17
24/01/2022 BITS MECHANICAL PRIVATE LIMITED 1

BITS MECHANICAL PRIVATE LIMITED

Embed Size (px)

Citation preview

Page 1: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 1

BITS MECHANIC AL PRIVATE LIMITED

Our Company Pr ofil e:

Bu sin ess o wn ed by : Mrs Sumo na Banerjee

Co mpany r eg istered add ress : 15 8 Saman vaya Co lo ny, Kh aju rik alan , Awadh p ur i, Bh op al- 46 20 2 1

Co mpany Reg istr ation Nu mb er : U3 11 0 2MP20 11 PTC02 7 31 4

Serv ice Tax Number: AAECB7 99 6DSD00 1

ESI : 18 0 00 1 88 70 00 0 06 0 6

PAN NO: AAECB7 99 6 D

Ou r Bank in g Asso ciatio n: Bank Of I nd ia, Awadh p ur i Branch , Bh op al

NEFT/RTGS CODE: BKID0 00 90 3 7

Email: bitsmechanical78 6@g mail.co m , d eep .b an er [email protected]

Co ntact Us: 85 84 05 8 56 5 , 7 04 42 82 2 73

Websi te : www.bitsme c hani cal. com

Page 2: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 2

BITS MECHANICAL PRIVATE LIMITED

Why “BITS MECHANICAL PVT LTD”* Assurance of 30-40 % faster project

completion by CCPM *

Our direct Presence at

Site with experienced site

engineersClose monitoring of each Activity duration with Zero Schedule Variance

Close monitoring of each Activity

Resource with Zero Variance as

planned

Close monitoring of Cost with

Zero Cost Variance

*non EPC project

Close monitoring of Quality with Zero tolerance (as

per BIS)

Close monitoring of Safety with zero

tolerance as per industrial safety

protocol

Page 3: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 3

Improved revenue Competitive edge of organisation

Satisfied Customers

Page 4: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 4

BITS MECHANICAL PRIVATE LIMITED

Our Work Orders for ACC Jamul and Shree Cement Baloda Bazar

Page 5: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 5

BITS MECHANICAL PRIVATE LIMITED

Our Work Orders for ACC Sindri Cment Works and ACC Bargarh Cement Works

Page 6: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 6

BITS MECHANICAL PRIVATE LIMITED

“Project Monitoring Services”

description in next slides

Preparation of Strategic Resource

based Micro Schedule (based on

productivity)

Earned Value Analysis for

monitoring the cost variance of non EPC projects

Preparation of Project MIS(S

curve, Bell curve, Banana curve required for

comparison plan vs. actual)

Preparation of DPR(plan/actual), Milestone tracker,

Daily slippage and Daily,

Monthly action plan with resource

Monitoring Quality at site and preparation of lab reports as per

BIS.

Preparation of Safety Reports as per

industrial protocol.

Page 7: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 7BITS MECHANICAL PRIVATE LIMITED

Preparation of CCPM schedule

Page 8: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 8

BITS MECHANICAL PRIVATE LIMITED

Preparation of Daily Progress Report

IN DPR showcasing the plan activity against the actual achieved with resource also

Page 9: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 9

BITS MECHANICAL PRIVATE LIMITED

Preparation of progress curve for project

Page 10: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 10

BITS MECHANICAL PRIVATE LIMITED

Preparation of Plan Vs Actual and Action Plan for month

Page 11: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 11

BITS MECHANICAL PRIVATE LIMITED

Preparation of Mile Stone Tracker and Resource loading Graph

Page 12: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 12

BITS MECHANICAL PRIVATE LIMITED

Preparation of Daily Summary Sheet

Below daily summary sheet having description and details required to understand the project situation with detailed slipping area and action

required to match the plan

Page 13: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 13

BITS MECHANICAL PRIVATE LIMITED

Preparation of Field Quality Plan and Report Field Quality

Plan

Mechanical Works

Fabrication Works

Welding Checks

Erection Works

Welding Checks

Equipment installation

Deficiency list rectification

No load trials, group trials and group sequential trials.

Civil Works

Rebar Works

Rcc Works

Electrical Works

Equipment cable Glanding, LIS, JB, Ear

thing

Housekeeping

Page 14: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 14

BITS MECHANICAL PRIVATE LIMITED

Preparation of Field Quality Plan and Report

Page 15: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 15

BITS MECHANICAL PRIVATE LIMITED

Preparation of Deficiency list Rectification/ IWT(informal walk through)

Page 16: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 16

BITS MECHANICAL PRIVATE LIMITED

Readiness of all Equipment (particular building at all levels ) comparing with schedule

Page 17: BITS MECHANICAL PRIVATE LIMITED

02/05/2023 BITS MECHANICAL PRIVATE LIMITED 17

BITS MECHANICAL PRIVATE LIMITED

Thanking you for your kind patience, to present you

ourselves.

We assure you the fastest Project Completion with Latest Monitoring tool at the Best Rates