administra

 It is now eas

g, copying, de

ormance and 

s from each gr

nslators. All d

Ps) that show

Manually Sche

ask mode is a

se it to set a t

d. Cubes excl

show active o

yment by elim

of the solutio

complexities f

of ActiveX als

t specific 

tion interface

sier than ever

leting, and 

cube build ti

roup. 

data can have

w field names 

duled task da

a new feature

task as 

ude inactive t

or inactive ta

minating Activ

on. The remov

for organizati

so facilitates 

 

e for 

r for 

mes 

in 

ata, in 

e in 

tasks 

sks. 

veX 

val of 

ons 

 

platfo

softw

App. 

Proje

can vi

admin

Figure 13. P

User D

name

PMO 

Projec

workf

orm maintena

ware update—

ct Permission

iew or edit th

nistrator to es

Project Server 20

Delegation: P

e colleagues to

officer or sys

ct Web App, s

flow, for insta

ance by remo

—whether it is

ns: The new P

heir projects (

stablish acces

010 – Project Per

Project Server

o act as their 

tem administ

so it can be u

ance. 

oving the need

s a hotfix, a cu

Project Permi

see Figure 13

ss rights to th

rmissions

r 2010 enhan

delegate wh

trator (see Fig

used for times

d to deploy d

umulative upd

ssions view e

3). Project ma

heir projects.

ced delegatio

en on vacatio

gures 14 and 

sheets, or to d

esktop comp

date, or a ser

empowers pro

anagers no lo

on capabilitie

on, for instan

15). Delegati

drive a projec

ponents every

rvice pack—to

oject manage

nger need to

es empower u

ce, without a

ion works acr

ct through its

y time a new 

o Project We

ers to control 

 rely on an IT

 

users to easily

assistance fro

ross all featur

s governance 

 

who 

m a 

res of 

 

Figure 14. P

Figure 15. P

ScalabThe EPM 

such as Ac

requireme

(SSP) desi

increase s

architectu

additiona

64‐bit and

larger pro

options. 

Project Server 20

Project Server 20

ble PlatfoSolution take

ctive Cache a

ents. Project 

gn (from Proj

scalability by 

ure now requ

l scalability a

d 32‐bit optio

oject plans an

010 – User Deleg

010 – Delegate se

orm es advantage 

nd the Queui

Server 2010 i

ject Server 20

allowing mor

ires 64‐bit ca

nd throughpu

ons. The 64‐bi

d master pro

ation

ession

of and extend

ing Service, d

is built on Sha

007) has been

re services to 

pability acros

ut for project

it option ensu

ojects that exc

ds the archite

elivered in Pr

arePoint Serv

n updated to 

run on the ap

ss all servers 

 data profiles

ures that proj

ceed the 2‐gig

ectural and pe

roject 2007 to

ver 2010, and

a Service App

pplication tie

in the farm, w

s. Project Prof

ject manager

gabyte (GB) m

erformance e

o scale to me

d the Shared S

plication mod

er. Project Ser

which inheren

fessional 201

rs can more e

memory limit 

 

 

enhancement

eet enterprise

Service Provid

del that helps

rver 2010 

ntly provides 

10 is available

asily work wi

 on earlier 32

 

ts, 

der 

s to 

e in 

th 

2‐bit 

 

ArchiteProject Se

Client app

16). The P

applicatio

databases

 

Project Se

architectu

front‐end

communi

Access La

business o

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ecture erver 2010 is 

plications can

PSI is the API t

ons can define

s through the

erver 2010 ex

ure includes P

 applications 

cate with the

yer (DAL). Cli

objects and th

built on Micr

 access the se

to Project Ser

e handlers for

e data access 

xtends the arc

Project Profes

communicat

e business obj

ent applicatio

he DAL from 

osoft .NET Fr

erver busines

rver that ena

r server‐side 

layer. 

chitecture int

ssional 2010 a

te with the m

ject layer. Bu

ons do not di

clients. 

