Upload
lykhuong
View
235
Download
1
Embed Size (px)
Citation preview
BIM Services For Architect
ww
w.p
innacl
eca
d.c
om
VIRTUAL MOCK UPS & VISUALIZATION
COORDINATION WITH OTHER TRADES
CONTENT DEVELOPMENT
DESIGN DEVELOPMENT SUPPORT
INTERIOR DESIGN
INDEX . . . .
Design Development Support 04
Energy Analysis
Why Pinnacle
11
07Coordination With Other Trades
Virtual Mock Ups & Visualization
07
Testimonials
12
09
QC Process
Project Snapshots 14
Work Flow
13
10
Content Development 10
Commitment
We are committed to our core values and corporate mission:
| Maximize client value by adopting the latest technologies and innovations.
| Improve project efficiency by streamlining workflow and provide high quality services.
| Save time by using a large globalteam to leverage time zone advantages.
| Reduce client costs up to 30% by harnessing a highly experienced global work force.
Revolutionizing the AEC Industry
03
Benefits of Architectural Modeling 03
Interior Design
08
Revolutionizing the AEC Industry
03
Benefits of Architectural Modeling
| Integrated Building Materials: Real-world materials drive detailed plan, section and elevation representations of building components to save documentation time. The integrated Accurender, raytracing and radiosity engine uses the same materials, saving time and effort when producing visualizations.
| Conceptual Cost Estimating: Quantity take offs can be extracted from model which, when linked with the prevalent rates of materials, labor and construction techniques, can enable the stakeholders to prepare cost estimates.
| Quality: Ensures all data and graphics, details, schedules, drawings and sheets in the CD set is current and coordinated.
| Efficiency: Eliminate 2D by generating CD set from BIM models which are accurate and coordinated.
| Coordination: Streamline communication with 3D visualization among all stakeholders for quick decision making during design and pre construction phase.
Our clients have reported cost savings up to 30% by successfully implementing BIM.
Sales Tool: 3D visualization enables potential investors, buyers and owners to understand the layout and spatial interrelationships of a project.
|
Bidirectional Associativity: Ensures all changes to any part of the building need to be made only once. Ensures annotation decisions, such as a changed sheet scale properly resizing all annotations and graphics, need to be made only once.
|
Proper planning and coordination are the keys to the successful execution of projects in the construction industry. Advancements in 3D technology and the advent of Building Information Modeling (BIM) have revolutionized the Architectural, Engineering and Construction (AEC) industry.
BIM allows stakeholders to create and examine virtual representations of the architecture model and other utilities of their project. The virtual construction can be used to generate accurate construction drawings and address all constructability issues before construction begins.
Pinnacle Infotech has been acknowledged as the global leader in providing innovative BIM solutions. We have received several awards and recognition from both industry and government. Pinnacle received Deloitte Technology Fast 500 award in 2014 for 86% growth rate in Technology as per Asia Pacific Ranking and Deloitte Technology Fast 50 India award in 2015.
NASSCOM, the leading IT trade association, has named Pinnacle among the Top IT Innovators for 6 years between 2007-17. We are in the process to upgrade our existing ISO certification 9001:2008 to 9001:2015. Also, implementing Environment Management System (EMS) 14001:2015 which will be completed by 2017.
The successful completion of more than 4500 BIM projects in 34 countries has provided Pinnacle with a deep understanding of international building codes and procedures. Our global delivery system allows us to maintain constant contact with our clients making geographical separation meaningless.
We recognize the importance of effective work process management and regular communication when outsourcing services. We have developed an ideal mix of infrastructure, experience, global presence and commitment to excellence that has led to long-term relationships with more than 1000 clients worldwide.
04
Design Development Support
Pinnacle is the global leader with 15 years of experience in working with architects and assisting them in the process of developing their design. Our dedicated team of skilled personnel interacts with architects to understand their design-intent and provides value-added support as the design evolves from conceptual /schematic stage to construction stage. In order to do this, the inputs required by Pinnacle include any or all of the following:
Conceptual Drawings
Hand-sketches
Conceptual Models
Pinnacle’s resources translate designer’s thoughts, expressed through the aforesaid inputs into buildable information in the form of 2D drawings and/or 3D models.
The above process can pass through one or more of the following stages of Design Evolution:
1) Concept Design:
Conceptual design is the very first phase of design, in which the drawings or the solid models are the dominant tools to provide a description of the proposed system. The description is in terms of a set of integrated ideas and concepts about what the proposed system should do, behave and look like, so that it is understandable by the users in their desired manner. We relate this stage of design roughly to the LOD 100 Revit model.
