© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Presented by
Heavy Haul Equipment
Logistic Strategies in
Iron-Ore Mining
Michel Plourde, Director Systems
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Agenda
• About ArcelorMittal Mines Canada
• Challenges & Strategies
– Mindset
– Technologies
– Integration details
• Applications and Use Cases
• How the PI System was Applied
• Results & Benefits
• Conclusion
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
ArcelorMittal is the World’s Number one Steelmaker
5
• Mines Canada - largest iron-ore producer
of the ArcelorMittal mining group
• Operates two open-pit mines in
Northern Quebec in Canada at Mont-
Wright and Fire Lake
• 26Mt annual concentrate production
capacity
• Best in class pellet plant producing 10Mt of
high quality iron-ore pellets.
• Quebec's North Shore - two interdependent companies, ArcelorMittal Mining Canada and ArcelorMittal Infrastructure Canada, that haul and ship over 26 million metric tons of iron ore products every year for the international steel market.
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
ArcelorMittal Mines Canada – Heavy Haul Operator
6
• Transports concentrate between Mont-
Wright and port facilities in Port-Cartier over
a privately owned 420 Km railway
• Operates fleet of 36 GE and EMD
locomotives and over 1200 ore cars on
single rail mainline;
• Largest private shipping port in Canada with
29Mt shipped in 2015 and over 500 ship
calls to port
• Operates Truck & Shovel open-pit mines with some 15 high capacity electric excavators and some 50 Caterpillar 240T and 400T trucks
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
From Pit to Client– Transportation logistics
Open PIT Mining Extraction Beneficiation
@ 62% Fe
Rail Haul Pelletizing plant Shipping
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Transforming our mining
business with supply
chain resilience
8
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Key Elements – What’s the problem?
• Following expansion project at the Mine 16Mt – 23Mt WE REALIZED
NEED TO DE-BOTTLNECK our TRANSPORTATION SUPPLY CHAIN!
• We required an architecture to transform our data into “information” to be more resilient.
– What were the means?
• Add Context to data to provide Actionable information
• Juxtapose operational excellence metrics VS business metrics;
• Implement automatic and consistent Event and Excursion Tracking to add Resilience to transportation supply chain;
• Integrate Pit-to-Client decision making and planning through Data Collaboration
• Follow the Money Trail throughout each transportation process along the supply chain
• Implement one consistent Information HUB integrating all systems
9
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Data Actionable Information
10
Valu
e
Effort Required
Descriptive
Analytics
Diagnostic
Analytics
Predictive
Analytics
Prescriptive
Analytics
What
Happened?
Why did it
Happen?
What do we want to
happen Next?
How to make
It Happen?
Accountability
Collaboration
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
A little history …. PI Servers as data sources
Prior to 2012, PI Server typically used as a data historian
• 2 PI Servers, 50 000 points
• PI ProcessBook, PI DataLink, ActiveView…
• 3 types of interfaces
• PI OLEDB Provider
• Heavy on in-house applications
12
PI Server
50 000 points
Process
DCS & PLCProduction
units
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Evolving ….
Since 2012
• PI System Infrastructure as an Entreprise Data HUB, 140 000 points
• PI Visualization Suite along with PI Coresight
• PI Asset Framework (AF)
• Event Frames
• PI ProcessBook, PI DataLink, PI Manual Logger, Notifications
• 6 types of interfaces
• PI OLEDEB Enterprise
• Integration to COTS systems and applications
13
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
The PI Infrastructure as an information source
14
Data
Operations & SCP
• DCS & PLCs
• Mining, Railway, Port
systems & equipment
Maintenance Systems
• Events & State
• Statistics & KPI’s
ERP & business systems
• KPI’s & Forecasting
• Health & Safety
• Costing….
Context Information
PI Server AF
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Asset Framework – Key to Providing Context
15
UC’s were quite revealing
… Lobby discussions with Osvaldo
Bascur ... Lance Fountaine …
• Defined UNIT Template
• Equipment
• Process
• Plant
• Business Unit
• Time Usage Model
• Costing and Value
• ……
• Transformation of DATA and
EVENTS into Information
PROVIDING CONTEXT
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Asset Framework - the Power of Aggregation
Operational Data
Ore Type, Hardness, Separation index, Transport Index, Air Holdup,
Berthing queue, conveyor performance, Drilling performance, Truck
factor, Conformity to Plan….
