    Rosemount Tank Radar AB Confidential

    Best Pract ices:

    Ins tal l ing New RadarTank Gaug ingfor level and overfilling on all typeof tanks with all type of products

    Hans Manner

    Nicolas Odru

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    2/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 2 Rosemount Tank Radar AB Confidential 2

    Best Pract ices Ins tal l ing New Radar Tank Gaug ing

    Industry Trends Engineering standards and guidelines

    What equipment do I need?

    How do I get it installed on my tank? How do I get the readings in the control

    room?

    Safety & Overfill Prevention

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    3/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 3 Rosemount Tank Radar AB Confidential 3

    Compl ience to Standards

    API standards 3.1B Automatic Tank Gauging 7 Temperature Measurements

    3.3 LPG measurements

    3.6 Hybrid Measurements 2350 Overfill Protection

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    4/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 4 Rosemount Tank Radar AB Confidential 4

    Accu racy Performance

    Pattern approvals for Custody Transfer Accuracy OIML R85:2008

    International Organization of Legal Metrology

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    5/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 5 Rosemount Tank Radar AB Confidential

    Indus try Trends

    Radar

    Continuous

    Redundancy

    Safety

    IEC 61508

    API 2350

    Wireless

    Openness

    Internet

    Mechanical

    Point Switch

    Closed systems

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    6/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 6 Rosemount Tank Radar AB Confidential 6

    Tank Equipment

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    7/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 7 Rosemount Tank Radar AB Confidential

    Tank Equ ipment

    7

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    8/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 8 Rosemount Tank Radar AB Confidential

    Tank Equ ipment Fixed Roo f Tank

    8

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    9/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 9 Rosemount Tank Radar AB Confidential

    Tank Equ ipment Float ing Roo f Tank

    9

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    10/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 10 Rosemount Tank Radar AB Confidential 10

    Tank Equ ipment

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    11/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 11 Rosemount Tank Radar AB Confidential

    Tank Equ ipment

    11

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    12/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 12 Rosemount Tank Radar AB Confidential 12

    Where to ins tal l the equ ipment on the tank?

    Look for Man ways Other nozzles

    Gauge hatches

    Still Pipes

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    13/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 13 Rosemount Tank Radar AB Confidential 13

    Where to ins tal l the Tank Equipm ent?

    Manway 20Nozzle 8

    Nozzles 2, 4, 8Gauge hatch

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    14/90

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    15/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 15 Rosemount Tank Radar AB Confidential 15

    Use exist ing s t i l l pipes

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    16/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 16 Rosemount Tank Radar AB Confidential 16

    Use the exist ing Sti l l Pipe

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    17/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 17 Rosemount Tank Radar AB Confidential 17

    Dont worry about dirty and slotted pipes

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    18/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 18 Rosemount Tank Radar AB Confidential 18

    Where to ins tal l the Tank Equipm ent?

    Still Pipesfitted inexistingaccesshatch

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    19/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 19 Rosemount Tank Radar AB Confidential 19

    Where to ins tal l the Tank Equipm ent?

    Still Pipefitted inexistingaccesshatch

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    20/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 20 Rosemount Tank Radar AB Confidential 20

    Where to in stal l the Tank Gauge

    What does API Ch 3.1B say?

    Roof mounting

    Close to the tank wall to avoid roof flexing influence

    Still pipe

    Slotted

    Fixed at the bottom end

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    21/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 21 Rosemount Tank Radar AB Confidential 21

    Where to instal l the Temperature Sensor?

    Same location as theRadar

    Separate nozzle

    Still pipe arrangements

    Floating Roofpenetration options

    The Temp Sensor canbe combined with aWater bottom sensor

    Transmitter

    Temp sensor

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    22/90

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    23/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 23 Rosemount Tank Radar AB Confidential 23

    Where to instal l the Temperature Sensor?

    Same locationas the Radar

    Fixed Roof tank

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    24/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 24 Rosemount Tank Radar AB Confidential 24

    Where to instal l the Temperature Sensor?

