17
Agenzia Lucana di Sviluppo e di Innovazione Agenzia Lucana di Sviluppo e di Innovazione in Agricoltura in Agricoltura A.L.S.I.A. A.A.S.D. A.A.S.D. PANTANELLO PANTANELLO BIOREM BIOREM LIFE11 ENV/IT/000113 LIFE11 ENV/IT/000113 Meeting Meeting Metaponto, 25 July 2013 Metaponto, 25 July 2013

BIOREM LIFE11 ENV/IT/000113 Meeting Metaponto, 25 July 2013

  • Upload
    hestia

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

A.L.S.I.A. Agenzia Lucana di Sviluppo e di Innovazione in Agricoltura. A.A.S.D . PANTANELLO. BIOREM LIFE11 ENV/IT/000113 Meeting Metaponto, 25 July 2013. Preparatory actions Implementation actions Monitoring of the impact of the project actions Communication and dissemination actions - PowerPoint PPT Presentation

Citation preview

Page 1: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

Agenzia Lucana di Sviluppo e di Innovazione in Agenzia Lucana di Sviluppo e di Innovazione in AgricolturaAgricoltura

A.L.S.I.A.A.L.S.I.A.

A.A.S.D.A.A.S.D.PANTANELLOPANTANELLO

BIOREMBIOREMLIFE11 ENV/IT/000113LIFE11 ENV/IT/000113

Meeting Meeting

Metaponto, 25 July 2013Metaponto, 25 July 2013

Page 2: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

Progetto Biorem - ActionsProgetto Biorem - ActionsA. Preparatory actions

A. Implementation actions

B. Monitoring of the impact of the project actions

C. Communication and dissemination actions

D. Project management and monitoring of the project progress

Page 3: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actions

The following three demostration plots (360 mThe following three demostration plots (360 m22 each) will be each) will be set up by PANTANELLO:set up by PANTANELLO:

-Bernalda-Metaponto (MT): vertisol characterized by high erosion and low water input;

-Bernalda-Pisticci (MT): overexplited cambisol with poor vegetable cover;

- Bernalda-Metaponto (MT): poorly developed semi-arid regosol

Samples of soil from the 3 demostration plots will be collected (3 months) at 0-20 and 20-40 cm depth

B.1 Demonstration of the innovative soil monitoring method through a characterization of the initial soil conditions:characterization of the initial soil conditions:

Page 4: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actionsB.2 Demonstration of the addition of

exogenous organic matter to 3 different types of soil

The NATURE (compost, fresh organic matter, sewage sludge…) and the AMOUNT (about 20-25 kg m-2) of the organic amendment will be estabilished on the base of the initial soil conditions (action B.1).

The organic matter will be incorporated into the soil top layer (0-20 cm depth0-20 cm depth).

Responsable: Alsia

Page 5: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actions

B.3 Demonstration of BIOREM revegetation strategies

The plants will be chosen as to be well adapted to water stress conditions and will depend on the initial soil characterization (action 1.1).

The following plants could be selected: Pino halepensis, Pistacia lentiscus.

The use of plants inoculated with micorrhizza might be contemplated.

Responsable: PANTANELLO

Page 6: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B2. Demonstration addition organic B2. Demonstration addition organic mattermatter 16 set 2013

Page 7: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B2. Demonstration revegetation B2. Demonstration revegetation strategiesstrategies

Page 8: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actions

The three selected fields will be set up and managed by PANTANELLO (3-5 months)

Demostration plots (360 mDemostration plots (360 m22 each) each)

During all the phases of the actions, photos and videos During all the phases of the actions, photos and videos will be takenwill be taken

2.5 m wide strips will be left between sub-plots2.5 m wide strips will be left between sub-plots

Page 9: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actions

Plant distance: 1x1 m

Pino halepensis

Pistacia lentiscus

Page 10: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actionsB.2 Demonstration of the addition of

exogenous organic matter to 3 different types of soil

The NATURE (compost, fresh organic matter, sewage sludge…) and the AMOUNT (about 20-25 kg m-2) of the organic amendment will be estabilished on the base of the initial soil conditions (action B.1).

The organic matter will be incorporated into the soil top layer (0-20 cm depth0-20 cm depth).

Responsable: ALSIA

Page 11: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actionsB.4 Demostration of the innovative biochemical monitoring

methodology

Soil samples from all the sub-plots will be collected every six months:- immediately after the application of the remediation strategies (3-5 months)- monitoring genetic plant with support of CNR Firenze

Each soil sample will consist of three subsamples collected at 0-20 and 20-40 0-20 and 20-40 cm depthcm depth

Each sample will consist of leaves plant used for soli regeneration

During these months, PANTANELLO PANTANELLO will perform the ordinary management and empirical monitoring of the involved soils.

PANTANELLO PANTANELLO will provide environmental reportsenvironmental reports containing all the environmentally relevant information gathered from the previous actions.

Page 12: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B2. Demonstration revegetation B2. Demonstration revegetation strategiesstrategies

25 settembre 2013

Page 13: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B2. Demonstration revegetation B2. Demonstration revegetation strategiesstrategies

25 ottobre 2013Weed elimination

Page 14: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

C. Dissemination actionsC. Dissemination actions

Project

poster pubblication

Page 15: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

C. Dissemination actionsC. Dissemination actions

Seminars january and february

Page 16: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

C. Dissemination actionsC. Dissemination actions

Project

poster pubblication

Page 17: BIOREM LIFE11 ENV/IT/000113 Meeting  Metaponto, 25 July 2013

B. Implementation actionsB. Implementation actionsB.4 Demostration of the innovative biochemical monitoring

methodology

Soil samples from all the sub-plots will be collected every six months:-immediately after the application of the remediation strategies (3-5 months)-6 months later (10 months)-12 months later (16 months) -18 months later (22 months)

Each soil sample will consist of three subsamples collected at 0-20 and 20-40 0-20 and 20-40 cm depthcm depth

During these months, PANTANELLO PANTANELLO will perform the ordinary management and empirical monitoring of the involved soils.

PANTANELLO PANTANELLO will provide environmental reportsenvironmental reports containing all the environmentally relevant information gathered from the previous actions.