7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
1/90
Rosemount Tank Radar AB Confidential
Best Pract ices:
Ins tal l ing New RadarTank Gaug ingfor level and overfilling on all typeof tanks with all type of products
Hans Manner
Nicolas Odru
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
2/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 2 Rosemount Tank Radar AB Confidential 2
Best Pract ices Ins tal l ing New Radar Tank Gaug ing
Industry Trends Engineering standards and guidelines
What equipment do I need?
How do I get it installed on my tank? How do I get the readings in the control
room?
Safety & Overfill Prevention
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
3/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 3 Rosemount Tank Radar AB Confidential 3
Compl ience to Standards
API standards 3.1B Automatic Tank Gauging 7 Temperature Measurements
3.3 LPG measurements
3.6 Hybrid Measurements 2350 Overfill Protection
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
4/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 4 Rosemount Tank Radar AB Confidential 4
Accu racy Performance
Pattern approvals for Custody Transfer Accuracy OIML R85:2008
International Organization of Legal Metrology
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
5/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 5 Rosemount Tank Radar AB Confidential
Indus try Trends
Radar
Continuous
Redundancy
Safety
IEC 61508
API 2350
Wireless
Openness
Internet
Mechanical
Point Switch
Closed systems
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
6/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 6 Rosemount Tank Radar AB Confidential 6
Tank Equipment
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
7/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 7 Rosemount Tank Radar AB Confidential
Tank Equ ipment
7
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
8/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 8 Rosemount Tank Radar AB Confidential
Tank Equ ipment Fixed Roo f Tank
8
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
9/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 9 Rosemount Tank Radar AB Confidential
Tank Equ ipment Float ing Roo f Tank
9
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
10/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 10 Rosemount Tank Radar AB Confidential 10
Tank Equ ipment
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
11/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 11 Rosemount Tank Radar AB Confidential
Tank Equ ipment
11
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
12/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 12 Rosemount Tank Radar AB Confidential 12
Where to ins tal l the equ ipment on the tank?
Look for Man ways Other nozzles
Gauge hatches
Still Pipes
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
13/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 13 Rosemount Tank Radar AB Confidential 13
Where to ins tal l the Tank Equipm ent?
Manway 20Nozzle 8
Nozzles 2, 4, 8Gauge hatch
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
14/90
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
15/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 15 Rosemount Tank Radar AB Confidential 15
Use exist ing s t i l l pipes
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
16/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 16 Rosemount Tank Radar AB Confidential 16
Use the exist ing Sti l l Pipe
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
17/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 17 Rosemount Tank Radar AB Confidential 17
Dont worry about dirty and slotted pipes
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
18/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 18 Rosemount Tank Radar AB Confidential 18
Where to ins tal l the Tank Equipm ent?
Still Pipesfitted inexistingaccesshatch
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
19/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 19 Rosemount Tank Radar AB Confidential 19
Where to ins tal l the Tank Equipm ent?
Still Pipefitted inexistingaccesshatch
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
20/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 20 Rosemount Tank Radar AB Confidential 20
Where to in stal l the Tank Gauge
What does API Ch 3.1B say?
Roof mounting
Close to the tank wall to avoid roof flexing influence
Still pipe
Slotted
Fixed at the bottom end
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
21/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 21 Rosemount Tank Radar AB Confidential 21
Where to instal l the Temperature Sensor?
Same location as theRadar
Separate nozzle
Still pipe arrangements
Floating Roofpenetration options
The Temp Sensor canbe combined with aWater bottom sensor
Transmitter
Temp sensor
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
22/90
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
23/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 23 Rosemount Tank Radar AB Confidential 23
Where to instal l the Temperature Sensor?
Same locationas the Radar
Fixed Roof tank
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
24/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 24 Rosemount Tank Radar AB Confidential 24
Where to instal l the Temperature Sensor?
Same locationas the Radar
Floating RoofTank
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
25/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 25 Rosemount Tank Radar AB Confidential 25
Where to instal l the Temperature Sensor?
Floating RoofTank
Roofpenetration
thru a rubbergasket
Support andcabling at theplatform level
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
26/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 26 Rosemount Tank Radar AB Confidential 26
Where to in stal l the Pressu re Senso r (Dens ity) ?
Lower end of the tank
Existing nozzles
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
27/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 27 Rosemount Tank Radar AB Confidential 27
Where to instal l the Local Readout?
