15
DEPARTMENT OF ENVIRONMENTAL HEALTH AND SAFETY Office of Environmental Compliance Michigan State University 150 Giltner Hall East Lansing, MI 48824-1101 517/355-0153 Fax: 517/432-6686 www.ehs.msu.edu MEMORANDUM To: Mark Lutkenhoff, PIA for Asbestos, Physical Plant From: Zach Hansmann, Environmental Coordinator, EHS Date: September 22, 2011 RE: Clinical Center Skim Coat Plaster Clarification: Bldg 200 – Clinic Wing It was recently brought to my attention that the original Clinical Center building inspection performed by Fishbeck, Thompson, Carr, and Huber (FTC&H) in February of 2008 improperly sampled Homogenous Area number 7 - Drywall with paster skim coat. Specifically, samples were not collected from each building and building construction history was not taken into consideration. Of the eight original samples collected, only one tested positive for asbestos. This single positive sample was collected in building 202, which is not connected to builings 200 or 201 in any way. As a result of this poor inspection 359,980 square feet of this material was identified as asbestos containing material (ACM) throughout all three buildings. On September 14, 2011 I collected additional samples from building 200 in an attempt to further delineate the extent of the asbestos containing drywall and plaster skim coat. All samples collected in this building tested negative for asbestos. Please update your copies of the asbestos inspection report for Clinical Center Building 200 to identify HA #7 – Drywall with plaster skim coat as a non-asbestos containing material. I have attached a bulk sample log, bulk sample analytical results, sample location maps, and a building history map to this memo. Please let me know if you have any questions. 9/22/2011 1 of 15

Bldg#0200 Asbestos Inspection Update Sept/2011 · On September 14, 2011 I collected additional samples from building 200 in an ... 9/22/2011 1 of 15. DATE: BUILDING: INSPECTOR: Zach

Embed Size (px)

Citation preview

   

 

DEPARTMENT OFENVIRONMENTAL

HEALTH ANDSAFETY

Office of EnvironmentalCompliance

Michigan State University150 Giltner Hall

East Lansing, MI 48824-1101

517/355-0153Fax: 517/432-6686www.ehs.msu.edu

 MEMORANDUM  To: Mark Lutkenhoff, PIA for Asbestos, Physical Plant From: Zach Hansmann, Environmental Coordinator, EHS Date: September 22, 2011 RE: Clinical Center Skim Coat Plaster Clarification: Bldg 200 – Clinic Wing  

It was recently brought to my attention that the original Clinical Center building inspection performed by Fishbeck, Thompson, Carr, and Huber (FTC&H) in February of 2008 improperly sampled Homogenous Area number 7 - Drywall with paster skim coat. Specifically, samples were not collected from each building and building construction history was not taken into consideration. Of the eight original samples collected, only one tested positive for asbestos. This single positive sample was collected in building 202, which is not connected to builings 200 or 201 in any way. As a result of this poor inspection 359,980 square feet of this material was identified as asbestos containing material (ACM) throughout all three buildings.

On September 14, 2011 I collected additional samples from building 200 in an attempt to further delineate the extent of the asbestos containing drywall and plaster skim coat. All samples collected in this building tested negative for asbestos.

Please update your copies of the asbestos inspection report for Clinical Center Building 200 to identify HA #7 – Drywall with plaster skim coat as a non-asbestos containing material. I have attached a bulk sample log, bulk sample analytical results, sample location maps, and a building history map to this memo. Please let me know if you have any questions.

9/22/2011 1 of 15

DATE: BUILDING: INSPECTOR: Zach Hansmann

ASBESTOSTOTAL MATERIAL MATERIAL MATERIAL DETECTED* SAMPLE

HA # FOOTAGE TYPE CONDITION F/NF ACM (Y/N) (Y/N) # SAMPLE LOCATION

1 N N 1-1 closet wall in A101B

HA DESCRIPTION: NOTES: N 1-2 corner in A101 at service counter

Skim plaster on corner bead

N 2-1 closet wall in A101B

2 N

N 2-2 northeast wall in A100A

HA DESCRIPTION: NOTES:

N 2-3 east wall above ceiling in A144A

Drywall with plaster skim coat

N 2-4 southeast wall in A143

N 2-5 east wall of A116

N 2-6 northeast corner of AM130

N 2-7 north corner in AM205

N 2-8 west walll in AM235

3 N N 3-1 drywall joint compound near stair 8

HA DESCRIPTION: NOTES: N 3-2 drywall joint compound outside A-117-MD

Drywall joint compound N 3-3 drywall joint compound outside A-117-MD (AC2 door)

HA DESCRIPTION: NOTES:

HA DESCRIPTION: NOTES:

9/14/2011

MICHIGAN STATE UNIVERSITY - ENVIRONMENTAL HEALTH AND SAFETY

Clinical Center - Clinic Wing (Bldg #200)

BULK SAMPLE LOG

Page 1 of 19/22/2011 2 of 15

Client Name:Project Name:

Summary:

BULK SAMPLE ANALYTICAL REPORTFibertec IHS Project #30345-1

NVLAP Accreditation #101510-0

Michigan State UniversityClinical Center - A Wing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

1914 Holloway Drive, Holt, Michigan 48842

Page 1 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

Summary:

Date Sampled: Client P.O. #:Date Submitted: C.O.C. #:Date Analyzed:

Fibertec Sample

NClient I.D.

N A l t

9/14/2011 N/A9/14/2011 1059659/15/2011

Non-Asbestos Containing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

No. No. AnalystCBD

CBD

Description / Location Asbestos Type Portion

White granular material skim plaster NAD Non-fibrous material 97%

1-1 1-1 White granular material, skim plaster on corner bead, closet wall in A101B.

NAD Non-fibrous material 97%Cellulose fibers 3%

CBD

CBD

1-2 1-2 White granular material, skim plaster on corner bead, corner in A101 at service counter.

NAD Non-fibrous material 97%Cellulose fibers 3%

2-1 2-1 Gray granular material, skim plaster over plaster and drywall, closet wall

NAD Non-fibrous material 85%Cellulose fibers 15%

CBD

yin A101B. Layer 1 of 3.

2-1 2-1 Brown fibrous material, skim plaster over plaster and drywall, closet wall in A101B. Layer 2 of 3.

NAD Cellulose fibers 90%Non-fibrous material 10%

CBD2-1 2-1 White tabular material, skim plaster over plaster and drywall, closet wall in A101B. Layer 3 of 3.

NAD Non-fibrous material 97%Cellulose fibers 3%

CBD

CBD

2-2 2-2 Gray granular material, skim plaster over plaster and drywall, NE wall in A100A. Layer 1 of 3.

NAD Non-fibrous material 85%

2 2 2 2 Brown fibrous material, skim plaster NAD Cellulose fibers 90%

Cellulose fibers 15%

CBD2-2 2-2 Brown fibrous material, skim plaster over plaster and drywall, NE wall in A100A. Layer 2 of 3.

NAD Cellulose fibers 90%Non-fibrous material 10%

1914 Holloway Drive, Holt, Michigan 48842

Page 1 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

9/22/2011 3 of 15

Client Name:Project Name:

Summary:Clinical Center - A Wing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

BULK SAMPLE ANALYTICAL REPORTFibertec IHS Project #30345-1

NVLAP Accreditation #101510-0

Michigan State University

1914 Holloway Drive, Holt, Michigan 48842

Page 2 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

Summary:

Date Sampled: Client P.O. #:Date Submitted: C.O.C. #:Date Analyzed:

Fibertec Sample

NClient I.D.

N A l t

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

9/14/2011 N/A9/14/2011 1059659/15/2011

Non-Asbestos-Containing No. No. Analyst

CBD

CBD

Description / Location Asbestos Type Portion

2-2 2-2 White tabular material, skim plaster over plaster and drywall, NE wall in A100A. Layer 3 of 3.

NAD Non-fibrous material 97%

Gray granular material skim plaster NAD Non-fibrous material 90%

Cellulose fibers 3%

CBD

CBD

2-3 2-3 Gray granular material, skim plaster over plaster and drywall, E wall above ceiling in A144A. Layer 1 of 3.