    Same locationas the Radar

    Floating RoofTank

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    25/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 25 Rosemount Tank Radar AB Confidential 25

    Where to instal l the Temperature Sensor?

    Floating RoofTank

    Roofpenetration

    thru a rubbergasket

    Support andcabling at theplatform level

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    26/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 26 Rosemount Tank Radar AB Confidential 26

    Where to in stal l the Pressu re Senso r (Dens ity) ?

    Lower end of the tank

    Existing nozzles

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    27/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 27 Rosemount Tank Radar AB Confidential 27

    Where to instal l the Local Readout?

    At the gauge hatch

    At grade level

    By the road side

    Or at all of the above

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    28/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 28 Rosemount Tank Radar AB Confidential 28

    Local Readou t

    At Grade Level

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    29/90

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    30/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 30 Rosemount Tank Radar AB Confidential 30

    Where to instal l the Local Readout?

    By the road side

    Drive-thru readings

    Day and night

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    31/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 31 Rosemount Tank Radar AB Confidential 31

    How to connect a new system to the Contro l Room

    Use existing cabling

    Emulation

    Minimized conduit free new cabling

    Wireless

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    32/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 32 Rosemount Tank Radar AB Confidential

    32

    Emulat ion : Remove Old, Instal l NewPlug n Play

    Disconnect the old cabling Remove the old Gauge

    Mount the radar antenna Mount the new Gaugeand connect the wiring

    Done!

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    33/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 33 Rosemount Tank Radar AB Confidential 33

    How to connect a new system to the Contro l Room

    OLD NEW

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    34/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 34 Rosemount Tank Radar AB Confidential 34

    How to connect a new system to the Contro l Room

    Minimized new cabling

    Intrinsically Safe

    Conduit Free

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    35/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 35 Rosemount Tank Radar AB Confidential 35

    How to connect a new system to the Contro l Room

    Minimized new cabling

    LAX Airport

    One paircable

    IntrinsicallySafe

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    36/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 36 Rosemount Tank Radar AB Confidential 36

    How to connect a new system to the Contro l Room

    Wireless

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    37/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 37 Rosemount Tank Radar AB Confidential 37

    How to connect a new system to the Contro l Room

    Wireless

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    38/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 38 Rosemount Tank Radar AB Confidential 38

    How to connect a new system to the Contro l Room

    Wireless

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    39/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 39 Rosemount Tank Radar AB Confidential 39

    How to connect a new system to the Contro l Room

    Wireless

    Well proven

    On 2500+ tanks

    Robust

    Safe

    IEC 62591 standard

    O fi l l P t t i i th R t 2160

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    40/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 40 Rosemount Tank Radar AB Confidential

    Overfi l l Protect ion w ith Rosemount 2160Wireless Vibrat ing Forks LeveL Switch

    No wiresNo moving parts

    No re-calibration Long power module life

    Self Checkingcondition monitoring

    Virtually unaffected byprocess conditions

    9 years at 1 minuteupdate rate

    Min update rate of1s for control

    Steam,vapors, dust

    Densitychanges

    Temperaturechanges

    I t t Ad d Di t i

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    41/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 41 Rosemount Tank Radar AB Confidential

    Inst rument Advanced Diagnos t ics-Health /Self Check Diagnos t ics The 2160 continuously performs instrument health diagnostics to self-

    check the condition of the fork and sensor Control room can be alerted to emerging issues allowing preventative

    maintenance to be scheduled- avoid process down-time

    2160 Frequency Monitoring : interface detection between oil/water,wet sand/liquid...

    Fault conditions detected Standard Enhanced

    Process memory failure

    External damage to fork

    Internal wire disconnect or break

    Internal damage to sensor

    Excessive corrosion to fork

    O fil l P t t i i th R t

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    42/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 42 Rosemount Tank Radar AB Confidential

