CITY OF SUNNYVALE, CALIFORNIA INVITATION FOR BIDS No. PW16-28 PRIMARY TREATMENT FACILITY PACKAGE 2 PUBLIC WORKS PROJECT NO. UY-16/01-20 BID SPECIFICATIONS APPENDICES VOLUME 7 OF 7 Date of Ad Publication December 16, 2016 BIDS DUE: Wednesday, February 8, 2017 BY 3:00 PM At the Office of the Purchasing Division Sunnyvale City Hall Annex 650 West Olive Avenue Sunnyvale, CA 94086 Contact Person During Bidding Period: Pete Gonda, Purchasing Officer [email protected] (408) 730-7418 MANDATORY PRE-BID CONFERENCE Date and Time: Thursday, January 19, 2017 at 10AM Location: Water Pollution Control Plant Training Room 1444 Borregas Avenue, Sunnyvale, CA 94089 OPTIONAL PRE-BID CONFERENCE Date and Time: Tuesday, January 24, 2017 at 10AM and 11AM

BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

CITY OF SUNNYVALE, CALIFORNIA

INVITATION FOR BIDS No. PW16-28

PRIMARY TREATMENT FACILITY PACKAGE 2 PUBLIC WORKS PROJECT NO. UY-16/01-20

BID SPECIFICATIONS

APPENDICES VOLUME 7 OF 7

Date of Ad Publication

December 16, 2016

BIDS DUE:

Wednesday, February 8, 2017 BY 3:00 PM At the Office of the Purchasing Division

Sunnyvale City Hall Annex 650 West Olive Avenue Sunnyvale, CA 94086

Contact Person During Bidding Period:

Pete Gonda, Purchasing Officer [email protected]

(408) 730-7418

MANDATORY PRE-BID CONFERENCE Date and Time: Thursday, January 19, 2017 at 10AM

Location: Water Pollution Control Plant Training Room 1444 Borregas Avenue, Sunnyvale, CA 94089

OPTIONAL PRE-BID CONFERENCE Date and Time: Tuesday, January 24, 2017 at 10AM and 11AM

Page 2: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 3: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

CITY OF SUNNYVALEWATER POLLUTION CONTROL PLANT

PRIMARY TREATMENT FACILITY -PACKAGE 2

PUBLIC WORKS PROJECT NO. UY-16/01-20

VOLUME 7 OF 7

APPENDICES

DECEMBER 2016ISSUED FOR BID

Page 4: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 5: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

LICENSEE RESPONSIBLE FOR SPECIFICATIONS

LICENSEE RESPONSIBLE FOR SPECIFICATIONS 1 pw://Carollo/Documents/Client/CA/Sunnyvale/9265A10/Specifications/Package 02/PE Stamps Sheets (FS)

Contract Documents prepared by or under the direction of the following registered persons:

Signed: 11/29/2016

James P. Hagstrom, P.E. California - Civil 50890 CIVIL ENGINEERING Carollo Engineers, Inc., 870 Market Street, Suite 728 San Francisco, California 94102, Telephone: 415-399-1601

Signed: 11/29/2016

James A. Wickstrom, P.E. California - Civil 57732 CIVIL ENGINEERING Carollo Engineers, Inc., 2700 Ygnacio Valley Road, Suite 300 Walnut Creek, California 94598, Telephone: 925-932-1710

Page 6: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 7: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-i pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

VOLUME 1 OF 7

DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT

SECTION NO. TITLE 00010 NOTICE INVITING BIDS 00100 INSTRUCTIONS TO BIDDERS 00200 INFORMATION AVAILABLE TO BIDDERS 00300 BID FORM 00310 BID SCHEDULE 00430 DESIGNATION OF SUBCONTRACTORS 00440 SITE VISIT DECLARATION 00450 SCHEDULE OF MAJOR EQUIPMENT AND MATERIAL SUPPLIERS,

PRODUCTS IDENTIFIED BY NAME AND SUBSTITUTION 00460 CERTIFICATION OF BIDDER’S EXPERIENCE AND QUALIFICATIONS 00461 CERTIFICATION OF ELECTRICAL SUBCONTRACTOR’S EXPERIENCE

AND QUALIFICATIONS 00480 NONCOLLUSION AFFIDAVIT 00490 AFFIDAVIT OF SAFETY COMPLIANCE 00500 GENERAL CONSTRUCTION CONTRACT 00610 FAITHFUL PERFORMANCE BOND 00620 PAYMENT BOND 00630 ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF

RETENTION 00700 GENERAL CONDITIONS 00800 SUPPLEMENTARY GENERAL CONDITIONS 00823 ESCROW BID DOCUMENTS 00900 STATE REVOLVING FUND PROGRAM SUPPLEMENTARY

CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS SECTION NO. TITLE 01010 SUMMARY OF WORK 01015 SITE SAFETY PLAN 01025 MEASUREMENT AND PAYMENT 01026 ALLOWANCES 01035 MODIFICATION PROCEDURES 01050 FIELD ENGINEERING 01060 REGULATORY REQUIREMENTS AND PERMITS 01061 ENVIRONMENTAL MITIGATION AND MONITORING REQUIREMENTS

Page 8: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-ii pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

01090 REFERENCES 01200 PROJECT MEETINGS 01210 PROJECT DOCUMENT CONTROL SYSTEM 01310 PROGRESS SCHEDULES AND REPORTS 01340 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01345 REQUESTS FOR INFORMATION AND CLARIFICATIONS 01354 HAZARDOUS MATERIAL PROCEDURES 01400 QUALITY CONTROL 01510 TEMPORARY UTILITIES 01560 TEMPORARY CONTROLS 01600 MATERIAL AND EQUIPMENT 01605 PRODUCT REQUIREMENTS 01610 PROJECT DESIGN CRITERIA 01612 SEISMIC DESIGN CRITERIA 01614 WIND DESIGN CRITERIA 01710 FINAL CLEAN-UP 01720 PROJECT RECORD DOCUMENTS 01730 OPERATION AND MAINTENANCE DATA 01740 WARRANTIES AND BONDS 01750 SPARE PARTS AND MAINTENANCE MATERIALS 01756 COMMISSIONING AND PROCESS START-UP 01759 WATER LEAKAGE TEST FOR CONCRETE STRUCTURES