NAD Non-fibrous material 90%Cellulose fibers 10%

2-3 2-3 Gray cementitious material, skim plaster over plaster and drywall, E

NAD Non-fibrous material 97%Cellulose fibers 3%

CBD2-3 2-3 White tabular material, skim plaster over plaster and drywall, E wall above ceiling in A144A. Layer 3 of 3

NAD Non-fibrous material 95%

ywall above ceiling in A144A. Layer 2 of 3.

Cellulose fibers 5%

CBD

3.

2-4 2-4 Gray granular material, skim plaster over plaster and drywall, SE wall in A143. Layer 1 of 3.

NAD Non-fibrous material 85%Cellulose fibers 15%

CBD

CBD

2-4 2-4 Brown fibrous material, skim plaster over plaster and drywall, SE wall in A143. Layer 2 of 3.

NAD Cellulose fibers 95%Non-fibrous material 5%

2 4 2 4 White tabular material, skim plaster NAD Non-fibrous material 97% CBD2-4 2-4 White tabular material, skim plaster over plaster and drywall, SE wall in A143. Layer 3 of 3.

NAD Non-fibrous material 97%Cellulose fibers 3%

1914 Holloway Drive, Holt, Michigan 48842

Page 2 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

9/22/2011 4 of 15

Client Name:Project Name:

Summary:

BULK SAMPLE ANALYTICAL REPORTFibertec IHS Project #30345-1

NVLAP Accreditation #101510-0

Michigan State UniversityClinical Center - A Wing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

1914 Holloway Drive, Holt, Michigan 48842

Page 3 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

Summary:

Date Sampled: Client P.O. #:Date Submitted: C.O.C. #:Date Analyzed:

Fibertec Sample

NClient I.D.

N A l t

9/14/2011 1059659/15/2011

Non-Asbestos-Containing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

9/14/2011 N/A

No. No. AnalystCBD

CBD

Description / Location Asbestos Type Portion

Brown fibrous material skim plaster NAD Cellulose fibers 95%

2-5 2-5 Gray granular material, skim plaster over plaster and drywall, E wall of A116. Layer 1 of 3.

NAD Non-fibrous material 85%Cellulose fibers 15%

CBD

CBD

2-5 2-5 Brown fibrous material, skim plaster over plaster and drywall, E wall of A116. Layer 2 of 3.

NAD Cellulose fibers 95%Non-fibrous material 5%

2-5 2-5 White granular material, skim plaster over plaster and drywall, E wall of

NAD Non-fibrous material 95%Cellulose fibers 5%

CBD

yA116. Layer 3 of 3.

2-6 2-6 Gray granular material, skim plaster over plaster and drywall, NW corner of AM130. Layer 1 of 3.

NAD Non-fibrous material 85%Cellulose fibers 15%

CBD2-6 2-6 Brown fibrous material, skim plaster over plaster and drywall, NW corner of AM130. Layer 2 of 3.

NAD Cellulose fibers 95%Non-fibrous material 5%

CBD

CBD

2-6 2-6 White tabular material, skim plaster over plaster and drywall, NW corner of AM130. Layer 3 of 3.

NAD Non-fibrous material 95%

2 7 2 7 Gray granular material, skim plaster NAD Non-fibrous material 85%

Cellulose fibers 5%

CBD2-7 2-7 Gray granular material, skim plaster over plaster and drywall, N wall in AM205. Layer 1 of 3.

NAD Non-fibrous material 85%Cellulose fibers 15%

1914 Holloway Drive, Holt, Michigan 48842

Page 3 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

9/22/2011 5 of 15

Client Name:Project Name:

Summary:Clinical Center - A Wing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

BULK SAMPLE ANALYTICAL REPORTFibertec IHS Project #30345-1

NVLAP Accreditation #101510-0

Michigan State University

1914 Holloway Drive, Holt, Michigan 48842

Page 4 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

Summary:

Date Sampled: Client P.O. #:Date Submitted: C.O.C. #:Date Analyzed:

Fibertec Sample

NClient I.D.