At the gauge hatch
At grade level
By the road side
Or at all of the above
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
28/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 28 Rosemount Tank Radar AB Confidential 28
Local Readou t
At Grade Level
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
29/90
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
30/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 30 Rosemount Tank Radar AB Confidential 30
Where to instal l the Local Readout?
By the road side
Drive-thru readings
Day and night
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
31/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 31 Rosemount Tank Radar AB Confidential 31
How to connect a new system to the Contro l Room
Use existing cabling
Emulation
Minimized conduit free new cabling
Wireless
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
32/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 32 Rosemount Tank Radar AB Confidential
32
Emulat ion : Remove Old, Instal l NewPlug n Play
Disconnect the old cabling Remove the old Gauge
Mount the radar antenna Mount the new Gaugeand connect the wiring
Done!
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
33/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 33 Rosemount Tank Radar AB Confidential 33
How to connect a new system to the Contro l Room
OLD NEW
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
34/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 34 Rosemount Tank Radar AB Confidential 34
How to connect a new system to the Contro l Room
Minimized new cabling
Intrinsically Safe
Conduit Free
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
35/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 35 Rosemount Tank Radar AB Confidential 35
How to connect a new system to the Contro l Room
Minimized new cabling
LAX Airport
One paircable
IntrinsicallySafe
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
36/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 36 Rosemount Tank Radar AB Confidential 36
How to connect a new system to the Contro l Room
Wireless
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
37/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 37 Rosemount Tank Radar AB Confidential 37
How to connect a new system to the Contro l Room
Wireless
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
38/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 38 Rosemount Tank Radar AB Confidential 38
How to connect a new system to the Contro l Room
Wireless
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
39/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 39 Rosemount Tank Radar AB Confidential 39
How to connect a new system to the Contro l Room
Wireless
Well proven
On 2500+ tanks
Robust
Safe
IEC 62591 standard
O fi l l P t t i i th R t 2160
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
40/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 40 Rosemount Tank Radar AB Confidential
Overfi l l Protect ion w ith Rosemount 2160Wireless Vibrat ing Forks LeveL Switch
No wiresNo moving parts
No re-calibration Long power module life
Self Checkingcondition monitoring
Virtually unaffected byprocess conditions
9 years at 1 minuteupdate rate
Min update rate of1s for control
Steam,vapors, dust
Densitychanges
Temperaturechanges
I t t Ad d Di t i
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
41/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 41 Rosemount Tank Radar AB Confidential
Inst rument Advanced Diagnos t ics-Health /Self Check Diagnos t ics The 2160 continuously performs instrument health diagnostics to self-
check the condition of the fork and sensor Control room can be alerted to emerging issues allowing preventative
maintenance to be scheduled- avoid process down-time
2160 Frequency Monitoring : interface detection between oil/water,wet sand/liquid...
Fault conditions detected Standard Enhanced
Process memory failure
External damage to fork
Internal wire disconnect or break
Internal damage to sensor
Excessive corrosion to fork
O fil l P t t i i th R t
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
42/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 42 Rosemount Tank Radar AB Confidential
Overf il l Protect ion w i th Rosemount3308 Wireless Guided Wave Radar
No wiresNo moving parts
No re-calibration Long power module life
Single probe handlescoating better
Virtually unaffected byprocess conditions
9 years at 1 minuteupdate rate
Steam,vapors, dust
Densitychanges
Temperaturechanges
P ti M i t i th
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
43/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 43 Rosemount Tank Radar AB Confidential
Proact ive Maintenance w ithAdvanced Diagnos t ics Signal Quality Metrics alerts potential measurement
problems, e.g. caused by probe coatingField
Time
SignalQuality
Control room
Level PV
Signal quality
Low
High
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
44/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 44 Rosemount Tank Radar AB Confidential
Rosemount Level Wireless2160 Fork Switc h & 3308 Guided Wave Radar
Inaccessible or uneconomic alarms: Fast installation of additional instruments
Gain access to advanced diagnostics: Self Check Diagnostics
Signal Quality Metrics
Integrate more information into any controlroom host without new I/O:
Eliminate costly cable runs System integration
http://www2.emersonprocess.com/en-US/brands/rosemount/Temperature/Single-Point-Measurement/648-Wireless/Pages/index.aspxhttp://www2.emersonprocess.com/en-US/plantweb/wireless/products/Pages/SmartWirelessGateway.aspxhttp://www2.emersonprocess.com/en-US/brands/rosemount/Temperature/Single-Point-Measurement/648-Wireless/Pages/index.aspxhttp://www2.emersonprocess.com/en-US/brands/rosemount/Temperature/High-Density-Measurement/848T-Wireless/Pages/index.aspxhttp://www2.emersonprocess.com/en-US/plantweb/wireless/products/Pages/SmartWirelessGateway.aspx7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
45/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 45 Rosemount Tank Radar AB Confidential 45
Readout
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
46/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 46 Rosemount Tank Radar AB Confidential 46
Readout
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
47/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 47 Rosemount Tank Radar AB Confidential 47
Extended Readout
Intranet
Internet
Portabledevices
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
48/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 48 Rosemount Tank Radar AB Confidential 48
Get Tank info d istr ibu ted
Open protocols
OPC
Modbus
WebServer
Overfi l l Safety
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
49/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 49 Rosemount Tank Radar AB Confidential 4
Overfi l l Safety Tank Gaug ing plays an important par t
Passive protection layer
Emergency response layer
Process control layerProcessShutdown
Active protection layer
ProcessValue
Process control layer
Safety layerEmergencyShut Down
Time In Use
Why overf i l l prevent ion
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
50/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 50
Why overf i l l prevent ionis impo rtant for Industry ? EUSafety and Environmental directives
are more and more restrictive : Member States are obliged to transpose it
into a national law within the set deadline
Directive 96/61/EC on integrated pollutionprevention and control
Directive 96/82/EC on the control of majoraccident hazards involving dangeroussubstance
Tank overfill is an important concern :
Industry have to improve the Safetyof theirsites to reduce pollution risks
Industrial requests for overfillprevention device applications
have risen in recent years
Buncef ield o i l s torage UK
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
51/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 51
Buncef ield o i l storage, UKDec . 2005
Overfill of fuel storage tank Bad configuration and faulty
independent high level switchon floating roof
20 large storage fuel tankstook fire
Over 40 people injured
UK Health and safetyExecutive investigation
resulted in 25recommendations on fuelstorage sites
Tank Overf i l l Prevent ion :
http://localhost/var/www/apps/conversion/tmp/scratch_3//upload.wikimedia.org/wikipedia/commons/6/67/Hemel_Hempstead_fuel_explosion_map.jpg7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
52/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 52
Tank Overf i l l Prevent ion :Key Points
Detection should beindependantof the primarylevel measurement device andseparate failure alarm ispreferable
Proof testing is required :manual test or internaldiagnostics can be used
Redundancy with differenttechnologies is a commonstrategy for critical leveldetection
Tank Overf i ll Prevent ion :
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
53/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 53
Tank Overf i ll Prevent ion :Customer chal lenge
Customers need to increase theSafetyof their existinginstallation :
More information needed forcontinual supervision in the
control room (less operatorsround)
Additionalindependent highlevel alarm on your primarylevel measurement
Remote tank locations / Nolocal power supply
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
54/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 54
Sing le Point fo r Overf i ll Protect ion
Advantages :
Independent safety system
Not affected by processchanges
Different types of on/off alarmoutput available
Functionality is less dependanton configuration, mechanicalinstallation and start up
To be considered :
One device for each levelalarm
Power supply needed forelectronics
No separate fault signaloutput
Vibrat ing Forks is one of the most common
techno logy used in process industry
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
55/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 55
Rosemount Vibrating Forks Port fo l io
OEM Core Premier
Advanced Health Diagnostic
PlantWeb alerts
Direct load,PNP,DPDT Relay, 8/16
IS NAMUR
Direct Load,
PNP/PLC
Direct load,PNP, 12VRelay, 8/16
IS NAMUR
Wireless HART
-70 +260C
SIL 2 High & Low Level
-70 +260C
Diagnostic
Diagnostic
-40 +180C
-40 +150C
-40 +150C
Basic or Advanced :
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
56/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 56
Basic or Advanced :What is the d if ference ?
Forks
Frequency Circuit
Output Circuit
Forks
Frequency Circuit
Output Circuit
Self Check Diagnostics
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
57/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 57
The frequency band below show the six sensors states of the 2130
switching bands divided into three groups :Valid sensor frequency : Wet or DryFault Sensor frequency :
Too Wet : broken wire to the cassette, over-temperature, build-upToo Dry : sensor body lost mass due to damage to sensor, corrosion
Zero Frequency
2130/2160 Sensor States
*DFF : Dry Forks FrequencySensor switching limits are percentage of the calibrated frequency
Wet Dry Too Dry
Frequency Switching Bands
Too Wet
0HZ DFF28% DFF + 4.5%
DFF* 1400 Hz
2130 Self Check available on all
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
58/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 58
Direct Load
PNP
Relay
Namur
8-16mA*
Fault Relay*
2130Self Check available on allCassettes :
*ProvideSeparate fault signal output
Electr ical Ins tal lat ion o f the 2130
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
59/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 59
Electr ical Ins tal lat ion o f the 2130
8-16mAHigh Level A larm
PSU
Hazardous AreaSafe Area
Dry = On
Heartbeat LED On
+
-ION= 15...17 mA
PE
(Ground)
U = 24 Vdc Nominal
Drives 4-20 mA Analog Intput
+
-
Compatible with NAMUR NE43
Electr ical Ins tal lat ion o f the 2130
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
60/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 60
Electr ical Ins tal lat ion o f the 2130
8-16mAHigh Level A larm
PSU
Hazardous AreaSafe Area
Dry = On
+
-
PE
(Ground)
U = 24 Vdc Nominal
Drives 4-20 mA Analog Intput
+
-
Heartbeat LED Flashing1Hz
IOFF= 7.5...8.5 mA
Compatible with NAMUR NE43
Electr ical Ins tal lat ion o f the 2130
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
61/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 61
Electr ical Ins tal lat ion o f the 2130
8-16mAFaul t Condi t ions
PSU
Hazardous AreaSafe Area
Dry = On
+
-
PE
(Ground)
U = 24 Vdc Nominal
Drives 4-20 mA Analog Intput
+
-
Heartbeat LED Pulsed
IFAULT< 3.7 mA
Compatible with NAMUR NE43
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
62/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 62 Rosemount Tank Radar AB Confidential
Overfi l l Safety Tank Gauge Redundancy
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
63/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 63 Rosemount Tank Radar AB Confidential
Overfi l l Safety Tank Gauge Redundancy
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
64/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 64 Rosemount Tank Radar AB Confidential
Overfi l l Safety Tank Gauge Redundancy
Level & Roof Gauging
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
65/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 65 Rosemount Tank Radar AB Confidential
Overf i l l Safety
Level & Roof Gauging
Common Si tuat ion :
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
66/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 66 Rosemount Tank Radar AB Confidential
Common Si tuat ion :Only One Tank Opening
Need for two
Radars but only oneopening available
What to do?
66
I want two Radarson one nozzle!
Put 2 Radar in 1
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
67/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 67 Rosemount Tank Radar AB Confidential 67
2 Radar in 1 Only one tank
opening
Easy installation
Total electricseparation
Operates in parallel
On-Tank Redundancy Made Easy
2-in -1 Radar
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
68/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 68 Rosemount Tank Radar AB Confidential 68
On-Tank Redundancy Made Easy
Redundancy
Dual operation
Gauging
Overfill Alarm Separated
Built in Spare
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
69/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 69 Rosemount Tank Radar AB Confidential 69
Safety Standard Compliant
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
70/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 70 Rosemount Tank Radar AB Confidential 70
Safety Standard Comp liant
API 2350 compliant
IEC 61508 certified
Certified SIL2
Certified SIL3
TV, (WHG) certified
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
71/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 71 Rosemount Tank Radar AB Confidential 71
Summary
Its easy to install new
Tank Gauging Minimum Wiring
Wireless
Use existing tankopening
Use exisiting Still Pipes
Easy to connect toother systems
Get Overfil Protectionat the same time
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
72/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 72 Rosemount Tank Radar AB Confidential
Rosemount Raptor System
5900S RadarLevel Gauge
2410 Tank Hub
2240S Multi-inputTemperatureTransmitter
2120/2160Liquid Level switch
2230 Graphical
Field Display
5300/5400Radar LevelTransmitter
375 /475 FieldCommunicator