    Overf il l Protect ion w i th Rosemount3308 Wireless Guided Wave Radar

    No wiresNo moving parts

    No re-calibration Long power module life

    Single probe handlescoating better

    Virtually unaffected byprocess conditions

    9 years at 1 minuteupdate rate

    Steam,vapors, dust

    Densitychanges

    Temperaturechanges

    P ti M i t i th

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    43/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 43 Rosemount Tank Radar AB Confidential

    Proact ive Maintenance w ithAdvanced Diagnos t ics Signal Quality Metrics alerts potential measurement

    problems, e.g. caused by probe coatingField

    Time

    SignalQuality

    Control room

    Level PV

    Signal quality

    Low

    High

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    44/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 44 Rosemount Tank Radar AB Confidential

    Rosemount Level Wireless2160 Fork Switc h & 3308 Guided Wave Radar

    Inaccessible or uneconomic alarms: Fast installation of additional instruments

    Gain access to advanced diagnostics: Self Check Diagnostics

    Signal Quality Metrics

    Integrate more information into any controlroom host without new I/O:

    Eliminate costly cable runs System integration

    http://www2.emersonprocess.com/en-US/brands/rosemount/Temperature/Single-Point-Measurement/648-Wireless/Pages/index.aspxhttp://www2.emersonprocess.com/en-US/plantweb/wireless/products/Pages/SmartWirelessGateway.aspxhttp://www2.emersonprocess.com/en-US/brands/rosemount/Temperature/Single-Point-Measurement/648-Wireless/Pages/index.aspxhttp://www2.emersonprocess.com/en-US/brands/rosemount/Temperature/High-Density-Measurement/848T-Wireless/Pages/index.aspxhttp://www2.emersonprocess.com/en-US/plantweb/wireless/products/Pages/SmartWirelessGateway.aspx
  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    45/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 45 Rosemount Tank Radar AB Confidential 45

    Readout

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    46/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 46 Rosemount Tank Radar AB Confidential 46

    Readout

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    47/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 47 Rosemount Tank Radar AB Confidential 47

    Extended Readout

    Intranet

    Internet

    Portabledevices

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    48/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 48 Rosemount Tank Radar AB Confidential 48

    Get Tank info d istr ibu ted

    Open protocols

    OPC

    Modbus

    WebServer

    Overfi l l Safety

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    49/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 49 Rosemount Tank Radar AB Confidential 4

    Overfi l l Safety Tank Gaug ing plays an important par t

    Passive protection layer

    Emergency response layer

    Process control layerProcessShutdown

    Active protection layer

    ProcessValue

    Process control layer

    Safety layerEmergencyShut Down

    Time In Use

    Why overf i l l prevent ion

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    50/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 50

    Why overf i l l prevent ionis impo rtant for Industry ? EUSafety and Environmental directives

    are more and more restrictive : Member States are obliged to transpose it

    into a national law within the set deadline

    Directive 96/61/EC on integrated pollutionprevention and control

    Directive 96/82/EC on the control of majoraccident hazards involving dangeroussubstance

    Tank overfill is an important concern :

    Industry have to improve the Safetyof theirsites to reduce pollution risks

    Industrial requests for overfillprevention device applications

    have risen in recent years

    Buncef ield o i l s torage UK

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    51/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 51

    Buncef ield o i l storage, UKDec . 2005

    Overfill of fuel storage tank Bad configuration and faulty

    independent high level switchon floating roof

    20 large storage fuel tankstook fire

    Over 40 people injured

    UK Health and safetyExecutive investigation

    resulted in 25recommendations on fuelstorage sites

    Tank Overf i l l Prevent ion :

    http://localhost/var/www/apps/conversion/tmp/scratch_3//upload.wikimedia.org/wikipedia/commons/6/67/Hemel_Hempstead_fuel_explosion_map.jpg
  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    52/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 52

    Tank Overf i l l Prevent ion :Key Points

    Detection should beindependantof the primarylevel measurement device andseparate failure alarm ispreferable