N A l t

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

9/14/2011 N/A9/14/2011 1059659/15/2011

Non-Asbestos-Containing No. No. Analyst

CBD

CBD

Description / Location Asbestos Type Portion

2-7 2-7 Brown fibrous material, skim plaster over plaster and drywall, N wall in AM205. Layer 2 of 3.

NAD Cellulose fibers 95%

White tabular material skim plaster NAD Non-fibrous material 95%

Non-fibrous material 5%

CBD

CBD

2-7 2-7 White tabular material, skim plaster over plaster and drywall, N wall in AM205. Layer 3 of 3.

NAD Non-fibrous material 95%Cellulose fibers 5%

2-8 2-8 Gray granular material, skim plaster over plaster and drywall, W wall in

NAD Non-fibrous material 85%Cellulose fibers 15%

CBD2-8 2-8 Brown fibrous material, skim plaster over plaster and drywall, W wall in AM235. Layer 2 of 3.

NAD Cellulose fibers 95%

yAM235. Layer 1 of 3.

Non-fibrous material 5%

CBD2-8 2-8 White tabular material, skim plaster over plaster and drywall, W wall in AM235. Layer 3 of 3.

NAD Non-fibrous material 95%Cellulose fibers 5%

CBD

CBD

3-1 3-1 Tan granular material, drywall joint compound, near Stair 8.

NAD Non-fibrous material 95%Cellulose fibers 5%

3 2 3 2 Tan granular material, drywall joint NAD Non-fibrous material 92% CBD3-2 3-2 Tan granular material, drywall joint compound, outside of A-117-MD.

NAD Non-fibrous material 92%Cellulose fibers 8%

1914 Holloway Drive, Holt, Michigan 48842

Page 4 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

9/22/2011 6 of 15

Client Name:Project Name:

Summary:

BULK SAMPLE ANALYTICAL REPORTFibertec IHS Project #30345-1

NVLAP Accreditation #101510-0

Michigan State UniversityClinical Center - A Wing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

1914 Holloway Drive, Holt, Michigan 48842

Page 5 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

Summary:

Date Sampled: Client P.O. #:Date Submitted: C.O.C. #:Date Analyzed:

Fibertec Sample

NClient I.D.

N A l t

9/14/2011 1059659/15/2011

Non-Asbestos-Containing

13 Submitted Bulk Samples, 29 Sample Layers Analyzed.

9/14/2011 N/A

No. No. AnalystCBD

Description / Location Asbestos Type Portion

3-3 3-3 Tan granular material, drywall joint compound, outside of A-114-MD (ACZ door).

NAD Non-fibrous material 95%Cellulose fibers 5%

1914 Holloway Drive, Holt, Michigan 48842

Page 5 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

9/22/2011 7 of 15

Comments

1914 Holloway Drive, Holt, Michigan 48842

Page 6 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

Comments

Bulk samples are analyzed using the USEPA Test Method EPA/600/R-93/116. The constituent percent reported representsan estimate of the area percent of the component. The test report relates only to items tested. This report is not intendedto be used as a product endorsement by NVLAP or any agency of the U.S. Government. Fine fibers like those in floor tilemay not be discernible by this method. This report shall not be reproduced, except in full, without the written approval ofthe laboratory. Individual sample layers are homogeneous, unless otherwise noted. Test items were received in acceptablecondition. Revision 4.0 dated 12/8/2010.

If no asbestos was/were detected in the sample/samples the acronym NAD (no asbestos detected) will appear in theAsbestos Type column of the report.

Approved Signatory:

Date: 9/19/2011

1914 Holloway Drive, Holt, Michigan 48842

Page 6 of 6

Telephone: (517) 699-0345 Facsimile: (517) 699-0382

9/22/2011 8 of 15

TO BUILDING 201

AM10078SF

A10293SF

A108I133SF

A108H138SF

A108G137SF

A109A101SF

A109B49SF

A108J134SF

A108B133SF

A108C138SF

A108D138SF

A108E140SF

A110F88SF

A110C138SF

A108A135SF

AM106202SF

A107

CUST19SF

A108K37SF

A106B29SF

A106776SF

A106C203SF

A106A61SF

A110G138SF

A110H138SF

A110I133SF

A110J136SF

A110K199SF

A110E388SF

A109C31SF

A100B82SF

A1011025SF

A100A78SF

A101C98SF

A144A118SF

AM14286SF

A101B177SF

A101A119SF

A1001861SF

A140G138SF

A140H137SF

A140I133SF

A140J136SF

A140537SF

A140K30SF

A140D138SF

A140C137SF

A140B133SF

A140A151SF

A142E284SF

A140F284SF

A138A203SF

A138C61SF

A138B29SF

A142D137SF

A142C138SF

A142B133SF

A142A135SF

A142536SF

A138844SF A141

718SF

A141A101SF

A141B49SF

A141C31SF

A142H138SF

A142G138SF

A142I133SF

A142J151SF

A143

CUST19SF

A142K32SF

A139

CUST19SF

AM14094SF

A112A72SF

A114E75SF

A114F128SF

A114D75SF

A112D101SF

A113A57SF

A113B179SF

AM112

MECH211SF

A114A72SF

A114B75SF

A114C75SF

A114G58SF

A112AA25SF

A114L66SF

A114J101SF

A114H173SF

A115D75SFA115C

143SF

A115CA75SF A115F

23SF

A115E75SF

A115G120SF

A115K37SF

A115J36SF

A114868SF

A115M1560SF

A114M101SF

A115B101SF

A117HB73SF

A117HA83SF

A115MA211SF

AM117223SF

A116

CUST43SF

A117C155SF

A11778SF

A117D44SF

A117A632SF

A117F153SF

A117E99SF

A117H290SF

A117I279SF

A117G36SF

A117J141SF

A117P99SF

A117097SF A117N

92SF

A117M104SF A117L

104SFA117K203SF

A118F128SF

A118E96SF

A118D133SF

A118G86SF

A118B83SF

A118C122SF

A118A167SF

A118J83SF

A118K88SF

A1372731SF

A135A399SF

A135B382SF

AM133195SF

A132125SF

A137K180SF

A137L98SF

A134

MT

194SF

A133

WT

274SF

A13164SF

A13087SF

AM13077SF

A130A46SF

A130B36SF

A130C164SF

A129423SF

HW11123SF

HW21526SF

HW3354SF

HW4276SF

HW6932SF

HW71200SF

HW9337SF

HW10607SF

SW1138SF

SW2205SF

SW3178SF

SW4147SF

SW11159SF

SW10204SF

SW9137SF

SW8192SF

A118P254SF

A118H88SF

A118O100SF

A118M95SF A118L

198SF

A118N100SF

A118Q110SF

D100B54SF

D100C74SF

A128D

A110D83SF

A110A121SF

A112C467SF

A112101SF

A113120SF

A109668SF

A110B97SF

A108492SF

A10526SFA103A

MT

176SF

A103B

WT

139SF

A103C

UT

62SF

A111

CUST19SF

A118540SF

A108M107SF

A109D381SF

A109E61SF

A110M29SF

A108F38SF

A137J139SF

A137N70SF

A137M280SF V1

41SF

EP4

ELEV70SF

EP3

ELEV81SF

EP2

ELEV77SF

EP1

ELEV81SF

HW17191SF

HW8683SF

HW5243SF

A136871SF

A1351083SF

FIRST FLOOR PLAN - NORTH200N202

201 200S

OR

IG. D

RA

WN

BY

SH

EE

T

AP

PR

OV

ED

BY

DATE

SC

ALE

BU

ILD

ING

NO

.

ENGINEERING AND ARCHITECTURAL SERVICESPHYSICAL PLANT DIVISION

OF

LAS

T R

EV

ISE

D O

NL

AS

T R

EV

ISE

D B

Y

LAST EXPORTED

12

DV

C

SD

F

07-2

6-9

3

1" =

30'

EJS

05-2

6-2

010

O_0200_01_BASE.DWG

Last Export Date: 7/15/2011 Filename: O_0200_01_BASE.dwg

9/22/2011 9 of 15

hansmann
Text Box
1-2
hansmann
Line
hansmann
Text Box
1-1 2-1
hansmann
Line
hansmann
Line
hansmann
Text Box
2-2
hansmann
Line
hansmann
Text Box
2-3
hansmann
Line
hansmann
Text Box
2-4
hansmann
Line
hansmann
Text Box
2-5
hansmann
Line
hansmann
Text Box
2-6
hansmann
Line
hansmann
Text Box
Negative Sample

