BIM PROJEKTIRANJE U ELEKTROTEHNICI
MILJAČKI DAMIR,
DIPL.ING.EL.
1. OPĆENITO O BIM-U1.1. ŠTO JE BIM?
BIM (ENG. BUILDING INFORMATION MODELING) JE IZGRADNJA DIGITALNOG
INTEGRIRANOG MODELA.
KRATICA BIM IMA NEKOLIKO ZNAČENJA:
■ BUILDING INFORMATION MODEL
■ BUILDING INFORMATION MODELING
■ BUILDING INFORMATION MANAGEMENT.
RASPRAVE O BIM-U TREBAJU SE ODNOSITI NA PRAKTIČNU PRIMJENU BIM MODELA. BIM
PRISTUP MOŽE SE PRIKAZATI U DVA SMJERA: KAO TEHNOLOGIJA I KAO
METODOLOGIJA. BIM KAO 'TEHNOLOGIJA' PREDSTAVLJA DIGITALNU REPREZENTACIJU
FIZIČKIH I FUNKCIJSKIH KARAKTERISTIKA GRAĐEVINE, A KAO ’METODOLOGIJA´
OMOGUĆUJE SURADNJU RAZLIČITIH SUDIONIKA U RAZLIČITIM FAZAMA ŽIVOTNOG
VIJEKA GRAĐEVINE.
U TOME POGLEDU, STRUČNA I ZNANSTVENA LITERATURA DEFINIRA BIM KAO:
PROCES U KOJEM RAZLIČITI SUDIONICI RADE ZAJEDNO, UČINKOVITO RAZMJENJUJU
INFORMACIJE TE SURAĐUJU NA STVARANJU UČINKOVITIJEG PROCESA GRADNJE ALI I
UČINKOVITIJIH GRAĐEVINA.
TEHNOLOGIJU KOJA OMOGUĆUJE KOORDINACIJU ILI KOMBINIRANJE RADA RAZLIČITIH
INTERESNIH SKUPINA U BIM MODEL. BIM MODEL JE TRODIMENZIONALAN (3D),
OBJEKTNO USMJEREN MODEL UNUTAR KOJEG SU INTEGRIRANE INFORMACIJE. TO JE
TRODIMENZIONALAN PRIKAZ GRAĐEVINE U KOJEM SE SVI DIJELOVI KOJI SAČINJAVAJU
GRAĐEVINU SMATRAJU BIM ELEMENTIMA TE SU MEĐUSOBNO POVEZANI. SVAKI OD TIH
ELEMENATA JEDINSTVEN JE I SADRŽI INFORMACIJE O SVOJOJ GEOMETRIJI I
SVOJSTVIMA. TAKAV PRISTUP OMOGUĆUJE ORGANIZACIJU VIRTUALNOG MODELA TE
POHRANU INFORMACIJA O ELEMENTIMA.
BIM – TEHNOLOGIJA STANDARD JE U VELIKOM BROJU ZEMALJA EU I SVIJETA –
U VELIKOJ JE EKSPANZIJI TE SU VLADE RAZVIJENIJIH DRŽAVA ZAKONSKI
REGULIRALE NJEGOVU IMPLEMENTACIJU; U VELIKOJ BRITANIJI OD 1.4.2016.
ZA SVE JAVNE INVESTICIJE OBAVEZNA JE PRIMJENA TZV. BIM LEVEL 2 NAČINA
RADA, A SLIČAN PRINCIP TAKOĐER UVODE FRANCUSKA I DANSKA.
U ŠVEDSKOJ I NORVEŠKOJ BIM TEHNOLOGIJU VEĆ GODINAMA KORISTE
JAVNOPRAVNA TIJELA I VELIKE GRAĐEVINSKE TVRTKE ZBOG OSTVARIVANJA
ZNATNIH UŠTEDA.
DIREKTIVOM 2014/24/EU EUROPSKOG PARLAMENTA I VIJEĆA, BIM JE
NAVEDEN KAO SMJER IZRADE PROJEKTNE DOKUMENTACIJE KOJEM TREBAJU
TEŽITI SVE ZEMLJE ČLANICE EU TE ĆE SVE ČLANICE EU-A S VREMENOM
REGULIRATI SVOJU ZAKONSKU OSNOVU I U TOM POGLEDU.
U HRVATSKOJ, ODAKLE DOLAZIM, TEK SE OČEKUJE ZAKONSKA
IMPLEMENTACIJA BIM TEHNOLOGIJE SUKLADNO DIREKTIVI 2014/24/EU
EUROPSKOG PARLAMENTA I VIJEĆA I TENDENCIJA JE ZAKONSKE REGULACIJE
KORIŠTENJA BIM-A KAO U RAZVIJENIJIM DRŽAVAMA EU, DOK ISTOVREMENO
NE POSTOJI HRVATSKI BIM STANDARD NI TRŽIŠNA KONKURENTNOST
LOKALNIH PROJEKTANTSKIH TVRTKI.
VAŽNO JE NAGLASITI DA BIM NIJE TERMIN KOJIM SE OZNAČAVA
TRODIMENZIONALNI MODEL GRAĐEVINE, VEĆ SE ON ODNOSI NA PROCES
IZRADE PROJEKATA I PROJEKTNE DOKUMENTACIJE. BIM PROCES, IZMEĐU
OSTALOG, PODRAZUMIJEVA IZRADU 3D INFORMACIJSKOG MODELA KOJI UZ
3D GEOMETRIJU SADRŽI I OSTALE PODATKE O GRAĐEVNIM ELEMENTIMA
(DEBLJINA, GUSTOĆA, FIZIKALNE KARAKTERISTIKE, POZICIJA ITD).
BIM OBUHVAĆA SVE SUDIONIKE U PROCESU GRAĐENJA: PROJEKTANTE,
INVESTITORE, UPRAVITELJE, IZVOĐAČE, PROIZVOĐAČE MATERIJALA ITD., A
KORIŠTENJEM BIM SUSTAVA KREIRANJE TEHNIČKE DOKUMENTACIJE JE
NEUSPOREDIVO BRŽE, TOČNIJE I AŽURNIJE OD KLASIČNOG 2D CRTANJA.
BIM JE PROCES KOJI POMIČE INDUSTRIJU U GRAĐEVINSKOM SEKTORU
PREMA POTPUNO SURADNIČKOM RADU S JASNIM I PREPOZNATLJIVIM
KLJUČNIM DOGAĐAJIMA, KOJI SE U OVOM PROCESU DEFINIRAJU U OBLIKU
BIM RAZVOJNIH RAZINA (ENG. LEVELS). TAJ RAZVOJNI PROCES ODREĐEN JE
MODELOM BIM ZRELOSTI TE OPISAN NA ČETIRI RAZVOJNE RAZINE (LEVELS 0,
1, 2, 3) S CILJEM DEFINIRANJA STANDARDA I PREPOZNAVANJA POTREBA ZA
OSTVARENJE POJEDINE RAZINE.
MODEL S ČETIRIMA RAZVOJNIM RAZINAMA PRIKAZAN JE NA SLJEDEĆOJ SLICI:
SLIKA : BEW-RICHARDS MODEL ZRELOSTI BIM-A
IZVOR: PREUZETO PAS 1192-3:2014
RAZINA 0 BIM: PREDSTAVLJA TRADICIONALAN NAČIN RADA UZ POMOĆ
KOJEG SU SE PROJEKTI I DRUGA TEHNIČKA DOKUMENTACIJA IZRAĐIVALI
U DVODIMENZIONALNOM OBLIKU, A KOMUNIKACIJA SE OSTVARIVALA
INFORMACIJAMA NA PAPIRU ILI ELEKTRONIČKIM PUTEM, ODNOSNO
KOMBINACIJOM OBAJU NAČINA.
RAZINA 1 BIM: PREDSTAVLJA RAZINU KOJA JE KOMBINACIJA 3D CAD-A ZA
KONCEPCIJU RADA I 2D ZA IZRADU PROJEKTA I TEHNIČKE DOKUMENTACIJE
TIJEKOM PROCESA IZDAVANJA DOZVOLA. KOMUNIKACIJA I DIJELJENJE
PODATAKA PROVODI SE ELEKTRONIČKIM PUTEM U OKOLINE ZA RAZMJENU
PODATAKA (COMMON DATA ENVIRONMENT, CDE). NA TOJ SE RAZINI
TRENUTAČNO NALAZI VEĆINA ORGANIZACIJA, IAKO JOŠ NIJE DOSEGNUTA
RAZINA SURADNJE IZMEĐU RAZLIČITIH PROJEKTNIH DISCIPLINA I FAZA.
RAZINA 2 BIM: RAZINA NA KOJOJ SE PROVODI BIM SURADNJA. SVE
PROJEKTNE STRANE KORISTE SE VLASTITIM 3D MODELIMA I NE RADE
NUŽNO NA ISTOM, ZAJEDNIČKOM MODELU. KOMUNIKACIJA I
KOLABORACIJA MEĐU DISCIPLINAMA OSTVARUJE SE PREKO ZAJEDNIČKOG
FORMATA DATOTEKE TE JE TAJ ASPEKT SURADNJE KLJUČAN ZA OVU RAZINU.
SVAKA ORGANIZACIJA KOJA PRIMJENJUJE TAKAV FORMAT I NAČIN
SURADNJE U MOGUĆNOSTI JE KOMBINIRATI TE PODATKE S VLASTITIMA U
CILJU OBJEDINJENJA BIM MODELA TE PROVEDBE POTREBNIH PROVJERA
MODELA. NAGLASAK JE NA MOGUĆNOSTI BILO KOJEG SOFTVERA DA IZVEZE
SVOJ PROIZVOD U NEKI FORMAT DATOTEKE KOJI JE ZAJEDNIČKI
SURADNICIMA NA PROJEKTU. KORISTE SE SLJEDEĆI FORMATI: IFC (INDUSTRY
FOUNDATION CLASS) FORMAT ILI COBIE (CONSTRUCTION OPERATIONS
BUILDING INFORMATION EXCHANGE) TE DRUGI.