The following images graphically illustrate one such collaboration with an architect:
Input from Architect:
LOD 100 Models include elements defined as Masses and are used for preliminary studies, such as Conceptual Design and Overall Project Phasing.
Exploring Design Options during Concept Design Stage
Pinnacle facilitates the design process by using the Design Options tool within Revit. In Revit, every design option belongs to a design option set, which is a way of structuring the design options into clusters to assist the architect’s workflow. In order to take an instance, a project may have 3 design options for an exterior façade, 2 options for a bathroom configuration and 3 options for the reflected ceiling plan. Revit enables the architect to create several sets for each major type of option being explored. So the project can have the following design option sets:
2. Schematic Design:
Schematic design is an initial design scheme that seeks to define the general scope of the project, including scale and relationships between the building components. The architect’s sketches interpreting the client’s desired functional relationships between various activities are translated to a model, corresponding roughly with the LOD 200 Revit model.
05
Exterior Facades
Bathrooms
Reflected Ceiling Plans
In each of the above sets, it is possible to have as many options as required by the architect. The design process is expedited with this methodology of creating and developing several alternatives in a single model. Once an option is accepted or finalized, the architect can delete all the other options from the model.
The following images graphically illustrate this methodology:
The following images graphically illustrate one such collaboration with an architect:
LOD 200 models include elements where the Masses are replaced with Generic Components. Analysis based on Overall Systems can be performed and Quantities based on Specific Elements can also be obtained. The major characteristics of components are their thickness and width, allowing quick quantity-takeoffs.
06
3. Detailed Design:
Detailed Design is the stage following schematic design where the schematic design decisions are worked out in greater details. The details are reflected in the model, corresponding roughly with the LOD 300 Revit model. This also provides the client with drafted to-scale drawings, illustrating how the project would look like after the construction gets over.
The following images graphically illustrate one such collaboration with an architect:
LOD 300 models include elements where the Generic Components have been replaced with fully defined Assemblies. Analysis based on Specific Systems can be performed and Quantities based on Materials can also be obtained. At LOD 300, the model can be leveraged for the generation of traditional Construction Documents and Shop Drawings and can be used for the analysis of Energy Performance, Clash & Cost.
4. Construction Documentation:
Construction Documentation is a bridge between building design and physical building form. It encompasses the preparation of drawings and specifications that set forth the detailed requirements for the construction of a building project. In terms of modeling, this corresponds roughly with the LOD 400 Revit model with all information of the building.
The following images graphically illustrate one such collaboration with an architect:
LOD 400 Models include elements that are accurate in terms of size, shape, location, quantity and orientation with complete fabrication, assembly and detailing information. At this Level, the Model has non-geometric (3D) information like text, dimensions, notes and 2D details and it is a complete representation of all the proposed elements. Analysis can also be performed at this level such as Energy Performance, Clash Detection and Sequencing & Cost.
07
During this stage, Pinnacle produces the following sheets:
Overall Floor Plan
Enlarged Floor Plans
Typical room layouts
Elevations (All 4 Sides)
Building sections
Partition Details
Typical Details
Door & window Details
Floor Finish Plans
Floor Finish Details
Reflected Ceiling Plans & Details
Furniture Layout plans
Landsacpe plans & Details (As required)
Interior Elevations
Egress Plans
Quantity take offs
Door & Window Schedules
Co-ordination with Other Trades
Coordination between different elements of a building is essential for the building design to be efficient. The gaps between design disciplines are a common cause for change orders in the field of construction and can be eliminated by early coordination among all trades (Architecture, Structure, MEP), thereby closing the design loopholes.
Pinnacle’s team with 15 years of expertise proactively gets involved in finding & highlighting the possible gaps to the relevant disciplines.
Interior Design
Pinnacle has also the expertise in assisting architects with the development of interior design - be it for renovation of building or new building. Our team assists architects in their presentations by using AutoCAD, Revit, 3DS Max, AutoCAD Architecture, Photoshop, Illustrator, SketchUp, Microstation, Navisworks, Bluebeam, A 360 Collaboration, Autodesk BIM 360 Glue, Newforma collaboration and continue the job to Formatting & Construction Documentation stage with all detailing and necessary sections along with creation of schedules of materials & fixtures used.