UP 6R

TO R

ADIO

LOG

Y

A118A167SF

A118J83SF

A118K88SF

A13164SF

A13087SF

AM13077SF

A130C164SF

A129423SF

A127290SF

A126579SF

D142492SF

D141A181SF

D132618SF

D138124SF

D13983SF

D141149SF

D142A119SF

D152189SF

D15148SF

D14745SF

D14646SF

D13642SF

D135554SF

D13450SF

D131452SF

D130140SF

D105228SF

D104134SF

D109218SF

D10899SF

D10630SF

A123180SF

D107105SF

D12539SF

D115205SF

D116126SF

A124300SF

A150686SF

A125A274SF

A125B121SF

D159295SF

D154201SF

D153122SFD158

100SF

D13723SF

D143779SF

D15713SF

D12937SF

HW9337SF

HW10607SF

HW11809SF

SW8192SF

SW5156SF

A118H88SF

A118M95SF A118L

198SF

D100B54SF

D100C74SF

D100A283SF

D102A172SF

D102B296SF D102D

68SF

D102E47SF

D102345SF

D102F48SF

D102C38SF

A128B59SF

A128A66SF

A128D51SF

D126892SF

E152123SF

E14969SF

E14661SF

E14565SF

E14899SF

E14252SF

E140106SF E138

CUST45SF

E150A81SF

E150523SF

E155175SF

E1271049SF

E127B97SF

E127A65SF

E120B231SF

E120C579SF

E120246SF

E11457SF

E112294SF

E112A52SF

E11653SF

E105101SF

E104109SF E103

116SFE102119SF

E100152SF

E107

CUST29SF

E10929SF

E127C96SF

E127E56SF

E127F7SF

A128521SF

E127D606SF

HW151150SF

SW6211SF

SW7160SF

A118540SF

D1001150SF

EP4

ELEV70SF

SW12227SF

HW16207SF

D120275SF D120B

58SF

D120A56SF

D121247SF

D117462SF

D11853SF

HW13525SF

D130A36SF

D130B32SF

D130D36SF

D130C32SF

E120A45SF

E127G14SF

D12880SF

D127275SF

E130A47SF

E130326SF

HW1458SF

E135105SF

E135A136SF

FIRST FLOOR PLAN - SOUTH

201

200N202200S

OR

IG. D

RA

WN

BY

SH

EE

T

AP

PR

OV

ED

BY

DATE

SC

ALE

BU

ILD

ING

NO

.

ENGINEERING AND ARCHITECTURAL SERVICESPHYSICAL PLANT DIVISION

OF

LAS

T R

EV

ISE

D O

NL

AS

T R

EV

ISE

D B

Y

LAST EXPORTED412

DV

C

SD

F

07-2

6-9

3

1" =

30'

RJR

07-1

2-1

1

O_0200_01_BASE.DWG

Last Export Date: 7/15/2011 Filename: O_0200_01_BASE.dwg

9/22/2011 10 of 15

hansmann
Line
hansmann
Text Box
CC-7-4
hansmann
Line
hansmann
Text Box
CC-7-2
hansmann
Line
hansmann
Text Box
CC-7-3
hansmann
Text Box
Negative Sample
hansmann
Line

Last Export Date: 5/8/2009 Filename: O_0200_MR1_BASE.dwg

9/22/2011 11 of 15

hansmann
Line
hansmann
Line
hansmann
Line
hansmann
Text Box
3-3
hansmann
Text Box
3-1
hansmann
Text Box
3-2
hansmann
Text Box
Negative Sample
hansmann
Line