RAZINA 3 BIM: RAZINA KOJA SE JOŠ UVIJEK NE PRIMJENJUJE U SVIJETU I
TRENUTAČNO SE SMATRA VIZIONARSKOM. IDEJA OVE RAZINE JEST DA
PREZENTIRA KOMPLETNU KOLABORACIJU SVIH STRUKA UZ POMOĆ
ZAJEDNIČKOG MODELA PROJEKTA KOJI SE NALAZI NA CENTRALNOM
REPOZITORIJU. SVRHA OVOG SUSTAVA JEST DA SVE STRANE MOGU
PRISTUPITI MODELU I UREĐIVATI GA, A KAO PREDNOST ISTIČE SE UKLANJANJE
ZAVRŠNOG SLOJA RIZIKA KONFLIKTA INFORMACIJA. TAKOĐER, OVA RAZINA
POZNATA JE POD NAZIVOM OPEN BIM.
U BIM PRISTUPU I BIM MODELIMA JOŠ NIJE ISTRAŽENO KAKO RIJEŠITI
AUTORSKA PRAVA I OBVEZE, NO TI PROBLEMI TRENUTAČNO SE RJEŠAVAJU
UGOVORNIM DOKUMENTIMA I BIM PLANOVIMA IZVRŠENJA TE SOFTVERSKIM
RJEŠENJIMA KOJA SADRŽAVAJU OGRANIČENJA U UREĐIVANJU, PISANJU,
ODNOSNO PRISTUPU PODACIMA.
1.2. 4D, 5D, 6D I 7D
DOSADAŠNJA PRAKSA UČVRSTILA JE SPOZNAJU I SISTEM RADA U 2D CAD
PROJEKTIRANJU. S TEHNOLOŠKIM RAZVOJEM, CAD SE RAZVIO I U NOVOJ
DIMENZIJI TE JE STVOREN 3D CAD. DALJNJI NAPREDAK TEHNOLOGIJE
ZAMIJENIO JE CAD TEHNOLOGIJU BIM TEHNOLOGIJOM, ČIJA JE BAZA 3D
MODEL NA KOJI SE VEŽU I RAZVIJAJU DODATNE DIMENZIJE, POPUT VREMENA
(4D), TROŠKOVA (5D), ODRŽIVOSTI I POTROŠNJE ENERGIJE (6D) TE
UPRAVLJANJA I ODRŽAVANJA OBJEKTA (7D).
1.3. Što je BIM projekt?
BIM PROJEKT JE STANDARDNI PROJEKT NA KOJEM JE PRIMIJENJEN BIM PRISTUP,
ODNOSNO KOJI POSEBNU VAŽNOST DAJE RAZMJENI I ISKORIŠTAVANJU
TOČNIH I PRAVODOBNIH INFORMACIJA U SVIM FAZAMA PROJEKTA I MEĐU
SVIM PROJEKTNIM SURADNICIMA. U BIM PROJEKTU PROŽIMAJU SE NOVE
PROJEKTNE ULOGE, KAO ŠTO SU BIM MENADŽERI, BIM KOORDINATORI, BIM
INŽENJERI ; NOVI ALATI - BIM SOFTVERI ; NOVI PROCESI - BIM PROCESI TE BIM
KORISTI , A SVE KAKO BI SE OSIGURAO TOČAN, KONTINUIRAN, JASAN I
ODRŽIV PROJEKT.
1.4. Što je BIM element?
BIM MODELI STVORENI SU OD SKUPINE BIM ELEMENATA. BIM ELEMENTI
SU 2D I 3D GEOMETRIJSKA PREZENTACIJA FIZIČKIH ELEMENATA IZGRAĐENA
OKOLIŠA, KAO ŠTO SU NPR. VRATA, PROZORI, OPREMA, SPUŠTENI STROPOVI,
ZIDOVI, KABELI, RAZDJELNICE, METALNE POLICE, ZAŠTITNE CIJEVI, PODNE KUTIJE,
VATRODOJAVNI ELEMENTI ITD. S RAZVOJEM PROJEKTA BIM ELEMENTI POSTAJU
SVE KONKRETNIJI - RAZRAĐENIJI U SKLADU S OČEKIVANIM I CILJANIM
PERFORMANSAMA. UZ 2D I 3D GEOMETRIJU, BIM ELEMENTI MOGU
SADRŽAVATI VIZUALNE KARAKTERISTIKE (KAO PODRŠKA PROCESU
RENDERIRANJA I IZRADI FOTOREALISTIČNIH VIZUALIZACIJA I ANIMACIJA),
TEHNIČKE ZAHTJEVE I ZAHTJEVE ZA IZVOĐENJE, INFORMACIJE O PROIZVODU
(ŠIFRA PROIZVODA, PROIZVOĐAČ, CIJENA ITD.) TE MNOGE DRUGE
INFORMACIJE.
OPIS BENEFITA UVOĐENJA BIM-a
Promjene u radnom procesu• Projektanti se susreću s novom metodologijom projektiranja koja obuhvaća direktan rad u 3D modelu s znatnim brojem informacija,
uz kontinuiranu suradnju svih sudionika gradnje.
• Brža i točnija dokumentacija uz više vremena utrošenog na dizajnerskim/projektantskima
Uštede• Korištenjem BIM tehnologija i procesa očekuje se ostvarivanje znatnih ušteda u procesu gradnje kroz jeftiniju gradnju, manje grešaka na
gradilištu, izbjegavanje kolizija i sl.
• BIM metodologija doprinosi i Održivim projektima i većina održivih projekata rađenje uz provođenje velikog broja analiza BIM alatima
Dokumentacija
• Jednostavnije praćenje promjena na projektima svih sudionika gradnje
• Manje grešaka, točna dokumentacija u svakom trenutku
• Jednostavnije ishođenje dozvola
• Jednostavnije provođenje financijskih analiza
• Bolji FM, manji troškovi cjelokupnog životnog vijeka građevine
Ulaganja• Očekuju se znatna ulaganja u javne projekte kroz BIM
• Države i vlade svih članica EU potiču se da u prijelaznom periodu odrade što više projekata kroz BIM
• Veća konkurentnost na tržištu
2. INFORMACIJSKI MODEL
OSNOVNA IDEJA BIM-A JE BIM 3D MODEL GRAĐEVINE KOJI SADRŽI I SVE INFORMACIJE
O TOJ GRAĐEVINI.
PRVI PROJEKTI PONEKADA IZGLEDAJU TAKO DA MODEL POSLUŽI SAMO KAO OSNOVA
ZA PROJEKTNU DOKUMENTACIJU, ŠTO JE KORISNO ALI TO JOŠ UVIJEK NIJE BIM. BIM
POČINJE KADA UZ GEOMETRIJU MODEL SADRŽI I SVE INFORMACIJE KOJE SU
DOGOVORENE DA ĆE SE RAZMJENJIVATI NA PROJEKTU.
POSTAVLJA SE PITANJE DALI SVE INFORMACIJE NA PROJEKTU MOGU STATI U JEDAN
MODEL?
NA BIM PROJEKTIMA POSTOJI VIŠE MODELA. NO VAŽNO JE DA POSTOJI JEDAN -
ZAJEDNIČKI MODEL - GDJE SE SPAJAJU SVE POTREBNE INFORMACIJE VAŽNE ZA
DONOŠENJE ODLUKA I ORGANIZACIJU GRADNJE.
2.1. Potrebe za BEP
BIM JE PROCES ZAJEDNIČKOG KREIRANJA ZGRADE U DIGITALNOM OKRUŽENJU.
BIM PLAN IZVRŠENJA PROJEKTA – BEP (BUILDING EXECUTION PLAN), JE OSNOVNI
DOKUMENT KOJI DEFINIRA BIM STRATEGIJU I PROCESE KOJI SU POTREBNI ZA
USPJEŠNO ODVIJANJE I ZAVRŠETAK BIM PROJEKTA.
OVAJ DOKUMENT SADRŽI SLIJEDEĆE ELEMENTE:
· ZADUŽENJA
· ODGOVORNOSTI
· ZAHTJEVE I PROCESE
· DOBRU PRAKSU
· RELEVANTNE POSLOVNE PROCESE
· ZAHTJEVE ZA SOFTVER
BEP (BUILDING EXECUTION PLAN), ILI PLAN IZVRŠENJA SE KORISTI KAKO BI POJASNIO
I DEFINIRAO POJEDINE ZADATKE UNUTAR CJELOKUPNOG BIM PROCESA.
TO OMOGUĆAVA SUDIONICIMA DA SHVATE SVOJA ZADUŽENJA I ROKOVE, DA
SHVATE ZBOG ČEGA SU TI ZADACI NUŽNI ZA CJELOKUPNI USPJEH PROJEKTANTSKO
/ GRADITELJSKOG TIMA.
BEP KOORDINIRA SUDIONIKE U PROJEKTU U OSTVARIVANJU CILJEVA ZA USPJEH
PROJEKTA.
JEDNA OD PRVIH DEFINICIJA BEP DOKUMENTA SU NJEGOVI CILJEVI. NE TREBA SVAKI
PROJEKT TEŽITI BIM SAVRŠENSTVU, NAPROTIV NA POČETKU TREBA DEFINIRATI CILJEVE
I STVARNE ZAHTJEVE KOJE BIM NA POJEDINOM PROJEKTU TREBA ZADOVOLJITI.
UVOĐENJE PREVIŠE (NEPOTREBNIH) DETALJA MOŽE ZAKOMPLICIRATI PROJEKTIRANJE
I SNALAŽENJE U GOMILI INFORMACIJA ODUZIMAJUĆI NAM VRIJEME ZA BITNE
STVARI. CILJEVI MOGU PRIMJERICE BITI: KONTROLA KOLIZIJE IZMEĐU 3D ELEMENATA,
SURADNJA PROJEKTANATA U 3D SVIJETU, MODELIRANJE POSTOJEĆEG STANJA ZA
REKONSTRUKCIJE…
2.2. Svrha BEP dokumenta
OVAJ DOKUMENT KORISTITI SE KAO DODATAK OSTALIM STANDARDNIM
DOKUMENTIMA POTREBNIM ZA DEFINIRANJE I UGOVARANJE PROJEKTA, A NE
KAO NJIHOVA ZAMJENA. OVAJ DOKUMENT NE MOŽE BITI RAZLOG ZA BILO
KOJEG SUDIONIKA U PROJEKTU DA NE IZVRŠI OBAVEZE IZ UGOVORA.
BEP TREBAJU DOGOVORITI I PRIHVATITI SVI SUDIONICI NA BIM PROJEKTU KAKO
BI SE OSIGURALO EFIKASNO ODVIJANJE BIM PROJEKTA.