amework 3.5

ss layer throu

bles efficient 

events. Busin

roduced in Pr

and Project W

iddle tier only

siness object

rectly access 

5 to provide t

ugh Web serv

 remote acce

ness objects a

roject Server 

Web App clien

y through PSI

s use the dat

the primary d

rue multi‐tier

ice calls to th

ess by using d

access multip

2007. The Pr

nts in the fron

I Web service

abases throu

databases; Pr

r architecture

e PSI (see Fig

atasets. Exte

le Project Ser

roject Server 

nt‐end tier. Th

es, which in tu

gh the Data 

roject Server 

 

e. 

gure 

rnal 

rver 

2010 

he 

urn 

hides 

 

Figure 16. P

DeploySimilar to

size, depe

all farm to

Server 20

dependin

extranet a

informatio

Project Server 20

yment  SharePoint S

ending on you

opologies—sm

10 can be de

g on your IT r

access if reso

on about sett

010 – General Pro

Server 2010, a

ur business re

mall, medium

ployed on ph

requirements

urces outside

ting up extran

oject Server arch

a Project Serv

equirements. 

m, and large (s

ysical servers

s. In addition,

e of your orga

net access, se

hitecture

ver 2010 farm

As a three‐tie

see figure 17)

s or on virtua

 organization

anization nee

ee the EPM So

Project

m deployment

er application

). As with Pro

l servers (usin

ns can configu

d to collabor

olution System

t Web App.

t can vary in c

n, Project Ser

oject Server 20

ng Hyper‐V™ 

ure Project Se

ate on projec

m Requireme

 

complexity an

rver 2010 sup

007, Project 

technology) 

erver 2010 fo

cts. For more 

ents on TechN

 

nd 

pports 

Net. 

 

Figure 17. P

High ASeveral fe

Project Se

underlyin

mirroring

SharePBecause P

enhancem

The Share

experienc

Web site g

the major

and is acc

Figure 18)

Project Server 20

vailabilityeature improv

erver service 

g SQL Server®

Point 201Project Server

ments that all

ePoint Server 

ce and to mak

groups major

r areas—Appl

cessible by clic

). 

010 – Topologies

y vements in Pr

help achieve 

® high‐availab

0 Adminir 2010 is built

 Project Serve

2010 Centra

ke it easier fo

r functional a

lication Mana

cking its nam

roject Server 

high‐availabi

bility technolo

strationt on SharePoi

er 2010 admi

l Administrat

r users to find

reas together

agement, Mo

e or by clickin

2010 that are

lity architectu

ogies such as 

int 2010, it’s i

inistrators be

ion Web site 

d what they a

r and lists ma

nitoring, and 

ng the corres

e targeted at 

ure. Project S

 log shipping,

important to 

enefit from. 

is redesigned

are looking fo

any of the mo

 so on—is rep

sponding link 

the database

Server 2010 le

, clustering, a

describe key

d to provide a

or. The Centra

ost common t

presented on

in the left na

 

e level and at 

everages 

and database 

y SharePoint 2

a more familia

al Administra

tasks. Each on

n the start pag

v menu (see 

 

the 

2010 

ar 

tion 

ne of 

ge 

 

Figure 18. S

Although 

some new

applicatio

managed 

can more 

In ShareP

the Web a

on a singl

SharePoin

that provi

farm. The

reporting

Ca

D

R

R

 

harePoint Serve

the user inte

w options and

ons. Web app

through a Rib

easily view o

oint Server 20

application ea

e menu. 

nt Server 201

ide the admin

ese features a

. The followin

ategory 

iagnostics 

eliability and 

eporting 

r 2010 – Central

rface has cha

d functionality

lications are s

bbon interfac

or change det

007, many of

ach time. Now

0 provides ad

nistrator with

re categorize

ng table show

Monitoring 

l Administration

anged somew

y. One of the 

still created w

ce on the Man

ails about a W

f these tasks r

w, you simply

dditional main

h tools for mo

ed in the follo

ws the various

Functiona

Unified Lo

Usage dat

Develope

SharePoin

System Ce

Out‐of‐bo

System Ce

what, users wi

places where

with the same

nage Web Ap

Web applicati

required the 

y click the We

ntainability ca

onitoring the 

owing groups:

s categories a

ality 

ogging Service

tabase 

r dashboard 

nt Maintenan

enter Operati

ox usage repo

enter Operati

ill find many o

e this is more

e process, but

pplications pa

ion because a

user to click a

eb application

apabilities, in

health and pe

: diagnostics, 

and their corr

e (ULS) 

nce Engine (SP

ions Manage

orts 

ions Manage

of the menus

e obvious is in

t the experie

age. Using the

all options are

a different m

n, and all opti

ncluding a num

erformance o

reliability an

responding fe

PME) rules 

r monitoring 

r reports 

 

s familiar, wit

n managing W

nce is now 

e Ribbon, use

e just a click a

enu and rese

ions are laid o

mber of featu

of the SharePo

d monitoring

eatures. 

 

Web 

rs 

away. 

lect 

out 

ures 

oint 

g, and 

 

Figure 19. S

Figure 20. S

DiagnoThe Unifie

file impro

the mana

Logging p

harePoint Serve

harePoint Serve

ostics ed Logging Se

ovements, cor

geability enh

age (see Figu

r 2010 – Diagno

r 2010 – Crawl A

ervice (ULS) in

rrelation ID tr

ancements in

ure 18). Event

ostic logging

Activity Report

n SharePoint S

racing, and W

n Project Serv

t throttling co

Server 2010 i

Windows Powe

ver 2010. The

ontrols the sev

includes man

erShell™ scrip

e ULS is config

verity of even

ageability im

pting. Event t

gured on the 

nts that are c

 

 

provements, 

throttling is o

Diagnostics 

aptured in th

 

log 

ne of 

he 

 

Windows 

Events are

categorie

(EVFP) can

detected 

events, an

size by mo

specified 

Correlatio

request. S

Server 20

informatio

 

SharePoin

database.

Administr

is public. 

types of e

query usa

feature us

against th

 

Figure 21. S

event log an

e categorized

s. Updating a

n also be ena

and suppress

nd third‐party

ore than 50 p

location, and

on IDs that ar

SQL Profiler tr

10 includes s

on and config

nt Server 201

. This logging 

rators can rea

Because of th

events that ar

age, site inven

sage and licen

he number of 

harePoint Serve

d trace logs. A

d, and adminis

ll categories w

bled on the s

sed until cond

y logging soft

percent by usi

 administrato

e associated 

races also sho

everal Windo

gure the ULS. 

0 logs feature

is carried out

ad, query, and

his, third‐part

re logged are 

ntory usage, t

nsing informa

enterprise cl

r 2010 – Usage l

As the severit

strators can c

will lose chan

same Web pa

ditions return

ware can be 

ing NTFS file s

ors can also c

with each req

ow correlatio

ows PowerShe

e usage and p

t by the usage

d build report

ty application

shown in Fig

timer jobs, an

ation, an adm

ient access lic

logging

ty decreases,

change the se

nges to individ

ge. When EV

n to normal. T

integrated in

system comp

onfigure the 

quest can hel

n IDs, to furth

ell cmdlets ad

performance 

e service app

ts directly fro

s can also wr

ure 21 and in

nd rating usag

ministrator can

censes (CALs)

 the number 

ettings for any

dual categori

VFP is enabled

The ULS then 

to the ULS. T

pression. Trac

storage dura

p troublesho

her assist wit

dministrators

information t

plication, and 

om the usage 

rite their data

nclude page re

ge. Because t

n track the us

) purchased, 

of events log

y single categ

es. Event Log

d, repeating e

contains all a

The logs have 

ce logs can als

tion and amo

oot errors rela

th troublesho

s can use to re

that is entere

is enabled by

database bec

a to the usage

equests, feat

he usage data

se of enterpri

to help ensur

gged will incre

gory or for all

g Flood Protec

events are 

application lo

been reduce

so be located

ount of storag

ated to the 

ooting. ShareP

etrieve 

ed into the us

y default. 

cause the sch

e database. T

ure usage, se

abase tracks 

ise features 

re compliance

 

ease. 