Door Height Up
Ceiling Below
Instances of Pinnacle's completed projects:
08
Input from Architect:
Output from Pinnacle:
Energy Analysis:
Identifying as well as benchmarking energy use across buildings has become an important consideration for architects while designing. This identifies opportunities for energy efficiency that in turn aids cost savings and improved building performance. With Revit’s advance features of Solar study & Thermal analysis, Pinnacle’s team can do wonders in this segment as well.
Solar Study
Understanding the sun’s position, how it changes with respect to the buiding being designed over the course of a day or the different seasons in a year enables the architect to visualize the shadows and assess the building’s performance in terms of natural light and/or heating requirements.
Pinnacle assists architects to do this by using Solar Study tool in Revit.
09
Virtual Mockups & Visualization
Pinnacle facilitates the design verification process by enabling the architect to ensure that his design meets his client’s expectations. Virtual mockup of various building components, complete with equipment and finishes is an efficient device to do this.
Content Development
Pinnacle assists architects to transform 2D drafting and drawings to BIM base work process and provides the following for Content Development:
Drawing and/or Revit Template files
Standard Details/Callouts
Revit Families
BIM Consulting & Training
Revit Families contain all relevant information about technical specification including product manufacturer, Omni Class Code, Title & Subcategories, that help clients to identify the required component with much ease.
Instances of Revit Families created by Pinnacle:
Cabinet and Drawer
Fixture & Furniture
Doors & Windows
Specialty Equipment
Stairs & Railings
Care Cart and Desk
Caseworks, Sheets & Watches
Interior Decoration Accessories
Plumbing Fixtures
Mechanical Equipments
Electrical Fixtures
Structural Components (Columns, Beam, etc)
10
Quality Control Process
QC 2
Screen Check
Performed by QC Dept./Team
DELIVERY
TO
CLIENT
100% Quality
QC 1
Plot Check
Performed by Production Team
QC 3
Pre-Shipment Check
Performed by Project Manager
QC Check Phase I
The model is plotted on paper and a preliminary grid by grid check is done comparing it with the original contract documents. Member of the Project Management team assists in this process.
The project team leader sends status report to the QC Department to begin QC Phase II.
QC Check Phase III
The Project Manager conducts the pre-shipment check before sending them to the client.
QC Check Phase II
The QC Team performs a more detailed comparison of the Contract Documents against the 3D BIM model. Specific Checklist is prepared to review/check the deliverables. Their main objective is to review, identify and address the following:
The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues related to the project.
Missing data (if any)Mismatches with the contract documentsClashes (Old/New), Elevation, Routing, Fittings, etc.Construction point of view.Fly-Zones requirementsAttribute Checking (Pressure class, Pipe material, etc.)Location of Equipment such as VAV, Sleeves, Hangers, Valves.Equipment Connection details as per Schematic Drawings.Equipment Models as per Technical Submittals.Annotations & Dimensions, Aesthetic View.Miscellaneous issues
Our QC process is ISO 9001:2008 certified and managed by an independent QC team. We are in the process of implementing Environment Management System (EMS) ISO 14001: 2015, which will be completed by 2017.
The main objective of the quality control (QC) process is to detect errors and rectify it. Ensuring quality is a group effort and our dedicated QC team is led by a highly qualified and experienced Manager in M&E Coordination and Quality Control.
The entire QC process is handled in three phases:
11
Work Flow
CLIE
NT
AC
TIV
ITY
PIN
NA
CLE
AC
TIV
ITY
ARCHITECTURAL INPUTS
STRUCTURAL INPUTS
RESPONSE TO RFIS
REQUEST FORINFORMATION/CLARIFICATION
QUALITY CONTROL
QUALITY CONTROL
OK?
OK?
ALLINFORMATION
AVAILABLE?
FIRST SUBMISSION
DESIGNDEVELOPMENT
FINAL OUTPUT: REVIT MODEL & CONSTRUCTIONDRAWINGS
YES
YES
NO
NO
YES
NO
We have a standard BIM Process, which has been prepared, based on our experience, which we follow for all the Architectural projects, unless the project has other requirements. Below is a simple flow chart, which explains the process in detail:
The process has been broken down as per the responsibility.
The blue colored activity / task is PINNACLE’s responsibility.
The green colored activity / task is the client’s responsibility.
We have a Quality Process in place, to check the quality of the deliverable that is being provided to the client.