2.3. Kolaboracija
JEDNA OD GLAVNIH TEMA JE NAČIN SURADNJE RAZLIČITIH KORISNIKA BIM MODELA.KAKO ĆE
SE BIM MODEL DIJELITI IZMEĐU SUDIONIKA, DA LI ĆE TO BITI PUTEM DATOTEKA ILI PREKO NEKE
OD CLOUD PLATFORMI. KOLIKO ČESTO ĆE SE MODEL OSVJEŽAVATI I NADOPUNJAVATI NOVIM
PODACIMA? VRLO JE VAŽNO DA SVI SUDIONICI ZNAJU KADA ĆE DOBITI BIM MODEL
POJEDINOG SURADNIKA KAKO BI MOGAO PLANIRATI I ODRADITI SVOJE AKTIVNOSTI NA
VRIJEME.
DATOTEKE KOJE ĆE BITI KORIŠTENE ZA KOLABORACIJU I RAZMJENU INFORMACIJA TAKOĐER
TREBAJU BITI SPECIFICIRANE. TEŠKO ĆE SE NA NEKOM PROJEKTU PRONAĆI SAMO JEDNA
PLATFORMA, A POGOTOVO ĆE BITI RAZLIKA U VERZIJAMA SOFTVERA KOJEG KORISTE
POJEDINI PROJEKTANTI. SVE TO TREBA USUGLASITI I UNAPRIJED ISPROBATI KAKO BI SE
DONIJELA ISPRAVNA ODLUKA NA SAMOM POČETKU PROJEKTIRANJA.
MJESTO IZVRŠENJA POSLA POJEDINOG PROJEKTANTSKOG TIMA TAKOĐER MOŽE IMATI
ZNAČAJNU ULOGU. IDEALNO JE DA SE SVI NALAZE NA JEDNOM MJESTU, ALI VRLO MALO
VJEROJATNO.
TKO KONTROLIRA MODEL? NE ŽELIMO DA SE ZADACI PREKLAPAJU I DA SE ISTI ELEMENT
CRTA / MODELIRA OD STRANE VIŠE KORISNIKA JER SE TAKO GUBI VRIJEME I
KONZISTENTNOST SAMOG MODELA. TKO OD INVOLVIRANIH PROJEKTANATA SMIJE
VRŠITI PROMJENE NA ELEMENTIMA KOJI SU ZAJEDNIČKI? NA PRIMJER, PROMJENA
SNAGE KLIMA JEDINICE – INFORMACIJA TREBA BITI IDENTIČNA I U STROJARSKIM
PROJEKTIMA I U ELEKTROTEHNIČKIM PROJEKTIMA. STOGA TREBA JASNO DEFINIRATI
TKO JE DOGOVORAN I KAKO SE PROMJENE UNOSE U BIM MODEL.
DODATNU PAŽNJU TREBA POSVETITI PROVJERI MODELA I DOKUMENTACIJE I
OVJERAVANJU MODELA I DOKUMENTACIJE. TREBA DEFINIRATI JEDNU ILI VIŠE OSOBA
KOJE ĆE KOORDINIRATI I UPRAVLJATI INFORMACIJAMA.
DETALJNOST INFORMACIJA KOJA ĆE SE PROIZVODITI I DIJELITI JE BITNA, POGOTOVO
PLANIRA LI SE MODEL KORISTITI I ZA KREIRANJE PREFABRICIRANIH ELEMENATA, ILI ZA
KREIRANJE RADIONIČKE DOKUMENTACIJE. DETALJNOST SVAKOG POJEDINOG
NACRTA, ILI ELEMENTA SPECIFICIRANA JE U POSEBNOM LOD ”LEVEL OF
DEVELOPMENT” DOKUMENTU KOJI GOVORI O STUPNJU RAZRAĐENOSTI PROJEKTA ILI
POJEDINIH DIJELOVA.
2.4. Detekcija kolizije
SVAKA STRUKA ĆE ZA SEBE U SVOJOJ 3D BIM APLIKACIJI PROIZVODITI SVOJ
DIO PROJEKTA. U ODREĐENIM VREMENSKIM INTERVALIMA TI ĆE SE 3D BIM
MODELI OBJEDINITI KAKO BI SE SIMULIRAO NJIHOV STVARNI POLOŽAJ U
BUDUĆOJ ZGRADI. ŽELJA NAM JE SPRIJEČITI SUDARE TIH OBJEKATA U
VIRTUALNOM SVIJETU PRIJE NEGO LI TO SHVATIMO NA GRADILIŠTU. KOLIKO
ČESTO JE POTREBNO VRŠITI PROVJERU?
KOLIZIJE JE POTREBNO SPRIJEČITI, ALI KAKO DONIJETI ODLUKU KAKO ĆE
PONEKA KOLIZIJA BITI RIJEŠENA? TO JE ZADATAK ZA KOORDINACIJSKE
SASTANKE.
NARAVNO, NE TREBA SVAKU KOLIZIJU RJEŠAVATI, NEŠTO SE MOŽE I NA GRADILIŠTU
RIJEŠITI, NA PRIMJER BUŠENJE MANJIH OTVORA ZA ZAŠTITNE CIJEVI UMJESTO
IZVOĐENJA OTVORA PRILIKOM GRAĐENJA ODREĐENOG ELEMENTA.
I OVDJE SE POSTAVLJA PITANJE DETALJNOSTI MODELIRANJA, TREBA BITI MUDAR I
RAZBORIT DA SE PROJEKTANTI NE ZATRPAJU PRETJERANOM KOLIČINOM
INFORMACIJA, KOJE MOŽDA NISU POTREBNE BITI U 3D MODELU, A POGOTOVO IH
SE (MOŽDA) NE TREBA GLEDATI U SVJETLU PROVJERE KOLIZIJA. NA PRIMJER:
TREBAJU LI SE MODELIRATI NOSAČI METALNIH POLICA, ILI VISILICE ZA SPUŠTENE
SVJETILJKE?
2.5. Postojeće stanje
UKOLIKO SE RADI O INTERVENCIJI I REKONSTRUKCIJI POSTOJEĆE ZGRADE, ILI SE
MOŽDA NAŠ NOVI OBJEKT NASLANJA NA POSTOJEĆU SUSJEDNU ZGRADU TREBA
ODREDITI ODGOVARAJUĆI PRISTUP.
TREBA LI MODELIRATI I SPECIFICIRATI POSTOJEĆE INSTALACIJE U GRAĐEVINI? DO
KOJEG DETALJA?
PONOVO SE POSTAVLJA PITANJE O DETALJNOSTI TIH INFORMACIJA. SVAKAKO
ŽELIMO IMATI DOVOLJNO INFORMACIJA O POSTOJEĆEM OBJEKTU KAKO BISMO
NAŠ NOVI PROJEKT MOGLI ISPRAVNO PROJEKTIRATI.
ŽELIMO LI KORISTITI PODATKE O POSTOJEĆIM INSTALACIJAMA (DIJELA) OBJEKTA I
OSLONITI SE NA NJIHOVU TOČNOST KADA PROJEKTIRAMO SVOJ DIO? MOŽEMO LI
SE U NJIH POUZDATI? JESU LI DOVOLJNO TOČNE?
2.6. Faza koncepta i Idejni projekt
NEKI PROJEKTANTI TVRDE DA BIM NIJE POTREBAN U IDEJNOJ FAZI PROJEKTIRANJA,
DRUGI PAK INZISTIRAJU NA TOME DA JE BIM NUŽAN I U TOJ FAZI.
ŠTO SE BEP DOKUMENTA TIČE KRIVOG ODGOVORA NEMA, ALI JE POTREBNO DATI
ODGOVOR NA TO POSTAVLJENO PITANJE. MOŽDA SE MOŽE ZAPOČETI S
RASPOREDOM I PRIBLIŽNIM NAČINOM NAPAJANJA. TI SE PODACI MOGU IZVESTI U
NEKI DRUGI OBLIK, PRIMJERICE U EXCEL TABLICU TE SE MOGU KORISTITI PRILIKOM
DEFINIRANJA PROJEKTNOG ZADATKA PRIJE PRELASKA U SLJEDEĆU FAZU. KAO I U
OSTALIM PRIMJERIMA POTREBNO JE SPECIFICIRATI ŽELJENU DETALJNOST U KOJOJ
SE MODELIRAJU ELEMENTI ZA OVU RAZINU PROJEKTIRANJA. ŠTO ĆE SE OD TIH
INFORMACIJA PRENOSITI U SLJEDEĆU FAZU I NA KOJI NAČIN.
2.7. Glavni projekt
MOGU LI SE KORISTITI PODACI IZ RANIJE FAZE U KOJOJ SE RAZRAĐIVAO KONCEPT?
ŠTO SE OD POSTOJEĆIH INFORMACIJA MOŽE KORISTITI I NA KOJI NAČIN?
MOGU LI SE IDEJNE SKICE SKENIRATI, DIGITALIZIRATI I KORISTITI? DA LI ĆE TO
POBOLJŠATI KVALITETU NAŠEG PROJEKTIRANJA, ILI ĆEMO SAMO BESKORISNO
IZGUBITI VRIJEME PA JE PAMETNIJE KRENUTI OD POČETKA.
ZA NEKE STRUKE ĆE ODGOVOR MOŽDA BITI POTVRDAN, DOK ĆE ZA DRUGE
PROJEKTANTE BITI NEGATIVAN.
ODGOVOR JE SPECIFICIRAN U LOD DOKUMENTU.
2.8. Izvedbeni projekt
PRVO PITANJE KAO I KOD GLAVNOG PROJEKTA JE: KOLIKO OD PODATAKA
KREIRANIH U RANIJOJ FAZI MOŽEMO I TREBAMO KORISTITI ZA RAZRADU TRENUTNE
FAZE, TJ. U IZVEDBENOM PROJEKTU.
KOLIČINA INFORMACIJA U IZVEDBENOM PROJEKTU DRAMATIČNO SE POVEĆAVA PA
TREBAMO OBRATITI PAŽNJU I NA VELIČINU SAMOG BIM MODELA I NA NJEGOVU
UPRAVLJIVOST.