Smart WirelessTHUM Adapter
644 TemperatureTransmitter with SinglePoint Temperature Sensor
3051S PressureTransmitter
2160/65/75 FieldCommunication Unit
2180 Field BusModem
TankMater PCWorkstation inNetwork
Smart WirelessGateway
2410 2410 2410
2410
2230
5900S
THUM 5900S2240S5900S2240S
5400
5300
644
3051S
TankMaster.net
644
5400
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
73/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 73 Rosemount Tank Radar AB Confidential 73
Typical ins truments on LNG storage tanks
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
74/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 74 Rosemount Tank Radar AB Confidential 74
Rapto r 5900S radar fo r LNG Radar replacing servo in almost all
applications
Primary, secondary and HLAmeasurement using only radar
Highest accuracy over full range
Advanced signal processing
FMCW @ 10 GHz High sensitivity for long range
Digital accuracy reference
No aging or temperature effects
Verification during operation
SIL 2 and SIL 3 certified Unique 2-in-1 redundancy
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
75/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 75 Rosemount Tank Radar AB Confidential 75
Antenna5900S LPG/LNG Designed for
Liquefied gas in LPG/LNG tanks 4 in still-pipes sch 10 or 40
100 mm still-pipes
Quartz/Ceramic window as pressure sealing
Verification pin function
Optional Ball valve, fire-proof
Rosemount 2051 Pressure sensor
Flange available in six versions 4 in. class 150, class 300
6 in. class 150, class 300
8 in. class 150, class 300
New AdapterSeal & ballvalve
Level Accuracy: 5900S
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
76/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 76 Rosemount Tank Radar AB Confidential
-0.001
0
0.001
0 5 10 15 20 25 30
Downwards manual log
Upwards manual log
Downwards autolog
Upwards autolog
76
yexceeds OIML R85:2008
4
-4
2
-2
0
Old (R85:1998)
New (R85:2008)
(mm)
3
1
-1
-3Old (R85:1998)
New (R85:2008)
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
77/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 77 Rosemount Tank Radar AB Confidential 77
Veri f icat ion of Level measu rement
On-line verification duringnormal operation
Verification is made inside thetank
Tank remains closed and novalves need to be
maneuvered A reference pin is mounted
inside the still-pipe for levelverification
A bottom reflection ring
mounted at the end of thepipe is used for zeroverification
Photos
Raptor
http://localhost/var/www/apps/conversion/tmp/scratch_3/Photoshttp://localhost/var/www/apps/conversion/tmp/scratch_3/Photos7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
78/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 78 Rosemount Tank Radar AB Confidential 78
SIL 2 and 3 Cert i f ied
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
79/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 79 Rosemount Tank Radar AB Confidential 79
Bui l t In Proo f Test ing
The two Radars
will constantlysafety-checkeach other
Long time betweenmanual ProofTesting
No man on the
tank Saves $$$
Avoid Manual Proof Testing
Onl ine pro of test ing
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
80/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 80 Rosemount Tank Radar AB Confidential 80
Onl ine pro of-test ing
-check
Blueand Redlines separated for visibility.An alarm is given if the exceeds a defined limit
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
81/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 81 Rosemount Tank Radar AB Confidential
2-in -1 Radar
81
Radar #1Radar #2 High Level of Safety
SIL3 Rated
Low Cost Installation
On Tank Redundancy
High Availability
Less Proof Testing
Less Verification
Saves $$$in many ways
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
82/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 82 Rosemount Tank Radar AB Confidential
2x Radars on the same tank - wel l pro ven
Some LNG si tes using radar from Emerson:Radar gauges have been used for more than 10 years to measure level at several LNG
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
83/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 83 Rosemount Tank Radar AB Confidential 83
Radar gauges have been used for more than 10 years to measure level at several LNGimport terminals in Japan. So far 15+ tanks.
Trunkline LNG Co.Terminal, Lake Charles, USA
Gaz de FranceTerminal, Fos Cavaou, France Complete Emerson system solution CPC Taiwan - Receiving terminal, Northern Taiwan Qatargas II - Production site, 5 new tanks,
Complete Emerson system solution Radar for all Level measurements (primary, secondary, HLA)
FreeportQuintana Island - Receiving terminal, Texas, USA
Recent projects system solutions, Rex radar gauges combined with Whessoe LTDs
Cheniere - Sabine PassReceiving terminal, Louisiana, US. 5 tanks
Fluxys - Zeebrgge - Existing receiving terminal, Belgium
Exxon - Golden Pass LNGReceiving terminal, Texas US. 5 tanks
Woodside - Pluto LNGNew export terminal. 2 tanks in Ph I.