12
BIM
| P
ara
met
ric
cha
ng
e fo
r b
ette
r co
ord
ina
tio
n
Canada
CA
Aruba
Brazil
FinlandSwedenNorway
Ireland
France
Turkey
SAUDI ARABIA
Delhi
Hyderabad
Sanghai
Japan
Singapore
WA
Production Centres
AZ
Puerto Rico
Australia
Columbia
Iraq
Kazakhstan
LibyaMexico
Rwanda
Sri Lanka
OR
NV
MT
TX
PA
NYMI
MA
NJRI
CO
MN
OK
OHIN VANC
ALGASC
FL
MDDCIL
West Indies
LA
TNKY
Lebanon
USA
INDIAOman
Kuwait
UAE
BahrainJordan
Israel
QatarRiyadh
SWITZERLAND
Denmark EUROPE
BelgiumNetherlands
Malayasia
China
UK
DURGAPUR
KOLKATA
JAIPURDUBAI
Abu Dhabi
ITALY
LONDON
HOUSTON
Germany
Why Pinnacle?
Pinnacle is a global leader in providing innovative BIM services. Our in-house team of more than 1100 experienced Architects, Engineers and BIM professionals helps us provide end-to-end solutions to discerning clients around the world.
Our 3,28,364 sq ft, world-class production facility is equipped with high-end workstations, advanced servers with real time backup and a high speed data and voice network. There is a 24 x 7 uninterrupted power supply security system by CISCO.
Fast Turnaround
Our skilled team of professionals can provide quick turnarounds on complex projects. Pinnacle has successfully completed several large-scale projects across multiple verticals.
Global Presence
Experience in BIM Domain
We have a global experience of 17 years and have successfully collaborated with several leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment complexes, hotels, casinos, large retail center, high school, airport, commercial buildings, convention center, high rise towers, and industrial projects.
Communication
Pinnacle's Project Management team is available to clients through a number of communication channels including:
1. Global telephone networks for instant communication2. FTP (Exavault) over a secured network for file transfers3. Email (on Google server) for reports and interactions
Technical Strengths
4. Video and teleconferencing for presentations and conversations5. WebEx conferences with UK & US based phone systems6. Newforma project information management system
Our professionals use the latest BIM software: Autodesk Suite (Revit, Revit MEP, Revit Architecture and Revit Structure), Microstation, NavisWorks, Inventor, AutoCAD Civil 3D, Plant Design Suite, Pro/Engineer, Sysque, Allplan, Adobe Photoshop, Adobe Illustrator, Adobe Aftereffects, 3DS Max, Tekla Structure, SolidWorks, Autodesk Fabrication Suite, Quickpen, Cadpipe, SketchUp, Bluebeam, Pipenet, Elite, ETAP, DIALux and other software.
Pinnacle has offices around the world (USA, UK, UAE, ITALY, INDIA - Durgapur, Kolkata & Jaipur) enabling us to serve our clients around the clock.
As we have a deep understanding of global and regional codes and standards, we have ensured that our Quality Management System is as per ISO 9001:2008.
Testimonials
"Pinnacle has been a great resource and is willing to always take on work on short notice. The quality of work is excellent and always on time."
Travis
“Communication was smooth. Progress sets were helpful. All in all we are impressed with the work quality and adherence to our standards.”
Alex
"Having worked with Pinnacle for a year now, we have had very positive results. So far Pinnacle is one of the best outsourcing solutions we've worked with."
Aaron
“Your work was quite good overall. The speed at which you were able to return the drawing from my mark-up was also quite good.”
Woodrow
“It was our first time working with Pinnacle and they provided reliable service. The quality of work was excellent but most importantly, fast.”
Edgar
“Thank you all for hitting a tough schedule. You accomplished what we needed in a short amount of time and made client very happy.”
Don
“We are really appreciative of the work you do! It has helped us to grow our firm without a large staff, which really helps us adjust to market conditions!”
Kimberly
“We are very impressed with Pinnacle's speed and efficiency. We look forward to working with them on future projects.”
S. Chris
“The speed and compentency of the team has been such a value add to our firm!”
Tighe
Veronika
“Despite coming 2nd post tender Midas were able to secure the contract on this new build extension to this Grade II listed building in the historic centre of Bristol following extensive archaeological activity and preparatory ground works. As part of the initial talks with the client Midas presented the 4d sequence that was produced by Pinnacle for this project. This was a great way of starting a dialogue with the client! Everyone in the office including the client was very impressed with the animation, to the point, that the client also wanted to upload the sequence on his website for PR purposes. Personally, this has been my favourite project so far! Well done!”
“Very impressed with the turn-around and the amount of work done in such a short time. There were some back and forth but overall for the stage we were at (early schematic) we are very happy with the product.”