    Proof testing is required :manual test or internaldiagnostics can be used

    Redundancy with differenttechnologies is a commonstrategy for critical leveldetection

    Tank Overf i ll Prevent ion :

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    53/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 53

    Tank Overf i ll Prevent ion :Customer chal lenge

    Customers need to increase theSafetyof their existinginstallation :

    More information needed forcontinual supervision in the

    control room (less operatorsround)

    Additionalindependent highlevel alarm on your primarylevel measurement

    Remote tank locations / Nolocal power supply

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    54/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 54

    Sing le Point fo r Overf i ll Protect ion

    Advantages :

    Independent safety system

    Not affected by processchanges

    Different types of on/off alarmoutput available

    Functionality is less dependanton configuration, mechanicalinstallation and start up

    To be considered :

    One device for each levelalarm

    Power supply needed forelectronics

    No separate fault signaloutput

    Vibrat ing Forks is one of the most common

    techno logy used in process industry

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    55/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 55

    Rosemount Vibrating Forks Port fo l io

    OEM Core Premier

    Advanced Health Diagnostic

    PlantWeb alerts

    Direct load,PNP,DPDT Relay, 8/16

    IS NAMUR

    Direct Load,

    PNP/PLC

    Direct load,PNP, 12VRelay, 8/16

    IS NAMUR

    Wireless HART

    -70 +260C

    SIL 2 High & Low Level

    -70 +260C

    Diagnostic

    Diagnostic

    -40 +180C

    -40 +150C

    -40 +150C

    Basic or Advanced :

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    56/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 56

    Basic or Advanced :What is the d if ference ?

    Forks

    Frequency Circuit

    Output Circuit

    Forks

    Frequency Circuit

    Output Circuit

    Self Check Diagnostics

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    57/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 57

    The frequency band below show the six sensors states of the 2130

    switching bands divided into three groups :Valid sensor frequency : Wet or DryFault Sensor frequency :

    Too Wet : broken wire to the cassette, over-temperature, build-upToo Dry : sensor body lost mass due to damage to sensor, corrosion

    Zero Frequency

    2130/2160 Sensor States

    *DFF : Dry Forks FrequencySensor switching limits are percentage of the calibrated frequency

    Wet Dry Too Dry

    Frequency Switching Bands

    Too Wet

    0HZ DFF28% DFF + 4.5%

    DFF* 1400 Hz

    2130 Self Check available on all

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    58/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 58

    Direct Load

    PNP

    Relay

    Namur

    8-16mA*

    Fault Relay*

    2130Self Check available on allCassettes :

    *ProvideSeparate fault signal output

    Electr ical Ins tal lat ion o f the 2130

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    59/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 59

    Electr ical Ins tal lat ion o f the 2130

    8-16mAHigh Level A larm

    PSU

    Hazardous AreaSafe Area

    Dry = On

    Heartbeat LED On

    +

    -ION= 15...17 mA

    PE

    (Ground)

    U = 24 Vdc Nominal

    Drives 4-20 mA Analog Intput

    +

    -

    Compatible with NAMUR NE43

    Electr ical Ins tal lat ion o f the 2130

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    60/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 60

    Electr ical Ins tal lat ion o f the 2130

    8-16mAHigh Level A larm

    PSU

    Hazardous AreaSafe Area

    Dry = On

    +

    -

    PE

    (Ground)

    U = 24 Vdc Nominal

    Drives 4-20 mA Analog Intput

    +

    -

    Heartbeat LED Flashing1Hz

    IOFF= 7.5...8.5 mA

    Compatible with NAMUR NE43

    Electr ical Ins tal lat ion o f the 2130

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    61/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 61

    Electr ical Ins tal lat ion o f the 2130

    8-16mAFaul t Condi t ions

    PSU

    Hazardous AreaSafe Area

    Dry = On

    +

    -

    PE

    (Ground)

    U = 24 Vdc Nominal

    Drives 4-20 mA Analog Intput

    +

    -

    Heartbeat LED Pulsed

    IFAULT< 3.7 mA

    Compatible with NAMUR NE43

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    62/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 62 Rosemount Tank Radar AB Confidential

    Overfi l l Safety Tank Gauge Redundancy

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    63/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 63 Rosemount Tank Radar AB Confidential

    Overfi l l Safety Tank Gauge Redundancy

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    64/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 64 Rosemount Tank Radar AB Confidential

    Overfi l l Safety Tank Gauge Redundancy

    Level & Roof Gauging

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    65/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 65 Rosemount Tank Radar AB Confidential

    Overf i l l Safety

    Level & Roof Gauging

    Common Si tuat ion :

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    66/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 66 Rosemount Tank Radar AB Confidential

    Common Si tuat ion :Only One Tank Opening

    Need for two

    Radars but only oneopening available

    What to do?

    66

    I want two Radarson one nozzle!

    Put 2 Radar in 1

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    67/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 67 Rosemount Tank Radar AB Confidential 67

    2 Radar in 1 Only one tank

    opening

    Easy installation

    Total electricseparation

    Operates in parallel

    On-Tank Redundancy Made Easy

    2-in -1 Radar

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    68/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 68 Rosemount Tank Radar AB Confidential 68

    On-Tank Redundancy Made Easy

    Redundancy

    Dual operation

    Gauging

    Overfill Alarm Separated

    Built in Spare

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    69/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 69 Rosemount Tank Radar AB Confidential 69

    Safety Standard Compliant

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    70/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 70 Rosemount Tank Radar AB Confidential 70

    Safety Standard Comp liant

    API 2350 compliant

    IEC 61508 certified

    Certified SIL2

    Certified SIL3

    TV, (WHG) certified

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    71/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 71 Rosemount Tank Radar AB Confidential 71

    Summary

    Its easy to install new

    Tank Gauging Minimum Wiring

    Wireless

    Use existing tankopening

    Use exisiting Still Pipes

    Easy to connect toother systems

    Get Overfil Protectionat the same time

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    72/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 72 Rosemount Tank Radar AB Confidential

    Rosemount Raptor System

    5900S RadarLevel Gauge

    2410 Tank Hub

    2240S Multi-inputTemperatureTransmitter

    2120/2160Liquid Level switch

    2230 Graphical

    Field Display

    5300/5400Radar LevelTransmitter

    375 /475 FieldCommunicator

    Smart WirelessTHUM Adapter

    644 TemperatureTransmitter with SinglePoint Temperature Sensor

    3051S PressureTransmitter

    2160/65/75 FieldCommunication Unit

    2180 Field BusModem

    TankMater PCWorkstation inNetwork

    Smart WirelessGateway

    2410 2410 2410

    2410

    2230

    5900S

    THUM 5900S2240S5900S2240S

    5400

    5300

    644

    3051S

    TankMaster.net

    644

    5400

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    73/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 73 Rosemount Tank Radar AB Confidential 73

    Typical ins truments on LNG storage tanks

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    74/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 74 Rosemount Tank Radar AB Confidential 74

    Rapto r 5900S radar fo r LNG Radar replacing servo in almost all

    applications

    Primary, secondary and HLAmeasurement using only radar

    Highest accuracy over full range

    Advanced signal processing

    FMCW @ 10 GHz High sensitivity for long range

    Digital accuracy reference

    No aging or temperature effects

    Verification during operation

    SIL 2 and SIL 3 certified Unique 2-in-1 redundancy

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    75/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 75 Rosemount Tank Radar AB Confidential 75

    Antenna5900S LPG/LNG Designed for

    Liquefied gas in LPG/LNG tanks 4 in still-pipes sch 10 or 40

    100 mm still-pipes

    Quartz/Ceramic window as pressure sealing

    Verification pin function

    Optional Ball valve, fire-proof

    Rosemount 2051 Pressure sensor

    Flange available in six versions 4 in. class 150, class 300

    6 in. class 150, class 300

    8 in. class 150, class 300

    New AdapterSeal & ballvalve

    Level Accuracy: 5900S

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    76/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 76 Rosemount Tank Radar AB Confidential

