Company presentation
BIS Slovensko s.r.o.
BIS Slovensko s.r.o.
BIS Slovensko s.r.o.
SK-90041 Rovinka 590
BIS Slovensko
Headquarter and Locations
Location Sturovo:
SK – 943 03, Sturovo,
Tovarenska 1
+421 36 756 1157
Headquarter:
SK - 900 41, Rovinka 590
phone +421 2 459 85 205
Location Lithuania:
LT-89225 Mazeikai
Republikos str. 20-39
Turnover 2014: 8,86 MEUR
Employee: 136
Branches: Oil/Gas
▪ Petrochemical, chemical
▪ Metallurgy
▪ Energy
▪ Palp and paper
STN ISO 9001:2008, STN ISO 14001:2005, STN EN ISO 3834-2, EN 1090-2+A1:2011, OHSAS 18001:2009, SCCP 2011, ...
Page 2
BIS Slovensko
Organization Page 3
CEO
Wagner
Welding techn.
Zernovic
Business development
Tamas
HSEQ
Belancikova (P.U.)
Compliance Mgr.
Belancikova (P.U.)
CFO
Fajnorova
Engineering
Tichy
Maintenance, Machining,
Fabrication & Assembling
Tamas Macsai
Project Realization
Dercalik
Piping and Erection,
Turnaround
Suvorau
Finance / Control.
Fajnorova
Information techn.
Jakubik
Human Resources
Fajnorova
Logistic
Bican
Loc. Sturovo
Macsai
Commercial / Calc.
Hergott
Procurement
Hano
Loc. Lithuania
Suvorau
Project Management
Hehenberger
BIS Slovensko
Capacities Page 4
• Project Managers 6 (3 English, 2 German)
• Technicians 10 (3 English, 3 German)
• Sitemanager 10 (3 English, 3 German)
• Welders 22 (3 English)
• Pipe fitter 18 (5 English)
• Locksmiths 34 (4 English, 2 German)
(rotating EQ, electro motors, Valves, papermachine repairs, roll changing, tank fabrication, steel strucures)
▪ Machining depart. 16
• Electritian/Automation 12 (2 English)
• HSEQ 2 (2 English, 1 German)
• Welding Techn. 3 (3 English, 1 German)
• Admin. Management 16 (12 English, 10 German)
Capacities of Businesspartners which are used usually for abroad business:
Round 150 people available in different qualifications.
BIS Slovensko
Business Activity Page 5
Engineering Fabrication & Plant construction Maintenance &
Project planning Assembling Plant transfer Turnaround
Investment Phase Operating phase Divestment phase
Client
BIS Engineering FFabrication
& Construction Maintenance, Turnarounds, Engineering
Conversation, Extensions, Modernisation Deconstruction
Plant Layout Installation
Comissioning Operating Phase, Plant Optimisation Decomissioning
BIS Slovensko
Portfolio of countries experiance and Certifications Page 6
SLOVAKIA
Erections, relocations, modifications
Shutdowns, maintenance
Certifications:
STN ISO 9001:2008
STN ISO 14001:2005
STN EN ISO 3834-2
OHSAS 18001:2007
SCC** 2006
several technical authorization
BIS Slovensko s.r.o.
BIS Slovensko
Business activities and references
BIS Slovensko Reference
activity workshop production and machine processing
Production of Tanks, Silos,
Ducts...
Production of components
up to complete packages
Production of Skids Production of Frames /
Technological steel structure
Seite 8
BIS Slovensko Reference
Workshop machining departement Page 9
Roll and screw conveyor services
- Roll shaft repairs,change of roll journals
- Roll grinding (up to ø1600 x 10000)
- Roll production up to ø1600 x 10000
- Rotational part regeneration with metal spraying
- Dynamic and statical balancing ( up to ø2100 x 10000)
- Screw conveyor production up to ø1500 x 16000
Machine workshop rotational services
- Rotational part repair (gearboxes, pumps, agitators, conveyors)
- Spare part production
- Turning, grinding (up to ø2000 x 10000)
- Milling, drilling
- Planing (2000x1600x8000)
BIS Slovensko Reference
Electrical instrumentation and control system Page 10
Aktivitäten:
- PLC programming and diagnostics
- Service of control systems
- Manufacturing and installation of independent machine parts
including steering system
- Service of hydraulic and pneumatic systems
- Repair and revision of HV and LV distributions/switch rooms
- Electircal cabeling and installation
- Repair and maintenance of transformers
- Vibration measurements
- On site dynamic balancing
BIS Slovensko Reference
Service rotating equipment Page 11
Aktivitäten:
- Rolls, pumps, fans,
- Electrical motors,drives
- Screw conveyors, transport lines, gearboxes
- On-site maintenance, alignment of AC/DC motors
- Vibration measurements
- On site dynamic balancing
Page 12
BIS Slovensko
Prefabrication and fabrication possibilities of our workshops
Location: Šturovo, Slovak Republic
Workshop capacities: 7 workshops - in total 7000 m2 , heated with
bridge cranes
Services:
• Fabrication of steel structures,machine frames ,tanks,ducts
- max. dimensions : Width : 4000 mm, Hight: 4200 mm,
Weight : 50 t, Length : 16 000 mm
• Prefabrication of piping including PWHT and beveling
• Turning , machining:
- max. dimensions : Diameter: 2000 mm,Weight : 50 t,
Length : 10 000 mm
• Service of electro motors, pumps, blowers, gear boxes, rolls,….
-
Page 13
BIS Slovensko
important Machine park
GIUSTINA roll grinder 10000 / ø 1650
Grinding machine BUC63A/3000 3000 / ø 630
Planing machine HD125 8000 / 2000 / 1960
Horizontal drilling machine W100H 1000 / 1000 / 1000 Horizontal drilling machine W100A 1250 / 600 / 1120
Turning lathe SN63C, SU63A 3500 / ø 630 Turning lathe SU80 4000 / ø 800
Driller RFH75/1750 1750 / 75
CNC plasma cutting Pl. 2000 x 4000 mm
Turning lathe SR2000 10000 / ø 1600
Turning lathe SRM125/7000 10000 / ø 1010 Turning lathe SUA125PA + loeser grinder 10000 / ø 1010
Balancing machine SCHENK Ø 2100 / 10000 mm ( 7 t )
Engineering & Project planning
Detail engineering & CE certification
General project management & Construction site supervision
Spooling of Iso`s
As built documentation
Mechanical Assembly
Prefabrication and erection of inline components, supports and piping,
Fabrication and assembly of steel structures
Installation of equipments, machinery
Assembly of complete industrial plant, plant transfer
BIS Slovensko
activity Engineering, project realization Page 14
BIS Slovensko Reference
NESTE Oil Corporation, Rafinery (Naphta Isomerization)
Page 15
Customer: Bilfinger VAM Anlagentechnik
Location: Kilpilahti, Porvoo (Finland)
Realization: 2014 (6 Months), 2.5 MEUR
Scope: CS piping: 223 t
SS piping: 8 t
Field Welds: 5500
Prefab Welds: 2500
Activities:
• Prefabrication of 1500m (8 tons) Stainless Steel piping (DN15 to DN200)
• Prefabrication of 2700m (23 tons) Carbon Steel piping (DN15 to DN450)
• Erection of 8000m (231 tons) Pipe Work (DN15 up to DN450)
• Fabrication and erection of Primary and Secondary Supports (app. 25 tons)
• Execution of Pressure Tests for 100 Pressure Circuits.
• Execution of non-destructive tests
• Execution of all HSE regulations according law of Finland
• Documentation incl. AS - Built (1500 Isometrics)
• Complete erection of pipelines of whole new unit of Isomerization
Page 16
BIS Slovensko Reference
Revamp of FCC Production Unit – Preemraff, Lysekil –
Sweden
Customer: Preemraff
Location: Lysekil, Sweden
Realization: 2013
Scope: Piping: 65 t
Equipment: 97 t
Steel structures: 24 t
Activities:
• Prefabrication and erection of temporary and permanent support systems
• Erection of Flue gas line DN1200
• Dismantling/Installation of 1st/2nd stage cyclon dustbowls and diplegs in the
regenerator (SS)
• Dismantling/Installation of Spent Catalyst Stand Pipe in the regenerator (SS)
• Dismantling/Installation of all air/steam distributor arms and rings (SS)
• Dismantling/Installation of 2nd stage cyclon dustbowls and diplegs in the
dissengager (CS)
• Technical documentation according to ASME, EN
• 100 % X- Ray (RTG) on DN800-DN1200
• 100 % PT/MT/VT on DN>200
BIS Slovensko Reference
Revamp of Field Flare PH201 – Slovnaft refinery– TKB
Kovoprojekta a.s. Page 17
Customer: TKB Kovoprojekta a.s.
Location: Slovnaft refinery, Bratislava, Slovakia
Realization: 2014
Scope: - dismantling, prefabrication and erection of horizontal
and vertical piping and flare
- Works done during TA:
complete dismantling and erection of vertical flare gas
connections (height 110 m) including dismantling and
erection of flare within 7 days
Activities:
• Detailed planning of all the processes and lifting activities
• Lead of all of the involved companies to fullfil target schedule
• Dismantling all old lines and the burner head
• Installing new vapor line and burner head
• Modification of the top platform to fit the new design burner top
• Working on several workplaces above each other parallely
BIS Slovensko Reference
Nuclear Power Plant Mochovce – JEMO 3&4 - Slovakia
Erection of piping (CS, SS), equipment and steel structures Page 18
Customer: Modrany power/ENEL/SE
Location: Mochovce (SK)
Realization: 2010 - 2013
Scope: CS piping: 250 t
SS piping: 42 t
Valves: 47 t
Equipment: 952 t
Steel structures: 52 t
Activities:
• Prefabrication and erection of feed water system
• Production and erection of feed water tanks with accessories - on site – 201 t
• Prefabrication and erection of auxiliary feed water system
• Prefabrication and erection of high pressure air system
• Preheating and PWHT with resistant machines
• Production and erection of piping supports
• Pipes up to DN 1000, wall thickness up to 25 mm
• Technical documentation (ATD) according to BNS, ASME, EN + AS-BUILT
• 100 % X- Ray (RTG)
Page 19
BIS Slovensko Reference
Revamp of Ethylene unit – Project ECOVISION – SLOVNAFT a.s. (SK)
Revamp of three pyrolysis furnaces
Customer: Ido Hutny project/SLOVNAFT
Location: Ethylene unit, Slovnaft, Bratislava, Slovakia
Realization: 2008 - 2010
Scope: Piping: 7 200 m
Equipment: 150 eq. + 500 valves
Steel structures: 93 t
Activities:
• Dismantling of existing (old) technology
• Prefabrication and installation of piping and supports
• Refurbishment and reinforcing of existing steel structures
• Fabrication and erection of steel structures
• Equipment installation
• Chemical cleaning
• Accompanying Technical Documentation (ATD) + AS BUILT documentation
• Painting
Page 20
BIS Slovensko Reference
Installation of dust collector system and media piping of electric arc
furnace SSM Strazske
Customer: SSM Strazske/SGS Industrial Services
Location: Strazske, Slovak republic
Realization: 2010-2011
Activities :
Scope of supply dust collector system – 920 t: • installation primery circle • installation secondary circle • installation axial cyclon • installation dust filter • installation exhausting system Scope of supply piping – 38 t: • Prefabrication and erection piping of electric arc furnace DN 15 to DN 300 • Media piping: cooling water, hydraulic, grease, pressed air, inert gas, oxygen • chemical cleaning • AS-BUILT and ATD documentation and material testing
Page 21
BIS Slovensko Reference
Erection of new Conticast link, prefabrication and erection of frames,
Železiarne Podbrezová a.s.
Customer: Železiarne Podbrezová a.s.