Equipment & Process Status Data
Running, Maintenance, Stopped, Down, Trouble
Performance Metrics
Cost of Operation, Cost of shift Excursion, Running Cost of Downtime
Event
Kwh/ton, Hours Running, Rec/Grade, Tailings, weight recovery
Drill Consumables, Grinding balls, Limestone, Coke breeze, etc.
Min/Max/Stdev, Rate of Change, Totals
By Process Line, Plant Area, Process Equipment
For an hour, shift, day, week.
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Following The Money
• Bridging the gap between operations and business systems
• Extended Equipment Availability
• Reducing Operational Costs
• Leverage new operational technologies
• Engaging the Workforce and Partners
• Real-time enterprise Collaboration, Scheduling and Benchmarking
• So… How does this translate?
17
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Predicting the Result is the Prescription for Success!
18
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016 19
Aggregated Information for Shift Crew
Benefits:
• Make information timely enough to
mitigate production issues
• Same actionable data available to all.
• Real-time reporting available anytime
& anywhere
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Mobile Collaboration Across all Platforms
• Timely information
ensuring
accountability
• 24/7 availability
from anywhere
21
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Time Usage Model - A Practical Implementation
23
Production
Production time
Production target
Startup Shutdown
Reduction
Operating = Process/Eqpt providing at required level
Delayed = Equipment not providing service level required
Stopped = Equipment/Process idle
Down = Equipment broken
Maintenance = Scheduled Maintenance
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Mapping Processes and Equipment Against the UNIT
24
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Tracking Supply Chain with Event Frames
25
• Operating On Target
• Delayed Replan
• Stopped Replan
• Down Replan
• Maintenance Planned…
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
One Information Source for Optimised Supply Chain Planning
26
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Logistics Decisions Based on Context
28
Leading to clear and precise decisions!
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 201630
Benefits• Information collaboration with the PI System
– The right information in the right context
– Faster decision making
– Operations KPIs for management
– Enterprise KPIs for operations
– Collaboration of multiple systems and processes
• No additional Capex expenditure
• New collaborative Mindset in place
• Employee Engagement
• Integrated logistics process enabled with PI System as data HUB
Work in progress to continually improve the processes;
Striving to fulll INTEGRATION ALONG SUPPLY CHAIN
All levels of the company are driving to meet the same objective!
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Picture / Image
RESULTSCHALLENGE SOLUTION
31
COMPANY and GOAL
Company
Logo
31
Heavy-Haul Equipment Logistic
Strategies Using the PI System
ArcelorMittal is Mines Canada on Quebec's North Shore - The world's number one steelmaker hauls and ships over 26 million metric tons of iron ore products every year for the international steel marketWANTS to
Transform its mining business with supply chain resilience.
Increase speed and quality of logistic decisions to support an increase of 10+ Mt of throughput following expansion.
Use the PI System as an Information Hub to “Contextualize” data and manage all aspects of the supply chain.
Throughput targets of 26Mt were met as shipping capacity increased with no infrastructure investments
• Transform data into actionable information;
• Support KPI-based planning to drive business goals;
• Assist in scheduling maintenance at the right time based on market requirements
• Visibility on all strategic, tactical and
operational planning challenges;
• Increased production and ore
shipments from 23 to 26 Mt with
additional revenue of 120M$ in 2015
Mines Canada
• Reduction in variable production costs;
• Increase visibility of entire supply chain;
• Resilience in adapting to disruptions and plan changes
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Contact Information
Michel Plourde
Director of Systems
ArcelorMittal Mines Canada
3232
© Copyright 2016 OSIsoft, LLCUSERS CONFERENCE 2016
Questions
Please wait for the
microphone before asking
your questions
Please remember to…
Complete the Online Survey
for this session
State your
name & company
33
http://ddut.ch/osisoft
search OSISOFT in the app store