 

ction 

d in 

 in a 

ge. 

Point 

sage 

hema 

he 

earch 

e. 

 

A new add

informatio

disabled b

PowerShe

Reliab

A new add

SPME is a

basis, che

makes rec

Available 

Central Ad

the Health

The SPME

ensure th

Figure 22. S

SharePoin

real‐time 

dition to serv

on for each p

by default and

ell. 

bility and

dition to Shar

 new and imp

ecks the admi

commendatio

only to users

dministration

h Status secti

E maintains a 

at the ShareP

harePoint Serve

nt Server 201

alerts and tro

ver diagnostic

page load and

d can be inde

d Monit

rePoint Serve

proved versio

nistrative con

ons to resolve

s who have fa

n through the

ion, and they 

list of rules c

Point environ

r 2010 – Health

0 will ship a m

oubleshootin

cs is the devel

 in this way h

ependently en

oring 

er 2010 includ

on of the Best

nfiguration, p

e potential iss

rm administr

 Review Prob

are available

called Health 

ment is prop

Rule Definitions

management 

g in the conte

loper dashbo

helps troubles

nabled for eac

des the Share

t Practices An

performance, 

sues. 

rator credent

blems and Sol

e in System Ce

Rule Definitio

erly configure

s

pack for Syst

ext of a large

oard. This das

shoot perform

ch Web appli

Point Mainte

nalyzer. It per

best practice

ials, the resu

lutions link in

enter Operat

ons. The list is

ed and health

tem Center O

r infrastructu

hboard displa

mance issues

ication by usi

enance Engine

iodically, or o

es, and securi

lts are access

n the Monitor

ions Manage

s created by t

hy. 

Operations Ma

ure. It watche

ays detailed 

. This dashbo

ng Windows 

e (SPME). The

on an on‐dem

ty issues, and

sible through 

ring section a

r (see Figure 

the system to

anager. It pro

es events, mo

 

oard is 

mand 

nd 

22). 

o help 

 

ovides 

nitors 

 

performa

SharePoin

Log, usage

UpgradMicrosoft

2007 acro

to help en

There are

In‐pla

Datab

An in‐plac

Server 20

single pro

A databas

to a new P

restored o

the Projec

Server 20

migration

for Micros

 

Please ref

SharePoin

http:/

http:/

ExtensLeading P

that organ

LOB syste

ensure th

unique re

With 

2010,

nce counters

nt Server 201

e database, a

de from Pt is aware tha

oss their orga

nsure that cus

e two primary

ace 

base attach 

ce upgrade al

07 installatio

ocess. 

se attach upg

Project Serve

on SQL Serve

ct Web App in

10 instance, t

n scenarios fo

soft Project S

fer to TechNe

nt Server 201

//technet.mic

//technet.mic

sible andPM solutions

nizations can 

ems. The EPM

at customers

quirements. 

the portfolio 

 the PSI has b

, and takes co

0 understand

and SPME; an

Project Set our custom

nizations. Wi

stomers can s

y methods for

lows you to i

n, and then m

rade allows y

er 2010 install

r, and the new

nstance is cre

the database

r other produ

Server 2010. 

et for the resp

0: 

crosoft.com/p

crosoft.com/s

d Progras need to prov

develop and 

M Solution incl

s and Microso

The PSI includ

capabilities o

been extende

orrective acti

ds and discove

d is integrate

erver 200ers have mad

th this in min

smoothly mig

r upgrading fr

nstall Project

migrate the co

you to "attach

lation. Projec

w Project Ser

eated. When y

s are upgrade

uct versions, v

pective IT pro

projectserver

sharepoint 

ammablevide an open,

deploy custo

ludes the Pro

oft partners ca

des the follow

of Project Por

ed to include 

on where nec

ers topology;

ed with ULS.

