Benkala Mine Visit Report

Embed Size (px)

Citation preview

  • 7/29/2019 Benkala Mine Visit Report

    1/12

    BBEENNKKAALLAA MMIINNEE VVIISSIITT RREEPPOORRTT

    11:: IINNTTRROODDUUCCTTIIOONN::

    A visit to the Benkala mine, owned and operated by Kazcopper, was made on 21st

    August 2012.This report summarises the findings and observations.

    In summary, the mine and processing facility was designed as fit for purpose.

    To improve cash flow and recoup initial capital investment early, it was circumspect to

    commence mining on the richest part (+1.2% Cu) of the orebody (Figure 1), twice the designed

    grade of the plant at steady state.

    FFiigguurree 11::

    VViieeww ooff

    BBeennkkaallaa

    ooppeenn ppiitt,,

    tthhee rriicchheesstt

    ppaarrtt oofftthhee

    oorree ddeeppoossiitt

    The total labour force at the mine is around 250. Managerial staff has been stable but turnover

    at the lower levels has been as high as 40%. This is to be expected with a new facility, operating

    in a remote part of the country. This evolutionary process will build a stronger team, with acommon sense of dedication and purpose.

    Availability of competent rock for overliner material is a problem at the site; as a result, this

    material is quarried and transported from 60 kms away.

    Experiences learnt from this project can be used on future projects for a smoother and trouble

    free start up.

    The prudent philosophy adopted was to curtail cost at the front end of the plant but install the

    best equipment at the money making back end.

  • 7/29/2019 Benkala Mine Visit Report

    2/12

    22:: GGEENNEERRAALL OOBBSSEERRVVAATTIIOONNSS::

    2.1: ACID OFFLOADING

    This is carried out in open air, Figure 2. The major exposure of the operator to harsh weatherwill be in the opening and closing of the offloading hatch of the acid tanker.

    FFiigguurree 22:: OOppeenn aaiirr aacciidd

    ooffffllooaaddiinngg ssttaattiioonn

    A simple, but effective, priming system enables remote operation of the offloading pumping

    system, Figure 3.

    FFiigguurree 33:: AAcciidd ooffffllooaaddiinngg

    ppuummppss pprriimmiinngg ssyysstteemm.. AA

    ddiiffffeerreenntt aanndd mmoorree

    ssuuiittaabbllee fflloooorriinngg mmaatteerriiaall

    wwiillll bbee rreeqquuiirreedd

  • 7/29/2019 Benkala Mine Visit Report

    3/12

    2.2: FLOORING

    Locally made hard wearing tiles have been used at a fraction of the cost of ceramic tiling.

    However, because of the high expansion coefficient of this material, it is only suitable for indoor

    application, Figure 4. An alternative will be needed for outdoor application.

    FFiigguurree 44:: FFlloooorr ttiilliinngg uusseedd

    iinn tthhee ppllaanntt,, nnoott ssuuiittaabbllee

    ffoorr oouuttddoooorr aapppplliiccaattiioonn

    dduuee ttoo iittss hhiigghh eexxppaannssiioonn

    ccooeeffffiicciieenntt

    2.3: STRONG ACID STORAGE

    The storage of concentrated sulphuric acid complies with the Kazakhstan regulations of the

    tanks being suspended 1.7 metres above ground level, for mandatory leaks inspection, Figure 5.

    FFiigguurree 55::

    SSuuppppoorrtt ffoorr

    ccoonncceennttrraatteedd

    aacciidd ttaannkk,,

    aalllloowwiinngg 11..77

    mmeettrreess ooff

    hheeaadd

    cclleeaarraannccee ffoorr

    lleeaakkss

    iinnssppeeccttiioonn

  • 7/29/2019 Benkala Mine Visit Report

    4/12

    2.5: PLANT UPPER FLOORING and STAIRS

    Reinforced plastic grating was imported from China and used exclusively flooring and stairways

    Figures 6, and 7. The overall finish is neat and even.

    FFiigguurree 66::

    RReeiinnffoorrcceedd

    ppllaassttiicc ggrraattiinngg

    uusseedd ffoorr

    fflloooorriinngg

    FFiigguurree 77::

    RReeiinnffoorrcceedd

    ppllaassttiicc ggrraattiinngg

    uusseedd ffoorr ssttaaiirrss

  • 7/29/2019 Benkala Mine Visit Report

    5/12

    2.6: USE OF STAINLESS STEEL FOR TANKS

    The use of stainless steel for the construction of some tanks proved to be a wrong choice. Leaks

    have developed in a very short time, Figure 8.

    FFiigguurree 88::

    AA LLeeaakk iinn aa ssttaaiinnlleessss sstteeeell ttaannkk

    A better choice is Fibre Reinforced Plastic (FRP). Repairing a leak on an FRP tank is an easy job

    whereas that for a stainless steel tank is a protracted procedure, and success is not guaranteed.

    2.7: PICKET FENCE CONSTRUCTION

    The picket fence construction is the simplest the author has seen in his career. It entailed the

    splitting of an HDPE pipe longitudinally and using it, Figure 9.

    FFiigguurree 99:: PPiicckkeett

    ffeennccee

    ccoonnssttrruucctteedd

    ffrroomm HHDDPPEE ppiippee

  • 7/29/2019 Benkala Mine Visit Report

    6/12

    2.8: CHOICE OF RECTIFORMER

    The choice of rectiformer was also well planned. By buying from Rapid of the USA, Figure 10, it

    was 40% cheaper than buying from one of the larger suppliers such as ABB. However, there

    were disadvantages as Rapid did not provide a packaging and logistical service. Additional, but

    marginal expenses were incurred for those services.

    FFiigguurree 1100:: RRaappiidd

    rreeccttiiffoorrmmeerr,, 4400%% cchheeaappeerr

    tthhaann tthhee nneexxtt nneeaarreesstt

    ccoommppeettiittoorr

    2.9: THE PRESENCE OF ACID MIST IN THE ELECTROWINNING TANKHOUSE

    Acid mist is evident in the electrowinning tankhouse, but the situation on the day of the visit

    was not unbearable, Figure 11.

    FFiigguurree 1111:: AAcciidd mmiisstt

    iinn tthhee eelleeccttrroollyyttiiccttaannkkhhoouussee

  • 7/29/2019 Benkala Mine Visit Report

    7/12

    Measures are in place to attenuate the acid mist generation problem, namely:

    The use of plastic balls to curtail emission of mist, and The use of a flexible, and impervious, plastic mat above the cells to contain the mist

    The author feels that both of these measures will be more effective than the ubiquitous

    fume hood/extractor fan/scrubber combination, and significantly cheaper also.

    2.10: CATHODE QUALITY

    Cathode quality is very good. There was no sign of nodulisation, Figure 12. It is early days yet.

    Nodules form with the build up of impurities within the process.

    FFiigguurree 1122:: NNoodduullee--ffrreeee

    ccooppppeerr ccaatthhooddeess aatt

    BBeennkkaallaa

    2.11: VALVES WITHIN THE PLANT

    Plastic valves, imported from Italy, are used exclusively within the plant, Figures 13 and 14.

    Their feel and appearance reflect a quality product.

  • 7/29/2019 Benkala Mine Visit Report

    8/12

    FFiigguurree 1133:: SSmmaalllleerr

    ddiiaammeetteerr IIttaalliiaann mmaaddee

    ppllaassttiicc vvaallvvee,, uusseedd

    wwiitthhiinn tthhee pprroocceessss

    bbuuiillddiinnggss

    FFiigguurree 1144:: LLaarrggeerr ddiiaammeetteerr IIttaalliiaann mmaaddee ppllaassttiicc vvaallvvee

  • 7/29/2019 Benkala Mine Visit Report

    9/12

    2.12: PREGNANT LEACH SOLUTION (PLS) FEED PUMPS

    Centrifugal pumps with a dedicated priming system have been employed for this purpose,

    Figure 15. These pumps are significantly cheaper than the turbine pumps proposed for Aktogay.

    They are capable of sucking from a fairly deep PLS pond, Figure 16.

    FFiigguurree 1155:: PPLLSS

    ffeeeedd ppuummppss

    pprriimmiinngg ssyysstteemm

    FFiigguurree 1166::

    TThhee PPLLSS ffeeeedd

    ppuummppss ddrraaww

    ssoolluuttiioonn ffrroomm

    aa rreellaattiivveellyy

    ddeeeepp ppoonndd

  • 7/29/2019 Benkala Mine Visit Report

    10/12

    2.13: STOCK HOLDING

    Because of the remoteness of the site, there is an abnormally high stock of extractant on site,

    Figure 17. Dialogue has been opened with the supplier, BASF, to stock the extractant in country.

    This will improve cash flow significantly.

    FFiigguurree 1177::

    EExxttrraaccttaanntt

    uusseedd iinn tthhee

    pprroocceessss

    2.14: DOSING OF EXTRACTANT

    Many plants pump extractant to the process. At Benkala, the container is lifted to the floor of

    the mixer and the extractant fed by gravity.

    2.15: CRUD

    Crud has not appeared as yet, as a result, the crud filter press is lying idle, Figure 18.

    FFiigguurree 1188::

    CCrruudd ffiilltteerr

    pprreessss

    aawwaaiittiinngg uussee

  • 7/29/2019 Benkala Mine Visit Report

    11/12

    2.16: SYNERGIES TO BE DERIVED

    If a similar plant or a plant comprising multiple lines of this plant is built, significant cash held in

    stocks can be avoided. An agreement can be reached between the two plants where they hold

    separate spares such as:

    Cathodes Anodes Mixer mechanisms Electrolytic cells tanks, Figure 19

    And share between them when the need arises. Such an agreement can improve cash flow

    considerably.

    FFiigguurree 1199:: TTaannkk ffoorr aann

    eelleeccttrroollyyttiicc cceellll

    2.17: PRODUCTION PROFILE

    On the day of the plant visit, production was still being ramped up, but Benkala was already

    harvesting 20 tonnes of cathode per day, Figure 20. This is considered to be an average start up

    for such a plant.

  • 7/29/2019 Benkala Mine Visit Report

    12/12

    FFiigguurree 2200:: FFiinniisshheedd ppllaatteedd ccooppppeerr aatt BBeennkkaallaa,, aawwaaiittiinngg eexxppoorrtt

    33:: AACCKKNNOOWWLLEEDDGGEEMMEENNTTSS::

    The author wishes to express his gratitude to the management of the Kazakhmys projects team

    on the Aktogay project for offering him such an opportunity to visit the newest heap

    leach/SX/EW plant in Kazakhstan. This trip offered a new insight of how simplicity and

    practicality can add shareholder value.

    The hospitality of Kazcopper is deeply acknowledged, it was beyond compare. The discussions

    with Kazcoppers COO, Adil on the journey to and from the site was an education by itself, and

    highly appreciated. His pragmatic approach to project management and implementation is

    exactly what is needed to make such low grade deposits payable. Such logical methodology to

    project execution instilled tremendous confidence in the author. His indomitable insight of

    regulatory requirements within Kazakhstan is second to none.

    The humour of my colleagues Mark and Andrew must be mentioned for keeping me awake,

    alert and active during the arduous trip to the mine. This report is the culmination of their joint

    contributions in that respect.

    Ramoutar (Ken) Seecharran

    Process Plant Manager

    Aktogay