31
Best Practices for Roadway Best Practices for Roadway Tunnel Design, Construction, Tunnel Design, Construction, Maintenance, Inspection, and Maintenance, Inspection, and Operations Operations NCHRP 20 NCHRP 20 - - 68A, Scan 09 68A, Scan 09 - - 05 05 U.S. Domestic Scan Program U.S. Domestic Scan Program SCOBS 2010 Annual Meeting SCOBS 2010 Annual Meeting K. Thompson K. Thompson NCHRP Federal Highway Administration Federal Highway Administration American Association of State American Association of State Highway and Transportation Officials Highway and Transportation Officials National Cooperative National Cooperative Highway Research Program Highway Research Program 1

Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Best Practices for RoadwayBest Practices for RoadwayTunnel Design, Construction,Tunnel Design, Construction,Maintenance, Inspection, andMaintenance, Inspection, and

OperationsOperationsNCHRP 20NCHRP 20--68A, Scan 0968A, Scan 09--0505

U.S. Domestic Scan ProgramU.S. Domestic Scan Program

SCOBS 2010 Annual MeetingSCOBS 2010 Annual Meeting –– K. ThompsonK. Thompson

NCHRP

Federal Highway AdministrationFederal Highway AdministrationAmerican Association of StateAmerican Association of State

Highway and Transportation OfficialsHighway and Transportation OfficialsNational CooperativeNational Cooperative

Highway Research ProgramHighway Research Program1

Page 2: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

2

DisclosureDisclosure

This scan is being conducted as a part of NCHRP Project 20-68A, the U.S. DomesticScan program. The program was requested by the American Association of StateHighway and Transportation Officials (AASHTO), with funding provided throughthe National Cooperative Highway Research Program (NCHRP). The NCHRP issupported by annual voluntary contributions from the state Departments of

Transportation. Partial support for selected scans is provided by the U.S. Federal

Highway Administration or other agencies. Each scan is selected by AASHTO andthe NCHRP 20-68A Project Panel to address a single technical topic of broad interestto many state departments of transportation and other agencies. The purpose of each

scan and of Project 20-68A as a whole is to accelerate beneficial innovation by (a)

facilitating information sharing and technology exchange among the states and othertransportation agencies and (b) identifying actionable items of common interest.

Further information on the NCHRP 20-68A U.S. Domestic Scan program is availableat http://144.171.11.40/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=1570"

Page 3: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

3

BackgroundBackground

Recent events have highlighted the needfor national tunnel standards for new andexisting tunnels: Suspended tunnel ceiling collapse in Boston

Truck tunnel fire in southern California

Tunnel roof cracking in Colorado

Tunnel flooding in Virginia

2005 International Tunnel Scan

Page 4: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

4

2009 Domestic Tunnel Scan2009 Domestic Tunnel Scan

Proposed domestic scan on “Best Practicesfor Roadway Tunnel, Design, Construction,Maintenance, Inspection, and Operations”

Purpose:

Assist in addressing the need for nationaltunnel standards & a national tunnel inventory

Investigate tunnels on state, regional, & localhighway systems

Page 5: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

5

Domestic Tunnel ScanDomestic Tunnel ScanDevelopmentDevelopment

Scan proposal approved December 2008

Planning meeting held May 2009

Scan conducted September-October 2009

Page 6: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

6

Scan FocusScan Focus

Design & construction standards practicedby state DOTs & other tunnel owners

Maintenance & inspection practices

Operations, including safety as related toemergency response capability

Specialized tunnel technologies

Inventory criteria used by tunnel owners

Page 7: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

7

Scan FocusScan Focus

Including:

Fire suppression

Traffic management

Incident detection & management

Analysis, design, & construction repairs ofexisting tunnels

Page 8: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

8

Amplifying QuestionsAmplifying Questions –– Key TopicsKey Topics

Topic 1 – Specialized technologies currently used forexisting and new U.S. roadway tunnel design,construction, maintenance, inspection, and operations

Topic 2 – Standards, guidance, and best practices forexisting and new roadway tunnels in the U.S.

Topic 3 – Current criteria used by owners and statesto identify tunnels in their inventory

Specific questions for Topics 1 & 2 were grouped bydesign, construction, maintenance, inspection,operations, and a general topics group

Page 9: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Scan Team MembersScan Team Members

9Central Artery Tunnel, Massachusetts Turnpike Authority

Page 10: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Scan Team MembersScan Team Members

FHWA:FHWA: Jesus Rohena, Co-Chair, DC

Barry Brecto, WA

TRB Tunnels Committee:TRB Tunnels Committee: Fulvio Tonon, UT-Austin

Report Facilitator:Report Facilitator: Mary Lou Ralls, TX

State DOTs:State DOTs: Kevin Thompson, Co-Chair, CA Alexander Bardow, MA Bijan Khaleghi, WA Louis Ruzzi, PA Michael Salamon, CO

NCHRP Contract:NCHRP Contract:

Harry Capers, PrincipalInvestigator, Arora andAssociates

10

Page 11: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Scan HostsScan Hosts

Western U.S.:Western U.S.:

Caltrans

Colorado DOT

Washington State DOT

Seattle DOT Sound Transit

Web Conferences:Web Conferences:

Alaska DOT

District of Columbia DOT

Pennsylvania DOT

East Coast:East Coast:

Chesapeake Bay Bridge andTunnel District

Massachusetts TurnpikeAuthority

Port Authority of New Yorkand New Jersey

Virginia DOT

11

Page 12: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

6/10/2010 12

Domestic Scan Sites SelectedDomestic Scan Sites Selected

Boston, MA

NY/ NJ

Hampton Roads, VA

Denver, CO

Seattle, WA

San Francisco, CA

Alaska DOT Webinar

PennDOT Webinar

Washington DCDOT Webinar

Page 13: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Submersed Tube - Virginia

Page 14: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Eisenhower Tunnel - Colorado

Page 15: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Caldecott Tunnels in Oakland, CA

Page 16: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

16

Findings/RecommendationsFindings/Recommendations –– 11

Develop standards, guidance, and best practicesfor roadway tunnels.

Develop design criteria for new tunnels

Consider future rehabilitation

Use subject matter experts in advisory role

Develop design & construction standards &

guidelines for tunnel construction methods

Page 17: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

17

Findings/RecommendationsFindings/Recommendations –– 22

Develop emergency response system unique to eachfacility, considering human behavior, facilityventilation, & fire mitigation.

Perform facility fire ventilation study & develop plan;consider realistic spread of fire & smoke includingtoxic gases & heat, & effect of ventilation types on fire

Considering human instinctive response, improvefacility procedures to direct public to safety Consider better signage & intelligible public address systems

Consider additional research on spread of fire &smoke & how people react

Page 18: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

I-5 Truck Route UC- RepairSanta Clarita, California

Page 19: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

19

Findings/RecommendationsFindings/Recommendations –– 33Develop & share inspection practices among tunnel

owners.

Make tunnel inspection programs as similar as possible

to bridge inspection programs

Load rate per AASHTO Manual for Bridge Evaluation;

do structural analyses after physical or load changes

Develop inspection frequencies, minimum

coding requirements, & federal coding manual

Develop baseline data inventory for tunnels

Communicate best practices

Page 20: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

20

Findings/RecommendationsFindings/Recommendations –– 44

Consider inspection & maintenance operationsduring design stage.

Involve all disciplines in design phase

Provide adequate, safe, & unimpeded access to allcomponents

Tradeoffs between access & a practical design have cost &safety impacts for inspection & maintenance over life oftunnel

Page 21: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Inspection & Maintenance Access

Page 22: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

22

Findings/RecommendationsFindings/Recommendations –– 55

Develop site-specific plans for safe & efficientoperation of roadway tunnels.

Develop concise site-specific operations manual

Implement state-of-the-art video surveillance &

communication systems

Develop separate incident response manual

Restrict hazardous cargo or if no alternate route,

develop well-defined emergency response &

ventilation plan

Page 23: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

Operations Control Center

Page 24: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

24

Findings/RecommendationsFindings/Recommendations –– 66A tunnel includes a long-term commitment to

provide funding for preventive maintenance,system upgrades, & training/retention of operators.

Develop proactive plan that considers life-cycle costs

and establishes target level of condition, system

reliability, & performance

Consider future availability of replacement parts

Develop preservation guidelines for funding purposes

Develop financial mgmt. plan with separate funding

Develop training, retention, & succession plan

Page 25: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

25

Findings/RecommendationsFindings/Recommendations –– 77

Share existing technical knowledge within industryto design a tunnel.

Provide range of practical tunnel design options

File design documents electronically with backup

for easy retrieval by controlling owner

Share details & best practices while maintaining security

Page 26: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

26

Findings/RecommendationsFindings/Recommendations –– 88

Provide education & training in tunnel design &construction.

Offer graduate tunneling courses in university

civil engineering programs

Provide highway tunnel owner & FHWA engineers

with access to academic & industry education &

training on tunnels

Include on-line courses & certificates

Page 27: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––
Page 28: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

28

Implementation of Findings &Implementation of Findings &RecommendationsRecommendations

A step in process of developing national

standards & guidance

Provides data for consideration in development

of national tunnel inventory

Implementation lead: AASHTO HSCOBS

Technical Committee for Tunnels (T-20) in

conjunction with FHWA & TRB Tunnels &

Underground Structures Committee (AFF60)

Page 29: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

29

Implementation of Findings &Implementation of Findings &RecommendationsRecommendations

Planned activities:

Distribution of tunnel safety brochure

Research coordination & development ofneed statements

Technical presentations

Webinars

Articles & papers

Page 30: Best Practices for RoadwayBest Practices for Roadway Tunnel …sp.bridges.transportation.org/Documents/2010 SCOBS... · 2010-06-14 · 8 Amplifying QuestionsAmplifying Questions ––

30

Roadway Tunnel Related TopicsRoadway Tunnel Related Topics NCHRP Task 261 - Best Practices QC/QA for

Tunnels

NCHRP Task 276 - Development of Guidelines forRehabilitation of Existing Highway and Rail TransitTunnels

AASHTO HSCOBS (T-11) research proposal “LRFDSpecifications” for Roadway Tunnels

TRB SHRP 2 - High-Speed Nondestructive TestingMethods for Defects Behind or Within Tunnel Linings

AASHTO Tunnel Manual currently being published

Advanced Notice of Proposed Rulemaking