7 de significant 

nd, we have in

grate from Pro

rom Project S

t Server 2010 

ontent and se

h" restored co

t Server 2007

rver 2010 farm

you connect t

ed to Project 

visit TechNet 

o documentat

r  

e Platfor, extensible, a

om offerings a

oject Server In

an continue t

wing enhance

rtfolio Server 

both project 

cessary. The 

 grabs events

investments 

nvested in up

oject Server 2

Server 2007 to

on the same

ettings in you

opies of your 

7 farm databa

m points to th

to the databa

Server 2010.

Upgrade and

tion for both 

rm and program

and effective

nterface (PSI),

to extend Pro

ements in Pro

2007 incorpo

and portfolio

management

s from ULS, th

in deploying 

pgrade proces

2007 to Proje

o Project Serv

 hardware as

ur server farm

Project Serve

ases are back

hese restored

ases from the

 For addition

d Migration R

Project Serve

mable platfor

ly integrate t

, a flexible AP

oject Server to

oject 2010: 

orated into Pr

o capabilities.

t pack for 

he Windows E

Project Serve

sses and strat

ect Server 201

ver 2010: 

s your Project

m as part of a 

er 2007 datab

ked up and 

d databases w

e new Project

al upgrade an

Resource Cent

er 2010 and 

rm to help en

he toolset wi

PI that helps 

o meet their 

roject Server 

 

 

Event 

er 

tegies 

10. 

bases 

when 

nd 

ter 

nsure 

ith 

 

Comp

devel

Becau

consis

servic

Studio

 

Project Se

can use to

and small

easier cus

SharePoin

deployme

Project Se

database 

reports, d

solutions 

For additi

programm

Software 

programm

with othe

ShareBecause P

Server 20

SharePoin

solutions 

and Share

Server de

SharePoin

Sandboxe

unpredict

SharePoin

developm

but also b

productiv

patibility with

oped using P

use Project Se

stent and rob

ces, including 

o 2010, and S

erver 2010 off

o adapt and e

 organization

stomization o

nt features. U

ent of client a

erver 2010 ha

and Online A

dashboards, a

such SQL Ser

onal informa

mability, visit 

Developmen

ming referenc

er applications

Point 20Project Server

10 extend Pro

nt Server 201

using familia

ePoint Design

livers suppor

nt Server 201

ed solutions c

table code on

nt Server 201

ment platform

because signif

ve, and to be m

 all PSI 2007 

roject Server 

erver 2010 is 

bust platform 

Windows Co

SharePoint De

fers a wealth

extend the ca

ns. The integra

of many pages

Using Window

applications th

as a fully docu

Analytical Proc

nd key perfo

ver Reporting

tion about Pr

http://msdn.

t Kit (SDK); it 

ces to help cu

s for enterpri

010 Dever 2010 is built

oject Server 2

0 provides th

r tools while 

ner 2010 help

t for applicat

0 with read/w

an be deploy

n other applic

0 is a major s

m not only bec

ficant investm

more accessi

methods help

2007. 

built on Shar

to rapidly bu

ommunication

esigner 2010.

 of new deve

pabilities and

ation of Proje

s in Project W

ws Communica

hat connect w

umented, ded

cessing [OLAP

rmance indic

g Services and

roject Server 

.microsoft.co

contains doc

ustomize and 

se project ma

elopment on SharePoi

2010 in key w

e business co

leveraging a r

developers b

ion life cycle 

write capabili

yed to a share

ations in use.

step forward f

cause of the r

ments have be

ble to develo

ps ensure the

ePoint Server

uild and deplo

n Foundation,

 

lopment capa

d application o

ect Server 201

Web App, in ad

ation Founda

with Project S

dicated relatio

P] cubes) that

ators using fa

d Performanc

2010 and Mic

m/project. Re

cumentation, 

integrate Pro

anagement.

