Bill of Material (BOM)

  • Upload
    jai-ram

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

  • 8/18/2019 Bill of Material (BOM)

    1/10

  • 8/18/2019 Bill of Material (BOM)

    2/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: [email protected] Mobile: +91 9866293649

    Configuration:

    1. Create Materials for BOM

    2. Create material with item category group ERLA in material master  – 

    Sales org 2 screen to explode at header level.

    3. Create other materials as sub items with item category group NORM in materialmaster  – Sales org 2 screen.

    4. Maintain the stock levels for all the materials (MB1C).

    To create BOM

    Material: Enter the number of the material for which you want to create or edit a  bill of material. 

    Plant: Enter the plant for which you wish to create or process a bill of material. 

    BOM Usage: This key defines the area (such as engineering/design or production) where a BOM can

    be used.

    Valid-From Date: Specifies the start date for the validity period of an object (such as material, BOM)

  • 8/18/2019 Bill of Material (BOM)

    3/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: [email protected] Mobile: +91 9866293649

    Maintain the components of BOM which should explode and click on Save.

    Test in Sales Order is BOM is exploded at Header Level.

    ITEM ITEM CATEGORY SCHEDULE LINES

    Header Item TAQ CP = Determistic MRP

    Sub - Item TAE CT = No inventory

  • 8/18/2019 Bill of Material (BOM)

    4/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: [email protected] Mobile: +91 9866293649

    ITEM CATEGORY DETERMINATION

     Sales Document Type + Item cat group + Usage + Higher Level Item Cat = ITEM CATEGORY

    HEADER ITEM OR + ERLA + NIL + NIL = TAQ

    SUB –

     ITEM  OR + NORM + NIL + TAQ = TAE

    OR + NORM + NIL + TAQ = TAE

    OR + NORM + NIL + TAQ = TAE

    Go to VOV7

    Select TAQ from position button

      Click on details icon and maintain the values like below  Billing relevance [A] = Delivery related billing document.

      Price [X] = Standard

      Structure scope [A] = Explode single level of Bill of Materials

    [The value of this field causes to explode BOM in the document]

      Application [SD01] = Sales and Distribution

    It indicates the applications are where it has to explode

      Check manual alternatives.

    Select TAE from position button

      Click on details icon and maintain the values like below

      Billing relevance = BLANK

      Price = BLANK

      Statistical values: Indicates whether the system takes the value of an item intoaccount when it determines the total value of a document.

  • 8/18/2019 Bill of Material (BOM)

    5/10

  • 8/18/2019 Bill of Material (BOM)

    6/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: [email protected] Mobile: +91 9866293649

  • 8/18/2019 Bill of Material (BOM)

    7/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: [email protected] Mobile: +91 9866293649

    Processing at Component Level

    If you want the system to carry out pricing, inventory controls, and delivery processing at the

    component level, enter LUMF in the Item category group field of the Sales: sales org.

    2  screens in the material master record of the finished product.

    Configuration:

    1. Create Materials for BOM

    2. Create material with item category group LUMF in material master  – 

    Sales org 2 screen to explode at ITEM level.

    3. Create other materials as sub items with item category group NORM in material

    master  – Sales org 2 screen.

    4. Maintain the stock levels for all the materials (MB1C).

    ITEM CATEGORY DETERMINATION

     Sales Document Type + Item cat group + Usage + Higher Level Item Cat = ITEM CATEGORY

    HEADER ITEM OR + LUMF + NIL + NIL = TAP

    SUB  – ITEM  OR + NORM + NIL + TAP = TAN

    OR + NORM + NIL + TAP = TAN

    OR + NORM + NIL + TAP = TAN

  • 8/18/2019 Bill of Material (BOM)

    8/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: [email protected] Mobile: +91 9866293649

    ITEM ITEM CATEGORY SCHEDULE LINES

    Header Item TAP CT = No inventory

    Sub - Item TAN CP = Determistic MRP

    Go to VOV7

    Select TAP from position button

      Click on details icon and maintain the values like below

      Billing relevance [A] = Delivery related billing document.

      Price = BLANK

      Structure scope [A] = Explode single level of Bill of Materials

    [The value of this field causes to explode BOM in the document]

      Application [SD01] = Sales and Distribution

    It indicates the applications are where it has to explode

      Check manual alternatives.

    Go to VOV7

    Select TAN from position button

      Click on details icon and maintain the values like below

      Billing relevance [A] = Delivery related billing document.

      Price [X] = Standard

  • 8/18/2019 Bill of Material (BOM)

    9/10

  • 8/18/2019 Bill of Material (BOM)

    10/10

     

    Contact globally for SAP SD training: Jaya ram Prasad

    E mail: jayaramprasad26@gmail com Mobile: +91 9866293649