VELIKA KOLIČINA DETALJA NUŽNO ĆE USPORITI PROCES PROJEKTIRANJA I
ZAHTJEVI ZA RAČUNALA POSTAJU VEĆI. RAZBORITO TREBA ODLUČITI O KOLIČINI
DETALJA U POJEDINOJ FAZI PROJEKTIRANJA.
LOD JE I OVDJE KLJUČAN. DIO DOKUMENTACIJE MOŽE BITI PREPUŠTEN I
IZVOĐAČIMA.
2.9. Revizije projekta
VRLO VAŽNO JE DEFINIRATI KAKO ĆE SE UNOSITI PROMJENE TIJEKOM
PROJEKTIRANJA I GRAĐENJA OBJEKTA.
TREBA LI I U KOJOJ MJERI TREBA OSVJEŽAVATI POSTOJEĆI BIM MODEL? AKO TREBA
OSVJEŽITI MODEL – TKO JE OSOBA KOJA IMA TO ZADUŽENJE? RADI LI TO
PROJEKTANT IZVORNOG RJEŠENJA, JE LI DOŠLO DO PROMJENE USLIJED
SPECIFIČNE TEHNOLOGIJE IZVOĐAČA?
TKO SNOSI TROŠKOVE IMPLEMENTACIJE PROMJENA U BIM MODEL? DA LI ĆE BITI
DOVOLJNO POPRATITI IZMJENU SAMO U 2D DOKUMENTACIJI NA GRADILIŠTU?
2.10. Troškovnici i količine
BEP NARAVNO DEFINIRA I MOGUĆNOST KORIŠTENJA ČITANJA PODATAKA O
KOLIČINAMA IZ BIM MODELA.
POSTOJE SOFTVERI KOJI OMOGUĆUJU SPAJANJE TROŠKOVNIČKIH STAVAKA SA
ELEMENTIMA U BIM MODELU PA SE POSTAVLJA PITANJE IMAMO LI DOVOLJNO
DETALJAN BIM MODEL I ZA OVU SVRHU. U NEKIM SEGMENTIMA VJEROJATNO
IMAMO.
S DRUGE STRANE MNOGI DETALJI PREVIŠE SU SPECIFIČNI DA BI IH BILO SMISLENO
MODELIRATI I PRIKAZIVATI U BIM MODELU, PA TAKO I OVDJE VRIJEDI PRAVILO DA
SAGLEDATE VLASTITE MOGUĆNOSTI, MOGUĆNOSTI CIJELOG TIMA I DA DONESETE
ODLUKU O TOME KOJI ELEMENTI BIM PROJEKTA SE SMIJU KORISTITI ZA
AUTOMATSKO IZVLAČENJE KOLIČINA U SVRHU KREIRANJA TROŠKOVNIKA.
2.11. Koordinacijski sastanci
TKO JE ZADUŽEN ZA SAZIVANJE I PROVEDBU KOORDINACIJSKIH SASTANAKA?
JE LI TO JEDNA OSOBA, RADI LI SE JEDAN ZAJEDNIČKI KOORDINACIJSKI SASTANAK,
ILI SVAKA STRUKA ZA SEBE VODI SVOJE KOORDINACIJSKE SASTANKE?
JESU LI KOORDINACIJSKI SASTANCI PROJEKTANATA ODVOJENI OD
KOORDINACIJSKIH SASTANAKA IZVOĐAČA?
2.12. Tko piše BEP
NAJVJEROJATNIJE GLAVNI PROJEKTANT, NARAVNO UZ POMOĆ SURADNIKA I
PROJEKTANATA DRUGIH STRUKA.
IZVOĐAČ ĆE VJEROJATNO NAPRAVITI SVOJ BEP ZA SEBE I ZA SVOJE
PODIZVOĐAČE.
DAKLE, MOŽE BITI VIŠE BEP PLANOVA ZA ISTI OBJEKT, SVAKI SA SVOJIM
SPECIFIČNOSTIMA.
VAŽNO JE NAPRAVITI SUMARNI MASTER PLAN KOJI ĆE OBJEDINJAVATI SVE U ISTU
CJELINU.
2.13. Upravljanje i održavanje građevine
U KOM OBIMU SE PLANIRA UPOTREBA BIM MODELA I INFORMACIJA U SUSTAVU
ODRŽAVANJA ZGRADE ?
KADA ĆE MENADŽER ZA UPRAVLJANJE ZGRADOM DOBITI BIM MODEL NA
KORIŠTENJE? JE LI UKLJUČEN U RANIJOJ FAZI PROJEKTIRANJA?
SA STAJALIŠTA ODRŽAVANJA ČIM PRIJE SE OSOBE ZA ODRŽAVANJE UKLJUČE U
PROJEKTIRANJE TIM ĆE VIŠE UTJECAJA IMATI NA INFORMACIJE SADRŽANE U BIM
MODELU I NA ODLUKE KOJE VALJA DONIJETI ZA EFIKASNO UPRAVLJANJE
OBJEKTOM I OPTIMALIZACIJU TROŠKOVA KORIŠTENJA. SLUŽBE ODRŽAVANJA
MOGU SAGLEDATI BIM MODEL IZ SVOG ASPEKTA I PREDLOŽITI PROMJENE VEĆ U
FAZI PROJEKTIRANJA KAKO BI OLAKŠALE I POJEDNOSTAVILE PROCES
ODRŽAVANJA. TREBA IMATI NA UMU DA SE ZGRADA PUNO DULJE KORISTI NEGO
ŠTO SE GRADI I DA SKRIVENIH TROŠKOVA U ODRŽAVANJU MOŽE BITI JAKO PUNO.
PRIMJER BEP DOKUMENTA:
BIM Plan izvrsenja v_1.0.docx
3. LOD (LEVEL OF DEVELOPMENT) – STUPANJ RAZRAĐENOSTI PROJEKTA I STUPANJ DETALJNOSTI
3.1. Općenito o LOD
ŠTO JE ZAPRAVO LOD ILI STUPANJ RAZRAĐENOSTI PROJEKTA?
BIM PODRAZUMIJEVA UPRAVLJANJE S VRLO MNOGO PODATAKA
(OBJEKATA, MODELA, INFORMACIJA).
IZ TOG RAZLOGA POJAVIO SE LOD ILI STUPANJ RAZRAĐENOSTI PROJEKTA.
STOGA BISMO POJEDNOSTAVLJENO MOGLI REĆI DA JE LOD ILI STUPANJ
RAZRAĐENOSTI PROJEKTA MJERILO KOJU KOLIČINU PODATAKA
UGRAĐUJEMO U MODEL, NARAVNO, OVISNO O FAZI PROJEKTA.
LOD DAJE TOČNU RAZINU PODATAKA, PRETHODNO DOGOVORENU, OVISNO O
FAZI PROJEKTA. PRI TOME TREBA UZETI U OBZIR DA LOD NE PODRAZUMIJEVA
ISKLJUČIVO RAZINU TOČNOSTI GRAFIČKOG PRIKAZA, NITI MJERILO KOLIČINE, NITI
NUŽNO DRUGE INFORMACIJE POPUT MATERIJALA ILI PROIZVOĐAČA. SUDIONICI
GRADNJE NE MORAJU NUŽNO ZNATI SVE PODATKE O BIM ELEMENTU KOJI JE
UGRAĐEN U BIM PROJEKT.
PRIMJERICE, IZVOĐAČA NE ZANIMA KAKO IZGLEDA OPREMA KOJU MORA DOBAVITI,
ALI TREBA PODATKE O MODELU, PROIZVOĐAČU I KOLIČINU. PROJEKTANTI
INSTALACIJA NE TREBAJU NITI TE PODATKE, ALI TREBAJU ZNATI DIMENZIJE ISTOG I
EVENTUALNO POZICIJE PRIKLJUČAKA. INVESTITORA VJEROJATNO ZANIMA KAKO
IZGLEDA I KOJA JE CIJENA…
S OBZIROM NA NAVEDENO, PROJEKTANTI, SUDIONICI PROJEKTA, MORAJU ZNATI
KOLIKO ZAPRAVO INFORMACIJA MORAJU U ODREĐENOJ FAZI PROJEKTA
ISPORUČITI I NA KOJI NAČIN. UPRAVO TO DEFINIRA LOD ILI STUPANJ
RAZRAĐENOSTI PROJEKTA.
STUPANJ RAZRAĐENOSTI BIM MODELA POVEĆAVA SE KAKO SE PROJEKT RAZVIJA
PO SVOJIM FAZAMA, I ČESTO SE ZASNIVA NA POSTOJEĆIM INFORMACIJAMA KOJE
SE RAZVIJAJU IZ JEDNOSTAVNOG KONCEPTUALNOG MODELA DO DETALJNOG
IZVEDBENOG MODELA. U KONCEPTUALNOJ FAZI STUP ĆE BITI PRIKAZAN VRLO
SHEMATSKI S OSNOVNOM INFORMACIJOM („…OVDJE SE NALAZI STUP…“), STOL
VJEROJATNO NEĆE BITI PRIKAZAN, ILI ĆE BITI PRIKAZAN SHEMATSKI KAO I STUP BEZ
DALJNJIH INFORMACIJA.
U DALJNJIM FAZAMA ISTI ĆE BIM ELEMENT DOBITI SVE VIŠE INFORMACIJA (NPR.
TOČNE DIMENZIJE, MATERIJAL, ZA KABEL ĆE BITI DEFINIRANI TIP, ZA PODNU KUTIJU
PROIZVOĐAČ I SL.). NARAVNO, RAZLIČITI BIM ELEMENTI U PROJEKTIMA ĆE SE
RAZRAĐIVATI RAZLIČITIM BRZINAMA, A PODACI MOGU DOĆI OD RAZLIČITIH
SUDIONIKA PROJEKTA.
PRIMJER, NA TEMELJU RAZDJELNICE:
LOD 100 = OVDJE SE NALAZI RAZDJELNICA
LOD 200 = OVDJE SE NALAZI RAZDJELNICA MINIMALNIH DIMENZIJA
800X1000X250
LOD 300 = OVDJE SE NALAZI RAZDJELNICA MINIMALNIH DIMENZIJA
800X1000X250,METALNA,PUNA VRATA,IP44
LOD 400 = OVDJE SE NALAZI RAZDJELNICA MINIMALNIH DIMENZIJA
800X1000X250,METALNA,PUNA VRATA,IP44 , PROIZVOĐAČ, TIP
LOD 500 = OVDJE SE NALAZI RAZDJELNICA MINIMALNIH DIMENZIJA
800X1000X250,METALNA,PUNA VRATA,IP44 , PROIZVOĐAČ, TIP, DATUM NABAVE
BIM MODELI MOGU BITI VRLO KOMPLEKSNI I SADRŽAVATI VRLO MNOGO
PODATAKA. NEKI OD NJIH NISU NAM POTREBNI U ODREĐENIM FAZAMA PROJEKTA.