    -0.001

    0

    0.001

    0 5 10 15 20 25 30

    Downwards manual log

    Upwards manual log

    Downwards autolog

    Upwards autolog

    76

    yexceeds OIML R85:2008

    4

    -4

    2

    -2

    0

    Old (R85:1998)

    New (R85:2008)

    (mm)

    3

    1

    -1

    -3Old (R85:1998)

    New (R85:2008)

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    77/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 77 Rosemount Tank Radar AB Confidential 77

    Veri f icat ion of Level measu rement

    On-line verification duringnormal operation

    Verification is made inside thetank

    Tank remains closed and novalves need to be

    maneuvered A reference pin is mounted

    inside the still-pipe for levelverification

    A bottom reflection ring

    mounted at the end of thepipe is used for zeroverification

    Photos

    Raptor

    http://localhost/var/www/apps/conversion/tmp/scratch_3/Photoshttp://localhost/var/www/apps/conversion/tmp/scratch_3/Photos
  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    78/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 78 Rosemount Tank Radar AB Confidential 78

    SIL 2 and 3 Cert i f ied

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    79/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 79 Rosemount Tank Radar AB Confidential 79

    Bui l t In Proo f Test ing

    The two Radars

    will constantlysafety-checkeach other

    Long time betweenmanual ProofTesting

    No man on the

    tank Saves $$$

    Avoid Manual Proof Testing

    Onl ine pro of test ing

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    80/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 80 Rosemount Tank Radar AB Confidential 80

    Onl ine pro of-test ing

    -check

    Blueand Redlines separated for visibility.An alarm is given if the exceeds a defined limit

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    81/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 81 Rosemount Tank Radar AB Confidential

    2-in -1 Radar

    81

    Radar #1Radar #2 High Level of Safety

    SIL3 Rated

    Low Cost Installation

    On Tank Redundancy

    High Availability

    Less Proof Testing

    Less Verification

    Saves $$$in many ways

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    82/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 82 Rosemount Tank Radar AB Confidential

    2x Radars on the same tank - wel l pro ven

    Some LNG si tes using radar from Emerson:Radar gauges have been used for more than 10 years to measure level at several LNG

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    83/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 83 Rosemount Tank Radar AB Confidential 83

    Radar gauges have been used for more than 10 years to measure level at several LNGimport terminals in Japan. So far 15+ tanks.

    Trunkline LNG Co.Terminal, Lake Charles, USA

    Gaz de FranceTerminal, Fos Cavaou, France Complete Emerson system solution CPC Taiwan - Receiving terminal, Northern Taiwan Qatargas II - Production site, 5 new tanks,

    Complete Emerson system solution Radar for all Level measurements (primary, secondary, HLA)

    FreeportQuintana Island - Receiving terminal, Texas, USA

    Recent projects system solutions, Rex radar gauges combined with Whessoe LTDs

    Cheniere - Sabine PassReceiving terminal, Louisiana, US. 5 tanks

    Fluxys - Zeebrgge - Existing receiving terminal, Belgium

    Exxon - Golden Pass LNGReceiving terminal, Texas US. 5 tanks

    Woodside - Pluto LNGNew export terminal. 2 tanks in Ph I.

    PTT LNGMap Ta PutNew receiving terminal

    AGANynashamn LNGNew receiving terminal. 1 tk Ph. 1

    Chevron - GorgonNew tanks at export site, 2 LNG + 4 Condensate tanks. Totally 24

    radars

    Polskie LNGNew receivin terminal 2 tks.