Location: Podbrezová, Slovak republic
Realization: 2013
Scope: Erection of new conticast link, prefabrication and
erection of frames
Activities:
• New conticasting line (Danieli) mechanical erection for steel mill incl.
allignements
• Machine frame prefabrications,modifications
• dismounting works
Page 22
BIS Slovensko Reference
Plant transfer - Kemira
customer: Kemira
Location: France/Finland
Realization: 2013, 4 Wochen
Activities:
• Dismounting existing plant, mechanical, elctrical, messuarement, incl.
dokumentaiton work for reinstallation on new area
• Transport and installation of plant in Finland
Page 23
BIS Slovensko Reference
Installation Lamination line incl complete overhaul– Tetra Pak HU
Customer: Tetra Pak HU
Location: Hungary/Slovak republic – workshops in Štúrovo
Realization: 2013
Activities:
• Laminator machine - general overhaul
• Roll grinding, shaft repairs, adjustments
• Bearing unit changes
• Modifications
• Installation of complete line
• Start up
• Documentation
Page 24
BIS Slovensko Reference
Plant erection of Bitumen roof plate production for IKO Senica
Customer: IKO Senica – Canadian IKO Group
Location: Senica (SK)
Realization: 2010 - 2011
Scope: EPC Project
40 t of various SS material
Activities:
• Fabrication and erection of tanks, steel structures
• Manufacturing of finish product looper
• Erection of whole production line
• Authority engineering slovak standard
• Detail engineering finish product looper
• Refurbishment of used machines
BIS Slovensko Reference
Delivery and installation of new pulping plant Page 25
Delivery and installation of new pulping plant
Customer : Dunafin Kft. (Delfort Group)
Place : Dunaújváros (Hungary)
Date of realisation : 10/2014-4/2015
Job description :
- Design, delivery and installation of 2 pcs of
250m3 tanks,
- Fabrication and installation of 2 new 40m3
pulpers based on Voith design
- Design, fabrication and installation of plattforms
- Installation of production line (pumps, agitators,
conveyors, other supporting equipments)
Activities:
• Dismantling and erection of technological equipments
• Modification of technological equipments
• Planning, managing and supervising of projects
• Turn-key relocation of technological equipments
Other special services
• - Modification and modernization of control systems (Siemens)
• - Installation of pneumatic systems
• - Legalization of equipments installed in Slovak Republic
• - Delivery of project documentation
BIS Slovensko Reference
Prefabrication, fabrication and erection Page 26
BIS Slovensko
activitiy Turnaround, shut down, and Service Page 27
Turnaround and Shut down
Preplanning of work
Maintaining of heat exchangers,valve change,
„static Equipment“, pipe change, rotating EQ
Material handling
Shut down management
contractor management
Comissioning
Page 28
BIS Slovensko reference
Turnaround, Kuwait Petroleum Europoort – Q8 - 2013 - Netherlands
Customer: BIS Rohrleitungsbau, BIS Maintenance Nord
Location: Rotterdam, Netherlands
Realization: 2013
Scope: 80 people
Activities:
• Maintenance of vessels
• Maintenance of heat exchangers, valves, rotating equipment and extruders
• Complete revamp of existing pipelines – dismantling of existing pipelines,
modification and erection of refurbished ones (app. 250 Iso`s)
• Shut down duration: 2 months
• Preparation and planning of shutdown – 5 of our employees for 2 to 8
months directly at refinery
Page 29
BIS Slovensko reference
Turnaround, Unipetrol Litvinov 2011 – Czech republic
Customer: BIS Czech/Unipetrol
Location: Litvinov, Czech republic
Realization: 2011
Scope: 205 people
Activities:
• Preplanning Static EQ 3 month 2 technican
• Preplanning pipe program 2 month 2 technican
• Maintenance of vessels
• Maintenance of heat exchangers, valves, rotating equipment and extruders
• Revamp of pipelines – welding and reparation
• Start up asssistance
Page 30
BIS Slovensko reference
Turnaround, Borealis Schwechat 2011 – Austria, Germany
Customer: BIS Maintenance Nord, BIS Chemserv, Borealis
Location: Schwechat , Austria
Realization: 2011
Scope: 140 people
Activities:
• Maintenance of vessels
• Maintenance of heat exchangers, valves, rotating equipment and extruders
• Shut down duration: 5 weeks
BIS Slovensko Reference
Turnaround, shut down pulp & paper Page 31
Activities:
• Specialists for pulp & paper production plants
• Service papaermachine incl roll change
• Maintaining of vessels, heat exchangers, steam distribution system,..
• Shaft reparation and change of bearings
• Service on woodyard and transportation lines
• Preplanning, turnaround management, start up assistance
Thank you for your attention.