Last Export Date: 5/8/2009 Filename: O_0200_MR1_BASE.dwg

9/22/2011 12 of 15

A235559SF

A235A135SF

A235B133SF

A235C137SF

A235D138SF

A235E132SF

A235F130SF

A235G137SF

A235H137SF

A235I134SF

A235J147SF

A234715SF

A231A59SF

A231C199SF

A233G138SF

A233I133SF

A233J136SF

A233H138SF

A233468SF

A233F132SF

A233E130SF

A2311026SF

A231B29SF A234A

101SF

A234B49SF

A234C31SF

A233D138SF

A233B137SF

A233A151SF

A233C133SF

A233K30SF

A232

CUST19SF

A236

CUST19SF

AM23578SF

A235K32SF

AM22785SF

A229

WT

200SFA230

MT

126SF

A228

CUST18SF

A227I133SF

A227H137SF

A227G137SF

A227D138SF

A227C137SF

A227B133SF

A227A135SF

A227536SF

A227K32SF A227J

151SF

A223A59SF

A223B29SF

A2231026SF

A223C199SF

A225G138SF

A225H137SF

A225I133SF

A225J136SF

A225537SF

A225E284SF

A227F138SF

A227E141SF

A225D138SF

A225C137SF

A225B133SF

A225A151SF

A226C31SF

A226B49SF

A226A101SF

A226718SF

AM22594SF

A219A96SF

A221B212SF

A221C253SF

A221122SF

A220A119SF

A220278SF

A225K30SF

A224

CUST19SF

A219AA24SF

A218

CUST28SF

A217KC158SF

A221A79SF

A217KA144SF

A217KE149SF A217M

130SF

A217MA118SF A219B

140SF

A217N136SF

A217O135SF

A217A606SF

A217224SF

A217H74SF

A217G103SF

A217D103SF

A217C74SF

A217B152SF

A217CA114SF

A217E82SF

A217F83SF

A217HA114SF

A217I153SF

A217J194SF

A217KB99SF

A217L93SF

A217P134SF

A206G127SF

A206P126SF

A206N111SFAM215

198SF

A206O132SF

A216

MT

206SF

A201A193SF

A201210SF

A202A104SF

A202G153SF

A202B1558SF

AM202202SF

A202BA339SF

A202200SF

A202E101SF

A202D101SF

A202C136SF

A202F231SF

A203K126SF

A203L180SF

A203M45SF

A203MA30SF

A203N70SF

A2030114SFA203R

57SF

A203YA32SF

A203XA32SF

A203Y101SFA203X

95SF

A203TA101SF

A203UA101SF

A203WA101SF

A203W75SF

A203F206SF

A203A39SF

A203B28SF

A203C27SF

A203T74SF

A203S142SF

A203J47SF

A203Z168SF

A203Q84SF

AM204A212SF

A203D258SF

A203E1361SF

A203P

CUST17SF

A203U252SF

A2041706SF

A204I304SF

A204TA127SF

A204TB61SF

A204T442SF

A204S307SF

A204O315SF

A204R95SF

A204M206SF

A204L273SF

A204K582SF

A204J81SF

A204KE74SF

A204U109SF

A204KB62SF A204KA

84SF

A204QAH28SF

A204QA181SF

A204Q97SF

A204RA25SF

A204RB24SF A204RC

24SF

A204N361SF

A204MA15SF

A204MB14SF

A204MC14SF

A204MD14SF

A204W140SF

A204KD14SF

A204C149SF

A204E327SF

A204H79SF

A204PA181SF

A204AA28SF

A204P97SF

A205399SF

AM205229SF

A205C479SF

A205A25SF

A205H192SF

A205HA166SF A205HB

63SF

A205K219SF

A205M85SF

A205L122SF

A205N86SF

A205G514SF

A205F144SF

A205DB76SF

A205D145SF

A205DA17SF

A205E101SF

A205I24SF

A205B727SF

A205J

CUST19SF

A205P21SF

A205HC89SF

A205HD93SF

A206K459SF

A206649SF

A206J471SFA206D

223SF

A206E290SF

A206F78SF

AM20688SF

A206B55SF

A206C29SF

A206A172SF

A206H

CUST21SF

A214B269SF A209