nt int Server 201

ways that deve

ollaboration p

rich set of ou

be more prod

management

ty delivered b

ed hosting env

for SharePoin

richer set of o

een made in t

pers of all ski

e seamless mi

r 2010, devel

oy solutions u

, Business Co

abilities and s

of Project Ser

10 with Share

ddition to ma

ation improve

Server. Simila

onal and deci

t administrat

amiliar Micro

cePoint Servic

crosoft EPM S

efer specifica

code sample

oject 2010 clie

10, key enhan

elopers will b

platform for d

t‐of‐the‐box 

ductive, and V

t. Developers

by Business C

vironment to

nt products an

overall feature

the suite of to

ill levels. 

igration of all

opers can tak

using familiar 

onnectivity Se

scenarios tha

rver 2010 in l

ePoint Server

any new tech

es performanc

r to Project S

isional databa

ors can query

soft Business

ces.  

Solution exte

ally to the Pro

es, "How to" a

ents and Proj

ncements ma

benefit from. 

developers to

features. Visu

Visual Studio T

s can integrat

Connectivity S

o limit the imp

nd technolog

es that the pl

ools to make 

l custom solu

ke advantage

tools and 

ervices, Visual

at administrat

arge enterpr

r 2010 enable

nologies and 

ce, security, a

Server 2007, 

ase (reporting

y to build cus

s Intelligence 

ensibility and 

oject 2010 

articles, and 

ect Server 20

ade to ShareP

o rapidly build

ual Studio 20

Team Founda

te LOB data in

Services. 

pact of 

gies as a 

latform suppo

developers m

 

tions 

 of a 

tors 

ises 

es 

and 

tom 

010 

Point 

10 

ation 

orts, 

more 

 

SharePoin

most of w

Develo Visua

Visua

Visua

Wind

Share

Devel

Team

Rich Pl Share

Share

Silver

List lo

Busin

LINQ 

Perfo

Soluti

Event

Work

Client

REST 

Flexibl Sandb

Share

Upgra 

For additi

2010 Soft

 

 

 

 

nt Server 201

which are disc

oper Prodl Studio 2010

l Studio 2010

l Studio exten

ows® 7 and W

ePoint Design

loper dashbo

 Foundation S

atform SeePoint Ribbon

ePoint dialogs

light® Web p

ookups and re

ess Connectiv

to SharePoin

rmance enha

ion throttling

t enhancemen

flow enhance

t object mode

APIs 

e Deployboxed solutio

ePoint Online 

ading solution

onal resource

ware Develop

0 includes nu

cussed here. T

ductivity  0 SharePoint p

0 SharePoint t

nsions for Sha

Windows Vista

er 2010  

ard  

Server 2010 i

ervices  n  

s  

arts  

elationships  

vity Services  

t  

ancements  

  

nts  

ements  

els  

ment  ons  

 

ns 

e information

pment Kit (SD

umerous new 

The following

project types 

tools extensib

arePoint upgr

a® operating 

ntegration  

n about Share

DK), visit MSD

capabilities a

g list summari

and items  

bility  

rade  

system suppo

ePoint Founda

DN. 

and features f

izes new feat

ort  

ation 2010, a

for professio

ures.  

nd for the Sh

nal develope

harePoint Serv

 

rs, 

ver 

 

AdditProduct

MSDN Pro

Project 20

Project Te

Interact

Project 20

Enterprise

Project De

Microsoft

Project 

Download

Hosted Vi

IT Profe

Project Se

SharePoin

Project Ad

Develop

Project 

SharePoin

Programm

Additio

Project 20

 

tional Rt informati

oject 2010 Be

010 Blog 

eam Blog 

tive conten

010 Video Sho

e Project Man

eveloper Cen

t Office Projec

Profession

irtual Lab 

essional rel

erver 

nt 

dministration

per related

nt 

mability blog  

nal questio

010 

esourceion 

eta 

nt ‐ Videos

owcase 

nagement Mi

ter 

ct TechNet 

nal 2010 an

lated – Tec

n Blog 

d ‐ Develop

ons? Proje

es 

s & Session

crosoft Event

nd Project 

ch Center a

per center 

ct 2010 Fo

ns & WebC

ts 

Server 201

at TechNet

at MSDN 

orums! 

Cast  

10 Demo I

t  

mage: