BENAZIRABAP SOLAR POWER (SMC-PYT) LTDAdd' House 176. Street 13, Defence Officels' Housing
Society. Stadium Road.Karachi,PakistanTel: 92-21-34833590 Fax: 92-21-34833590
The Registrar
National Electric Power Regulatory Authority
OPF Building, 5hahrah-e-Jamhuriat
6-5/2, Islamabad
Subject: Application for a Generation License (this "Application",
I, Ve Jun, Company Secretary, being the duly authorized representative of Benazirabad Solar Power
{SMC-PVT} (the "Company"), by virtue of ~ Board Resolution passed through circulation on August 5,
2015, hereby apply to the National Electric Power Regulatory Authority (t.he "NEPRA") for the grant of a
Generation License to the Company pursuant to Section lS of the Regulation of Generation,
Transmission, and Distribution of Electric Power Act, 1997.
I certify that the documents-in-support attached wit.h this Application arc prepared and submitted in
conformity with the provisions of the National Electric Power Regulatory Authority licensing
(Application and Modification Procedure) Regulations, 1999, and undertake to abide by the terms and
provisions of the above-said regulations. I further undertake and confirm that the Information provided
in the attached documents-in-support is true and correct to the best of my knowledge and belief.
A Bank Draft dated 06.08.2015 in the sum of Rs. 209,964.00, being the non-refundable licence
application fee calculated In accordance with Schedule II to the National Electric Power Regulatory
Authority Licensing (Application and Modification Procedure) Regulations,1999, is attached herewith.
Yours truly,
VcJun
Company Secretary
Benazirabad Solar Power (SMC;PVT) .
Date bit_( r-1b!
BENAZIRABAD SOLAR PO~R (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' Housing
Society, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
CERTIFIED COpy OF THE RESOLUTIONS PASSED BY THE BOARD OF DIRECTORS OF
BENAZIRABAD SOLAR POWER (SMC-PVT.) LIMITED THROUGH CIRCULATION ON
August as, 2015.
"RESOLVEDTHAT Benazirabad Solar Power (SMC-PVT.) Limited (a company incorporated under the
laws of Pakistan with its registered office located at House 176, Street 13, National Stadium Colony,
Defense Officers Housing Society, Karachi Pakistan) be and is hereby authorized to file applications for
the grant of Generation License and/or Determination of Tariff or Adoption of Upfront Solar Tariff for
submission to the National Electric Power Regulatory Authority (NEPRA)in respect of its 20 MW Solar
PV Power Plant, to be located in Shaheed Benazirabad, Sindh and in relation thereto, enter into and
execute all required documents, make all fillings and pay all applicable fees, in each case, of any nature
whatsoever as required.II
"FURTHERRESOLVEDTHAT in respect of application for the Grant of Generation License (including any
modification to the application for the Grant of Generation License) for submission to National Electric
Power Regulatory Authority, and that:
1. Mr. Fan Jiang, Project Director
2. Ms. Ye Jun. Company Secretary
be and hereby singly empowered and authorized for and on behalf of the Company to review, execute,
submit and deliver the Generation License/Tariff Applications (including any modification to the
application for the Grant of Generation License/Tariff) and related documentation required by National
Electric Power Regulatory Authority, including any contracts, documents, power of attorney, affidavits,
statements, letters, forms, applications, deeds, guarantees, undertakings, approvals, memoranda,
amendments, letters, communications, notices, certificates, requests, statements, and any other
instruments of any nature whatsoever; sign and execute necessary documentation, pay the necessary
fees, appear before the National Electric Power Regulatory Authority as needed, and do all acts
necessary for completion and processing of the Generation License/Tariff Application (modification to
the application for the Grant of Generation License/Tariff); do all such acts, matters and things as may
be necessary for carrying out the purposes aforesaid and giving full effect to the above
resolutions/resolution".
For and on behalf of ~ %. ~ J~Benazirabad Solar Power !SMC-PVT.) .''
J3ENAZIRA6AD SOLAR POW.E.BJSMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' Housing
Society, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
APPLICATION FOR THE GRANT OF AGENERATION LICENSE
UNDER SECTION 15 OFTHE Acr ANDREGULATION 3 OF THE AMP REGULATIONS
1. NEPRA'sParticipation in the Process1.1. Section 15 of the Regulation of Generation, Transmission, and Distribution ofElectric Power Act, 1997 (the "Act") provides, inter alia, that:"(l)No person except under the authority of a license issued by the Authority underthis Act and subject to the conditions specified in this Act and as may be imposed bythe Authority, construct own or operate a generation facility.(2) An application for the grant of a license for a generation facility shall specify thetype of facility for which the license is applied; the location of the generation facility;and the expected life of the generation facility. II
1.2 Furthermore, Regulation-3 of the National Electric Power Regulatory Authority(Application and Modification Procedure) Regulations, 1999 (the "AMP Regulations")provides that an application for a license shall be made in the form specified in theAMP Regulations and further enumerates the documents required to be submittedto the Authority along with the requisite application.1.3. This Application for the grant of a generation license is made pursuant to Section15 of the Act and Regulation 3 of the AMP Regulations.
2.lntroduction of the Applicant/Sponsors2.1. As required under Section-24 of the Act, Benazirabad Solar Power (SMC-PVT.)("Applicant" "Petitioner" or the "Project Company") is an entity incorporated underthe Companies Ordinance, 1984, to act as a special purpose vehicle (the "SPV") andis setting up a 20 MW photovoltaic solar energy power generation plant at ShaheedBenazirabad, Sindh Pakistan (the "Project"). Copiesof the Certificate of Incorporation,Memorandum of Association and Articles of Association are attached herewith asAnnex-A hereto.2.2 The Applicant is developing the Project under the upfront tariff regime prescribedby the National Electric Power Regulatory Authority ("NEPRA")vide its determination#NEPRA/UTS-2015/17871-17874 dated 16 December 2015, as amended from time totime, (the "Upfront Tariff').2.3 The Project is being developed under the Public Private Partnership wherein aconsortium comprising of ZTECorporation, Technomen Kinetics Private Limited anddesignated department of the Government of Sindh (the "GOS"), will participate inthe Joint Venture (the "JV"). The Project was awarded in response to a proposalagainst which the successful bidders were issued a Letter of Intent (the "L01") dated22 May 2015, in pursuance of the GOSletter # DIR/PDS/(SOLAR-P-PROJECTS)/2014dated 11 December 2014, copies of the GOS letter and LOI herewith annexed asAnnex-B and C hereto.2.4 In order to move quickly towards the development of the Project it has beendecided with the express approval of the GOS, that the Project Company will
BENAZIRAeAO SOLAREQWEB.1S.MC-PYT) LTDAdd: House 176, Street 13, Defence Officers' Housing
Society, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
forthwith proceed and file the Application of Generation License before NEPRA.Atpresent, the Project Company is a single member company. It has been agreed withthe GOSthat the Project Company will be converted to private limited company toallow the participation of JV partners, which at present are completing their internalprocesses and activities. Copy of GOS letter # DAE/GEN/50/2014 dated 10September 2015 is herewith appended as Annex-D hereto,
3 Project Overview3.1. This Project will adopt polycrystalline PVmodule and central inverter technology.20 MW will be separated into 20xlMW subsystem. PV modules will be installed inarrays in a number of strings, each IMW PV subsystem will convert DC power to ACpower through IMW inverter. The AC output from inverter at 315 VACwill be steppedup to 11 KV or 66 KV.An llKV or 66KV substation will be built at the site as powerpurchaser's specification for Interconnection for the grid system. A SCADAsystem willbe adopted in this project for the purpose of power plant monitoring and powerdispatching. The power plant will meet the requirements of relative international andPakistan's standards.3.2 In respect of the financing arrangement a Letter of Interest has been issued tothe Project Company by Industrial and Commercial Bank of China Ltd confirming itsinterest in providing facility in the form of a loan amount not exceeding 85% of theTotal Contract Value (no more than USD30,000,000.00) for the Project proposed byZTECorporation.
4 Site4.1. Approximately 120 acres of land in Shaheed Benazirabad is being allocated bythe Department of Energy,Government of Sindh to the Project Company for 20 MWProject, The co-ordinates for the proposed site of the project are as below.Latitude: 26.440556 NLongitude: 68.847778 E4.2. A map of the proposed location for the Project is attached herewith as Annex- Ehereto.
5 EPC-Contractors5.1. ZTECorporation are also the EPCContractors for the Project. ZTECorporation isan international company with operations in 160 Countries, and the company is aleader in technology innovation, delivering superior products and business solutionsto clients all over the world. Founded in 1985, ZTE is listed on both the Hong Kongand Shenzhen Stock Exchanges and is China's largest listed telecoms equipmentcompany. ZTE Corporation has become the most successful Chinese enterprise onglobal communication energy products and an integrated energy solution providerwith worldwide service capabilities.5.2. ZTE has established 18 state of the art R&D centers in China, France, India and
BENAZIBA.Ei~D SOLAR PQW.EB..1~PVT) LTDAdd: House 176, Street 13, Defence Officers' Housing
Society, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
employs over 30,000 research professionals. With 107 subsidiaries devoted toinnovation globally, ZTEis the world's biggest originator of technology patent in eachof the past two years, according to data from the World Intellectual PropertyOrganization.5.3. Further details regarding the EPCContractors are annexed herewith.
6. Evidence/relevant correspondence;6.1. Copies of the pertinent correspondence are enclosed herewith for the learnedAuthoritys assistance and consideration.6.2. The Applicant would be pleased to provide any other assistance that the learnedAuthority may require in the matter of Grant of Generation License.6.3. This Application and its Annexure are being submitted in triplicate, with certaindocuments certified as necessary, each in accordance with Regulation 3(4) of theNEPRALicensing (Application & Modification Procedure) Regulations, 1999.
7. Additional GroundsIf required the Applicant seeks to raise further additional grounds in support of thisPetition at the stage of Hearing and Determination.
8. PrayerIt is most humbly prayed to the esteemed Authority as follows:A. That the Applicant be granted a Generation License for the development of theProject.B. That the Authority may be pleased to treat the Applicant's request for the grantof Generation License on a non-discriminatory basis and any concession offered toany further and better relief that the Authority may deem appropriate in thecircumstances may kindly be granted to the Petitioner.We hope the information/explanation provided above meets your requirements, andremain available to assist you if you have any further queries.Respectfully submitted for and on behalf of the Applicant:
Yours Sincerely
Vel"n i~Company SecretaryBenazirabad Solar Power{SMC-PVT)Limited
Annexure#
A Applicant Company's Constitutive Documents
B GOSletter
C letter of Intent
D GOSletter
E Site
F Feasibility Report
G Technical & Annual Return Statements
H Summary of Plant Details
I Prospectus
J O/S
K Profile
l ZTE Project Experience
M l.ol-Bank
N Profile of EPCContractor
0 SPVBank Account
P Interconnection Study(system studies, load flow, S.C,stability, reliability)
Q Environmental Study
100
BEFORE THE NATIONAL ELECTRIC POWER REGULATORY AUTHORITY
AFFIDAVIT
I, Ye Jun, dlo Ye Llnguo having Passport # P01138341, Company Secretary, Benazirabad Solar
Power (SMC-Pvt) hereby solemnly affirm and declare on oat that the contents of the
accompanying application for grant of Generation License including all attached documents-in-
support are true and correct to the best of my knowledge and belief and that nothing has been
concealed.
DEPONENT
SO"""" i r.- y0 j~Name: Ye Jun
Dated: &1I'} / J;Olb, '
,.'
J:L(':,'.,"1 .
\~;{;~;A010329
SECURITIES AND EXCHANGE COMMISSION OF PAKISTAN
COMPANY REGISTRATION OFFICE, KARACHI
CERTIFICATE OF INCORPORATION
[Under section 32 of the Companies Ordinance, 1984 (XLVII of 1984)]
Corporate Universal Identification No. 0094305
I hereby certify that BEl\AZlRABAD SOLAR POWER (SMC-PVT.)
LIMITED is this day incorporated under the Companies Ordinance, 1984 (XLVII
of 1984) and that the company is limited by shares.:;Ci:/~
, ., W
\~/' Given under my hand at Ktn:lchi this Ninth day of JUIYl Two Thousand and
Fifteen.
Incorporation tee Rs-,5,000/= only
~'?~ >(Sidney Custodio Pereira)
Joint Registrar of CompaniesKarachi
Yr(2t;~-:~:'I.
=:';;
-
FORM 1 ?f {b~~--.~..... ,... ' . ~..
DECLARATION OF APPLICANT FOR INCORPORATI.QN, .."t'O~E. "," .. ~~;~";;;~-:... ,.' ~\."w ,'_,-\
'It!t~'v .•~•.•••Please complete in typescript or in bOld block capitals. :. • ,\1
Name of the Company ~~irabad ~~_'a_rP_o_w_e_r(_S_M_C_-P_VT_.)_~_t~_·'__ '_~_l\J_:N_l_~_15-=o:::"1-ff'!
[RIAA=LA~W~ C~Q~Ri~
I,---,I_-'----ll. _I..-I__.!_TI...I---' ~f~~:B:n~ranch [ ~
1.
2. Presented by
3. Fee Paid (Rs.)
4. Receipt No.
5. Declarant's Name 8.Designation
6. Declarant's FatherName
7. Professionl Designation(delete the pottion notapp~cable)
8. Declaration
9. Signature of Declarant
N,I.C No. of Declarant
of Witness
14. Address of the witness
15. Date
THE COMPANIES ORDINANCE. 1964(Section 30(2) and rule 4)
Month YearDay
'--:-;:::----;---::-:--::--.li Date IT] CD I.___,____.____...---.J(Bank Challan to be attached in original)
lI MANZOOR AHMED MAHAR
, Advocate entitled to appear before 8 High- Court.' SIlf)leme Cewltl jI bI=I&I1er~tJ CBsl Il. MaR8gemeAI OQGElWAta~' pra£t~
l~tan ~he larFRatieR ef I1=1i8somJn!fIYI-ailer-5G<1 Fla~ea iA tlla Iartisles as Oif6G100.QfJi!!f af Il=1epFspeses cempBR)'. ._j
I do hereby solemnly and sincerely declare thata) I am the above named dedarant;b) aillhe requirements of (he Companies Ordinance, 1984, and lhe
rules made there under in respect of matters precedent (0 theregistration of the said Company and incidental thereto have .been complied with and !
I C) I make this solemn declaration conscienliously believing the IL..... s=-:3",m=eto be true _]
I ,~~~~~-' _---'
I 4 I 3 I 3 I 0 [SInB I 9 I 7 I 3 ITli._,_1 -=-9~I---'-_~~{~
f' UMAlMA PERACHA I RAFFIUDDIN PERACHA
14 ; 2 ! 3 :.~ ; 1 13 10 I J i 6 15 19 19 12 I Ir ·2~1. 10 iii SOUTH STREET, PHASE 2. DHA I
Day 'Month Year
[Q@ [ill] I~1(::) I \ 151-
............ " .. , ............ ,: .::" .. ,
",~,..' .;...
2.
FORM 21 fTHE COMP~~,!;",~~~~~ANCE.1984 ?f£.;_[Vi
NOTICE OF SITUATION OF REGISTERED OFFICE OR ANY CHANGE THEREI\6, e.1o~~~\"W.'\,.,,~,O..... 1',9 ,'.,.";;... ... _,,~\A' ,.\l''' ,-
Please complete In typescript or In bold block capitals. ~o(f\f(\\.
C_··· o_·!?_·~~~~~-~-~-~~~~~~----_\_~--~
l].en.azirab?_q Solar Power (SMC-PVT.) ltd ~
C'iiO I
1. Incorporation Number
Name at the Company
3. Fee Paid (Rs.) '--_-'-_'-1 .J Name & Branch of The Bank L
4. Receipt No. r=='-~(Bank Challan to be attached in onginan
~ MonthDate LJ._J! 1 [ I I
¥ear
5. The situation of registered office of the company J1
N/Awas changed from (state previous address) L-. . _
6. The registered office of theCompany is now situated at
I House 176, Street 13, National Stadium Colony, Defence Officers'Housin Societ. Karachi Sindh Pakistan(State full address with identifiable number I name of the premisesor building and street, road and locality besides the name of thetown and os/al area, where a licable.- 02~-34833590 -'~6.1 Telephone Nos
6.2 Fax No, if any
6.3. E-mail address
- 021-34302669
Day Month Year
7. With effect from (date) L.I_l :'___......J,I_J 12 '0 11 15 ISINCE INCORPORATION
i~;I.~r -.... [atures of Director/~Rief E*86uli ...91 L "* h!Kar~:,11 , \ .--~--l----+-f-----~--------J
:. K:~~~;~t5;,nolo" /1L-H:.:.:::.u..::.J;.:_:in""gh:_:_:u:.:a:___.~ --,
':'i t;..~'i~),on I~D;;._ire:;..:c:..:.:to:::.r__ .~ --,
~.... ff~ ~~P6rt Number of signatory I G I 2 I 2 ! 8 Lill....L1~3--,-16.:.....J1__;5'-....1.._.l..-...L...-L_!-.-...L...__J~f.,?IIP.~ "." Day Month Year
--. '.12. Date: I C) L0\ I L6l1OJ r:[i:--. r0::=-"-1--:-1 -',-=5--'1
-.....~..,
•••• I •••••••
THE COMPANIES ORDINANCE, 1984(Section 205)
PARTICULARS OF DIRECTORS AND OFFICERS, INCLUDING THE CHIEF EXECUTIVE, MANAGING AGENT, SECRETARY, CHIEFACCOUNTANT, AUDITORS AND LEGAL ADVISERS, OR OF ANY CHANGE THEREIN
Please complete in typescript or in bold black capitals.
1. Incorporation Number
2.
3.
4.
r- - ---------,
Present Name orsurname in full
(a)
NIC No or passportNo. in case of Foreign
National
G22833365
PE0118573
G33991354
POl138341
5.2 Ceasing o( off/CelRetirementIResignalion
Fathers I Husband'sName
(c)
Hu Suwen
Peng Zhongxin- .. _._-
Shi Huijun
Ye lin Guo
Usual residential address
(d)
nat No.4 on 34/F of block B causewaycentre No_28harbour road Wall Chai
Hoo Kon18-1602#, Taoyuanju, Baaan District,
Shenzhen, Guan don , ChinaRoom 0 on 14IF, Block 3, Hal)'i DongfangGarden, Hi-Tech Road South, Shenzhen,
Guan don , ChinaRoom 301, Building 14, WeiHai
Apartment, OingHai, ZhouShan. ZheJiang.China
NationalityDesignation
(el
Director Chinese
Chinese
Chinese
Chinese
5.3 Any other change in particulars
Nationality of origin(if other than
present nationality)
(g)
5. 1 New appointment/election
N/A
N/A
N/A
N/A-----------'
5.2 Ceasing of omceiRetirementIResignation
L--- _ _____J] L~D
Date of presentappointment Of
change
(j)
.______N/_____,A 1 ,----I =:Jr=.Other businessoccupation and
directorship (if any)
(h)
Qualification (incase of
aud itors/legaladvisers)
(I)
From the date ofincorporation
From the date ofincorporation
F rom the date ofincorporation
From the date ofincorporation
,---------
,---N'_____.A II.____N/A ---JII,---N/_____.A I L___I_NlA ___J
5.3 Any other change in particulars
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Changes stating howappointed or changed
(k)
r---------As per Articles of
Association
As. per Articles ofAssociation
As per Articles ofAssociation
As per Articles ofAssociation
N/A
Remarks (Stateapproval, jf any,
required under law)
(I)
--NIA
NIA
N/A
N/A
e~-!
l_ .. -I L. 1I' I [..
I
I~ _... J N/A N/A L_.. N/A N/A I N/A1
..J
6. Name of Signatory C--_· Hu Jinghua-p .~
Designation I Director._--_ ..-
~
Month YearGA\ [;r; l_ol40 I fEEEJ7 Signatures of Director Date: L. 0 1 5
...... ~... ', ~~.. ~~-~~::;.::::::~• " y' .......
•• '"" .f •....... ....... ,..
:-,;" •• II,~ ...dit .. :,! .. .IH..;',. ".'
~;u,': !J.,..... I
v.u;; I~t , •• ,~ ••. 1.
FORM S1[See rules 3 and 9(5)]
THE COMPANIES ORDINANCE, 1984
NOTICE OF NOMINATION OF NOMINEE DIRECTOR BY SINGLE MEMBEROF A SINGLE MEMBER COMPANY
5. Date of payment:
Day Month
[0 CD
Please complete in typescript Or in hold block capitals.
1. CUlN (Incorporation Number): I N/A
2. Name of the Company: Benazirabad Solar Power (SMC-PVT.) Ltd
3. Fee paid Rs: [_.__._I~~4. Name and branch of bank:
6. Dank Challan No: I (Bank Challan to be attached in original).L....... ..J
7. Name, NTC No., address and relationship of legal heirs:~le. I NI-C-N-O-·----·--rl-----A-dd-r-es-s-. -------r~-el-a-ti-on-s-h-lP--,·1
N/A ! I I I I : J_...._I -,--I ,--,-I1--,-1_._I ...._I .__ __.C_ ____,.S. Name, NIC No., and address of nominee directors:
Passport No. Status.Name. Address.
NomineeDirector
Peng Aiguang Chinese : PEO 118573 18-1602#, Taoyuanju, BaoanDistrict, Shenzhen, Guangdong,
China
Chinese; G33991354 Room Don 14fF, Block 3, HaiyiDongfang Garden, Hi-Tech Road
South, Shenzhen, Guangdong, China
AlternateNomineeDirector
I. hereby, COnsent to act as nominee director of the company i;0case of death of the single member.
-Signature of nominee director.
T, hereby, consent to act as alternate nominee director of thecompany in ease of non-availabil ity of nominee director.
Signature of alternate nom inee director.
I,II. Signature of single member: ~h112. Passport No. of IG 12 12 '8 1
313 J3 1
6 ISsignatory: I I
13. Date:
Day
[D I'llMonth
IDI61Year
-
THE COMPANIES ORDINANCE, 1984(Bcnazirabad Solar Power (SMC-PVT.) Ltd)
ARTICLES OF ASSOCIATION
OF
Benazirabad Solar Power (SMC-PVf.) Ltd
INTERPRETATION
1. In the interpretation of these articles the following expressionsshall have the following meanings unless repugnant to orinconsistent with the subject articles,-
(a) "alternate nominee director" means an individual nominated bythe single member to act as nominee director in case of non-availability of nominee director;
(b) "company" or "this company" means Benazirabad SolarPower (SMC-PVr.) Ltd;
(c) "directors" or "board of directors" means board of directors so thatit may consist of only the sole director or more than one directorsif so appointed under the relevant provisions of the Ordinance;
(d) "in writing" means written or printed or partly written andpartly printed or lithographed or typewritten or other substitutefor writing;
(e) "member director" means an individual becoming directordue to membership of the company in terms of clause (h) ofsection 187;
(f) "nominee director" means an individual nominated by the singlemember to act as director in case of death of single member;
(g) "private company" means a private company other than asingle member company;
(h) "rule" means the rule of the Single Member CompaniesRules, 2003;
(i) "Rules" means the Single Member Companies Rules,2003;
m "section" means section of tile Companies Ordinance, 1984(XLVlI ofl984); and
(k) "sole director" means the director of the company who is forthe time being the only director and the single member of thecompany, -
2. Ordinance shall, in the absence of any express provision to thecontrary, apply in relation to a single member company as it appliesin relation to such a company which is formed by two or morepersons or which has two or more persons as members.
SINGI,E MEMBER COMPANY
3. 'The company is a single member company and as such being aPrivate Company limited byshares:
(3) it shall not issue invitation to the public to subscribe for any shareof the company;
(b) the company shall not register any share(s) in the name of twoor more persons to hold one or more shares individually orjointly; and
(c) number of thc members of the company shall be limited to one.
SHARES
4. '111e company may increase U1Cnominal share capital in accordancewith sectionscz and 94.
5. Share certificatc(s) shall be issued under the seal of the Companyand shall be signed by the member director, and in case of his death,by the nominee director and the secretary.
; 6.; The company may, upon passing of a special resolution, issuefurther shares or transfer existing shares or part thereof causing thenumber of members to become two or more in accordance with theRules but it shall become a private company thereafter.
. )( 7·,'..
8.
The company shall not transfer all of the shares of a singlemem ber to two or more persons or part of shares of single member toother person(s) or allot further shares to any person other than thesingle member or, at any time, allow transfer of shares or allotmentof shares or both resulting ill number of members to become twoor more, except under thc authority of a special resolution for eof status from single member company to private romp ~~l1t1;a;~. -~its articles accordingly. ~~~.--~ -" ~~i~._...,,_ ~~\
....~ I , ~··1ir. ~ ~The single member may transfer all of his shares i Sl~ ~.... : 'iiiunder the authority of an ordinary resolution whet Q. ~ ~ ••• ~~,,;,
shall remain H single member company as it was befo c::! uc~~~ ,( jJI, 171<~ ~
",('/?C ....'1> •• ',':.:{!~~.,
-'.
2
9. A person whose name is entered as a member in the register ofmembers shall without payment, be entitled to receive, withinninety days after allotment or within forty-five days of theapplication for registration of transfer, a certificate under the sealspecifying the share or shares held by him.
TRANSFI~RAND TRANSMISSION OF SHARES
10. Transfer and transmission of shares shall be in accordance withprovisions of sections 74 to 81.
11. In case of death of the single member, the power to register or refusetransfer of shares shall be exercised by the secretary and thenominee director under the Rules.
12. If the company allots further shares or the shares held by the singlemember are transferred in total or in part and as a result thereof
/ the company becomes a private company, the fact that it has,~~_ converted from a single member company to a private company andl/ 'number of its members has increased to two or more shall be
recorded in the register of members along with the date of the eventand the particulars of the members,
13· Transmission of shares Lo the legal heirs shall be recorded in theregister of members by the secretary and the nominee director,
CHANGE OF STATUS
!4- The company may convert itself from single member privatecompany to a private company in accordance with the provisions ofrule a,
GENERAL MEETINGS
15· A general meeting, to be called annual general meeting, shall beheld, in accordance with the provisions of section 158 and rule 5.
16. All general meetings of the company other than an annual generalmeeting as specified in section 158 shall be called extraordinarygeneral meetings and shall be deemed to be held in accordance withthe provisions of rule 5· \\~Reii;j:~
(.,~~~'b ~;J~;;?<;,,'...,·I~~:=.retary shall attend all th 2 •... ~ . :~\co~ :, ny but shall have
c. r .~$' "_ .. ~,,, ..~. ~'!.,~ ... ~~ ,;.~~»z« ;/..:~~a}t~ ,~:,/
.... ~~~.~, •• .l.. .. ~.\~ ...• ~
-17·
N(YnCE AND PROCEEDINGS OF GENERAL MEETINGS
18. In case where the law specifies time period for giving of notice of anymeeting of the members or of directorfs), requirements of the lawshall be deemed to have been complied with if both the secretaryand the members are notified of the meeting and they altend suchmeeting provided that in case of annual general meeting the timeperiod for giving uf notice to the auditor of the company shall not beless than twenty one days.
19· The single member present ill person or through proxy shall be thequorum for the general meeting provided that secretary shall not actas proxy of the single member.
20. If the single member takes any decision which is required to be takenin a meeting of the board or in the general meeting or by means of aresolution and such decision is delivered by the single member inwriting, within three days of such decision, to the company for entryin the minute book and is so recorded, that decision shall be valid asif agreed in such a meeting.
DIRECTOR(S)A' mCf7V.'l'tZ.f- ;l..lflQserli~ ZTf. (I-\.\<.') L'i ~ .C),\~ 21.1 Th, fi"td1,ectoq' of the Company shall be the following persons:
:;:'01' , ) Hu Jinghua, a Chinese citizen, having passport no. G22833365;
Peng Aiguang, a Chinese citizen, having passport no. PEOl18573: andShi Yu, a Chinese citizen, having passport no. G33991354.
, I
22. The company shall always have the single member as a director but itmay have such number of other dircctor(s) who fulfill the conditionsas specified in section 187.
23· The board or the general meeting shall not have the power to removethe member director but the single member (or member director)shall have the power to remove any director, chief executive 01"
secretary through a resolution.
24· The director(s) shall have the powers as specified in section 196. -25· The directorts) shall appoint a chief executive in accordance with the
provisions of sections 198 and 199.
26. The director(s) shall cause minutes to be made in books as requiredunder section 173.
4
PROCEEDINGS OF DIRECTORS
26. The directors may meet together for the dispatch of business, adjournand otherwise regulate their meetings, as they think fit. Questions arising atany meeting shall be decided by a majority of votes. In case of an equality ofvotes, the chairman shall have and exercise a second or casting vote. Adirector may, and the secretary on the requisition of a director shall, at anytime, summon a meeting of directors. It is necessary to give notice of ameeting to all directors of the Company including directors for the timebeing absent from Pakistan.
•27. 'I11edirectors may elect a chairman of their meetings and determine theperiod tor which he is to hold office; but, ifno such chairman is elected, or ifat any meeting the chairman is not present within ten minutes after the timeappointed for holding the same or is unwilling to act as chairman, thedirectors present may choose one of their number to be chairman of themeeting.
28. The directors may delegate any of their powers not required to beexercised in their meeting to committees consisting of such member ormembers of their hody as they think fit; any committee so formed shall, inthe exercise of the powers so delegated, conform to any restrictions that maybe imposed on them by the directors.
29. (1) A committee may elect a chairman of its meetings; but, if no suchchairman is elected, or if at any meeting the chairman is not present withintell minutes after the time appointed for holding the same or is unwilling toact as chairman, the members present may choose one of their number to hechairman of the meeting.(2) A committee may meet and adjourn as it thinks proper. Questions arisingat any meeting shall be determined by a majority of votes of the memberspresent In case of an equality of votes, the chairman shall have and exercisea second 01' casting vote.
30 All acts done by any meeting of the directors or of a committee ofdirectors, or by any person acting as a director, shall, notwithstanding that itbe afterwards discovered that there was some defect in the appointment ofany such directors or persons acting as aforesaid, or that they or any of themwere disqualified, be as valid as if every such person had been duly appointedand was qualified to be a director.
31. A copy of the minutes of m . ~f~ard of directors shall befurnished to every director withi <:> ~~.~'~ .• te.ofmeeting.~a~""~..~~. ,,\~ <;. ~.
~ "-~..:"~~:: ~: ..\? !~ ~il'"~ t)\'~'" ...~~ .... _.\ IJ' 'i-. .JI':."" ~.,~ . ~ 0'/
\ ..~ to;'. ~-"~{C~~.,,!~~~ .
-
SECRETARY
33. A single member private limited company shall appoint a secretary intenus of section 204A and rule 6 who shall be responsible fordischarge of duties and functions normally discharged by asecretary under the corporate laws and secretarial practice.
34. The secretary shall be appointed at the time of incorporation andsubsequen tly on the same day or the day next following his resignationor removal or in case of his death within seven days of the event.
35, The sole director shall not be the secretary of tile company,
CONTRACfSwm-I TI-IESINGLE MEMBER
36. Contract between the company and single member shall be made inaccordance with the provisions of rule 8,
DIVlDENDS AND RESERVES
37. 111ecompany may declare dividends and pay in accordance with theprovisions of sectiolls248 to 251.
ACCOUNTS
38. The directorfs) shall Cc;'111se to keep proper books of account inaccordance with the provisions of section 230 and shall, as required bysections 233 and 236, cause to be prepared and to be laid before thecompany in general meeting such profit and loss accounts or incomeand expenditure accounts and balance sheets duly audited and reportsas are referred to in those sections. They shall in all respects complywith the provisions of sections 230 to 236.
40. Auditors shall be appointed and their duties raccordance with the provisions of sections 252 to 255.
So long as the company has only one director, the requiremen~i!l::~section 241 shall be deemed to have been met if the balances ~fjct' .~ ...c-,profit and loss account is authenticated by the sole director. .~ i!~.._~ :lJ;.:#.:~
~~~~/.Pli~~%. \ate ~~ .. ~\o;l." f ~~ 4:_' ~J;
~ ~~ .. z· .. r;:/\V" ~~,~,!-, ;' ./"0. '" -e ~"'.'- '.', . ..~. .'
··,':;_"!Ies anll tl~~.,;."'". '.::::.:;;;:;;,.;:...-'
-39·
TI-IE SEAL
41. The director(s) shall provide for the safe custody of the seal and theseal shall not be affixed to any instrument except by the authority of aresolution of the board of director(s) or by a committee of director(s)
6
authorized in that behalf by the member director and in thepresence of at least member director and of the secretary or suchother person as the director(s) may appoint for the purpose; and themember director and the secretary or other person as aforesaid shall signevery instrument to which the seal of the company is affixed in theirpresence.
WINDING UP
42. The company shall follow, in case of its winding up, the relevantprovisions of the Companies Ordinance, 1984 (XLVTIof 1984).
43. Every officer or agent for the time being of the company may beindemnified out of the assets of the company against any liabilityincurred by him in defending any proceedings, whether civil orcriminal arising out of his dealings in re1ation to the affairs of thecompany, except those brought by the company against him, in whichjudgment is given in his favour or in which he is acqui i{1lf~& r. '-connection with any application under section 488 in w ~~rclW~,~/iC;~ \.\\granted to him by the Court. .~<::i~_' \\\If ;i_,~j~~~
~ .. ~~ ~.~":"I. .~~~ ..~~ ~/
<$"Q~ .~t<~./'dille ,._ f'\\C,C,~"./............... _. ~
-7
I
I, whose name and address is subscribed, am desirous of being formed into a single member company, in pursuance of these Articles of Association,and I undertake to take the number of shares listed against my name.
Name and Surname (present and Father's/HusB8ft Nationality, with I Occupatio i No. o(sharesformer) in Full (in Block Letters) ti.!s Name in Full any former n Residential address in full taken by Signatureand NIC Number nationality subscriber
MIS ZfE (H.K.) LTDI
735878Hong Kong, China rm2307-09, 23/F, china 100
resources bldg, 26harbour road, wanchaiHong Kong, incorporationnO·735878
REPRESEJI.'TED BY Vice flat NO.4 on 34/F of block~~MS. HU JINGHUA HuSuwen Chinese General B causeway centre NO.28
G2283336S Manager harbour road Wan Chai . IHongKong
I~\\t~I 18-160u, Taoyuanju,
MR. PENG AIGUANG Peng Zhongxin Chinese Engineer Baoan District, Shenzhen,
PEo1l8S73 Guangdong, ChinaI
1 Room D on 14/F, Block 3.Shi Huiiun Chinese Finance Haiyi Dongfang Garden, ,
MS, SHlYUG33991534
. HI-Tech Road South,I Shenzhen, China
Total No. ofSharcs: 100
Dated "U-day of 1..,L Y J 2015
Witness to above signatures:
rtf""Signature: ~4Name: ;:-t ~!I c: '.,Father's Kame: R~h J"C!.,. L,
NIC Number: .., "2-')01- g).{) &11 _J-.JAddress: D -6 ?-!( (J 11. ;::'
iJ _ . -"Ct:k-t-r ~<f:#o'_', - ~ 'Y "\. _t'-'1.-
- .~.- .. .'
.. --_"'"......... ,¥
ANNEX BGos LETIER
ANNEX F
FEASIBILITY REPORT
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
TABLE OF CONTENTS
11.11.21.31.41.51.61.71.7.11.7.21.7.31.7.41.7.51.7.61.7.71.7.81.7.9
22.12.22.3
e 33.13.1.13.1.23.1.33.1.43.23.33.3.13.3.23.3.33.43.4.13.4.23.4.3
General Overview 5Location of the Site 5The Respondents & Project 8Capacity/Generation 9Engineering, Procurement and Construction 9O&M Management 10Health & Safety 11Environmental and Social 12Relevant Acts 12Approach and Methodology 12Construction Aspects 13Noise Level during Construction 14Impact of Fugitive Dust during Construction 14Harmful Effects on Flora & Fauna & Natural Vegetation 14Effluent Discharge Waste Water 14Hazardous Substances Storage 15Social Impacts 15
Task and Scale of Project 16Project Task 16Scale of Project 17Necessity of Project Construction 17
Preliminary Design 19Relative Standard 19General Design Codes 19Civil Engineering Design Criteria, Standards and Codes 19Mechanical Engineering Design Criteria, Standards and Codes '" 19Control and Electrical Engineering Design Criteria, Standards and Codes 19System Composition 21Technology and Equipment. 22PV Modules 22Mountings 30Inverters 34PV Power Plant Design 38Preliminary Outline of PV Power Plant 38PV Array Design 40Electrical Design 1fo44,
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.4.4 Lightning Protection and Grounding Design 573.4.5 Automatic Fire Alarm System 603.4.6 Video Security Monitoring System 603.4.7 Weather Protection of Major Equipments 613.4.8 Sewage Drainage System 623.5 Interconnection Study 63
4 Simulation Result 644.1 Solar Irradiation and Average Temperature 644.2 Simulation Result , 644.3 Power Plant Factor 664.4 Analysis of Solar Source 664.4.1 Monthly Report 664.4.2 Loss Coefficient 684.4.3 Uncertainty of simulation 704.5 25 Years Generated Calculation 714.5.1 Derating Curve of Module 714.5.2 25 Years Simulation Calculation 71
5 O&M Proposal. 745.1 Plant O&M organization and responsibility 745.1.1 Plant O&M organization 745.2 Preparation of Solar Product Inspection and Maintenance 745.2.1 Personnel. 745.2.2 Tools 745.2.3 Instrument preparation 755.2.4 Labor protection products 765.3 Solar product inspection and maintenance details 765.3.1 PV array and cable connection inspection 765.3.2 PV Array Structure Inspection and Maintenance 805.3.3 Inverter Maintenance Management.. 835.3.4 Transformer operation 855.3.5 SCADA Inspection and Maintenance 85
2
>,,:.~~a~~~~
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
FIGURES
Figure 1-1 Map of the site , 6
Figure 1-2 Site location from Google Earth 6
Figure 1-3 Monthly Global Irradiance of the Site 7
Figure 1-4 Monthly Average Temperature of the Site 7
Figure 3-1 the Appearance of a typical 255Wp Module 28
Figure 3-2 I-V-P Curves of the typical 255Wp polycrystalline PV module 28
Figure 3-3 Appearance of Fixed Type Mounting 33
Figure 3-4 1MW Container PV grid-connected inverter appearance 35
e Figure 3-5 Efficiency variation for various AC loads 36
Figure 3-6 Outline of PV Power Plant 39
Figure 3-7 1MWp PV generating sub-array layout... 40
Figure 3-8 Vertical Layout of PV String 41
Figure 3-9 Tilt angle calculation of PVsyst 42
Figure 3-10 Shading figure of 9:00 in 21st Dec 43
Figure 3-11 Shading figure of 16:00 in 21st Dec 43
Figure 3-13 11kV oil-immersed transformer's appearance 45
Figure 3-14 Appearance of 11kV switchgear 48
Figure 3-15 Comprehensive monitoring diagram 53
Figure 3-16 Video monitoring diagram 61
Figure 4-1 Normalized Productions 65
Figure 4-2 Performance Ratio 66
Figure 4-3 Monthly yield of 20MWp Power Plant 67
Figure 4-4 Loss Diagram of 20MWp PV Power Plant.. 68
Figure 4-5 Derating curve of module 71
Figure 5-1 Tools 75
Figure 5-2 Testing Instrument 76
Figure 5-3 Products of Labor Protected 76
Figure 5-4 PV Array Damage 77
Figure 5-5 Dust Whisking 78
Figure 5-6 Scrape dirt yr~ 7~
BENAZIRABAP SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 5-7 Pollutant Cleaning 79
Figure 5-8 Junction Box Check 79
Figure 5-9 Structure Rust.. 81
Figure 5-10 Bolts Loose 81
TABLES
Table 3-1 Comparison of Different PV Modules 24
Table 3-2 Comparison of Economy of Different Modules 25
Table 3-3 Comparison of Different Polycrystalline Silicon Modules 26
Table 3-4 Typical 255Wp Polycrystalline PV Module Specification 28
Table 3-5 Comparison of Mountings 31
Table 3-6 Parameter of Fixed Type Mountings 33
Table 3-7 1MW Container Inverter Technical Specifications 36
Table 3-8 PV module quantities in strings 41
Table 3-9 Specification of 11kV 1MVA Transformer 46
Table 3-10 Specification of breakers 48
Table 3-11 Relay Protection Devices 49
Table 3-12 Monitoring parameters 53
Table 3-13 Environment Specification of Major Equipments 61e Table 4-1 Monthly Solar Irradiation 64
Table 4-2 Monthly Average Temperature 64
Table 4-3 Information of 20MWp PV Power Plant 64
Table 4-4 The Loss Diagram of solar power plant., 69
Table 4-5 Simulation Generation and PR of 20MWp during 25 years 72
Table 5-1 Plant O&M Organization 74
4
BENAZIRABAD SOLAR POWER (SMC·pyn LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
1 General OverviewLocated on the Western stretch of the South Asian Continent, Islamic Republic of Pakistan
is presently in a state of energy shortage. The energy prices worldwide are on the increase
and the power supply system in Pakistan will come under more stress with passage of time.
The Government of Pakistan has thus placed the issue of power generation and supply as
one of the country's highest priorities and investing in renewable energies such as solar has
gained more and more importance.
A Renewable Energy Policy has been created by the Pakistan Government to encourage
the private sector to invest in the development of renewable energy solutions. And the
Government of Sindh has decided to set up 20MWp landmark Solar Photovoltaic Power
Plants at five various towns of the province of Sindh making a total of 100MWp to address
power shortage at these sites and adjoining areas.
Benazirabad Solar Power (SMC-PVT.) Ltd is required to propose a 25 year
Build-Own-Operate (BOO) 20MWp PV power plant project solution under the
Public-Private-Partnership (PPP) policy at Shaheed Benazirabad. In this project,
Benazirabad Solar Power (SMC-PVT.) Ltd will choose industry proven state of the art
technology which will have the highest level of efficiency and reliability currently available in
the international market and is suitable for the environmental conditions of the Sindh
province.
Benazirabad Solar Power (SMC-PVT.) Ltd envisages that installation of 20MWp Solar
Power will certainly help in reducing the gap between electricity supply and demand faced
presently, create more job opportunities for the inhabitant of the area, ensuring delivery of
clean power, and generate healthy economic activity as well as transfer of technology and
training to local manpower.
1.1 Location of the Site
Shaheed Benazirabad presently faces electricity shortage. The LOI issued by the Authority
wherein 20MWp Solar Power plants will be set up and for which a provision of 120 acres
land will be made available by GOS. The coordinates of site are as below:
Latitude: 26°25'54"N
5
,;~~:;:.i,:~
a~~~~
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Longitude:
Figure 1-1 Map of the site
.,
Mir Rah~enlBUK TCllpw
HafizMuhammlld
Nawaz xhoso
f.,.IJMill('J.L'lil;._. t. I,.,.
.... -,
"1.>.
i~a:IP;YPiiJoLM.,l~
Si'~jhoro'..:..Vl~
ShlihpurChOk., "'!I~
;.iV.lSot cl..i 'Jii:6 Deh 22 .Iamrao
,Q~iJI ~"wtlb Kol~L.,
Figure 1-2 Site location from Google Earth
The following figures shows the average annual irradiance for the site which is about
1990kWh/m2, and average temperature ranges between 16°C in winter and 35°C in
summer.
6
BENAZIRABAP SOLAR POWER (SMC-PVT) UPAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 1-3 Monthly Globallrradiance of the Site
N 200E-.c~
~ 150flcIV:0E 100...;a..DoCi 50
250
---_ __ .__ _._---_ -..-.-.--.-----
,
Io L
i !i
i + ~...;
j, ...r ,,
l,
I._. :
... !... , ..,
I ,i
--I
I
.i
.. !...
iI
Nov Dec I___________ .••..•. J
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Data from Meteonorm V7.1
Figure 1-4 Monthly Average Temperature of the Site
40
35
,,! I
,"'- -,-
.,.
i.c .. 1'
I--,-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Data from Meteonorm V7. 1
Rich solar irradiance resource is very suitable for solar power plant generation. However
higher temperature tends to lower efficiency of PV modules. The sunshine generation hours
are estimated at about 1691 hours annually and first year's Plant Capacity Factor is about
7
BENAZIRABAD SOLAR POWER CSMC-PYT) LIPAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
19.49%, 25 years' average plant capacity factor is 17.72%. The figures are encouraging to
obtain a good result for PV power plant.
1.2 The Respondents & Project
ZTE Corporation, main sponsor of Benazirabad Solar Power (SMC-PVT.) Ltd, is the
Respondent apart from being a globally-leading provider of telecommunications equipment,
network solutions, it is an experienced renewable energy solution provider in Pakistan and
many other countries. With operations in 160 countries, the company is a leader in
technology innovation, delivering superior products and business solutions to clients all over
the world. Founded in 1985, ZTE is listed on both the Hong Kong and Shenzhen Stock
Exchanges and is China's largest listed telecoms equipment company.
ZTE Corporation has finished many new energy projects in Pakistan.
1. Collaboration on Home Solar: 240,000 sets
From 2012 to 2014, cumulative 240,000 sets of home solar systems have been
delivered for Ujaala Program in Punjab
Daily solar power capacity generated could meet the requirement of numbers of
families, for 15-20 hours lighting and other home use.
2. Collaboration on Solar Street light: Cooperated with Lahore since August 2013, to build
the local solar street lighting systems
Fast deployment: 50 days only from solution confirmation to delivery
Customized design: reuse the existing lighting poles to save initial investment
High efficiency product: Energy saving LED lamps, solar controller with 98%
efficiency
3. Solar power for telecom site: since 2011, over 1000 green energy telecom sites have
been in service for PTCL, TP, CMPAK and etc
Benazirabad Solar Power (SMC-PVT.) Ltd envisages undertaking a Ground Based, Fixed
Bracket Plant having a capacity of 20MWp at Standard Testing Condition (STC) capable of
delivering 34142MWh to the National Grid during 1st year after commissioning. Spread over
8
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
an area of about 120 acres, it will house 78431 Polycrystalline PV modules of 255Wp rated
power each. For convenient system installation and maintenance, the 20MWp solar power
generation system will be divided into twenty 1MWp solar subsystems. The DC voltage of
each 1MWp PV subsystem (module) is converted in 3 phase AC with lower voltage through
the 3 phase inverter and is further stepped up to 11kV through a O.315/11kV 1000kVA
step-up transformer. Ten solar subsystems are connected together to form a ring with 11kV
cables and connect to the 11kV Bus Bar in the substation. There are two solutions to
evacuate power from solar power plant: (1) Three direct 11KV circuits each of 6 km length to
Jamrau Head 66/11 KV Substation.(2)Looping solar power plant IN-OUT of single 66KV
circuit between Jamrau Head and Sanghar. An 7.5MVar Switched Shunt Capacitor will be
connected to improve the power factor as per the standard laid down in NTDC Grid Code.
1.3 Capacity/Generation
It is expected that in the first full year of operation, the 20MWp design shall inject
34142MWh (20MWp*8760Hrs"19.49%) of electricity into the public grid before taking into
account first year degradation and losses. Over all generation during the 25 years' term of
this 20MWp PV power plant is expected to be 776.2GWh of electrical energy.
1.4 Engineering, Procurement and Construction
Benazirabad Solar Power (SMC-PVT.) Ltd will utilize excellent engineering practices in
preparing the design of the Plant. Proposed plant and equipment will be newly
manufactured and unused, and all the necessary information about EPC contractor,
subcontractor, and major equipment manufacturer will be provided in the appendices.
ZTE has a global supply chain and provide products and services to worldwide clients in
about 160 countries. ZTE has a mature procurement process to guarantee the steady
supply of equipment, in this 20MWp PV power plant project, and the procurement plan can
refer to below process.
i. Preparing Procurement Documentation
ii. Managing the Competition & Selecting Vendors
iii. Debriefing Losing Vendors9
BENAZIRABAD SOLAR POWER (SMC-PVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
iv. Executing the Procurement
v. Subcontract Monitoring
vi. Maintaining Traceability of Subcontractor Data
vii. Evaluation and Acceptance of Vendor Product
viii. MakelBuy Analysis and Rationale
All of the major equipments will be purchased from the manufacturers well versed and
experienced in PV power plant product in time to satisfy the requirement of implement
schedule. The information about these manufacturers is available in the appendices.
The estimated construction period for the Solar PV Plant is 24 weeks with flat open terrain
and good road and electrical transmission facility nearby.
The imported equipment would come via Karachi Sea Port. The civil work materials shall be
arranged from the nearest local markets and dealers. Certain items, such as steel
accessories, cables and electrical accessories shall come from China or appropriate
Pakistan cities including Islamabad, Karachi and Lahore,
It is proposed that the road facilities leading to PV plant and infrastructures for Power
Evacuation (TIL) will be constructed by respective HESCO. The site will be restored to the
original landscape following project completion.
1.5 O&M Management
The operations and maintenance of the solar project will be supervised by an associated
company of Benazirabad Solar Power (SMC-PVT.) Ltd and managed by a management
team of Benazirabad Solar Power (SMC-PVT.) Ltd. The O&M shall consist of routine
operational checks via remote and local monitoring, check calibration and maintenance of
electrical equipment, replacement of damaged equipment, PV module cleaning and general
ground work and repair to achieve efficient and reliable max possible generation.
The operational and maintenance plan includes the following scope of work:
• 24/7 remote monitoring and diagnostic services from power plant control centre:
10
"'."
""J" "<,. " BENAZIRABAD SOLAR POWER (SMC-pYT) LTD
Add: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Monitoring up to string level output to pinpoint location of errors on the power
plant.
• Monthly, quarterly and annual performance reports.
• Annual detailed system inspection and maintenance:
Measure string voltage and current at the inverter input.
Conduct first level maintenance on inverters.
Check integrity of structures and retighten bolts,
Inspect cables.
Inspect Junction Box for any loose/rusted connection and remove any
accumulative sulphate deposit.
Inspect MV transformers and switchgear,
• Client's access account for live monitoring of the PV power plant:
Access to live data collected over 10 min intervals.
Access to archive data.
• Module cleaning
• Grass cutting, if necessary
• Replacement spare parts
1.6 Health & Safety
The 20MWp PV power plants and all systems forming part of it will be constructed and
operated with safety as a priority consideration, The health and safety of all personnel,
whether constructors, operators, maintenance workers or others, shall be considered at all
stages of the development, and the EPC Contractor shall ensure that the safety of all
personnel is guaranteed during construction and O&M of the Plant.
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Contractor's health and safety policy and procedures shall include the international safety
practices covering but not be limited to the rules governing welfare, health, sanitation and
safety of employees.
Contractor's safety policy and procedures shall also comply with any special safety
regulations identified in the licensing, planning and design stages.
1.7 Environmental and Social
A detailed Initial Environmental Examination (lEE) has been performed for the proposed
identified site. Normally PV power plants built in undeveloped environment will have number
of positive impacts and negligible negative impacts to the existing environment as follows:
Significant improvement in the economic activities in the surrounding areas due to
generation of direct and indirect employment opportunities;
Environment pollution due to cut and fill operations, transportation of construction materials,
disposal of debris, noise, vehicle exhaust, vibration are the short term negative impacts due
to proposed project with mitigations being properly taken care.
1.7.1 Relevant Acts
Pakistan Environmental Protection Act, 1997
National Environmental Quality Standards, 2000
The Sindh Wildlife Protection (Amendment) Act, 2008
Land Acquisition Act, 1894
Protection of Trees and Brushwood Act, 1979
1.7.2 Approach and Methodology
Since construction of 20 MWp solar power plants is a new idea in Sindh, its environmental
examination was approached in two ways. Firstly, it was handled in a conventional way in
terms of preparing environmental statement (lEE report). Secondly, contemporary literature
was comprehensively reviewed regarding technical details of the PV technology and the
,~~~ :~.a==~L~l
BENAZIRABAD SOLAR POWER (SMC-PVJ) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
related information. Based on these approaches, this lEE report is prepared which explains
the understanding of objectives, approach to the services, methodology for carrying out the
activities & obtaining the expected output, and the extent and detail of such output.
The lEE methodology follows the conventional methods that meet the maximum of Sindh
EPA requirements as well as fulfills the IFC's guidelines on social and environmental
sustainability standards and policies. In the lEE process, the environmental and social
aspects were fully taken into account while gathering field information on physical assets,
biological resources and social settings of the project area.
1.7.3 Construction Aspects
Contractor's Facilities
Contractor will have to construct facilities for labor, machinery and vehicles, etc. It is
envisaged that there is lot of space available for the contractor around the project area
without disturbing any resident, ecology or the infrastructure.
Work Force
It is expected that the skilled staff will be engaged in the construction and installation work
during the construction stage of the project. The breakdown of the staff strength during the
average and peak construction stages is expected as 100 and 200, respectively.
Construction Material and Transportation
Solar panels will be erected on steel rods fixed in the ground. Similarly, other construction
material will also be used to build allied structures such as office, store room, parking area,
switchyard, etc. using framed construction technology. The framed structure will consist of
rei nforced cement concrete (RCC) using mainly steel, cement, sand, aggregate for
construction purposes. Transport of construction materials to the construction site will not be
a big issue till the vehicles run on metal roads but will face problem as soon as they turn on
the earthen tracks. The bearing capacity of these jeep-able tracks is low for heavy
machinery transportation. It is visualized that transportation may be suspended during wet
season due to worsened condition of the tracks.
13
.JiI~ ,,_:::~
a~;:=t~i)BENAZIRABAD SOLAR POWER (SMC-pyn LTD
Add: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
1.7.4 Noise Level during Construction
During construction period, noise level is expected to increase to 80-120dB due to
movement of construction machinery and equipment. This noise will impact areas close to
the construction site and the surrounding areas within 250 m_
The most likely persons to be impacted by the noise may be the labor working at site that
can use ear-plugs during working with the machinery.
1.7.5 Impact of Fugitive Dust during Construction
Solar power generation itself will not produce any toxic and harmful exhaust pollutants.
However, the vehicular exhaust and dust produced by excavation for foundations are the
only pollutants and their spread mainly depends on wind speed, direction and dry or wet
status of the ground surface. During summer, when wind speed is high and the surface is
dry, amount of blowing dust will be more than in winter. It is further to add that the air
pollution caused by dust blowing during construction will be temporary and will disappear
after the completion of construction.
1.7.6 Harmful Effects on Flora & Fauna & Natural Vegetation
The project area is located at the edge of desert where the ecological environment is
relatively fragile and vegetation is not rich. As such, there will be minimum damage to the
ecological environment and flora & fauna due to construction work except for some trees,
shrubs which have to be cleared before the start of construction. No further damage to flora
& fauna & natural vegetation is expected during construction period.
The project area is almost a desert and has little ecological impact on identified sites in
terms of wild animals and plants protection. It is envisaged that operation of the power unit
will not change the status of local animals and plants thus no adverse impact on the local
and surrounding ecological environment, especially on flora and fauna.
1.7.7 Effluent Discharge Waste Water
The production of wastewater from the project construction activities comes mainly by
washing the concrete truck mixers and other construction machinery, repairing equipment
and maintaining vehicles, but the total amount of such waste water is small. The
i~4
BENAZIRABAD SOLAR POWER (SMC·PYIl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
construction sites being scattered and wide, so the waste water can be used for spraying at
the construction site.
During the construction period, the domestic sewage will be collected, and transported
outside for safe disposal. During normal operation of the power plant, the same practice will
be continued.
1.7.8 Hazardous Substances Storage
No hazardous substances are applied in this project.
1.7.9 Social Impacts
This 20MWp PV power plant project will create employment opportunities for the local
people. Even indirect job opportunities will be created outside the project boundary. The
project would improve the basic infrastructure and the people of nearby villages can also
use these amenities. 8enazirabad Solar Power (SMC-PVT.) Ltd will give priority to the
skilled, un-skilled labor of the nearby villages. Overall, it is expected that there will be
marginal impacts on the socio-economic conditions of the locality and the impact will be
mostly positive.
15
BENAZIRABAO SOLAR POWER (SMC-PYT) LTOAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
2 Task and Scale of Project
2.1 Project Task
In this project, respondents are supposed to set up a 20MWp solar power plant in one of five
towns of Sindh Province, on the basis of Built Operate Own (BOO). 8enazirabad Solar
Power (SMC-PVT.) Ltd will undertake construction of a 20MWp Ground Based, Fixed
mounted PV solar power plant, spread over an area of about 120 acres. 8enazirabad Solar
Power (SMC-PVT.) Ltd will undertake the responsibility to carry out
Solar resource analysis
Engineering geology exploration,
Environmental impact assessment,
Overall scheme design of the system,
Electrical design,
Generation yield calculation,
Energy saving and consumption reduction analysis.
There after construct the solar power plant along with civil amenities and operate and
maintain after Project completion.
To minimize the land occupation area, the solar array is arranged in a rectangular shape.
The land occupation area includes land of solar array, inverters, transformers, arrival roads,
land for 11KV or 66 KV Substation and comprehensive building, etc.
16
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
2.2 Scale of Project
2.3 Necessity of Project Construction
The low carbon economy is the economic mode based on low pollution and low emission.
The essence is the high-efficiency utilization of energy source, development of clean energy
source and green GDP. "Low carbon economy" has become the global hotspot, which is
called as the fourth "low carbon revolution". European and American countries have greatly
promoted the "low carbon revolution" using the high efficiency and low emission as cores,
developed the "low carbon technology", and critically adjusted the policies of industries,
energy sources, technologies, trades, etc., so as to seize the opportunity and commanding
height. The "low carbon economy" involves wider industry and field uses, and the clean
energy source is very critical.
The solar energy is the clean renewable energy source as compared to the traditional power
generation method. There is no emission of air pollutants in the running process, the
conventional energy source is reduced, especially the consumption of coal resources, the
ecological environment is protected thus the influence on the environment is minimized and
clean power is delivered to the national grid, and the social benefits and
environment-friendly benefits are very obvious.
The development and building of solar power station thus meets the National
Environment-Friendly and Energy-Saving policy. The project is located in an economically
backward area and its implementation can drive the development of the local economy in a
number of ways and a few are enlisted below.
Creation of jobs would come into being for the local inhabitant of the area.
A lot of economic activity in form of general merchandize and supply of food items for the
work force would be required.
Technical knowhow will be transferred at each level (Erection, Testing, Commissioning, and
O&M) and a trained manpower would be produced.
Local transport activity will pick up for transportation of men and material.
17
"!,, BENAZIRABAP SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
With advent of economic affluence of the inhabitants, local construction boom (building of
new houses) could come into effect.
18
BENAZIRABAP SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
."".".,.~".---,---.----------------------3 Preliminary Design
3.1 Relative Standard
3.1.1 General Design Codes
• IEC 60364 (all parts), Low-voltage electrical installations
• IEC 61936-1, Power installations exceeding 1 kV A.C. - Part 1: Common rules
• IEC 60071, Insulation co-ordination - Part 1: Definitions, principles and rules
• IEC 60068, Environmental testing. Part 1: General and guidance
• NT DC - The Grid Code - 2005
• Solar Grid Code after GCRP meeting 20-09-2013
• Performance Standards (Generation) Rules-NEPRA 2009
3.1.2 Civil Engineering Design Criteria, Standards and Codes
• BCP SP-2007 Building Code of Pakistan
3.1.3 Mechanical Engineering Design Criteria, Standards and Codes
• BCP SP-2007 Building Code of Pakistan(Wind Load Part for PV Rack)
3.1.4 Control and Electrical Engineering Design Criteria, Standards and Codes
• IEC 60364-7-712:2002, Electrical installations of buildings - Part 7-712: Requirements
for special installations or locations - Solar photovoltaic (PV) power supply systems
• EN 50521 :2008 Connectors for PV systems
19
!.';j!~ BENAZIRABAD SOLAR POWER lSMC-PVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
• IEC 60228, 60364-1, 60332-1-2, 60754-1 and -2, 61034, TOV approval 2Pfg1169:
cable design and wiring for the electrical infrastructure and connection infrastructure
(DC cables should be solar cables)
• IEC 62109-1 and IEC 62109-2: Safety of power converters for use in photovoltaic
power systems - Part 1: General requirements & Part 2: Particular requirements for
inverters
• IEC 61215 Crystalline silicon terrestrial photovoltaic (PV) modules - Design
qualification and type approval
• IEC 61730 Photovoltaic (PV) module safety qualification
• IEC 61701 Salt mist corrosion testing of photovoltaic (PV)
• IEC 62109-1 and IEC 62109-2: Safety of power converters for use in photovoltaic
power systems - Part 1: General requirements & Part 2: Particular requirements for
inverters
• IEEE 1547 Standard for Interconnecting Distributed Resources with Electric Power
Systems
• IEC 60076, Power Transformers
• IEC 62271, High voltage switchgear and control gear
• IEC 60376, Specification of technical grade sulfur hexafluoride (SF6) for use in
electrical Equipment
• IEC 61439, Low-voltage switchgear and control gear assemblies
• IEC 60439, Low-voltage switchgear and control gear assemblies
• IEC 60947, Low-voltage switchgear and control gear
• IEC 60364 (4-41) Low-voltage electrical installations: Protection for safety - Protection
against electric shock
• IEC 60364 (5-54) Low-voltage electrical installations: Selection and erection of
electrical equipment - Earthing arrangements and protective conductori it20
:'t~:;;: '::~.. BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
• IEC 60298 High voltage switchgear in metallic enclosure
• IEC 61936-1 Power installations exceeding 1 kV A.C. - Common rules
• EN 50522 Earthing of power installations exceeding 1 kV A. C.
• IEC 60364-7-717 Low-voltage electrical installations: Requirements for special
installations or locations - Mobile or transportable units
• IEC 62305 (all parts), Protection against lightning
• IEC 60099 Surge arresters
• IEC 60364-6, Low-voltage electrical installations - Part 6: Verification
• IEC 62446, Grid connected photovoltaic systems - Minimum requirements for system
documentation, commissioning tests and inspection
• IEC 61000, Electromagnetic compatibility (EMC)
3.2 System Composition
Solar power plant generally includes following composition:
1. PV Module and mounting;
2. Solar array lightning combiner box;
3. Solar DC/AC lightning protection distribution cabinet;
4. Solar grid-connected inverter;
5. Medium voltage step-up transformer;
6. Medium voltage access system;
7. High voltage step-up transformer;
8. High voltage access system;
9. System communication monitoring device;
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13. Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
10. System lightning protection and grounding device;
11. System connection cable and protective material;
12. Comprehensive building, drainage infrastructure, etc.
3.3 Technology and Equipment
3.3.1 PV Modules
For the selection of PV Module, first and foremost consideration is the industry trend,
technology maturity, running reliability, future technology development trend of the
commercialized PV Module. The other consideration for selection however is the natural
environments, construction conditions, traffic transportation conditions around solar station.
Selection also involves the technical and economy parameters. The PV Module found
suitable for the centralized large grid-connected solar power station is selected which will of
course adhere to the international standards.
3.3.1.1 Classification of PV Module
PV Modules are classified as per the materials they are made of:
1) Silicon PV Module: mono-crystalline silicon, polycrystalline silicon, and Non-crystalline
silicon.
2) Chemical semiconductor PV Module: mono-crystalline chemical cell (GaAs cell),
polycrystalline chemical cell (CIGS cell and CdTe cell), and Oxide semiconductor cell (Cr203
and Fe203).
3) Organic semiconductor PV Module: molecular crystalline cell, charge transfer complex
cell, and high polymer cell.
4) Thin film PV Module: Non-crystalline silicon thin film cell (a-Si), polycrystalline thin film
solar battery, chemical semiconductor thin film solar battery and nano-crystalline thin film
cell.
BENAZI RABAD SOLAR POWER (SMC.pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.3.1.2 Comparison of Technical Properties
By combining solar industry status and productivity condition of the international PV Module
markets, the technical properties of main PV Modules are compared, i.e. crystalline silicon
cell and Non-crystalline silicon thin film cell.
1) Crystalline silicon PV Module
The earliest developed and large scale produced PV cell was Mono-crystalline Silicon Solar
Module. The commercially produced silicon based modules were 16% to 18% efficient and
had occupied the major market share for a long time. In comparison, the Poly-crystalline
Silicon solar module was slightly less efficient 14%-16%. But its production cost was
drastically lower and thus got a favorable market response. The technology cost efficiency
however can be easily balanced.
The crystalline silicon PV Module still leads the solar devices in the 21 st century, and is
continuously aiming to achieve the goal of higher efficiency and lower cost.
2) Non-crystalline silicon thin film cell (0 -Si)
The thin film PV Module is formed by depositing several micrometers or several dozens of
micrometers of semiconductor films on the glass, stainless steel, plastic and ceramic
substrates or the thin films. Since the semiconductor layer is thinner, the cell material can be
greatly saved, the production cost is reduced, and it is the novel solar battery with most
prospects, and becomes the key project and hotspot subject in the research and
development of world solar technology.
The non-crystalline silicon thin film cell has the most shares in the market. There are the
following characteristics:
a) The usage amount of material is less, the manufacturing technology is simple, the
continuous, large-area, automatic and batched production is realized, and the
manufacturing cost is low.
b) The consumed power in the manufacturing process is little, and the energy compensation
time is short.
c) The type of the substrate is selectable.
23
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
d) The weak light effect is good, the temperature coefficient is low, and the power generation
amount is much,
The scaled production of CdTe and CIGS cells in the thin film PV Modules is limited due to
the hypertoxicity of raw material or lacking of raw material, so they are still in investigation.
Aiming at reaching the goals of improving photoelectric conversion efficiency and reducing
production cost, each country is developing and investigating various types of PV Modules.
At present, the crystalline silicon PV Module and the thin film PV Module are the two
hotspots and key spots in the research and development of global novel solar modules. The
main properties of the commercialized mono-crystalline PV Module, polycrystalline silicon
PV Module, Non-crystalline silicon PV Module, CdTe PV Module and CIGS PV Module are
as shown in below table.
Table 3-1 Comparison of Different PV Modules
Crystalline silicon type Thin film Type
CategoriesMono-crystalline Non-crystalline Silicon Copper indium
Polycrystalline Silicon I Cadmium TellurideSilicon type diselenide
Commercial Efficiency 16%·18% 14%·16% 5%·9% 10%· 14% 10%·16%
Laboratory Efficiency 24% 20.3% 12.8% 16.4% 19.5%
Working Life 25 years 25 years 25 years 25 years 2S years
- Thickness of AssemblyThickness of Layer Thickness of Layer Lamella Lamella Lamella
Layer
Scale of Production Formed Formed Formed Formed Feasible
Neutral, exceptEnvironmental Issue Neutral Neutral Neutral Yes (using cadmium)
Using Cadmium
Cadmium andIndium is expensive
Major Material Source Medium Medium ' Abundant telluride are rarerare metal
metals
Manufacturing Cost Highest High : Low I Low Low
High Efficiency High Efficiency Matured Good Weak Light EffectGood Weak Light Good Weak Light
Key Advantages
itMatured Technology Technology Low Cost Effect Effect
24
BENAZIRABAP SOLAR POWER (SMC-PYD LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Lower Cost . Low Cost
As is evident from the above the comparison of solar modules the crystalline silicon cell has
higher Photo electric conversion efficiency, matured manufacturing technology, stable
product performance and long service life, the crystalline silicon cell is widely applied to the
grid-connected photoelectric power station project.