PTT LNGMap Ta PutNew receiving terminal
AGANynashamn LNGNew receiving terminal. 1 tk Ph. 1
Chevron - GorgonNew tanks at export site, 2 LNG + 4 Condensate tanks. Totally 24
radars
Polskie LNGNew receivin terminal 2 tks.
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
84/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 84 Rosemount Tank Radar AB Confidential 84
Rosemount LNG Radar Benefi ts
No moving parts
No re-calibration No maintenance
SIL2 / SIL3 safety functions
Built in High Alarm
On-Line verification during operation inside the tank
Custody Transfer Accuracy
Conformance to API, OIML, ISO and other standards
Proven Technology
Many excellent references on LNG and LPG
Anything for a single gauge to a complete LNG Management System
E d W t il (Wh )
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
85/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 85 Rosemount Tank Radar AB Confidential 85
Emerson and Wrts il (Whessoe)
Combining the skills and experience from two
organizations into an LNG storage management solutionprovider
Rosemount Tank Gauging
Rosemount is the measurement division within Emerson
Focus on high accuracy radar level gauges and supportinginstruments for temperature and pressure
System supplier, incl project management
Wrtsil Calais (Whessoe product name)
Focus on LTD gauges and LNG management software
Total LNG Tank Ins trumentat ion Solut ion
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
86/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 86 Rosemount Tank Radar AB Confidential 86
Loop 1
Loop 2
5900S +2410
Hi-Hi alarm
5900S LNG + 2410Secondary level
1146 LTD
TANKN1
Level alarms to ESD
5900S LNG + 2410
Primary level
2240S and 566multiple spot
temp
2240S and 566multiple spot
temp
Total LNG Tank Ins trumentat ion Solut ion
http://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/PUBLIC/Commerciaux/DOCUMENTATION%20COMMERCIALE/leaflets/last%20version/level/FICHE%201706B.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/PUBLIC/Commerciaux/DOCUMENTATION%20COMMERCIALE/leaflets/last%20version/level/FICHE%201706B.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/Users/pversluijs/Mes%20documents/Documentation/level/FICHE%201146-EN-1.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/PUBLIC/Commerciaux/DOCUMENTATION%20COMMERCIALE/leaflets/last%20version/level/FICHE%201706B.pdf7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
87/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 87 Rosemount Tank Radar AB Confidential 87
TANK N
2
Loop 2
TANK N
1
951020 mA lo op / RS232C
951020 mA lo op / RS232C
Loop 1
Loop 2
Loop 1
LNG Manager
LNG Manager
DCS
LNG Roll-OverPredictor
Serial l ink
Serial l ink
Serial l ink
Serial link
TRL2 bus for Raptor/2410 if not using
WM660
FCU 2160
T k d t i l (R l l O )
http://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/Users/pversluijs/Mes%20documents/LNG%20Expert%20Product%20Demo%20full.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3//SERVEURP/Users/pversluijs/Mes%20documents/LNG%20Expert%20Product%20Demo%20full.ppt7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
88/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 89 Rosemount Tank Radar AB Confidential 89
Tank detai l (Roll-Over)
S l f j t d
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
89/90
[File Name or Event]Emerson Confidential27-Jun-01, Slide 90 Rosemount Tank Radar AB Confidential 90
Sample of pro ject awardsCombined Emerson / Rosemount Tank Radar and Whessoe LTD
- recent projects realized at LNG terminals or production sites : ChenieresSabine Pass Exxons Golden Pass Fluxys (Zeebrugge, Belgium) Pluto LNG Australia
Nynashamn Sweden PTT LNG Map Ta Put Thailand Sonatrach Skikda LNG Algeria Gorgon Australia Polskie LNG Many new projects to be decided shortly
LNG f ( t i d)
7/18/2019 Best Practic instal new radar TGsystem LNG and overfilling_2.pdf
90/90
LNG references (con t inued)
Golden Pass LNG - new receiving terminal in
Texas; Five tanks. Installation 2008. CB&I US is the main EPC for the complete project
Whessoe LTD + software (Wrtsil)
Emerson partner to Wrtsil and supplied: 5 x Radar Rex 3960 5 x SDAU
5 x MST Cryo
2 x FCU 2160
http://www.goldenpasslng.com/assets/files/Sabine_locale_map.pdf