DIVISION 02 - SITE CONSTRUCTION SECTION NO. TITLE 02084 UTILITY STRUCTURES 02086 REINFORCED CONCRETE BOX SECTIONS 02130 MONITORING WELLS 02200 EARTHWORK 02221 TRENCHING, BACKFILLING, AND COMPACTING FOR UTILITIES 02222 BUILDING DEMOLITION 02250 LIME STABILIZATION 02260 EXCAVATION SUPPORT AND PROTECTION 02312 CONTROLLED LOW STRENGTH MATERIAL (CLSM) 02314 LOW DENSITY CELLULAR CONCRETE FILL 02317 PRECAST AND PRESTRESSED CONCRETE DRIVEN PILING 02320 GUIDED AUGER BORING 02330 LAUNCH AND RECEIVING SHAFTS

Page 9: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-iii pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

02361 RETAINING WALL SHEET PILING 02450 RETAINING WALL GATES 02553 IN PLANT TEMPORARY BYPASS PUMPING AND PIPING 02581 PRECAST ELECTRICAL HANDHOLES AND ELECTRICAL MANHOLES 02701 PREFABRICATED TRENCH DRAIN SYSTEM 02742A ASPHALTIC CONCRETE PAVING 02772 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 02820 FENCES AND GATES 02910 HABITAT MITIGATION SITE DESIGN, INSTALLATION, AND

MAINTENANCE

DIVISION 03 - CONCRETE SECTION NO. TITLE 03055 EPOXY BONDING REINFORCING BARS AND ALL THREAD RODS 03071 EPOXIES 03072 EPOXY RESIN/PORTLAND CEMENT BONDING AGENT 03102 CONCRETE FORMWORK 03150 CONCRETE ACCESSORIES 03154 HYDROPHILIC RUBBER WATERSTOP 03200 CONCRETE REINFORCING 03212 REINFORCING BAR COUPLERS 03214 REINFORCING BAR END ANCHORS 03300 CAST-IN-PLACE CONCRETE 03302 MASS CONCRETE 03366 TOOLED CONCRETE FINISHING 03600 GROUTING 03931 EPOXY INJECTION SYSTEM

DIVISION 04 - MASONRY SECTION NO. TITLE 04090 MASONRY ACCESSORIES 04100 MORTAR AND MASONRY GROUT 04220 CONCRETE UNIT MASONRY

DIVISION 05 - METALS SECTION NO. TITLE 05120 STRUCTURAL STEEL 05140 STRUCTURAL ALUMINUM 05190 ANCHORING AND FASTENING TO CONCRETE AND MASONRY

Page 10: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-iv pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

05310 STEEL DECKING 05410 STRUCTURAL METAL STUD FRAMING 05500 METAL FABRICATIONS 05510 METAL RAMPS AND STAIRS

DIVISION 06 - WOOD AND PLASTICS SECTION NO. TITLE 06072 MISCELLANEOUS ROUGH CARPENTRY 06160 SHEATHING 06608 FIBERGLASS REINFORCED PLASTIC 06611 FIBERGLASS REINFORCED PLASTIC FABRICATIONS 06616 FIBERGLASS REINFORCED PLASTIC HANDRAIL AND GUARDRAIL 06622 SEDIMENTATION TANKS – SPECIAL FIBERGLASS BAFFLE AND

TROUGH SYSTEMS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION SECTION NO. TITLE 07110 DAMPPROOFING 07190 WATER REPELLENTS 07214 BATT INSULATION 07220 ROOF AND DECK INSULATION 07414 FORMED METAL SOFFIT PANELS 07416 STANDING-SEAM METAL ROOF PANELS 07430 COMPOSITE METAL BUILDING PANELS 07545 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07620 SHEET METAL FLASHING AND TRIM 07720 ROOF ACCESSORIES 07900 JOINT SEALANTS

DIVISION 08 - DOORS AND WINDOWS SECTION NO. TITLE 08254 PRE-ASSEMBLED PLASTIC DOOR ASSEMBLIES 08320 FLOOR ACCESS DOORS 08332 OVERHEAD COILING DOORS 08412 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08710 DOOR HARDWARE 08800 GLAZING 08950 FIBERGLASS-SANDWICH-PANEL ASSEMBLIES

Page 11: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-v pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

VOLUME 2 OF 7

DIVISION 09 - FINISHES SECTION NO. TITLE 09910 PAINTING 09960 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES SECTION NO. TITLE 10290 PLASTIC SPIKE BIRD DETERRENT 10400 SIGNAGE 10520 FIRE PROTECTION SPECIALTIES