James
13
14
Project Snap Shots
14
LOCATIONPROJECT NAME DETAILS
BIM ENDDATE MANPOWER
SECTOR PROJECT AREA
Residential & Commercial
The Distillery at Lake Nona 329,404 Sq ft
5 EngineersOrlando,USA
February2017
Our scope of work for the project included creation of 3D BIM Model (wall, roof, windows, floors and Landscaping details), Clash Coordination as well as preparation of DD Set, CD & Permit Set Drawings.
Stadium The Ballpark Of the Palm Beaches 2 Engineers
West Palm Beach,Florida,USA
May2016
Our scope of work for the project included 3D Modeling of Electrical Equipment, Coordination and Constructability Analysis. Virtual Construction of the project in BIM enabled independent review of the constructability issues. We have highlighted discrepancies in drawings and inadequate information at the preconstruction stage through RFIs, accompanied with proposed solutions.
Commercial Museum of the Future 328,784 Sq ft
6 EngineersDubai,UAE
August2016
Pinnacle executed 4D Construction Phasing/Simulation Video of 4 minutes duration. The video included the modeling of Surrounding Buildings and Structures (Emarates Towers, Metro via Duct and Station) and the Models of the Temporary Structures (Tower Crane, Site Facilities, etc.).
Commercial The Mall at Green Hills 131,085 Sq ft
8 EngineersAnn Arbor,USA
October, 2016
Our scope of work for the project included 3D Model Creation of Architecture, Concrete, Structure, Site, HVAC, Site Utility, Plumbing, Mechanical, Fire Protection and Electrical Trades and Basic Coordination.
Mixed Use Rescore Hollywood 347,019 Sq ft
12 EngineersLos Angeles,USA
October2016
Our scope of work is to generate detailed 3D BIM model for producing construction document set from Schematic Design.
Mixed Use Serrano and 8th Street 379,520 Sq ft
8 EngineersLos Angeles,USA
February2017
Our scope of work for the project included 3D BIM Model creation for Architectural & Basic Concrete Structures at LOD 350 for designing construction document set.
Infrastructure Dubai Metro Route 2020 484,000 Sq.Ft.
6 Architect & EngineersDubai, UAE
January
2016Pinnacle's scope of work for the project included: 1.] 3D modeling of the architectural and structural element of the expo station and other elevated stations 2.] A video presentation of route 2020 showing the construction methodology 3.] 4D simulation of the expo station, ending with a walk-through showing the proposed condition.
Commercial Four Seasons Resort 385,900 Sq.Ft.
12 Architect & EngineersCalistoga,USA
October
2015A 3D BIM Model of Architecture and Structure. Civil site modeling (topography and landscape) of entire site. Major UG Utility modeling.2-3 minutes of 4D simulation and fly through.
Erickson Lantern Hill 177,750 Sq ft
3 EngineersNewark, USA
July, 2015
Pinnacle's scope of work for the project included the 3D Modeling of the Architectural & Structural trades in Revit. We deployed a team of 3 Engineers for the project and produced the final model after resolving all construction issues.
Residential Dubai Festival City 1,60,000 Sq.M.
10 Engineers Dubai, UAE
August
2015Architectural & Structural BIM Model Creation, 40%+100% Schematic Drawing Creation, Tender Drawing Creation.
Residential
15
Project Snap Shots
15
Hospitality Sofitel Wellington 71,128 Sq ft
4 EngineersLower Hutt,New Zealand
April, 2015
We animated the model in 4D as per the construction program of the project showing the different phases (existing, demolitions etc.) and executed the modeling of all exterior architectural and structural parts like walls, doors, columns and external parts of the building, that are essential for Bid presentation.
Mixed Use Commercial
One West Las Olas 38,408 Sq ft
3 EngineersFort Lauderdale,USA
April, 2015
Our scope of work for the project included 3D Modeling of the Architectural, Structural, Mechanical and Plumbing trades. We also provided assistance with 3D Electrical Modeling and executed the in-house and off-shore BIM coordination. Ultimately, we produced Shop Drawings from the clash-free coordinated model.
Commercial Pembroke Pines 305,000 Sq ft
8 EngineersFort Lauderdale,USA
April, 2015
3D Modeling of Architecture Exterior walls, Interior walls (without individual studs), Ceiling & soffit, Ceiling Grid, Door and window (generic), Stairs (as per schedule), Railings, Casework/Cabinets and Light Fixtures.
