3
Dead Bus Closing of NL Unit 01 and 02 Preliminary Requirements. 1. Only the following lines should be closed at the restoration procedure unless the failure was originated from those. O/L-N/L both circuits connects from O/L end then N/L end. O/L-Polpitiya both circuits connects from O/L end then Polpitiya end. N/L-Polpitiya both circuits connects from N/L end then Polpitiya end. (All other transmission lines should be opened.) 2. All auxiliary supplies should be OK for both machines (Cooling water, Pressure pumps, etc) via DG or O/L Stage 1 machine. At New Laxapana Control Room 3. N/L U1 or U2 machine should be started and energize the 132kV bus bar as per instructions of SCE. Steps for starting N/L machine are as follows. Keep the machine voltage in a lower value, when it reaches to the full speed. Close the 132kV breaker at full speed.

Black Restoration Procedure

Embed Size (px)

DESCRIPTION

Dead bus restoration procedure from Laxapana PS

Citation preview

Dead Bus Closing of OL Unit 04 and 05

Dead Bus Closing of NL Unit 01 and 02Preliminary Requirements.1. Only the following lines should be closed at the restoration procedure unless the failure was originated from those.

O/L-N/L both circuits connects from O/L end then N/L end.

O/L-Polpitiya both circuits connects from O/L end then Polpitiya end. N/L-Polpitiya both circuits connects from N/L end then Polpitiya end.(All other transmission lines should be opened.)

2. All auxiliary supplies should be OK for both machines (Cooling water, Pressure pumps, etc) via DG or O/L Stage 1 machine.At New Laxapana Control Room3. N/L U1 or U2 machine should be started and energize the 132kV bus bar as per instructions of SCE. Steps for starting N/L machine are as follows. Keep the machine voltage in a lower value, when it reaches to the full speed. Close the 132kV breaker at full speed.My No: LC/LPS/OE/21

10th May 2010

Chief Engineer (LPS)Request for standing instructions for system restoration from New Laxapana Generators at a total system failure. This refers to the letter, Interim Amendments to the Total failure Restoration Methodology dated 22nd March 2010 of DGM (System Control).As per your instructions the graft document prepared by the Operations Engineer regarding the system restoration from N/L machines at a total system failure is attached herewith.

Therefore please make necessary arrangements to issue the standing instructions procedure, considering this draft document with relevant changes and comments.

Operations Engineer (LPS)