DIVISION 11 - EQUIPMENT SECTION NO. TITLE 11069 PROGRESSIVE CAVITY PUMPS 11083 AERATION SYSTEM COARSE BUBBLE TYPE 11110 PRIMARY SEDIMENTATION TANK SLUDGE COLLECTOR 11215 HIGH-PRESSURE WASHERS 11234 POWER SKIMMER SCUM COLLECTION 11294B HEAVY-DUTY FABRICATED STAINLESS STEEL SLIDE GATES 11312C HORIZONTAL RECESS IMPELLER CENTRIFUGAL PUMPS 11312G SUBMERSIBLE LARGE CAPACITY CENTRIFUGAL PUMPS 11312J SUBMERSIBLE PROCESS LIQUID SUMP PUMPS 11312Q HORIZONTAL CHOPPER CENTRIFUGAL PUMPS 11312U VERTICAL NON-METALLIC SUMP CENTRIFUGAL PUMPS 11313E HORIZONTAL SELF-PRIMING SAMPLE CENTRIFUGAL PUMPS 11323 GRIT REMOVAL SYSTEM 11324 GRIT WASHER/DEWATERING UNITS 11332A MECHANICAL BAR SCREENS 11333 SCREENINGS WASHER/COMPACTORS11376A ROTARY-LOBE BLOWERS 11395 BIOLOGICAL ODOR CONTROL SYSTEM 11510 SAFETY EQUIPMENT 11635 AUTOMATIC SAMPLERS 11932 FERRIC CHLORIDE METERING PUMPS 11980 COMPRESSED AIR SYSTEM

Page 12: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-vi pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

DIVISION 12 - FURNISHINGS SECTION NO. TITLE 12510 OFFICE FURNITURE

DIVISION 13 - SPECIAL CONSTRUCTION SECTION NO. TITLE 13110 CORROSION CONTROL 13121 METAL CANOPY SYSTEMS 13150 LIQUID POLYMER FEED SYSTEM 13217 PLASTIC LINER FOR CONCRETE STRUCTURES 13238A ALUMINUM COVERS 13420 FIBERGLASS REINFORCED PLASTIC TANKS 13445A PNEUMATIC CYLINDER OPERATORS 13446 MANUAL ACTUATORS 13448 INTELLIGENT ACTUATORS

DIVISION 14 - CONVEYING SYSTEMS SECTION NO. TITLE 14555 SHAFTLESS SCREW CONVEYOR SYSTEM 14624 MONORAIL SYSTEM 14650 JIB CRANES 14670 WINCHES

DIVISION 15 - MECHANICAL SECTION NO. TITLE 15050 COMMON WORK RESULTS FOR MECHANICAL EQUIPMENT 15052 COMMON WORK RESULTS FOR GENERAL PIPING 15053 SEISMIC RESTRAINTS FOR PIPING 15054 EXPANSION CONTROL FOR PIPING 15058 PLASTIC LINER FOR CONCRETE PIPE 15061 PIPE SUPPORTS 15062 PREFORMED CHANNEL PIPE SUPPORT SYSTEM 15063 NON-METALLIC PIPE SUPPORT SYSTEM 15067 POLYETHYLENE (HDPE) 15075 EQUIPMENT IDENTIFICATION 15076 PIPE IDENTIFICATION 15082 PIPING INSULATION 15084 DUCTWORK INSULATION

Page 13: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-vii pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

15110 COMMON WORK RESULTS FOR VALVES 15111 BALL VALVES 15112 BUTTERFLY VALVES 15114 CHECK VALVES 15115 GATE, GLOBE, AND ANGLE VALVES 15116 PLUG VALVES 15117 SPECIALTY VALVES 15118 PRESSURE REDUCING AND PRESSURE RELIEF VALVES 15119 AIR AND VACUUM RELIEF VALVES 15120 PIPING SPECIALTIES 15121 PIPE COUPLINGS 15122 FIRE HYDRANTS 15125 STRAINERS 15210 CAST IRON SOIL PIPE: ASTM A 74 15211 DUCTILE IRON PIPE: AWWA C151 15225 REINFORCED CONCRETE PIPE 15234 POLYETHYLENE (PE) PIPE: ASTM D 2513 15244 POLYVINYL CHLORIDE (PVC) PIPE: AWWA C900 AND C905 15249 POLYVINYL CHLORIDE (PVC) PIPE: SCHEDULE TYPE 15259 CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE: ASTM F 441 15270 STEEL PIPE: GALVANIZED AND BLACK, ASTM A 53 15275 IN-PLANT STEEL PIPE-WELDED, AWWA C200 15286 STAINLESS STEEL PIPE AND TUBING 15293 DOUBLE CONTAINMENT PIPING 15400 PLUMBING FIXTURES AND EQUIPMENT 15430 EMERGENCY EYE/FACE WASH AND SHOWER EQUIPMENT 15525 EXHAUST HEAT RECOVERY SILENCER 15732 AIR CONDITIONING UNITS 15740 HEAT PUMPS 15812 METAL DUCTS 15814 FIBERGLASS REINFORCED PLASTIC DUCTS 15820 DUCTWORK ACCESSORIES 15830 FANS 15852 LOUVERS 15936 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC 15954 TESTING, ADJUSTING, AND BALANCING FOR HVAC 15956 PIPING SYSTEMS TESTING 15958 MECHANICAL EQUIPMENT TESTING

Page 14: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-viii pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