STOGA JE VRLO VAŽNO DA SE DEFINIRA LOD ILI STUPANJ RAZRAĐENOSTI
PROJEKTA.
STUPANJ RAZRAĐENOSTI NAM TAKOĐER DAJE PODATAK I KOLIKO SU INFORMACIJE
SADRŽANE U PROJEKTU POUZDANE. NARUČITELJ / INVESTITOR DEFINIRA STUPANJ
RAZRAĐENOSTI KOJI JE POTREBAN U INFORMACIJSKOM ZAHTJEVU INVESTITORA
(ENG. EMPLOYER’S INFORMATION REQUIREMENTS - EIR). INFORMACIJSKI ZAHTJEV
INVESTITORA, EIR, MOŽE SE DODATI BIM PROTOKOLU, ILI BITI DIO UGOVORA, ŠTO
DOSTAVU OBAVEZNIH INFORMACIJA ČINI UGOVORNOM OBVEZOM. SVAKAKO JE
POTREBNO DA SE LOD DEFINIRA PRILIKOM IZRADE BEP-A.
3.2. Kako se definira LOD
LOD SE OBIČNO DEFINIRA KROZ TABLIČNI PRIKAZ.
LOD JE NUŽNO DEFINIRATI PRILIKOM IZRADE BEP-A (BIM EXECUTION PLAN / BIM
PLAN IZVRŠENJA). TABLIČNI PRIKAZ LOD OBIČNO JE SASTAVNI DIO BEP-A.
S OBZIROM NA RAZLIČITE STUPNJEVE IMPLEMENTACIJE BIM-A U STRUCI,
PRIPREMLJENI SU OSNOVNI TABLIČNI LOD PRIKAZI KOJE JE POTREBNO ISPUNITI
PRILIKOM IZRADE BEP-A. ZA POČETAK IMPLEMENTACIJE ZBOG JEDNOSTAVNOSTI I
ZA PROJEKTE MANJEG OBIMA, PREPORUČA SE JEDNOSTAVNI TABLIČNI PRIKAZ. S
RAZVOJEM IMPLEMENTACIJE U UREDIMA, PREPORUČA SE DETALJNIJE RAZRADA I
ŠIRE SHVAĆANJE. SVAKAKO, KOD KOMPLEKSNIJIH PROJEKATA, BITI ĆE NUŽNO
JASNO DEFINIRATI ISPORUKE, I SVAKAKO JE NUŽNO DA SVI SUDIONICI SHVAĆAJU
OBAVEZE KOJE PROIZLAZE IZ ISTOG.
JEDNA OD OSNOVNIH SVRHA LOD TABLICA JE I DA NAM GOVORI KOJE SE
INFORMACIJE SA SIGURNOŠĆU U KOJOJ FAZI PROJEKTA MOGU KORISTITI.
MOŽEMO TO OPISATI I KAO MJEROM SIGURNOSTI INFORMACIJA.
PRIMJERICE, IAKO U FAZI PROJEKTA GDJE JE DEFINIRAN LOD 200, RAZDJELNICA
IMA UNESENE INFORMACIJE DO RAZINE LOD 500, SA SIGURNOŠĆU MOŽEMO
KORISTITI SAMO PODATKE DEFINIRANE LOD 200 RAZINOM.
I
LOD ILI STUPANJ RAZRAĐENOSTI PROJEKTA NARAVNO GOVORI I U KOJOJ JE
PROJEKT ZAPRAVO FAZI ŠTO SE DOVRŠENOSTI TIČE. JASNO JE DA JE ZA LOD 300
POTREBNO ZNATNO VIŠE VREMENA NEGO ZA LOD 100, ŠTO PRENESENO U NEKO
MJERILO ZNAČI DA BI LOD 100=20% , A LOD 500 = 100%. LOD 300 = 60%, ALI
PRI TOME TREBA SHVATITI DA NISU SVI ELEMENTI PROJEKTA PRI TOME ZAVRŠENI
60% VEĆ DA JE CJELOKUPAN PROJEKT ZAVRŠEN DO RAZINE 60% (PRIMJERICE,
STROJARSKE INSTALACIJE U TOM TRENU MOŽDA ĆE KROZ LOD TABLICU BITI
DEFINIRANE DO RAZINE 40%).
IZ SVEGA NAVEDENOG MOŽEMO LOD ILI STUPNJEVE RAZRAĐENOSTI PROJEKTA
POVEZATI SA TRADICIONALNIM FAZAMA PROJEKTA, DEFINIRANIM I ZAKONOM O
GRADNJI.
LOD 100 = KONCEPT, IDEJNO RJEŠENJE
LOD 200 = IDEJNI PROJEKT
LOD 300 = GLAVNI PROJEKT
LOD 400 = IZVEDBENI PROJEKT
LOD 500 = SNIMAK IZVEDENOG STANJA
LOD JE POVEZAN S FAZOM PROJEKTA, NO NARUČITELJ PROJEKTA MOŽE DEFINIRATI
RAZLIČITE STUPNJEVE RAZRAĐENOSTI RAZLIČITIH GRAĐEVINSKIH ELEMENATA ZA
POJEDINU FAZU PROJEKTA.
OSIM NAVEDENIH LOD-OVA, MOGU SE DEFINIRATI I MEĐUSTUPNJEVI NPR.:
LOD 290 = PRELIMINARNA POZICIJA REGALA NA STROPU
LOD 292 = PROVJERA FUNKCIONALNIH CJELINA NAPAJANJA
LOD 294 = PROVJERA PROTUPOŽARNE ZAŠTITE
LOD 300 = GLAVNI PROJEKT
U SVRHU DEFINIRANJA PROJEKTNOG ZADATKA I DINAMIKE RAZRADE PROJEKTA
IZRAĐUJE SE LOD TABLICA. LOD TABLICA JE DVODIMENZIONALNA MATRICA. U
LIJEVOM STUPCU NAVODIMO ELEKTROTEHNIČKE ELEMENTE, DOK U PRVOM REDU
FAZE ILI CILJEVE PROJEKTA. U DRUGOM REDU NAVODIMO STUPANJ
RAZRAĐENOSTI, PROJEKTANTA (MODEL, ELEMENT, AUTOR) I STUPANJ DETALJNOSTI.
3.4. Implementacija LOD na projektima - preporuke
KLJUČNA PREPORUKA JEST UPORABA POSTOJEĆIH STANDARDA ZA LOD.
RAZVOJ SPECIFIČNOG LOD STANDARDA OD NULE ZA SVAKI NOVI PROJEKT
TREBAO BI SE IZBJEGAVATI.
DALJNJE PREPORUKE:
1.DEFINIRAJTE GEOMETRIJU SVAKOG ELEMENTA MODELA ZA SVAKI IMENOVANI
LOD PREMA STANDARDU. BIMFORUM LOD SPECIFIKACIJA,
3.DEFINIRAJTE SADRŽAJ PODATAKA SVAKOG ELEMENTA MODELA ZA SVAKI
IMENOVANI LOD U ODNOSU NA STANDARD.
4.KORISTITE STANDARDNE LOD TABLICE
5.KORISTITE STANDARD ZA PROTOKOLE KOJE TREBA PROMATRATI TIM ČLANOVA
KADA SE ZAJEDNIČKI UPRAVLJA MODELOM NA PROJEKTU
6.DOKUMENTIRATI DOGOVORENE STANDARDE
4. KLASIFIKACIJESUSTAVI KLASIFIKACIJE SU HIJERARHIJSKI BROJČANI (UGLAVNOM, JER NEKI SADRŽE I
SLOVA) SUSTAVI KOJIMA SE POKUŠAVA S JEDINSTVENIM BROJEVIMA OPISATI SVE ŠTO
JE SADRŽANO I SVE ŠTO TREBA BITI OPISANO U BIM PROJEKTU I CIJELOM PROCESU
PROJEKTIRANJA I GRADNJE. KLASIFIKACIJA JE VEZANA UZ KATEGORIZACIJU,
ODNOSNO, KLASIFIKACIJA JE PROCES KATEGORIZACIJE KOJIM SU SVI OBJEKTI
PREPOZNATLJIVI, DIFERENCIRANI I RAZUMLJIVI.
MODEL IMA VRLO MNOGO PODATAKA, ALI SU ISTI KATEGORIZIRANI NA RAZLIČITE
NAČINE I TEŠKO IH JE TUMAČITI I KORISTITI.
BUDUĆI DA SE PODACI KORISTE UPRAVO ZA IZRADU TROŠKOVNIKA, PROCJENA
TROŠKOVA I SPECIFIKACIJE ELEMENTA UGRAĐENIH U PROJEKT, RAZLIČITO
KATEGORIZIRANI PROJEKTI I ELEMENTI MOGU IZAZVATI VRLO VELIKE GREŠKE,
ODNOSNO PODACI SU NEISKORISTIVI.
KAKO JE JEDNA OD OSNOVNIH IDEJA KLASIFIKACIJE UPRAVO UNIFORMNOST
PODATAKA PROIZLAZI DA JE POTREBNO KOD IZRADE BIM PROJEKTA ZAJEDNIČKI
DEFINIRATI KOJI ĆE SE SUSTAV KLASIFIKACIJE KORISTITI TE BI SVI SUDIONICI PROJEKTA
TREBALI KORISTITI ISTI SISTEM.