89SFA208108SF

A210429SF

A208B1086SF

A214

WT

173SF

A214AA21SF

SW1158SF

SW2171SF

SW3156SF

SW4153SF

SW11161SF

SW10168SF

SW9156SF

SW8162SF

HW12298SF

HW21419SF

HW32580SF

HW4654SF

A217KD167SF

A206NA26SF

A206MA26SF

A215

WT

200SF

A215A

UT

63SF

A207142SF

EP1

ELEV72SF

EP2

ELEV88SF

EP3

ELEV81SF

EP4

ELEV70SF

HW81200SF

HW6245SF

HW9594SF

HW10435SF

HW7564SF

HW11109SF

A2191562SF

A233L82SF

A207C73SF

A207A70SF

A207B72SF

A206M93SF

A206Q98SF

A206L95SF

200N202201 200S

OR

IG. D

RA

WN

BY

SH

EE

T

AP

PR

OV

ED

BY

DATE

SC

ALE

BU

ILD

ING

NO

.

ENGINEERING AND ARCHITECTURAL SERVICESPHYSICAL PLANT DIVISION

OF

LAS

T R

EV

ISE

D O

NL

AS

T R

EV

ISE

D B

Y

LAST EXPORTED

5

12

DV

C

SD

F

07-2

6-9

3

1" =

30'

GH

K

08-2

6-1

0

O_0200_02_BASE.DWG

Last Export Date: 7/15/2011 Filename: O_0200_02_BASE.dwg

9/22/2011 13 of 15

hansmann
Line
hansmann
Text Box
2-7
hansmann
Line
hansmann
Text Box
2-8
hansmann
Text Box
Negative Sample
hansmann
Line

A219B140SF

A217O135SF

A217224SF

A217D103SF

A217C74SF

A217B152SF

A217CA114SF

A217E82SF

A206G127SF

A206P126SF

A206N111SFAM215

198SF

A206O132SF

A205H192SF

A205HA166SF A205HB

63SF

A205K

219SF

A205L122SF

A205G514SF

CUST

A205HC89SF

A206K459SF

A206649SF

A206J471SFA206D

223SF

A206E290SF

A206F78SF

AM20688SF

A206B55SF

A206C29SF

A206A172SF

A206H

CUST21SF

A214B269SF A209

89SFA208108SF

A210429SF

A211632SF

A208B1086SF

A213562SF

A214

WT

173SF

A214AA21SF

A212980SF

AM212165SF

A212A157SF

A213B192SF

A213A

CUST14SF

SW8162SF

SW5158SF

HW32580SF

HW5549SF

A215A

UT

63SF

A207142SF

EP4

ELEV70SF

HW10435SF

SW6211SF

A207C73SF

A207A70SF

A207B72SF

A206M93SF

A206Q98SF

A206L95SF

SECOND FLOOR PLAN - SOUTH200S201

200N202O

RIG

. DR

AW

N B

Y

SH

EE

T

AP

PR

OV

ED

BY

DATE

SC

ALE

BU

ILD

ING

NO

.

ENGINEERING AND ARCHITECTURAL SERVICESPHYSICAL PLANT DIVISION

OF

LAS

T R

EV

ISE

D O

NL

AS

T R

EV

ISE

D B

Y

LAST EXPORTED

12

DV

C

SD

F

07-2

6-9

3

1" =

30'

RJR

7/1

2/1

1

O_0200_02_BASE.DWG

Last Export Date: 7/15/2011 Filename: O_0200_02_BASE.dwg

9/22/2011 14 of 15

9/22/2011 15 of 15

aLahouti
Typewritten Text
aLahouti
Typewritten Text
aLahouti
Typewritten Text
ORIGINAL CONSTRUCTION ADDITION 0 182,783 SQFT YEAR 1976
aLahouti
Typewritten Text
aLahouti
Typewritten Text
ADDITION 1M. R. C.4,986 SQFTYEAR 1985
aLahouti
Typewritten Text
aLahouti
Typewritten Text
aLahouti
Typewritten Text
ADDITION 2M. R. C.8,585 SQFTYEAR 1988
aLahouti
Typewritten Text
ADDITION 3RADIO-PHARMACEUTICAL17,989 SQFTYEAR 2003
aLahouti
Typewritten Text
aLahouti
Typewritten Text
aLahouti
Typewritten Text
aLahouti
Typewritten Text
aLahouti
Typewritten Text
aLahouti
Typewritten Text