BHGE – Encryo Introduction
Introduction
Business
Execution
Head Quarter in Beijing
Introduction
Encryo is Baker Hughes (a GE company) joint venture in China
company.
Established in 2003, has 320+ staff
Business cover technology supply, engineering and design,
equipment/modular supply and EPC lump sum work.
Oil and Gas
LNG
Petrochemcial /chemical
Others
Encryo Introduction
International engineering with fully (E,P,C) capability.
Expertise in Modular Design / Supply for all Facilities
Experience in Canada, US, Europe, Africa, Middle East, Australia,
China and Other Areas.
Full Capacity in International Standards and Codes and CE
marking.
Business for onshore and offshore
Encryo Introduction
6
Sectors and Services
Low cost engineering
Specialized
Project Services
Gas processing/
LNG
Petrochemical
Other Industry
Feasibility
Studies
Procurement Environmental
Services
Estimating
Permitting Modularization
BHGE
Global Support
Project Delivery
PMC/FEED/EPCM/EPC
Site Service
enCryo
Modular Plant
Maintenance/
Operation
Business Overview
Oil and Gas
Oil/gas field
Gas Processing
CNG
Terminal
Pipeline
LNG/Crogenic
Liquefaction
Terminal
Cryogenic
Application
CO2 Plant
Modular
Skid
Modular
Offshore
Refinery/Chemical
Refinery
Sulfur Management
Organic Chemical
Non-organic
Special Chemical
Other Industry
Distributed Energy
Resource
8
Petrochemical / Chemical
LNG
Oil&Gas
Others Industry
Customer Sectors and Services
Front End Engineering
High Value Engineering
Permitting
Feasibility Studies
Environmental Services
Estimating
Modularization
Construction & HSE Mgt
Procurement Services
Operation
3D CAD & Modeling
PMC / IPMT / EPCM / EPC
Business
Oil and Gas
Oil and gas business cover all oil/gas facilities in the oil/gas field after well,
include:
Well pad
Gathering
3 phase separation
Pipeline
Oil terminal
Etc.
Business-Oil&Gas
Leader in Gas Processing Solutions
Dry Gas Well
Oil/Gas
Separation Wet Gas Well
Oil Well
H2S & CO2
Remover Dehydration
Treatment Facility Refinery
Gas
Processing
LNG
CNG
Gasification
Sulfur Recovery
CO2 Recovery CO2
Sulfur
Natural Gas
LNG
CNG
CO & H2
Ethane
LPG
LPG Tanker
Refinery
Product
Methane
Off Gas
Off Gas
Typical products available:
Well Pad Facility
Dew Point Control
Refrigeration Unit
Dehydration (adsorption and TEG)
Sweetening (Amine)
LPG Recovery
LNG (Liquefaction Unit)
Gas Processing Units
Gasification
Gas Treatment Unit
Dew Point Control and LPG Recovery (11 units)
Refrigeration Unit (48 units)
Dehydration (adsorption and TEG) ( 32 units)
Sweetening / Amine Unit (33 units)
LNG (Liquefaction Unit) (32 units)
Specific Gas Treatment Unit Experience
Scope Description
Service Scope Includes
Concept and Sketch
Design
Procurement
Fabrication/Assembly Management
Packing & Protection for Shipping
Custom Clearance & Logistic Coordination
Site Supervision, commissioning and start up
Business
LNG / CNG
GE fueling solution
Nm^3/day
GE Gas Monetization Solutions
CNG HFA* (Home Fueling Appliance)
Micro LNG
CNG In A Box™ /
Small LNG
230
100,000
2,000,000
Large LNG
23,000
12
CNG In A Box™ Hi-Flow
* Under development
CNG
LNG liquefaction
LNG Terminal and
regas
LNG distribution
Scope Description
GE tech utilized in >80% of large scale LNG systems
2 – 600 x 104 Nm3/Day
Liquefaction
Modular Plant
Since 1989
300,000Nm3/Day LNG, SCMR
1991, Wills Texas, USA 150,000Nm3/Day LNG, DEXP, 2004, China
750,000Nm3/Day LNG, PCMR, 2008, Peru
6 Sets 50,000Nm3/Day Mobile LNG,
Under Construction, Australia
Natural Gas Distribution -Fueling Solutions
LNG Truck Loading
BHGE CNG in a Box
LNG (Liquefaction Unit) (48 units)
LNG Terminal (4 projects)
LNG Regas facility (12 projects)
CNG ( 220 units)
LNG related Business
2x50,000Nm3/d Movable LPG
300,000nm3/d LNG Plant
1,000,000nm3/d LNG Plant
Business
Chemical / Petrochemcial
Chemical/Petrochemical Plant
Encryo has provided the design and project management for
30+ Chemical Plant Projects include:
Celanese Nanjing Acetic Acid Project
BOC UK Gasification Plant
Tehong Inner Mongolia Ethanol Plant
Saudi Addar Chemical Plant
P&G Tongxiang Detergent Plant
P&G Tokyo Detergent Plant
Ashlang Changzhou Ploymer Plant
Taixin CPKelco Special Chemical plant
Eastman Chemical Nanjing
Refinery
Units
FCC Gasoline
SRU Tail Gas etc.
Hydrogenation Recycle H2
FCC/DCU LPG
FCC/DCU Off Gas
LPG/Light Gasoline/C4
MTBE
Amine Process Improvement
Desulfurization Technology
(API-DS)
FCC Gasoline Extraction and
Hydrodesulfurization
Technology (EHDS)
MTBE Desulfurization Technology
(MTBE-DS)
Caustic Process Improvement
Desulfurization Technology
(CPI-DS)
---Caustic Residue/Tail Gas
Zero Discharge Technology
Sulfur Management
Together with reputable licensor, Encryo has been providing
the technology, design and project management for sulfur
related business, areas include:
Gasoline upgrade
MTBE technology and upgrade
Hydrodesulphurization
Clause
Tail gas treatment
Caustic sulfur removal without waste
Amine
Abstraction sulfur chemical from light oil
SO2 recap and treatment
Execution
Standards and code used:
European Union Directive (CE Marking)
Mechanical: ASME, BS EN
Piping: ASME, ANSI
Instrument/Electrical: IEC, ISO
C/S/A: ACI /AISC
Design meet following country requirement: Europe, US,
Canada, Australia, Japan, Middle East and China.
Standard and Codes
450+ modules / skid in last 5 years
80+ modules / skid in under design /fabrication now
Fully capable to design, procurement and fabrication per
US standards and codes and meet US/Europe/Austrlia
client requirement
Modular Experience
Engineering Full Service & Design Capabilities
Engineering Management
Process
Piping & Layout
Mechanical
Civil/Structure/Architecture
Instrument
Electrical
CAE & 3D Design
Intelligent Systems
Procurement Services
Full Range
Procurement Service
Expediting
Inspection Service
Logistics
Coordination
Site Material
Control Purchasing
Vendor Sourcing
Data / Audit
Project
Procurement
Subcontract
Administration
Fabrication Yard (Partner)
1600+ staff
450,000 ft2
Partial projects didn’t shown due to confidential issues
Experience
Experience and Capabilities
Dew Point Control and LPG Recovery (11 units)
Refrigeration Unit (48 units)
Dehydration (adsorption and TEG) ( 32 units)
Sweetening / Amine Unit (33 units)
LNG (Liquefaction Unit) (32 units)
Specific Gas Treatment Unit Experience
Amine Unit for Remove H2S and CO2
Capacity: 10,000~4,000,000 nm3/d (one train)
Operating Pressure: 0.5~10Mpa
Amine Unit
Dew Point Control and LPG Recovery
Capacity: 10,000~2,000,000 nm3/d (one train)
Operating Pressure: 0.5~10Mpa
Dew Point Control and LPG Recovery
LNG Unit
Capacity: 50,000~5,000,000 nm3/d (one train)
1mmscfd-150mmscfd (one train)
Different process are available
LNG
Flare Gas Recovery
Petrochina Tazhong Flare Gas Recovery (2 units, CNG)
Estimated TIC USD4million (each unit)
Project Dates Aug 2012- May 2013
Project Description
80,000nm3/d (3MMSCFD) flare gas recovery,
This facility include; Encryo scope:
Perform all process design work
Perform all engineering design
Local authority coordination
Cost estimate
Procurement service
Site supervision
3 phase separation
Feed gas compressor
Molecular sieves bed
CNG compression
Heavy hydrocarbon storage
CNG storage tanks
Utility/facility
Dew Point Control and LPG Recovery
SRC LPG Project (Dew Point Control and LPG Recovery )
Estimated TIC USD19million
Project Dates May 2007- August 2009
Project Description
510,000nm3/d LPG Recovery Unit,
This facility include;
Encryo scope:
Perform all process design work
Perform all engineering design
Cost estimate
Procurement
Training
Dehydration unit
Refrigeration unit
Amine unit
Distillation
LPG storage
Utility/facility
LPG Recovery
Sinopec YPC LPG Project (Dew Point Control and LPG Recovery)
Estimated TIC USD24million
Project Dates May 2005- March2007
Project Description
600,000nm3/d dew point control and LPG
recovery unit,
This facility include;
Encryo scope:
Perform all process design work
Perform all engineering design
Procurement service
Site supervision
Training
Feed gas compressor
Dehydration
Refrigeration unit
LPG recovery unit
LPG storage
Utility/facility
Typical Products from Previous Projects
Project Pictures
3D Design
Client approved to use
3D Design
Client approved to use
15m
3.5m 3.5m
Modular layout & Segment
Module Size: 15m(L) X 3.5m(W) X 10m(H)
Modular Design layout
Container Module
Module for UK
Skid 01
Skid 02-1
Skid 02-2
LNG Modular Plant
300,000nm3/d LNG
300,000Nm3/d LNG
200,000nm3/d LNG
2x50,000Nm3/d Movable LPG
PLC / SCADA
Petrochina 100,000Nm3/d LNG Plant
CBM LNG Modules
Shell 1,000,000nm3/d LNG Modular Unit
LNG Plant
LNG Plant
Overview
Thank You
www.encryo.com; www.ge.com