ZA GRAĐEVINSKOJ INDUSTRIJI I UPRAVLJANJU GRAĐEVINAMA, SUSTAVI KLASIFIKACIJA
OSIGURAVAJU RAZLIČITIM SUDIONICIMA RAZUMIJEVANJE ŠTO „NEŠTO“ U BIM
PROJEKTU JEST. TO „NEŠTO“ ŠTO JE KATEGORIZIRANO SISTEMIMA KLASIFIKACIJE MOŽE
BITI BILO ŠTO OD KOMPLEKSA I INFRASTRUKTURE (TURISTIČKA NASELJA, SVEUČILIŠNI
BOLNIČKI CENTRI, AUTOCESTE I TUNELI) SVE DO VRLO MALIH ELEMENATA (NAMJEŠTAJ,
RASVJETA, UTIČNICE I SL.) SUSTAVI KLASA ČESTO SU HIJERARHIJSKI GDJE SU GLAVNE
KLASE PODIJELJENE U PODRAZREDE DUBOKE RAZINE. TO NAM OMOGUĆAVA DA
BUDEMO VRLO SPECIFIČNI U KATEGORIZACIJI I ISTODOBNO BOLJE RAZUMIJEVANJE NA
VIŠIM RAZINAMA.
AKO SE KLASIFIKACIJA KORISTI DOSLJEDNO, LJUDI / SUDIONICI PROJEKTA ĆE
LAKŠE PRONAĆI INFORMACIJE. STROJEVI ĆE MOĆI RAZUMJETI ZNAČENJE
STRUKTURIRANIH PODATAKA.
KLASIFIKACIJA JE TAKOĐER VAŽNA ZA STANDARDIZACIJU. POMOĆI ĆE
VLASNICIMA PRIKUPITI PODATKE O TROŠKOVIMA.
TAKOĐER ĆE POMOĆI IZVOĐAČIMA I DOBAVLJAČIMA DA BEZ OBZIRA NA
PROJEKTANTA I PROJEKT VRLO JEDNOSTAVNO MOGU PROVESTI NABAVU I
DOBAVU, UZ POTPUNO RAZUMIJEVANJE ONOGA ŠTO TREBAJU NUDITI.
POSTOJE DVA NAJRAŠIRENIJA SUSTAVA KLASIFIKACIJE: OMNICLASS I UNICLASS.
POSTOJE I DRUGI SISTEMI KLASIFIKACIJE, ALI SU U MANJOJ MJERI ZASTUPLJENI.
KAO ŠTO JE REČENO, RAZLIKUJEMO OMNICLASS KOJI DOLAZI IZ SAD-A I UNICLASS
KOJI DOLAZI IZ UK-A. ISTI SU U OSNOVI VRLO SLIČNI. OBA SUSTAVA SASTOJE SE OD
VIŠE TABLICA (UNICLASS IH IMA 15, UNICLASS2015 IH IMA 11, OMNICLASS IH IMA 15)
KOJE NAM SLUŽE ZA ISPRAVNU KLASIFIKACIJU SVAKOG BIM ELEMENTA. KLASE SU
UGLAVNOM KOMBINACIJA NAZIVA KLASE (KRATKI OPIS / IME) I VRIJEDNOST KLASE
(KOD KOJI OPISUJE POZICIJU KLASE UNUTAR HIJERARHIJE). MOGUĆI SU I DODATNI
OPISI, A SVE KAKO BISMO JEDNOSTAVNIJE DONIJELI ODLUKU KOJU KLASU
PRIMIJENITI ODNOSNO KAKO BISMO MOGLI RAZUMJETI RAZLIKE IZMEĐU RAZLIČITIH
SISTEMA KLASIFIKACIJE.
SLIČNOST KLASIFIKACIJA VIDLJIVA JE IZ SLJEDEĆEG PRIMJERA:
PRIMJER IZ OMNICLASS TABLICE 23 - ELEMENTI:
23-35 13 11 STRUJNI TRANSFORMATORI
23-35 13 15 13 11 ENERGETSKI MREŽNI SUHI TRANSFORMATORI
23-35 15 00 ELEKTRIČNI MOTORI
23-35 23 21 UPS JEDINICE
PRIMJER IZ UNICLASS2015 TABLICE SS - SISTEMI:
SS_70_30_25_25 SUSTAV UZEMLJENJA I IZJEDNAČAVANJA POTENCIJALA
SS_70_30_35_40 SUSTAV VISOKONAPONSKIH DALEKOVODA
SS_70_80_25_70 SUSTAV RASVJETE AUTOCESTA
SS_70_80_33_88 SUSTAV RASVJETE POZORNICE TEATRA
SS_75_10_70_88 SUSTAV TELEVIZIJSKE DISTRIBUCIJE
5. RAZMJENA PODATAKA I FORMATI
OSNOVA BIM PROJEKTA JE EFIKASNA RAZMJENA I KORIŠTENJE INFORMACIJA.
INFORMACIJE SE U BIM PROJEKTIMA UGLAVNOM NALAZE U BIM MODELIMA PA JE
RAZMJENA MODELA KLJUČNA ZA PROVOĐENJE PROJEKTA. KAKO BI EFIKASNO
RAZMJENJIVALI INFORMACIJE MORAMO NA SVAKOM BIM PROJEKTU TREBAMO IZMEĐU
OSTALOGA DOGOVORITI:
➢ STANDARDE IMENOVANJA
➢ FORMATE DATOTEKA
➢ NAČIN RAZMJENE
➢ STRUKTURU PODATAKA
➢ PROCEDURE RAZMJENE
5.1. Standardi imenovanja
STANDARDI IMENOVANJA SU NUŽNI ZA USPJEŠNO KORIŠTENJE PODATAKA NA
PROJEKTU. POTREBNO JE DOGOVORITI STANDARDE IMENOVANJA ZA DATOTEKE,
MAPE I ELEMENATA UNUTAR DATOTEKA.
KAKO SE U SVAKOM BIM PROJEKTU POJAVLJUJE VELIKI BROJ DATOTEKA VAŽNO JE
JASNO RAZAZNATI ŠTO SVAKA OD NJIH SADRŽI. TU KLJUČNU ULOGU IMA
IMENOVANJE DATOTEKA. IMENOVANJE SE MOŽE DOGOVORITI OD PROJEKTA DO
PROJEKTA UNUTAR BEP-A ALI BILO BI KORISNO PRIDRŽAVATI SE NEKOG
UVRJEŽENOG STANDARDA.
PRIJEDLOG IMENOVANJA BIM DATOTEKA DAN JE U BEP.
5.2. Formati datoteka
U SVAKOM BIM PROJEKTU UOBIČAJENO JE DA POSTOJI VIŠE FORMATA DATOTEKA,
OVISNO O BIM SOFTVERSKIM ALATIMA KOJE KORISTE SUDIONICI NA PROJEKTU.
KOJE ĆE FORMATE KORISTITI SUDIONICI UNUTAR TIMOVA POJEDINIH STRUKA
DOBRO JE DEFINIRATI ALI NIJE KLJUČNO ZA PROVOĐENJE BIM PROJEKTA.
KLJUČNO ZA PROVOĐENJE PROJEKTA DEFINIRATI KOJI ĆE SE FORMATI KORISTITI ZA
RAZMJENU DATOTEKA I INFORMACIJA NA PROJEKTU.
OVISNO O ZAHTJEVIMA NARUČITELJA I MOGUĆNOSTIMA SUDIONIKA MOGUĆE JE
DEFINIRATI RAZLIČITE FORMATE DATOTEKA ZA ISPORUKU.
IZVORNI FORMATI BIM ALATA
TO SU FORMATI KOJI SE MOGU EDITIRATI SAMO U IZVORNOM BIM ALATU. OVI
ALATI SU POGODNI ZA RAZMJENU DATOTEKA UKOLIKO SVI SUDIONICI KORISTE
ISTE ILI KOMPATIBILNE ALATE. PREDNOSTI RAZMJENE U IZVORNIM FORMATIMA JE
ŠTO SU SVE INFORMACIJE SAČUVANE I MOGUĆE JE I NAKON RAZMJENE NASTAVITI
RAD NA MODELU. NISU PRIKLADNI ZA PROJEKTE GDJE SE KORISTI VIŠE RAZLIČITIH
BIM ALATA.
RVT - OVE JE AUTODESKOV FORMAT KOJI KORISTI AUTODESK REVIT. POJAVLJUJE SE
JOŠ I RFA FORMAT KOJI OZNAČAVA POJEDINI SASTAVNI ELEMENT REVIT MODELA
(REVIT FAMILIJU). VIŠEKORISNIČKI RAD IMPLEMENTIRAN JE UNUTAR SAMOG ALATA.
PLN - NATIVNI ARCHICAD FORMAT. ZA VIŠEKORISNIČKI RAD NA ISTOM MODELU
KORISTI SE APLIKACIJA BIM SERVER KOJA JE U BITI VELIKA BAZA PODATAKA I
OMOGUĆUJE PRISTUP MODELU IZ LOKALNE MREŽE ILI PUTEM INTERNETSKE VEZE.
ZA POTREBE ARHIVIRANJA PROJEKTI SE MOGU SPREMITI U PLA FORMAT, KOJI
SADRŽI I SVE KORIŠTENE BIBLIOTEKE OBJEKATA I SIMBOLA.
NDW (PRJ)- FORMAT KOJI KORISTI ALLPLAN JE NWD (NEMETSCHEK DRAWING), U
STVARI ALLPLAN U POZADINI KORISTI BAZU PODATAKA I NE MOŽE SE REČI DA
KORISTI SAMO JEDAN TIP DATOTEKE. ZA PUNU FUNKCIONALNOST POTREBAN JE
ČITAVI PROJEKT KOJI SE NALAZI U PRJ MAPI SOFTVERA.
DWG – OVO JE AUTODESKOV FORMAT KOJI JE ORIGINALNO KORISTIO AUTOCAD
ALI GA DANAS MOGU IZVOZITI I UVOZITI GOTOVO SVI BIM ALATI. OVA FORMAT
NE PRENOSI BIM INFORMACIJE ALI U RANIM BIM PROJEKTIMA KORISTITI ĆE SE ZA
RAZMJENU INFORMACIJA SA SURADNICIMA KOJI NE KORISTE BIM ALATE.
SVAKI IZVOZ I UVOZ DATOTEKA KOJE NISU U IZVORNOM FORMATU JE SITUACIJA
GDJE SE MOŽE DOGODITI DA DOĐE DO GUBLJENJA INFORMACIJA. ZATO U SVIM
SITUACIJAMA GDJE JE MOGUĆE RAZMJENJIVANJE IZVORNIH DATOTEKA TO JE
PREPORUČENA SOLUCIJA.
IFC – INDUSTRY FOUNDATION CLASSES(IFC) NAJRAŠIRENIJI NEZAVISNI FORMAT ZA
RAZMJENU BIM DATOTEKA JE. TO JE OTVOREN I NEUTRALAN FORMAT KOJA
OMOGUĆUJE RAZMJENU INFORMACIJA O GRAĐEVINI MEĐU RAZLIČITIM CAD / BIM
APLIKACIJAMA.VEĆINA BIM ALATA MOGU IZVESTI MODELE I UVESTI MODELE TOG
FORMATA. OVAJ FORMAT NAMJENJEN JE SAMO ZA ČITANJE INFORMACIJA IZ
MODELA I NIJE NAMIJENJEN DA SE NA NJEMU NASTAVI RAD. IFC DAJE
INFORMACIJU O GEOMETRIJI MODELA, ALI I DODATNE PODATKE UGRAĐENE
MATIČNOM APLIKACIJOM U BIM MODEL.
PREDNOST JE OVOG FORMATA ŠTO GA MOŽEMO KORISTITI U RAZNIM
APLIKACIJAMA TE NE OGRANIČAVA PROCES SAMO NA JEDNU PLATFORMU.
NEDOSTATAK JE TO ŠTO JEDNOM KADA IZVEZEMO U TAKAV FORMAT RAD NA
MODELU VIŠE NIJE MOGUĆ VEĆ SAMO ČITANJE GEOMETRIJE I INFORMACIJA.
DA BI IFC FORMAT ISPRAVNO ISPUNIO SVOJU ZADAĆU POTREBNO JE IZVRŠITI
IZVJESNA PODEŠAVANJA PRIJE IZVOZA U TAJ FORMAT. KOMPATIBILNOST SA SVIM
DRUGIM BIM ALATIMA NOSI SA SOBOM I NEKE MANE PA JE NEDOSTATAK OVOG
FORMATA DA SE NEKE INFORMACIJE IZ IZVORNOG MODELA IPAK GUBE.
COBIE – CONSTRUCTION OPERATION BUILDING INFORMATION EXCHANGE
(COBIE) JE NEZAVISAN FORMAT KOJIM SADRŽAVA UGLAVNOM
TEKSTUALNE/BROJČANE PRIKAZE PODATAKA A NE GRAFIKU ILI GEOMETRIJU.
PODACI SU UGLAVNOM ORGANIZIRANI U TABLICE ILI RELACIONE BAZE
PODATAKA. OVAJ FORMAT SE KORISTI ZA PRIJENOS PODATAKA KOJI SE
GENERIRAJU TIJEKOM PROCESA I IZGRADNJE TE SE PREDAJU SUBJEKTIMA KOJI
KRAJNJIM KORISNICIMA – ODRŽAVANJE. ZA RAZLIKU OD IFC FORMATA OVAJ
FORMAT PRIKAZUJE PODATKE NA NAČIN DA IH KORISNIK MOŽE KORISTITI DOK JE
IFC PRILAGOĐEN TOME DA GA KORISTE BIM SOFTVERI.
Izvor: bimtaskgroup.org
5.3. Način razmjene
ŠTO JE RAZMJENA DATOTEKA I INFORMACIJA EFIKASNIJA TO JE EFIKASNIJI I SAM
BIM PROJEKT. POD EFIKASNOM RAZMJENOM INFORMACIJA PODRAZUMIJEVA SE DA
SU INFORMACIJE AŽURIRANE I SVIMA DOSTUPNE.
ISTO TAKO VAŽNO JE NAGLASITI DA SU DATOTEKE KOJE SE KORISTE NA BIM
PROJEKTIMA PUNO VEĆE NEGO U KLASIČNOM 2D NAČINU RADA. PA JE TIME
DISTRIBUCIJA DATOTEKA NEŠTO OTEŽANA, A KOLIČINA PROSTORA ZA POHRANU
TREBA BITI VEĆA. DANAŠNJA RJEŠENJA BAZIRANA NA RAZMJENI DATOTEKA
MAILOVIMA I POHRANJIVANJE DATOTEKA NA ODVOJENIM MJESTIMA NISU
POGODNA ZA EFIKASNO UPRAVLJANJE INFORMACIJAMA.
KAKO BI SE OSIGURALI GORE NAVEDENI UVJETI U BIM PROJEKTIMA KORISTI SE
CENTRALNO MJESTO ZA POHRANU DATOTEKA (ENG. COMMON DATA
ENVIROMENT - CDE).
TO JE CENTRALNO MJESTO ZA POHRANU, UPRAVLJANJE I DIJELJENJE SVIH
RELEVANTNIH DATOTEKA I INFORMACIJA NA PROJEKTU MEĐU SVIM SUDIONICIMA
NA PROJEKTU.
CDE MOŽE IMATI RAZNE FORME, OVISNO O VELIČINI I KOMPLEKSNOSTI PROJEKTA I
MOGUĆNOSTIMA KOJE SE ŽELE KORISTITI. OD DIJELJENE MAPE NA DISKU
(DOVOLJNO ZA MANJE PROJEKTE ILI POČETNE FAZE) DO NAPREDNOG SERVISA U
OBLACIMA. OVO RJEŠENJE TREBA BITI DIGITALNO, SVI TREBAJU IMATI PRISTUP DO
PODATAKA KOJI SU TAMO SMJEŠTENI I TREBA GA SE MOĆI PODIJELITI NA DIJELOVE
OVISNO O KATEGORIJI INFORMACIJA.
KAKO GOD BILO BITNO JE DA SU PODACI NA TOJ LOKACIJI SVIMA DOSTUPNI U
SVAKOM TRENU I KOREKTNO STRUKTURIRANI KAKO BI SE JEDNOZNAČNO ZNALO
KOJA DATOTEKA JE AKTUALNA ZA POJEDINOG KORISNIKA.
NADALJE TREBALO BI OMOGUĆITI SELEKTIVAN PRISTUP PODACIMA OVISNO O
POTREBAMA SUDIONIKA I PRAVIMA KOJE JE DAO NARUČITELJ. NE TREBAJU SVI
SUDIONICI SVE PODATKE PA JE NAKON ODLUKE KOME ŠTO TREBA POTREBNO
ORGANIZIRATI PODATKE SA DOGOVORENIM PRAVIMA PRISTUPA.
PRIJEDLOG ORGANIZACIJE TOG MJESTA ZA POHRANU PODATAKA DAT JE U BEP-U
PREMA UK STANDARDIMA, ALI MOGUĆE GA JE PODESITI PREMA POTREBAMA
POJEDINOG PROJEKTA.
NARAVNO UZ PODATKE KOJI ĆE BITI DISTRIBUIRANI PREKO TE ZAJEDNIČKE
PLATFORME POTREBNO JE DA SVAKI SUDIONIK ČUVA SVE RELEVANTNE VERZIJE
DATOTEKA NA SVOJOJ LOKACIJI.
5.4. Struktura podataka
JASNA STRUKTURA PODATAKA PRUŽA NAM JEDNOSTAVNIJE SNALAŽENJE I
UPRAVLJANJE PODACIMA. ONA TREBA BITI DOGOVORENA MEĐU SVIM
SUDIONICIMA NA PROJEKTU PUTEM BEP-A.
UOBIČAJENA PODJELA DATOTEKA JE NA RADNE, DIJELJENE, PREDANE I ARHIVIRANE.
STRUKTURA MAPA
INFORMACIJE U CDE MOGU BITI U RAZNIM STATUSIMA ALI PREPORUČAJU SE ČETIRI
GLAVNA STATUSA:
RADNO
SADRŽI NEODOBRENE INFORMACIJE SVAKOG SUDIONIKA. KORISTE IH KORISNICI
UNUTAR ISTE ORGANIZACIJE SUDIONIKA.
DIJELJENO
DATOTEKE KOJE SU PROVJERENE I ODOBRENE DA IH MOGU KORISTITI DRUGI
SUDIONICI. MOGU BITI DODIJELJENA PRAVA PRISTUPA.
PREDANO
INFORMACIJA KOJA JE ODOBRENA OD NARUČITELJA I SPREMNA ZA ISHOĐENJE
DOZVOLA, IZRADU PONUDBENE DOKUMENTACIJE ILI GRAĐENJE.
ARHIVA
DATOTEKE KOJE VIŠE NISU AKTUALNE ALI IH JE POTREBNO SAČUVATI RADI
PRAĆENJA RADA NA PROJEKTU.
5.5. Procedura razmjene
OSIM SAMIH FORMATA U BIM PROJEKTU POTREBNO JE DEFINIRATI I PROCEDURE
RAZMJENE PODATAKA KOJI MOGU UKLJUČIVATI: NAČINE ODOBRAVANJA
INFORMACIJA, NAČINE PREUZIMANJA DATOTEKA / MODELA, FAZE/ROKOVI, RAZINE
RAZVIJENOSTI MODELA, ISL.
SVAKI PREDANI MODEL POTREBNO JE OPISATI KAKO BI SVI SUDIONICI TOČNO
ZNALI O KAKVIM SE INFORMACIJAMA RADI. NEKE OD INFORMACIJA KOJE BI BILO
ZNATI O PREDANOJ DATOTECI SU: DATUM RAZMJENE, REVIZIJU, TVRTKU
ISPORUČITELJA MODELA, OPIS MODELA, KONTROLNU LISTU ISPUNJENIH ZAHTJEVA.
OVE INFORMACIJE MOGU BITI U ZASEBNOJ DATOTECI KOJA ĆE SE ISPORUČITI UZ
MODEL. KORISNO JE SVE RAZMJENE UPISATI U TABELU DOSTUPNU NA CDE KAKO BI
SVI BILI UPOZNATI SA STANJEM.
6. ODGOVORNOST
ODGOVORNOST PRILIKOM IZRADE PROJEKTNE DOKUMENTACIJE JEDNOSTAVNO JE
UTVRDITI: PROJEKTI RAZLIČITIH STRUKA UVEZANI SU I ISPORUČENI, OVJERENI ŽIGOM
I POTPISOM PROJEKTANTA TE SVE ŠTO JE SADRŽANO U MAPI JE ODGOVORNOST
ONOGA TKO JU JE IZRADIO I OVJERIO.
UTOPIJSKA IDEJA KAKO ĆE U BIM SUSTAVU SVI PROJEKTANTI RADITI NA ISTOM
MODELU I U REALNOM VREMENU DIJELITI PODATKE RASPLINULA SE VRLO BRZO JER JE
U TOM SLUČAJU NEMOGUĆE UTVRDITI ODGOVORNOST.
NPR. PROJEKTANT ELEKTROTEHNIKE BI MOGAO POMAKNUTI NOSIVI STUP RADI LAKŠEG
SMJEŠTANJA SVOJIH INSTALACIJA. TAKVE PROMJENE NE BI BILE LAKO VIDLJIVE,
POGOTOVO AKO SE RADI O VEĆEM MODELU, A GREŠKA BI SE UTVRDILA TEK NA
GRADILIŠTU ŠTO U POTPUNOSTI NEGIRA SMISAO PRIMJENE BIM PROCESA.
UKOLIKO JE JEDAN OD ZAHTJEVA PRILIKOM UGOVARANJA IZRADE PROJEKTA I
PRIMJENA BIM-A, SVE UKLJUČENE STRANE MORAJU ZNATI ŠTO SE TOČNO
PODRAZUMIJEVA.
NEMOGUĆE JE U UGOVORU NAVESTI JEDNOSTAVNU STAVKU KAO NPR. “PROJEKTANT
MORA PROJEKT IZRADITI U BIM SUSTAVU.” JER TIME NIJE DEFINIRANO NIŠTA, A MOŽE
BITI DEFINIRANO SVE, OVISNO O PERCEPCIJI POJEDINE ZAINTERESIRANE STRANE
(INVESTITOR MISLI DA JE ZATRAŽIO SVE ŠTO JE MOGUĆE NAPRAVITI, A PROJEKTANT
MISLI DA TREBA ISPORUČITI SAMO ONO ŠTO JE NUŽNO).
ODGOVORNOST U BIM PROCESU UTVRĐENA JE KROZ DVIJE GLAVNE STAVKE:
1.PROPISANIM STUPNJEM RAZRAĐENOSTI PROJEKTA (ENGL. LOD - LEVEL OF
DEVELOPMENT)
STUPANJ RAZRAĐENOSTI PROJEKTA SASTOJI SE OD GRAFIČKIH (LEVEL OF DETAIL =
STUPANJ DETALJNOSTI) I NE-GRAFIČKIH PODATAKA (LEVEL OF INFORMATION =
STUPANJ INFORMACIJA).
LOD PRECIZIRA KAKO TREBAJU BITI MODELIRANI POJEDINI ELEMENTI BIM MODELA
(METALNE POLICE, KABELI, RAZDJELNICE ITD), A SVE KAKO BI SE ZADOVOLJILA
POJEDINA FAZA PROJEKTA.
NPR. NEMA SMISLA U MODEL KOJI SE KORISTI ZA IDEJNO RJEŠENJE UNOSITI TOČNE
LOI DEFINIRA POTREBNE INFORMACIJE ZA POJEDINU FAZU: OD GENERIČKIH
INFORMACIJA U RANIJIM FAZAMA PROJEKTA (NPR. KADA ODREĐENIH DIMENZIJA) PA
DO PRECIZNIJIH (NPR. TOČNA MARKA I MODEL KADE, NJENE PRECIZNE DIMENZIJE,
NAČIN UGRADNJE, TOČNA GEOMETRIJA ITD).
2.PROCESOM RAZMJENE PODATAKA I BIM MODELA U TZV. CDE (COMMON DATA
ENVIRONMENT)
PROCES RAZMJENE PODATAK MORA BITI JEDNOSTAVAN I JASAN SVIM SUDIONICIMA.
POŠTO ĆE SE U BIM PROCESU KORISTITI VIŠE RAZLIČITIH APLIKACIJA POTREBNO JE
DEFINIRATI NAČIN RAZMJENE I POHRANE INFORMACIJA.
MOGUĆE JE KORISTITI JEDNOSTAVNE CLOUD SERVISE ZA POHRANU PODATAKA (NPR.
DROPBOX), SOFTVERE ZA UPRAVLJANJE PODACIMA (BIMEYE, DROFUS), KLASIČNE
UREDSKE ALATE (EXCEL, WORD, GOOGLE DOCS)...
SUDIONICI
POTREBNO JE RAZLIKOVATI POJEDINE SUDIONIKE U BIM PROCESU TEMELJEM NJIHOVIH
ZADUŽENJA I ODGOVORNOSTI:
1.BIM MODELER ZADUŽEN JE ZA IZRADU BIM MODELA U NEKOJ OD BIM APLIKACIJA
(ARCHICAD, ALLPLAN, REVIT ITD). NIJE NUŽNO U ISTO VRIJEME I PROJEKTANT, ODN. NA
VEĆIM PROJEKTIMA ĆE SIGURNO JEDAN PROJEKTANT VODITI TIM OD VIŠE BIM
MODELERA.
2.BIM KOORDINATOR ZADUŽEN JE ZA KOORDINACIJU MODELA RAZLIČITIH STRUKA:
PREKLAPANJE MODELA ARHITEKTURE I INSTALACIJA, PRONALAŽENJE
NEUSUGLAŠENOSTI I KOLIZIJA, EVIDENTIRANJE PROBLEMA TE VOĐENJE
KOORDINACIJSKIH PROCESA ZA IZNALAŽENJE RJEŠENJA DOKUMENTIRANIH PROBLEMA.
3.BIM MANAGER ODGOVORAN JE ZA PLANIRANJE I PROVEDBU BIM PROCESA.
VODITELJ JE IZRADE BIM PROVEDBENOG PLANA, NADZOR NAD PROVEDBOM TE
PRILAGODBU PROCESA UKOLIKO SE TIJEKOM IZRADE PROJEKTA POKAŽU
MOGUĆNOSTI ZA OPTIMIZACIJOM METODA RADA I RAZMJENE PODATAKA.
PRIMJERA RADI, U AUSTRIJI PREDVIĐAJU DA ĆE IM SE U SLIJEDEĆIH DESET GODINA
POJAVITI POTREBA ZA JAKO VELIKIM BROJEM BIM RADNIH MJESTA:
OKO 30.000 BIM MODELERA, 3.000 BIM KOORDINATORA I 300 BIM MANAGERA.
TAKAV POTENCIJAL JE NARAVNO PRISUTAN I U SVIM OSTALIM DRŽAVAMA KOJE
PROPIŠU PRIMJENU BIM PROCESA U PROJEKTIRANJU.
7. POJMOVNIK
BEP – BIM PLAN IZVRŠENJA (ENG. BIM EXECUTION PLAN - BEP)
BIM – PROCES PROJEKTIRANJA, IZVOĐENJA ILI UPRAVLJANJA IZGRAĐENIM OKOLIŠEM
PRIMJENJUJUĆI ELEKTRONIČKE OBJEKTNO USMJERENE INFORMACIJE.
BIM ALAT – SOFTVERSKO RJEŠENJE UZ POMOĆ KOJEG AUTOR IZRAĐUJE BIM MODEL
BIM MODEL – MODEL INFORMACIJA O GRAĐEVINI.
BIM VODITELJ PROJEKTA – OSOBA KOJA JE ZADUŽENA ZA VOĐENJE BIM DIJELA
PROJEKTA
CDE – ZAJEDNIČKO PODATKOVNO OKRUŽENJE.
EIR – BIM ZAHTJEVI NARUČITELJA (ENG. BIM EMPLOYER'S INFORMATION REQUIREMENTS
– EIR)
KOMPONENTA / BIM ELEMENT – VIRTUALNI ELEMENT KOJI PREDSTAVLJA FIZIČKI
GRAĐEVINSKI OBJEKT.
LOD – STUPANJ RAZRADE ELEMENATA BIM MODELA.
LOI - RAZINA RAZVIJENOSTI ELEMENATA BIM MODELA KOJA UKLJUČUJE SAMO ATRIBUTE
MODELA, A NE I GEOMETRIJU MODELA.
OBJAŠNJENJE BIM POJMOVA MOŽETE POTRAŽITI NA: HTTPS://BIMDICTIONARY.COM/
8. PRIMJER ELEKTROTEHNIČKOG PROJEKTA U BIM SOFTVERUDOLJE NA SLAJDOVIMA JE PRIMJER JEDNE OBITELJSKE VILE NA JADRANU
IZRAĐENE U BIM SOFTWERU. INVENSTITOR JE ZAHTIJEVAO BIM PROJEKT – NE
SPECIFICIRAJUĆI ŠTO POD TIME SMATRA – TE JE PROJEKT IZRAĐEN U BIM
SOFTWERU.
TLOCRT INSTALACIJE
3D RENDER
3D OSJENČANJE
PREDNJI PRESJEK
TLOCRT RASVJETE
SLIKA OSVJETLJENJA PROSTORA
TLOCRT S UTIČNICAMA
TLOCRT KOMUNIKACIJSKE INSTALCIJE
PRIKAZ KOMUNIKACIJSKE INSTALACIJE I DODJELJIVANJA
PRIKAZ SPAJANJA U KOMUNIKACIJSKOJ RAZDJELNICI
TLOCRT VATRODOJAVE
TLOCRT TEMELJNOG UZEMLJIVAČA
PRIKAZ POSTAVLJANJA KANALICA
PRIKAZ
PRIKAZ POSTAVLJANJA PODNE INSTALACIJE
PRIKAZ POSTAVLJANJA METALNIH POLICA
TLOCRTNI PRIKAZ POSTAVLJANJA METALNIH POLICA
3D PRIKAZ METALNIH POLICA
PRIKAZ U 3D PRELASKA METALNIH POLICA
PRIKAZ STRUJNIH KRUGOVA U ENERGETSKOJ RAZDJELNICI
AUTOMATSKI GENERIRANA JEDNOPOLNA SHEMA
AUTOMATSKI GENERIRANA TROPOLNA SHEMA
AUTOMATSKI GENERIRAN POPIS STRUJNIH KRUGOVA
AUTOMATSKI GENERIRANA TERMINAL LISTA
PRIMJER AUTOMATSKOG PRORAČUNA
AUTOMATSKI GENERIRANA BLOK SHEMA VATRODOJAVE
AUTOMATSKI GENERIRANA BLOK SHEMA KOMUNIKACIJSKE INSTALACIJE
PRIKAZ MOGUĆEG ISPISA
IZVOZ TROŠKOVNIČKIH STAVKI U EXCEL