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    84/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 84 Rosemount Tank Radar AB Confidential 84

    Rosemount LNG Radar Benefi ts

    No moving parts

    No re-calibration No maintenance

    SIL2 / SIL3 safety functions

    Built in High Alarm

    On-Line verification during operation inside the tank

    Custody Transfer Accuracy

    Conformance to API, OIML, ISO and other standards

    Proven Technology

    Many excellent references on LNG and LPG

    Anything for a single gauge to a complete LNG Management System

    E d W t il (Wh )

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    85/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 85 Rosemount Tank Radar AB Confidential 85

    Emerson and Wrts il (Whessoe)

    Combining the skills and experience from two

    organizations into an LNG storage management solutionprovider

    Rosemount Tank Gauging

    Rosemount is the measurement division within Emerson

    Focus on high accuracy radar level gauges and supportinginstruments for temperature and pressure

    System supplier, incl project management

    Wrtsil Calais (Whessoe product name)

    Focus on LTD gauges and LNG management software

    Total LNG Tank Ins trumentat ion Solut ion

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    86/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 86 Rosemount Tank Radar AB Confidential 86

    Loop 1

    Loop 2

    5900S +2410

    Hi-Hi alarm

    5900S LNG + 2410Secondary level

    1146 LTD

    TANKN1

    Level alarms to ESD

    5900S LNG + 2410

    Primary level

    2240S and 566multiple spot

    temp

    2240S and 566multiple spot

    temp

    Total LNG Tank Ins trumentat ion Solut ion

    http://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/PUBLIC/Commerciaux/DOCUMENTATION%20COMMERCIALE/leaflets/last%20version/level/FICHE%201706B.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/PUBLIC/Commerciaux/DOCUMENTATION%20COMMERCIALE/leaflets/last%20version/level/FICHE%201706B.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/Users/pversluijs/Mes%20documents/Documentation/level/FICHE%201146-EN-1.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/PUBLIC/Commerciaux/DOCUMENTATION%20COMMERCIALE/leaflets/last%20version/level/FICHE%201706B.pdf
  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    87/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 87 Rosemount Tank Radar AB Confidential 87

    TANK N

    2

    Loop 2

    TANK N

    1

    951020 mA lo op / RS232C

    951020 mA lo op / RS232C

    Loop 1

    Loop 2

    Loop 1

    LNG Manager

    LNG Manager

    DCS

    LNG Roll-OverPredictor

    Serial l ink

    Serial l ink

    Serial l ink

    Serial link

    TRL2 bus for Raptor/2410 if not using

    WM660

    FCU 2160

    T k d t i l (R l l O )

    http://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/Users/pversluijs/Mes%20documents/LNG%20Expert%20Product%20Demo%20full.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/Users/pversluijs/Mes%20documents/LNG%20Expert%20Product%20Demo%20full.ppt
  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    88/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 89 Rosemount Tank Radar AB Confidential 89

    Tank detai l (Roll-Over)

    S l f j t d

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    89/90

    [File Name or Event]Emerson Confidential27-Jun-01, Slide 90 Rosemount Tank Radar AB Confidential 90

    Sample of pro ject awardsCombined Emerson / Rosemount Tank Radar and Whessoe LTD

    - recent projects realized at LNG terminals or production sites : ChenieresSabine Pass Exxons Golden Pass Fluxys (Zeebrugge, Belgium) Pluto LNG Australia

    Nynashamn Sweden PTT LNG Map Ta Put Thailand Sonatrach Skikda LNG Algeria Gorgon Australia Polskie LNG Many new projects to be decided shortly

    LNG f ( t i d)

  • 7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf

    90/90

    LNG references (con t inued)

    Golden Pass LNG - new receiving terminal in

    Texas; Five tanks. Installation 2008. CB&I US is the main EPC for the complete project

    Whessoe LTD + software (Wrtsil)

    Emerson partner to Wrtsil and supplied: 5 x Radar Rex 3960 5 x SDAU

    5 x MST Cryo

    2 x FCU 2160

    http://www.goldenpasslng.com/assets/files/Sabine_locale_map.pdf