VOLUME 3 OF 7

DIVISION 16 - ELECTRICAL SECTION NO. TITLE 16050 COMMON WORK RESULTS FOR ELECTRICAL 16052 HAZARDOUS CLASSIFIED AREA CONSTRUCTION 16060 GROUNDING AND BONDING 16070 HANGERS AND SUPPORTS 16075 IDENTIFICATION FOR ELECTRICAL SYSTEMS 16123 600-VOLT OR LESS WIRES AND CABLES 16124 MEDIUM VOLTAGE CABLES 16125 FIBER OPTIC CABLE AND APPURTENANCES 16130 CONDUITS 16131 ALUMINUM CABLE TRAYS 16133 DUCT BANKS 16134 BOXES 16140 WIRING DEVICES 16150 LOW VOLTAGE WIRE CONNECTIONS 16151 MEDIUM VOLTAGE CABLE CONNECTIONS 16210 UTILITY COORDINATION 16222 LOW VOLTAGE MOTORS UP TO 500 HORSEPOWER 16232 SINGLE DIESEL FUELED ENGINE GENERATOR ABOVE 200 KW 16240 BATTERY SYSTEMS 16245 LOAD BANK: STATIONARY RESISTIVE 16251 GENERATOR CONTROL SYSTEM FOR PARALLEL OPERATION 16262 VARIABLE FREQUENCY DRIVES 0.50 – 50 HORSEPOWER 16264 VARIABLE FREQUENCY DRIVES 60 – 500 HORSEPOWER 16272 DRY-TYPE TRANSFORMERS 16273 LIQUID FILLED PAD MOUNTED TRANSFORMERS 16285 SURGE PROTECTIVE DEVICES 16290 ELECTRICAL POWER MONITORING 16295 PROTECTIVE RELAYS 16305 ELECTRICAL SYSTEM STUDIES 16342 15-KILOVOLT MEDIUM VOLTAGE METAL CLAD SWITCHGEAR 16411 DISCONNECT SWITCHES 16412 LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS 16413 LOW VOLTAGE INSULATED CASE CIRCUIT BREAKERS 16414 LOW VOLTAGE POWER CIRCUIT BREAKERS

Page 15: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-ix pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

16422 MOTOR STARTERS 16430 LOW VOLTAGE SWITCHGEAR 16441 GROUP-MOUNTED CIRCUIT BREAKER SWITCHBOARDS 16444 LOW VOLTAGE MOTOR CONTROL CENTERS 16445 PANELBOARDS 16472 PACKAGED POWER SUPPLY CENTER 16510 LIGHTING: LED LUMINAIRES 16710 FIRE ALARM AND SMOKE DETECTION SYSTEM 16950 FIELD ELECTRICAL ACCEPTANCE TESTS

DIVISION 17 - INSTRUMENTATION AND CONTROLS SECTION NO. TITLE 17050 COMMON WORK RESULTS FOR PROCESS CONTROL AND

INSTRUMENTATION SYSTEMS 17100 CONTROL STRATEGIES 17101 SPECIFIC CONTROL STRATEGIES 17201 LEVEL MEASUREMENT: SWITCHES 17206 LEVEL MEASUREMENT: ULTRASONIC 17208 LEVEL MEASUREMENT: RADAR PULSE TIME OF FLIGHT (PTOF) 17301 FLOW MEASUREMENT: SWITCHES 17302 FLOW MEASUREMENT: MAGNETIC FLOWMETERS 17305 FLOW MEASUREMENT: THERMAL MASS 17307 FLOW MEASUREMENT: ULTRASONIC TRANSIT TIME 17401 PRESSURE/VACUUM MEASUREMENT: DIAPHRAGM SEALS 17402 PRESSURE/VACUUM MEASUREMENT: INSTRUMENT VALVES 17403 PRESSURE/VACUUM MEASUREMENT: SWITCHES 17404 PRESSURE/VACUUM MEASUREMENT: GAUGES 17405 PRESSURE/VACUUM MEASUREMENT: DIRECT 17501 ANALYZERS: PH GENERAL 17504 ANALYZERS: GAS MONITORS 17507 ANALYZERS: SLUDGE DENSITY METER 17511 ANALYZERS: CONDUCTIVITY 17524 ANALYZERS: SLUDGE DEPTH 17604 TEMPERATURE MEASUREMENT: RTD 17622 WEIGHT MEASUREMENT: STRAIN GAUGE 17631 WEATHER STATION 17710 CONTROL SYSTEMS: PANELS, ENCLOSURES, AND PANEL

COMPONENTS

Page 16: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-x pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

17712 CONTROL SYSTEMS: UNINTERRUPTIBLE POWER SUPPLIES 10 KVA AND BELOW

17720 CONTROL SYSTEMS: PROGRAMMABLE LOGIC CONTROLLERS 17721 CONTROL SYSTEMS: LOCAL OPERATOR INTERFACE (LOI) 17730 CONTROL SYSTEMS: PCS COMPUTER EQUIPMENT 17733 CONTROL SYSTEMS: NETWORK MATERIALS AND EQUIPMENT 17735 CONTROL SYSTEMS: FIELDBUS EQUIPMENT AND DEVICES 17762 CONTROL SYSTEMS: PCS SOFTWARE 17765 PROGRAMMING REQUIREMENTS 17903 SCHEDULES: I/O LIST 17905 SCHEDULES: HMI SOFTWARE POINTS LIST 17950 TESTING, CALIBRATION, AND COMMISSIONING

VOLUME 4 OF 7

DRAWINGS

VOLUME 5 OF 7

DRAWINGS

VOLUME 6 OF 7

DRAWINGS

VOLUME 7 OF 7

APPENDICES

APPENDIX A GEOTECHNICAL STUDY MASTER PLAN AND FACILITIES UPGRADE PROJECT WATER POLLUTION CONTROL PLANT SUNNYVALE, FUGRO, JUNE 2016

APPENDIX B CITY OF SUNNYVALE WATER POLLUTION CONTROL PLANT STANDARD OPERATING PROCEDURES

APPENDIX C TECHNICAL MEMORANDUM SITE INVESTIGATION ANALYSIS, APRIL 2014

APPENDIX D REPORT ON PRE-DEMOLITION INSPECTION & BULK SAMPLING FOR ASBESTOS AND LEAD-CONTAINING MATERIALS AND POLYCHLORINATED BIPHENYL (PCB) CONTAINING OILS PERFORMED ON THE PRIMARY CONTROL BUILDING, APS, GRIT BASINS, AND MAINTENANCE BUILDING, AL CLANCY AND ASSOCIATES, OCTOBER 2015

Page 17: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

City Project No. UY-16/01-20 Invitation for Bids #PW 16-28 City of Sunnyvale Primary Treatment Facility Package 2 December 2016

TABLE OF CONTENTS

TABLE OF CONTENTS TOC-xi pw://Carollo/Documents\Client/CA/Sunnyvale/9265A10/Specifications/Package 02\TOC.docx (FS)

APPENDIX E PERMITS

RWQCB Section 401 Water Quality Certification US Army Corps of Engineers Section 404 Individual Permit CDFW Streambed Alteration Agreement BAAQMD Compliance and Enforcement Agreement BCDC Permit BAAQMD Authority to Construct (TO BE ATTACHED WHEN PERMIT

IS ISSUED)

APPENDIX F CITY OF SUNNYVALE WATER POLLUTION CONTROL PLANT CONTROL SYSTEM STANDARDS, AUGUST 2016

Control System Standards: Standards Governance Control System Standards: Programmable Logic Controller (PLC) Control System Standards: Human Machine Interface (HMI) Control System Standards: Programming Tagging Control System Standards: Communications and Security Control System Standards: HMI Reports Control System Standards: Control Algorithms

Page 18: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 19: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

pw://Carollo/Documents/Client/CA/Sunnyvale/9265A10/Specifications/Package 02/Final_Submittal_Vol_7_AppxCvrs.docx (FS)

APPENDIX D

REPORT ON PRE-DEMOLITION INSPECTION &BULK SAMPLING FOR ASBESTOS ANDLEAD-CONTAINING MATERIALS AND

POLYCHLORINATED BIPHENYL (PCB) CONTAINING OILS PERFORMED ON THE PRIMARY CONTROL

BUILDING, APS, GRIT BASINS, AND MAINTENANCE BUILDING,

AL CLANCY AND ASSOCIATES, OCTOBER 2015

Page 20: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 21: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

AL CLANCY & ASSOCIATES ENVIRONMENTAL HEALTH CONSULTANTS

REPORT ON PRE-DEMOLITION INSPECTION & BULK SAMPLING FOR ASBESTOS & LEAD-CONTAINING MATERIALS

andPOLYCHLORINTATED BIPHENYL (PCB) CONTAINING OILS

PERFORMEDon the

PRIMARY CONTROL BUILDING, APS, GRIT BASINS & MAINTENANCE BUILDINGat the

CITY OF SUNNYVALE WATER POLLUTION CONTROL PLANTSunnyvale, California

onOctober 15 & 22, 2015

byAL CLANCY & ASSOCIATES

279 ADAMS STREET, OAKLAND, CALIFORNIA 94610 [510] 893-9695 P.O. BOX 20974, PIEDMONT, CALIFORNIA 94620

Page 22: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

2

INTRODUCTION

On October 15 & 22, 2015, inspections and bulk sampling for PCB-containing oils, asbestos containing materials (ACM), and lead-containing coatings were performed on the PrimaryControl Building, Auxiliary Pumping Station (APS), Grit Sedimentation Basins & Gallery,and Maintenance Equipment Storage Building at the City of Sunnyvale Water Pollution Control Plant (WPCP) in Sunnyvale, California. The inspection and bulk sampling were conducted to determine whether or not any asbestos-containing materials or lead-containing coatings are present prior to the planned demolition of the structures.

The inspections and sampling were performed by Al Clancy, MPH, Certified Industrial Hygienist, and Cal-OSHA Certified Asbestos Consultant for Al Clancy & Associates at the request of Craig Mobeck, Project Engineer for the City of Sunnyvale Public Works Department.

EXECUTIVE SUMMARY -Asbestos was only detected in residual roofing vent sealant on the Maintenance Equipment Storage.

-Lead was detected at levels ranging from 110 parts-per-million (ppm) to 98,000 ppm. Nine of the samples reached the 5,000 ppm threshold that defines lead-based paint (LBP). The highest levels detected were generally in the reddish-orange paint on the electrical conduit & boxes, although some green and yellow paints also had levels at or above the LBP threshold.

-No PCBs were detected in the oil samples.

EQUIPMENT AND ANALYTICAL METHODS

Bulk samples of suspected asbestos or lead containing materials were collected into plastic containers which were marked with individual identification numbers. Descriptions of each sample was noted in the field notes and included on the chains-of-custody (COC).

Asbestos: Sample analysis was performed using Polarized light Microscopy (PLM). The samples were first examined by stereoscopic, dissecting microscope for determination of homogeneity and preliminary evaluation of composition and presence of fibers. Fibers noted during stereoscopic examination were mounted in various refractive index oils for identification; homogenized portions of the entire samples were also mounted in R.I. oils for identification and quantification of all components. Polarized light examination of the samples was performed on a polarized light microscope with analyzer and 530 nanometer compensator plate. All minerals and/or man-made materials were identified and percentages of each estimated and/or counted.

Lead: Paint chip analysis was by flame atomic absorption spectrometry (FLAA) according to the EPA’s “Standard Operating Procedures” 1991.

Asbestos and lead laboratory analyses were performed by Micro Analytical Laboratories in Emeryville, California. Micro Analytical Laboratories is accredited by the AmericanIndustrial Hygiene Association (AIHA).

Page 23: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

3

EQUIPMENT AND ANALYTICAL METHODS - continued

Hydraulic fluid and engine oil samples were collected into amber bottles directly from the equipment with the assistance of WPCP maintenance personnel. Sample analysis was according to EPA Method 8082.

Oil samples analysis for PCBs was conducted by Curtis & Tompkins, Ltd. in Berkeley, California. Curtis & Tompkins is accredited by the State of California.

The sampling was performed by Al Clancy MPH, Certified Industrial Hygienist, Certified Hazardous Materials Manager, Certified Lead-Related Construction Inspector/Assessor/ProjectDesigner & Monitor, and Certified Asbestos Consultant for Al Clancy & Associates.

RESULTS & DISCUSSION

ASBESTOS:Results of PLM analysis of the various bulk samples collected from the “Project #2” structures(i.e., Auxiliary Pumping Station, Primary Control Building, Grit Sedimentation Basins/Pond & Gallery and Maintenance Equipment Storage Building) indicated that asbestos (5% chrysotile) was detected only in the sample of non-friable sealant on the rooftop vent of the Maintenance Equipment Storage Building. The amount on the vent is relatively insignificant and in fact may be only residual material left over from a asbestos-containing roof abatement in 2012, although it is also possible that it was newly applied at that time in that this kind of asbestos-containing product has not been banned may still be available for use.

No asbestos was detected in the following sampled materials:

Primary Control Building - Packing mud Steam Separation Room Hot 1 Tank

- Sealant for Steam Separation Room conduit array penetration on east side

- Concrete for Engine Deck compressor 1

- Mortar/infill in concrete where hand rails are anchored

- Caulking in expansion joints on catwalk

- Concrete catwalk

- Seal/gasket on ‘off-load’ gates

- Concrete pad at southwest corner of the drying bed

Page 24: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

4

RESULTS & DISCUSSION – Asbestos: continued

Auxiliary Power Supply - Gasket on 2” pipe flange

- Concrete screen platform support

- Concrete upper perimeter

Sedimentation Basins/Ponds - Concrete for basins/ponds

- Grout on sky-lights

- Concrete cracks epoxy

- Topping (dark gray) on concrete walkway

- Black asphaltic patch north basin

Sedimentation Gallery - Concrete pad for pump motor #7

- Mortar/infill in concrete where hand rails are anchored

- Caulking in expansion joints on catwalk

- Concrete catwalk

- Seal/gasket on ‘off-load’ gates

- Concrete pad at southwest corner of the drying bed

Maintenance Equipment Storage Building - Asphalt composition roofing

- Wallboard system (i.e., gypsum-board with joint compound & texture)

- Mortar on bricks

LEAD:Analysis of the paint samples collected from the “Project #2” structures indicated lead present in 67 of the 85 samples at levels ranging from 76 parts-per-million (ppm) to 98,000 ppm. Generally, the highest levels were seen in the orange paints on electrical conduit. Lead levels detected in 17 of the samples are above the 5,000 ppm threshold that defines lead-based paint (LBP) and are in bold font on the accompanying tables. The remaining 18 samples were all non-detect for lead.

Page 25: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

5

RESULTS & DISCUSSION – Lead: continued

Cal-OSHA 8CCR 1532.1 regulates disturbance of lead-containing materials including manual demolition. For manual demolition of paints containing less than 3,000 ppm of lead it is not anticipated that airborne lead exposures would reach the Cal-OSHA 30 micrograms per cubic meter of air (μg/M3) “action level.” The rationale for this claim is that if a dense, and unlikely, cloud of 10 milligrams per cubic meter of air (mg/M3) were generated during manual demolition of paint with 3,000 ppm the lead content of the cloud would be just at the 30 μg/M3 “action level.” A more likely ‘just visible’ dust cloud of 1 mg/M3 would contain 3 μg/M3 of lead. For the lead-based paints (i.e., equal to or greater than 5,000 ppm) under the worst-case 10 mg/M3cloudscenario the Cal-OSHA permissible exposure limit (PEL) of 50 μg/M3 would be reached, but again this level of dust is unlikely and maintaining it for the 8-hour, time weighted average (TWA) applied to the PEL is even more unlikely. For the case of mechanical demolition (e.g., excavators) the exposure risk is reduced due to the remoteness of the equipment operator from the materials with the lead-containing coatings on them, which are mainly metal conduits and pipes. “Hot-work” (e.g., torch-cutting) on lead-containing paints requires supplied air respirators.

PRIMARY CONTROL BUILDING SAMPLE DESCRIPTION LOCATION RESULT SSR-GRAY PAINT DECK SSR - GROUND FLOOR 110 PPM LT. GRAY HOT 1 TANK SUPPORT SSR - GROUND FLOOR <75 PPM LT. BLUE HOT 1 TANK WATER LINE SSR - GROUND FLOOR 110 PPM BROWN PAINT HOT 1 TANK DRAIN LINE SSR - GROUND FLOOR 320 PPM DK. LT. ORANGE PAINT HOT 1 TANK CONDUIT SSR - GROUND FLOOR 20,000 PPM DK. BLUE VERTICAL DRAIN WEST SIDE SSR - GROUND FLOOR 2,000 PPM GREEN PAINT INST. AIR WEST SIDE SSR - GROUND FLOOR 4,200 PPM ORANGE PAINT CONDUIT BY RPI PANEL SSR - GROUND FLOOR 46,000 PPM CRÈME PAINT WEST WALL SSR - GROUND FLOOR <63 PPM ORANGE PAINT CONDUIT ARRAY E. SIDE SSR - GROUND FLOOR 35,000 PPM GRAY PAINT ON DECK/FLOOR ENGINE DECK <76 PPM BROWN PAINT ON COMPRESSOR #1 ENGINE DECK 540 PPM GREEN PAINT ON RECEIVER AIR TANK ENGINE DECK 7,100 PPM GREEN PAINT ON VERTICAL PIPE N.W. ENGINE DECK 32,000 PPM BROWN PAINT ON PIPE N.W. CORNER ENGINE DECK 980 PPM DK. BLUE PAINT #3 WATER N.W. CORNER ENGINE DECK 230 PPM YELLOW PAINT GAS LINE N.W. CORNER ENGINE DECK 62,000 PPM LT. BLUE PAINT #2 WATER N.W. CORNER ENGINE DECK 2,600 PPM CREME PAINT ON WALLS ENGINE DECK 130 PPM RED PAINT ON ENGINE PAD ENGINE DECK <81 PPM GRAY PAINT MAIN ENGINE ENGINE DECK 130 PPM GRAY PAINT GEAR BOX ENGINE #3 ENGINE DECK 1,000 PPM YELLOW PAINT GAS PRESS. REG. ENG #3 ENGINE DECK 98,000 PPM LT. BROWN PAINT LUBE OIL ENG. #3 ENGINE DECK 160 PPM SILVER/RED ON EXHAUST PIPE ENGINE DECK 250 PPM GRAY PAINT ON RED HAND RAIL ENGINE DECK 13,000 PPM WHITE PAINT HOT WATER #2 ENGINE DECK <81 PPM GREEN PAINT ON PUMP #3 PRE-AIR SILENCER PUMP ROOM 4,700 PPM DK. BROWN PAINT PUMP #1 PUMP ROOM <80 PPM DK. GREEN #2 WATER N. WALL PUMP ROOM 140 PPM LT BROWN #2 LUBE OIL N. WALL PUMP ROOM <79 PPM ORANGE PAINT CONDUIT E. WALL PUMP ROOM 39,000 PPM BLUE PAINT #3 WATER E. WALL PUMP ROOM 970 PPM

Page 26: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

6

RESULTS & DISCUSSION - Lead: continued

AUXILIARY PUMPING STATION SAMPLE DESCRIPTION LOCATION RESULT GREE PAINT INST. AIR NEXT TO ROADWAY 1,700 PPM GRAY PAINT ON PLATFORM SUPPORT AT LADDER TO SUMP 680 PPM BROWN PAINT ON CLIMBER SCREEN EAST SIDE OF TANK 600 PPM BROWN PAINT ON LARGE ~2’ PIPE LARGE HOLDING TANK 220 PPM BROWN PAINT ON CLIMBER SCREEN GUARD WEST SIDE PUMP ASSEMBLY 130 PPM DK. BLUE PAINT VERT. PIPE WEST END 570 PPM DK. BLUE PAINT HORIZ. PIPE NORTH SIDE 540 PPM LT. BLUE HORIZ PIPE NORTH SIDE NORTH SIDE 230 PPM ORANGE LG. BOX CONTROL N. SIDE NORTH SIDE <81 PPM ORANGE SWITCH CLIMBER SCREEN EAST END 21,000 PPM BROWN HOIST GATE CONTROL EAST END 2,200 PPM YELLOW PAINT BOLLARD GROUND LEVEL 5,400 PPM

GRIT SEDIMENTATION SAMPLE DESCRIPTION LOCATION RESULT ORANGE CONDUIT SOUTH SIDE BASIN #1 PONDS/BASINS <76 PPM DK. BLUE WATER PIPE S. SIDE BASINE #1 PONDS/BASINS <67 PPM GRAY LIGHT POLE #15 PONDS/BASINS <82 PPM BLACK PAINT AIR RISER BASINE #1 PONDS/BASINS <87 PPM BLUE PAINT INTERIOR BASIN #1 PONDS/BASINS 76 PPM GRAY LIGHT POLE #9 PONDS/BASINS 140 PPM ORANGE CONDUIT BASIN #7 MOTOR PONDS/BASINS 200 PPM BLACK PAINT BASIN #7 MOTOR PONDS/BASINS <78 PPM GRAY PAINT HANDRAIL EAST SIDE PONDS/BASINS <77 PPM GREEN PAINT AUXILIARY BLOWER PONDS/BASINS 6,700 PPM WHITE PAINT ELEC. PANEL N. OF BLOWERS PONDS/BASINS <82 PPM GRAY GRIT WASHER PLATFORM PONDS/BASINS 160 PPM RED/ORANGE PAINT GRIT WASHER CONDUIT PONDS/BASINS 3,600 PPM BROWN GRIT WASHER PIPE PONDS/BASINS 380 PPM BLACK GRIT WASHER HOPPER PONDS/BASINS 780 PPM GRAY PAINT HANDRAIL @ S. & N. WING GALLERY 7,600 PPM CRÈME WALL PAINT BELOW HANDRAIL GALLERY 1,800 PPM GRAY CONCRETE PAD RAW SLUDGE DRIVE GALLERY 310 PPM GREEN PRE-AERATION AIR 10” PIPE GALLERY 2,600 PPM BROWN PROCESS SAMPLING PIPE NR. SINK GALLERY 650 PPM DK. BLUE DRAIN LINE NEAR SINK GALLERY 200 PPM BLACK SLEEPER RAW SLUDGE DRIVE GALLERY 490 PPM BLACK PAINT GRIT REMOVAL PUMP #3 GALLERY 680 PPM DK. GREEN DRAIN NR. N. WING WEST WALL GALLERY 790 PPM BROWN CHECK SCUM EJECTOR N. WING GALLERY 900 PPM GRAY FLOOR COATING N. WING GALLERY 83 PPM ORANGE CONDUIT GRIT REMOVAL #7 GALLERY 17,000 PPM GREEN PAINT PRE-AERATION AIR S. WING GALLERY 1,800 PPM ORANGE CONDUIT GRIT REMOVAL PUMP #4 GALLERY 13,000 PPM DK. BLUE WATER #3 S. WING B/ 3 & 4 GALLERY 95 PPM LT BLUE WATER #2 S. WING B/ 3 & 4 GALLERY 120 PPM GREEN PAINT COMPR. AIR S. WING B/ 3 & 4 GALLERY 2,000 PPM ORANGE CONDUIT CONTROL ROOM GALLERY 20,000 PPM

Page 27: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

7

RESULTS & DISCUSSION - Lead: continued

MAINTENANCE EQUIPMENT STORAGE SAMPLE DESCRIPTION LOCATION RESULT WHITE PAINT ON FLASHING @ ROOF EXTERIOR <73 PPM BROWN METAL PANELS/SIDING EXTERIOR <480 PPM ORANGE/RED PAINT ON CONDUIT INTERIOR EAST SIDE 13,000 PPM GREEN PAINT ON SERVICE AIR LINE INTERIOR EAST SIDE 1,100 PPM BLUE PAINT ON #2 WATER LINE INTERIOR EAST SIDE 330 PPM

Scrap metal recyclers typically are not concerned about lead coatings so that the painted metal materials would not have to be stripped prior to delivery to scrap metal companies.

Assuming recycling of the metal demolition waste, the remaining materials are not expected to exceed the 1,000 ppm total threshold limit concentration that would require disposal as lead-hazardous waste. Nevertheless, prior to disposal the demolition debris should be sampled and characterized for the record.

PCB:Analysis of the samples of hydraulic fluid and engine oils revealed no PCBs detected.

HEALTH EFFECTS & REGULATIONS

The following is meant to be a summary only and not a comprehensive review of asbestos and lead health effects and regulations.

There are no post-abatement air clearance levels, although levels should at least be below the action level. The California Department of Public Health (DPH) has set surface contamination clearance levels for lead abatement as follows:

o 40 μg/ft2 for interior floors o 250 μg/ft2 for interior window sills o 400 μg/ft2 for exterior horizontal surfaces

The requirement to perform surface contamination clearance swipe sampling applies only to lead paint abatement work in public and residential buildings, and does not apply to activities such as the routine preparation and re-painting of surfaces with lead-based or lead-containing paint which are not intended as lead hazard abatement efforts.

Notifications: Contractors must be notified of the presence of lead-containing coatings and results of lead sampling must be made available to potential lessees and purchasers of this property before they become obligated under lease or sales contracts. Landlords and sellers are also required to distribute an educational pamphlet and include standard warning language in their leases or sales contracts. DPH requires notification from contractors performing lead hazard abatement work.

Page 28: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

8

HEALTH EFFECTS & REGULATIONS - continued

Worker Training & Monitoring: The Cal-OSHA lead-in-construction standard (8 CCR 1532.1)sets the 8-hour time-weighted average (8-hr. TWA) permissible exposure limit (PEL) for airborne lead at 50 micrograms per cubic meter of air (μg/m3), with a 30 μg/m3 “action level” (AL) which is also an 8-hour TWA.

Personnel performing “trigger tasks” such as demolition, sanding, abrasive blasting, heat-gun removal, etc. on any lead containing coatings must be properly trained, exposure and medically monitored, and provided with appropriate respiratory and personnel protection pending findings of initial air exposure monitoring.

Waste Disposal: Waste generated during demolition/renovation activities involving materials identified above as lead-containing must be characterized to determine total lead content. If the total lead concentration exceeds the 1,000 ppm total threshold limit concentration (TTLC), then it must be disposed of as hazardous waste.

If the total lead result is below the TTLC, then the waste must be tested for soluble lead and if the result is equal to or greater than the 5 ppm soluble threshold limit concentration (STLC) the waste must also be disposed of as hazardous.

Certification: The DPH requires certification of personnel performing lead inspections, assessments, monitoring, clearance sampling, and hazard abatement in public and residential buildings. For non-public buildings the DPH worker certification is not required.

Building demolition work, including as a part of a renovation/remodel, is not considered lead abatement so that the worker certification does not apply, unless airborne lead exposures exceed the PEL. However, relevant sections of the Cal-OSHA lead construction standard still apply, including initial exposure monitoring and training.

LIMITATIONS

The data, information, interpretations, and recommendations contained in this report are presented solely as bases and guides to the conditions existing at the time of collection of the samples.

The conclusions and professional opinions presented herein were developed by Al Clancy & Associates in accordance with generally accepted practices and procedures.

As with all environmental reports, the opinions expressed here are subject to revisions in the light of new information which may be developed in the future, and no warranties are expressed or implied.

Page 29: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

9

Respectfully submitted,

AL CLANCY & ASSOCIATES

Al Clancy, MPH Certified Industrial Hygienist (ABIH #3879) Certified Hazardous Materials Manager (IHMM #2831) Certified Lead Inspector/Assessor/Project Designer & Monitor (CDPH #2239) Certified Asbestos Consultant (Cal-OSHA #92-0486)

Page 30: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

PRIMARY CONTROL BUILDING GROUND FLOOR ASBESTOS & LEAD SAMPLES LAB REPORTS

Page 31: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 32: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 33: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 34: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 35: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 36: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 37: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

PRIMARY CONTROL BUILDING ENGINE DECK ASBESTOS & LEAD SAMPLES LAB REPORTS

Page 38: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 39: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 40: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 41: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 42: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 43: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 44: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 45: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 46: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

PRIMARY CONTROL BUILDING PUMP ROOM ASBESTOS & LEAD SAMPLES LAB REPORTS

Page 47: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 48: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 49: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 50: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 51: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 52: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

AUXILIARY PUMPING STATION ASBESTOS & LEAD SAMPLES LAB REPORTS

Page 53: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 54: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 55: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 56: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 57: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 58: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 59: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 60: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for

SEDIMENTATION PONDS ASBESTOS & LEAD SAMPLES LAB REPORTS

Page 61: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 62: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 63: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 64: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 65: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 66: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for
Page 67: BID SPECIFICATIONS - Sunnyvale Cleanwater Const. Plans...14624 monorail system 14650 jib cranes 14670 winches division 15 - mechanical section no. title 15050 common work results for