4
english

biogest imagefolder ENG · 2016. 4. 11. · 2015 burton agnes (uk) 500 kw + gas injection = 2 000 kw pollybell 500 kw + gas injection = 2 000 kw honeybourne (uk) 500 kw kingsweek

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: biogest imagefolder ENG · 2016. 4. 11. · 2015 burton agnes (uk) 500 kw + gas injection = 2 000 kw pollybell 500 kw + gas injection = 2 000 kw honeybourne (uk) 500 kw kingsweek

english

Page 2: biogest imagefolder ENG · 2016. 4. 11. · 2015 burton agnes (uk) 500 kw + gas injection = 2 000 kw pollybell 500 kw + gas injection = 2 000 kw honeybourne (uk) 500 kw kingsweek

Biogest is an international biogas

plant manufacturer with its head­

quarters in Austria. Our end­to­end

biogas services range from project

development, design engineering and

financing, to turnkey plant construction

and technical and biological services

aimed at ensuring effective plant

operation.

In addition to plant engineering acti v i­

ties, our Own Plant Operations

business builds and operates facilities

which are part­owned by Biogest.

Project development takes place in

partnership with local companies. Our

aim is to establish long­term project

partnerships which enable both sides

to capitalize on the significant potential

currently available in our target mar­

kets. Thanks to our partners’ agricultu­

ral know­how and our own extensive

biogas experience, Biogest’s projects

promise a combination of operating

expertise, outstanding efficiency and

attractive returns on investment.

Our PowerRing plant type was developed to handle an unlimited supply of renew­

able raw materials, either with or without slurry, and has proven its worth in a

number of international reference facilities. Biogest’s PowerRing technology is

suitable for use with almost any substrate. Less easily degradable substrates do not

require pre­treatment, meaning they can be processed without causing difficulty.

A specially developed feeding system and substrate supply enables the use of large

quantities of slurry while also removing the problem of energy loss during the

degradation phase. As a result, the PowerRing system is the ideal choice for com­

panies requiring large­scale slurry processing.

In addition to the flexibility resulting from the wide range of available substrates,

Biogest’s PowerRing technology also offers the following benefits:

• Low energy consumption • Excellent specific methane yields

• Outstanding reliability • High degradation level with minimum substrate

and operational stability consumption

• High total full load hours • Standard designs ranging from 500– 4,000 kWel

Page 3: biogest imagefolder ENG · 2016. 4. 11. · 2015 burton agnes (uk) 500 kw + gas injection = 2 000 kw pollybell 500 kw + gas injection = 2 000 kw honeybourne (uk) 500 kw kingsweek

Biogas plant schematic

II.I.

Biogest is an international team

of highly motivated employees,

directly participating in the owner­

ship and the success of the com­

pany. We support our customers

on site in their local language and

offer our employees an extensive

profess ional development program

to maintain our technological

advantage in this rapidly devel­

oping industry. Our management

team has a total of 50 years of

experience in this industry.

To date we have completed over

130 biogas plant projects, the

major ity of them within Europe

— the geographical focus of the

company’s activities.

Biogest fully appreciates the huge

potential for biomass projects in

this region as well as the long­term

benefits of biogas­fired electricity

and heat generation.

The small PowerCompact biogas plant has been specifically designed for small and

medium­sized livestock farms and can use agricultural waste such as slurry or feed

waste as substrates, either with or without energy crops. Up to 100 kW of the elec­

tricity and heat generated by the plant can be fed into the grid or used for private

consumption. In addition to its modular and compact design, which helps keep time

and costs to a minimum, this plant design offers numerous additional advantages:

• Reduction of input costs by process ­

ing large quantities of slurry

• Plug and play — simple installation

and low­maintenance, fully auto­

matic operation

• Can be extended as required

• High quality components and parts

• Easy to integrate into existing

infrastructure

• Suitable for isolated operation

Page 4: biogest imagefolder ENG · 2016. 4. 11. · 2015 burton agnes (uk) 500 kw + gas injection = 2 000 kw pollybell 500 kw + gas injection = 2 000 kw honeybourne (uk) 500 kw kingsweek

2015 BURTON AGNES (UK) 500 KW + GAS INJECTION = 2 000 KW POLLYBELL 500 KW + GAS INJECTION = 2 000 KW HONEYBOURNE (UK) 500 KW KINGSWEEK 250 KW MILL­NURSERIES (UK) 2 000 KW HIILLFIELDS (UK) 124 KW FROGMARY (UK) 499 KW + GAS INJECTION = 2 000 KW MANN (UK) 124 KW RUSHYWOOD (UK) 500 KW JOHNSTON (UK) 124 KW GREAT HELE (UK) 500 KW2014 ENFIELD (UK) 499 KW + GAS INJECTION = 2 000 KW BILSTHORPE (UK) 500 KW + GAS INJECTION = 2 000 KW BALMANGAN (UK) 124 KW LITTLETON (UK) 124 KW CROFTHEAD (UK) 124 KW GLEBE (UK) 124 KW MONIKI (UK) 500 KW Y­FARMS (UK) 124KW COSTON (UK) 500KW BROADMEADOWS (UK) 124KW SLAVYANOVO (BG) 800 KW ABERDEEN (UK) 526 KW HOGSBROOK (UK) 1 300 KW BRAMHAM (UK) 1 200 KW DJULOVAC (HR) 1 000 KW BJALO POLE (BG) 600 KW STAMBOLIJSKI (BG) 1 000 KW AKSAKOVO (BG) 1 000 KW TINWALD (UK) 1 200 KW2013 JUSTICETOWN (UK) 100 KW KIRKBRIDE HOUSE (UK) 500 KW GELTBRIDGE (UK) 250 KW PECKMOOR (UK) 500 KW BEARLEY (UK) 2 000 KW CHAVANAGE (UK) 2 000 KW VRBAS II (RS) 500 KW

CHOTÝCANY II (CZ) 99 KW GARBOVA (RO) 1 000 KW CEFA BIHOR (RO) 2 900 KW VETRKOVICE (CZ) 526 KW

TOPOLJE 1 (HR) 330 KW KLOUŽOVICE II (CZ) 526 KW

TAKO (CZ) 549 KWZÁLUŽÍ­MORINA II (CZ) 549 KW

BELCICE (CZ) 526 KW STARA PAZOVA II 300 KW

ARDUD (RO) – OPO 1 500 KW2012 LYSICE­BYCKOVICE (CZ) 548 KW BALS (CZ) 1 000 KW

TÓFALU (HU) 1 000 KW AVICOLA (RO) 600 KW DOBRICH (BG) 800 KW SKALSKO (CZ) 600 KW STRÍŽOVICE (CZ) 600 KWRÍŽOVICE (CZ) 600 KWˇ

HORINEVES (CZ) 1 000 KW STRÍŽOVICE II (CZ) 482 KWRÍŽOVICE II (CZ) 482 KWˇ

ŽÁKAVA (CZ) 998 KW LUKOVÁ (CZ) 600 KW MECÍN(CZ) 600 KWCÍN(CZ) 600 KWˇ

LHOTA POD LIBCANY (CZ) 600 KW TISOVÁ (CZ) 999 KW STAROSEDLSKÝ HRÁDEK (CZ) 835 KW GRODZIEC SLASKI (PL) 600 KW HORÁK – CHOT HORÁK – CHOT HORÁK – CHOTOVICE (CZ) 637 KW PRUSINKY (CZ) 998 KW2011 OTICE (CZ) 526 KW

PREŠTREŠTˇ ˇREŠTREŠTOVICE (CZ) 800 KWKOSTELNÍ VYDRÍ (CZ) 600 KWRÍ (CZ) 600 KWˇ

HLUBOŠ (CZ) 834 KWNECHANICE (CZ) 800 KW HRADEŠICE (CZ) – OPO 660 KWVELKÉ NEMCICE (CZ) 998 KWHLOHOVEC (SK) 526 KWVESTEC (CZ) 800 KW

CERNÁ (CZ) 526 KW VYSOKÉ (CZ) 526 KW BREST (BG) 1 200 KW KUNŽAK (CZ) 600 KW DOLNÍ NEMCÍ (CZ) 999 KWCÍ (CZ) 999 KWˇ

KLOUŽOVICE (CZ) 1 063 KW MILEC (CZ) 526 KW LESNÁ (CZ) 320 KW SOSNICOWICE (PL) 526 KW TRENCIANSKÁ TEPLÁ (SK) 1 000 KWCIANSKÁ TEPLÁ (SK) 1 000 KWˇ

CHRÁST (CZ) 600 KW RADOVESICE (CZ) 834 KW KOSOVÁ HORA (CZ) 834 KW RTYNE (CZ) 400 KW HROTOVICE (CZ) 600 KW2010 MORINA (CZ) 526 KW

MOKROVRATY/DOBRÍŠ (CZ) 625 KWRÍŠ (CZ) 625 KWˇ

STARÉ SMRKOVICE (CZ) 600 KW BECEJ (RS) 1 000 KW

VRBAS (RS) 1 000 KW GAV KREMS (AT) 380 KW TIMISOARA COUNTY (RO) 3 500 KW STÁDLEC (CZ) 330 KW PETROVICE U SEDLCAN (CZ) 834 KW PETROVICE – BYSTRICE (CZ) 999 KW ÚJEZD U CHOCNE (CZ) 999 KW2009 MILKMEN (HU) 1 000 KW

POBEŽOVICE (CZ) 500 KWEŽOVICE (CZ) 500 KWˇ

CHYNORANY (SK) 995 KW NOVOSEDLY (CZ) 600 KW

YAMBOL (BG) 500 KW2008 DEŠOV (CZ) 526 KW

KRIŽANOV (CZ) 526 KWRIŽANOV (CZ) 526 KWˇ

TIŠTÍN (CZ) 526 KWDRAHOBUDICE (CZ) 526 KW

HEADQUARTERS Austria

BIOGEST Energie- und Wassertechnik GmbHInkustraße 1– 7 / 5 / 2A-3400 KlosterneuburgAustriaT + 43 2243 20840F + 43 2243 20840 40E offi [email protected] www.biogest-biogas.com

Czech Republic

BIOGEST Energie aVodní Technologie s.r.o.17. listopadu 48/28CZ-690 02 BreclavCzech RepublicT + 420 774 110 042E offi [email protected] www.biogest-biogas.com

Italy

BIOGEST ItaliaCorso di Porta Nuova 11IT - 20121 MilanoItalyT + 39 335 727 14 88F + 39 236 569 130E offi [email protected] www.biogest-biogas.it

Romania

BIOGEST SRLBulevardul Revolut,iei Nr. 20SAD 2 – Ap. 6RO-300024 Timi ,soaraRomaniaT + 40 256 220555E offi [email protected] www.biogest-biogas.com

Serbia

BIOGEST Energie- & Wasser technik GmbH – Ogranak Bulevar Nikole Tesle 3RS-11080 BeogradSerbiaT + 381 62 26 36 10E offi [email protected] www.biogest-biogas.com

United Kingdom & Republic of Ireland

BIOGEST UK Ltd & Republic of Ireland City PointTemple GateBristol, BS1 6PLM + 44 7506 090037E offi [email protected] www.biogest-ad.com

France

BIOGEST FR51 rue de la PerdièreFR-53000 LavalFranceT + 33 6 86 47 88 47E offi [email protected] www.biogest-biogaz.fr

TAKO (CZ) 549 KWZÁLUŽÍ­MO

EL STARA PAZOVA II 300 KW

ARDUD (RO) – OPO 1 500 KW

TISOVÁ (CZ) 999 KW STAROSEDLSKÝ HRÁDEK (CZ) 835 KW GRODZIEC SLASKI (PL) 600 KW HORÁK – CHOT PRUSINKY (CZ) 998 KW2011 OTICE (CZ) 526 KW

2007 HLEBNOC (UA) 400 KW2007 HLEBNOC (UA) 400 KW NOVÉ LHOTICE – LIBOME NOVÉ LHOTICE – LIBOME ˇRICE (CZ) 526 KWRICE (CZ) 526 KW

LIBELIBEN – DOLNÍ BN – DOLNÍ BN – DOLNÍ Bˇ REŽANY (CZ) 526 KWREŽANY (CZ) 526 KWREŽANY (CZ) 526 KWˇ

KRÁSNÁ HORA (CZ) 526 KWKRÁSNÁ HORA (CZ) 526 KWCHOTÝCHOTÝ ˇCANY (CZ) 526 KWCANY (CZ) 526 KWCHOTÝCANY (CZ) 526 KWCHOTÝ

NEUKIRCHEN (AT) 250 KW NEUKIRCHEN (AT) 250 KW2006 GAV KREMS II (AT) 125 KW2006 GAV KREMS II (AT) 125 KW ÖKOENERGIE GUTAU (AT) 250 KW ÖKOENERGIE GUTAU (AT) 250 KW

STEINHAUS (AT) 100 KWSTEINHAUS (AT) 100 KW2005 ARGE BIOGAS EGGERDING (AT) 500 KW 2005 ARGE BIOGAS EGGERDING (AT) 500 KW

GAV KREMS I (AT) 125 KW GAV KREMS I (AT) 125 KW BIOENGERIE WACHTBERG (AT) 250 KW BIOENGERIE WACHTBERG (AT) 250 KW NONNDORF (AT) 500 KW NONNDORF (AT) 500 KW PRELLENKIRCHEN DEUTSCH HASLAU (AT) 500 KW

2004 PROJECT NEUSTROM II (AT) 200 KW BIOGAS GMBH MOLLN (AT) 250 KW BIOGAS MANK GMBH (AT) 500 KW

BIOENERGIE THENING GMBH I. G. (AT) 500 KW WEIBERN (AT) 500 KW

2003 BIOENERGIE KALLHAM GMBH (AT) 250 KW CSOBAJ (HU) 90 KW KLEIN PYRACH (AT) 150 KW

2001 PROJECT NEUSTROM I (AT) 150 KW UTZENAICH GMBH (AT) 500 KW ASPACH KEG (AT) 500 KW

Reference projects Construction and / or planning: