3
Blast furnace revamping solution: Safety first, success on time whatever happens BOCCARD STEEL SOLUTIONS Blast Furnace Revamping BLAST FURNACE REVAMPING You want to achieve a new construction, modification, repairs and/or optimization with controlled production and guaranteed safety for your blast furnace project. Boccard is an industrial integrator that strives to offer you the best, most cost-effective and safest choice in heavy industrial manufacturing. We offer innovative and integrated solutions for the construction of your Blast Furnace. By using our global expertise and resources in all skill sectors we are able to fully manage the project from start to finish. An efficient preparation and a proactive team to ensure that the Restart is On Time.

Blast Furnace Revamping - Boccard...• Boccard achieves 100% of the WPQR (Welding Procedure Qualification Record) 3D laser • 3D modeling for a tailored integration of the shell’s

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

  • Blast furnace revamping solution:

    Safety first, success on time

    whatever happens

    BOCCARD STEEL SOLUTIONSBlast Furnace Revamping

    BLAST FURNACE REVAMPING

    You want to achieve a new construction, modification, repairs and/or optimization with controlled production and guaranteed safety for your blast furnace project.

    Boccard is an industrial integrator that strives to offer you the best, most cost-effective and safest choice in heavy industrial manufacturing. We offer innovative and integrated solutions for the construction of your Blast Furnace. By using our global expertise and resources in all skill sectors we are able to fully manage the project from start to finish.

    An efficient preparation and a proactive team to ensure that the Restart is On Time.

  • BLAST FURNACE REVAMPING

    MEANS DEVELOPED TO MEET YOUR REQUIREMENTS

    LIFTING/WELDING PROVEN TECHNICAL PERFORMANCES

    Welding quality• Optimization studies of the welding processes and metallurgical preparation

    • 100% of the welders are qualified

    • Implementation of continuous controls throughout the NDT (UT, MT, PT, VT, RT)

    • Boccard achieves 100% of the WPQR (Welding Procedure Qualification Record)

    3D laser• 3D modeling for a tailored integration of the shell’s parts

    Fixed and mobile platforms• Design studies

    • Manufacturing

    • Commissioning

    Cooling systemBoccard studying the best solutions to optimize the cooling of blast furnaces:

    • Engineering

    • Channel cooling manufacturing

    Procedures of operations

    After an organized preparation and planification period, Boccard develops processes to handle equipment inside of the blast furnaces (staves,etc.) involving mechanized and robotic solutions.

    These technologies guarantee secure operations (Safety first).

    YOUR BENEFITS

    TRANSFERT THERMIQUE ET AGITATIONBLAST FURNACE REVAMPING

    Boccard accompanies you and realizes for you the following specific operations:

    • Studies, calculations

    • Heavy load lifting

    • Thick welding

    AN INNOVATIVE APPROACH

    • Reactivity for a systematic management of hazards

    • Risk removal of the interfaces associated to multi-disciplines proposed by Boccard

    • Expertise in the management of subcontractors

    • Significant mobilization of qualified operational resources

    • Proven experience in managing complex projects

    • Safety procedures implementation before the shutdown

    • Works before shutdown are optimized in order to generate free periods

    +

    Serenity

    Entrust Boccardto build your project

    from A to Zlimiting the risk

    interfaces

    +

    Time savings

    Boccard innovates to optimize

    the performance of its operations

    +

    Lifting solutions• Experience in handling heavy loads

    Thick weldingHigh performance welding processes qualified by Boccard (Innershield, coated electrodes), all positions:

    • Max 120mm thickness with Post Weld Heat Treatment (PWHT)

    • Max 80mm thickness without PWHT

    Performance

    Boccard has morethan 450

    welding procedurescarried out internally

    +A CUSTOMIZED EXPERTISE

    ArcelorMittal Dunkerque - HF-2

    [COUPE CONCENTRICITE CREUSET] Relevé 2015.

    Agence Côte d’Opale

    Ingénieurs - Géomètres Experts D.P.L.G

    Aménagement - Environnement

    Bureau d'Etude V.R.D

    Parc de l’étoile

    Rue Galilée

    59760 GRANDE-SYNTHE

    Tél : 03.28.27.98.58 Fax : 03.28.27.98.61

    www.ma-geo.fr

  • BOCCARD CONSTRUCTION MAINTENANCE

    Contact: [email protected]

    Boc

    card

    Bla

    st F

    urna

    ce re

    vam

    ping

    leafl

    et -

    201

    7 ve

    rsio

    n/D

    esig

    n an

    d co

    nstr

    uctio

    n: B

    occa

    rd

    / p

    hoto

    s : B

    occa

    rd -

    iSoc

    k/ 2

    016

    A global reach with local capabilities