Arlington,USA
525,000 Sq.Ft.Rosslyn Central Place
Pinnacle's scope of work included the creation of 3D Models (LOD 300) for coordination. We executed the architectural modeling of the exterior walls, interior walls (without individual studs), ceiling, soffit, doors, windows (as per schedule), stair and railing. We also constructed the structural models for Beams (Primary & Secondary), Columns, Structural Slab/Metal Deck, CMU/Pre-cast walls, Footing, Foundation and Metal Canopy/Trellis.
December,2014
8 Architects & Engineers
Residential
Scope included creation of Architectural & Structural 3D Model (LOD 350), and Coordination.
Residential
Florida,USA
8th Avenue Residences December2013
381,000 Sq.Ft.
10 Architects & Engineers
Ambit of this project includes Architectural and Structural 3D Modeling, MEP-FP (Mechanical, Electrical, Plumbing, Fire Protection) and 3D Modeling. Providing coordination services, Final Shop Drawings and generation of constructability report & Quantity Take-Off, creation of 3D Mock up along with Phasing & 4D Scheduling.
Mixed Use Residential Township
Doha,Qatar
Msheireb Downtown Doha March2014
390,192 Sq.M.
34 Architects & Engineers
Delivered a 3D BIM Model of Architecture, Structure, Mechanical, Electrical, Plumbing and Fire Protection services after a complete coordination among all the trades. Clash reports were also generated from the model.
Residential
Florida,USA
Vintage Park Apartments November2013
425,754 Sq.Ft.
5 Architects & Engineers
LOCATIONPROJECT NAME DETAILS MANPOWER
SECTOR PROJECT AREA
Shopping Mall March2012
417,500 Sq.M.North Gate Mall
32 Architects & CivilEngineers
Pinnacle was responsible for the modeling of the entire mall area site along with the six associated office buildings. A walk through presentation was done based on the Architectural and Structural elements to show the key areas as requested by the client.
Doha,Qatar
Great American TowerOffice Garage Retail
October 1,350,000 Sq.Ft.
201025 Architects & Engineers
Pinnacle's scope of work for the project included 3D modeling of the Architectural and Structural elements as per the contract drawings along with BIM coordination for clash free construction at site.Cincinnati,
USA
University University of Maryland 121,705 Sq.Ft.
20 Architects &Engineers
Baltimore County
December
USA
2010Architecture model, Structure for PHAB, for MEP coordination. BIM for isolated sound proof panel. 3D model Architectural wall Floor. Penetration and non penetration walls. Mock Black Box presentation, PT House, Rehearsal Studio.
BIM ENDDATE
ww
w.p
innacl
eca
d.c
om
Italy Office
Phone: + 39 0341630070Email: [email protected]
Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy
Jaipur Office
Plot No - IT-A-016-E, Mahindra World City, (Jaipur) LTD, PO - Mahindra World City, Tehsil -Sanganer, Jaipur - 302037
Pinnacle Infotech Solutions
Texas, USA
Dubai, UAE
Lecco, Italy
Kolkata, India
Durgapur, IndiaJaipur, India
London, UK
Pinnacle Infotech Inc.
6161 Savoy Drive #1125,Houston, TX 77036Phone: 713 780 2135Fax: 713 780 8784Email: [email protected]
USA Office
Biswanath TodiOperations ManagerCell: 832 283 6628
International Office Locations
UAE Office
Office No – 307, 3rd Floor, Building No. 7 PO Box - 345869, Dubai Outsource ZoneDubai, UAE
Pinnacle Infotech Technologies FZ-LLC
Kuntal Chakraborty
Phone: +971 55 736 3498Email: [email protected]
Zurich, Switzerland
India Office Locations
Pinnacle Infotech Solutions
S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone: +91 343 6602222 / 6602231–35Fax: +91 343 6602230
Durgapur Office UK Office
TechHub, 4-5 Bonhill Street London EC2A 4 BX
Mathew GomesPhone: +44 20 7096 1664Email: [email protected]
Pinnacle Infotech Limited
Switzerland Office
c/o, Transcon InternationalSpirackerstrasse 258044 GockhausenSwitzerland
Mr. Bernhard Kössler
Email: [email protected]
Phone: +41 56 535 3267
Kolkata Office
Plot - II/F/11, Block - 4B, 4th Floor, Room No. 402,Ecospace Business Park, New Town, Rajarhat, Kolkata - 700156
Pinnacle Infotech Solutions
Email: [email protected]
Email: [email protected]
Email: [email protected]
Pinnacle Infotech Inc.