  • Bethel Park High SchoolBethel Park High SchoolBethel Park, PA,

    Weekly Progress SlideshowMay 7 2010May 7, 2010

  • Continued Cut / Fill Operations

    Constructing access ramp between Areas D & E. (Right)

  • Foundations- Footers & Caissons

    Area E Step Footing (Left) andArea E Step Footing (Left) and Freshly Poured, Area H Caissons (Above).

  • Foundation Drainage and A li ti f W t fiApplication of Waterproofing

  • Retaining Walls- Area ERetaining Walls Area E

  • Retaining Walls- Area HRetaining Walls Area H

  • Steel Framing- Areas B & CSteel Framing Areas B & C

  • Steel Framing- Areas B & CSteel Framing Areas B & C

  • Steel Framing- Areas B & CSteel Framing Areas B & C

  • Installation of Metal DeckingInstallation of Metal Decking

  • Scheduled Work for Next Few Weeks:Scheduled Work for Next Few Weeks:

    • Underground Building MEP Items• Underground Building MEP Items.• Foundation and Retaining Wall Construction. • Waterproofing and Backfilling in Areas D F & H• Waterproofing and Backfilling in Areas D, F & H.• Crane Relocation to Courtyard.

    St l F b i ti ti t Si l F b• Steel Fabrication continues at Sippel Fab.• Steel Erection in Areas C, B & A.

    HVAC R h I ’ (A C)• HVAC Rough-In’s (Area C)• Electrical Rough-In’s (Areas C, D & H)

  • Thank YouThank YouThe EndThe End

    By: Ryan WallaceIntern Massaro CMS LLCIntern, Massaro CMS, LLC