The non-crystalline silicon cell has lower efficiency, large land occupation area and
instability. Along with the development of technology and market, since the manufacturing
technology is relatively simple, the high-temperature process is not required and the
performance is higher than that of the crystalline silicon cell under the weak light condition,
and the non-crystalline silicon cell occupies certain shares at market.
3.3.1.3 Comparison of Economy
The competition among the manufactures, the technological advancement and market
development has resulted in bringing down the prices of solar modules. Taking 10MWp
capacity of China using fixed installation type as example, the price of the polycrystalline
silicon module is USDO.95IWp, the price of the non-crystalline silicon module is
USDO.89IWp. The primary comparison of the direct costs of these two type PV Modules is
as shown in below table.
Table 3-2 Comparison of Economy of Different Modules
ItemsPolycrystallineSilicon Module
Non-crystallineSilicon Module
Array area (unit: 10,000 m2) 21 39
10MWp Modules(unit million USD) 9.5 8.9
Other equipment (unit: million USO) 10.9 12
Civil work (unit: million USO) , 2.6 3.7
Designl management(unit: million
USO)
Sum (unit: million USO) 24 25.6
25
BENAZIRABAD SOLAR POWER (SMC-pYJ) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Note: 1) The land cost is based on free allocation. 2) The data in the table is only primarily
calculated in China market.
According to above table, the polycrystalline silicon module economic benefit is slight higher
than that of non-crystalline silicon module.
3.3.1.4 Determination of Types of PV Module
According to the solar irradiance, characteristics and environmental conditions, various PV
Modules can be used on project. But the type of PV Module should be reasonably designed
in the specific application, so as to reach the optimum running effect.
By comprehensively comparing the technical and economical running performances of the
two type's modules with largest shares at the market, the crystalline silicon cell has higher
technical maturity, stable efficiency, and higher-scale application in domestic and at abroad,
higher occupation in the PV Module market, therefore the price of polycrystalline silicon cell
is reduced and becomes more reasonable. Therefore, it's recommended to adopt
polycrystalline silicon module.
3.3.1.5 Rated Power Selection of PV Module
The polycrystalline silicon modules are manufactured as multiple wattages, and range from
5Wp to 300Wp. Since the installation capacity of this project is 20MWp, the land occupation
area is wide and installation amount is high. So the module with larger power is adopted, in
order to reduce the land occupation and installation amount.
Here we take 175Wp, 255Wp and 290Wp models of one manufacture for example. The
comparison of three polycrystalline silicon module is as shown in below Table.
Table 3-3 Comparison of Different Polycrystalline Silicon Modules
Rated Power 175Wp 255Wp 290Wp
Module Efficiency [%] 14.5 15.4 14.9
Market Application little i highest higher
Number of Each String (pes) 26 ! 22 17 i~String of 1MWp System (string) 220 180 204
26
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Rated Power 175Wp
5720
114400
20.02
255Wp
3960
78431
20
290Wp
3468
69360
20.11
Number of 1MWp System (pcs)
Number of 20MWp System (pcs)
Totally Installation Capacity(MWp)
From above table, it's evident that less quantity of 255Wp and 290Wp assemblies are
required as comparing to 175Wp module. It means that:
-the number of connecting points is less,
-the construction schedule is fast,
-the fault rate is reduced,
-the contact resistance is little,
-the usage amount of cables is less,
-and the integral loss of the system is relatively reduced.
The polycrystalline silicon modules produced by main manufacturers worldwide for large
grid-connected solar power plant, is usually 235Wp to 310Wp now. Because of the higher
efficiency and lower manufacturing cost, the 255Wp module is preferred and has captured
higher market share compositely.
By comprehensively considering module efficiency, market occupation rate, construction
work amount, manufacturer supply capability, etc. It's recommended to adopt the 255Wp
polycrystalline silicon module.
255Wp polycrystalline silicon module is 25-year transferrable power output warranty: 5
years/95%, 12 years/90%, 18 years/85%, 25 years/80%.
1O-year material and workmanship warranty.
Module certified to withstand extreme wind(2400 Pascal) and snow loads (5400
Pascal) .Compatibility to different inverter designs.
The appearance of 255Wp module is shown at below figure.
27
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSOCiety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 3-1 the Appearance of a typical 255Wp Module
The I-V-P Curves and specifications of the 255Wp polycrystalline silicon module at STC are
shown as follows.
Figure 3-2 I-V-P Curves of the typical 255Wp polycrystalline PV module
: 0~;:-----'"--·-.--.i
7~'--800 W/fll
6 •<'.......-I:ell......::sU
5 6(lC \",1"'1
43 .00 W/m'
2 . ····~·_~H_._··~_.,,~· ·.·. . _
1 i :lefll fA' ,II
o -L-- __
o 5 10 15 20 25 30 35 40Voltage [V]
Table 3-4 Typical 255Wp Polycrystalline PV Module Specification
Item Description
Maximum rated power (Pmax) at STC 255Wp
Rated power tolerance ± 5W
Electrical Maximum operating voltage (Vmp)
characteristics Maximum operating current (Imp)
Open circuit voltage (Voc)
Short circuit current (Isc)
i 30.5VDC
8.37 A
37.9VDC
8.76A
28
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety. Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Temperature
Item Description
Maximum system voltaqe ; 1000VdcI
Conversion efficiency I 15.81%
Minimum efficiency at 200 W/m2 (25°, 95% or higher of STC
AM 1.5) efficiency
Power temperature coefficient Tc-Prn ,-0.42%JOC
characteristics I Current temperature coefficient Tc-Isc ~+0.06%JOC
Voltage temperature coefficient Tc-Voc I -0.32%fOC
Solar Cell
Cell dimensions (L x W)
Number of cells
Polycrystalline silicon
156 x 156mm
Mechanical
, Module dimensions (L )( W )( D) mm
. Module weight
60 (6 x1 0)
1636x986x35
18.5kgs
MC4
4.0 rnrn", (-) 1000mm
; and (+) 1000 mm
: characteristics Connector type
Cable length
Frame ! Anodized aluminum alloy
i IP6? rated (3 bypass
diodes)
-40°C - +85°C
Junction Box
Ambient
characteri sties
Operating temperature
Certification I TUV,UL
Performance warrants
: 5 years/95%,
12 years/90%,
18 years/85%,
25 years/80%
Tolerance of wind + snow
i withstand extreme wind
I (2400 Pascal) and snow
• loads (5400 Pascal)
29
'.:' ..!'1!ii;",I!ia. BENAZIRABAP SOLAR POWER (SMC-PVT) LTD
Add: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.3.2 Mountings
3.3.2.1 Classification of PV Module Mountings
When the solar power station is designed, the mounting of solar array has larger influence
on the received radiation amount. The mountings of solar array include fixed installation type
and automatic tracing types. The automatic tracing types include the single-axis tracing
system and the double-axis tracing system. The single-axis tracing (horizontal single-axis
tracing and inclined single-axis tracing) system traces the sun track from east to west at the
fixed inclining angle, and the double-axis tracing (full tracing) system changes the azimuth
and tilt angle along with the change of seasonal position of sun track.
3.3.2.2 Comparison of PV Module Mountings
For the automatic tracing type system, the inclining surface can furthest receive the sun
radiation amount. so as to increase the power generation amount. According to the primary
calculation, if the horizontal single-axis tracing type is adopted, the theoretical power
generation amount is improved by 15% to 20% (under the ideal condition that the tracing
system is free from shielding from sunrise to sunset). If the inclined single-axis tracing
method is adopted, the theoretical power generation amount is improved by 25% to 30%. If
the double-axis tracing method is adopted, the theoretical power generation amount is
improved by 30% to 35%. But the practical working efficiency of the system is smaller than
the theoretical value because of many reasons, such as mutual projection shade of the solar
modules, difficult synchronizing of tracing mountings, etc. The investment of the double-axis
tracing method is greatly higher than the single-axis system, and the land occupation area is
relatively higher.
According to the investigation data of this project. the crystalline silicon modules are
installed. If the horizontal single-axis tracing method is adopted, the practical power
generation amount is improved by about 15%. If the inclined single-axis tracing method is
adopted, the practical power generation amount is improved by about 20%. Under the
condition, the fixed installation type is used as standard, a typical 1MWp solar array adopts
the three Mountings, and the comparison results are as shown in below table.
30
BENAZIRABAP SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Table 3-5 Comparison of Mountings
Fixed Horizontal Inclined Double-axisItems
Installation Single-Axis Single-axis Tracing
Increase of power100 115 120 125
generation (%)
Land occupation area2.4 3.2 4.8 . 5.0
(uniI:10,OOOm2)
Increase of direct100 111 114 122
investment (%) ., -- ... :
Rotary . RotaryRotary mechanism,
Running maintenance Quantity of work mechanism, and mechanism, andand high workload
high workload higher workload
Multi-pointPoint of support Multi-point support Multi-point support Multi-point support
support
Level the plate Level the plate Level the plateFixed windward
surface during high surface during high surface during higharea, and poor
I wind, and goodGale resistance capacity . wind, and good wind, and goodanti-wind
anti-wind anti-wind anti-windperformance
performance ' performance performance
From the data in the table, the fixed type and the automatic tracing type respectively are
different in that the fixed type has lower investment, the mounting system is basically free
from maintenance, and the land occupation area is relatively less, meanwhile, the automatic
tracing type has higher investment and requires certain maintenance.
The power generation amount is greatly improved in comparison with the fixed type with
optimum tilt angle, and the electricity cost of the station power station adopting the automatic
tracing type is reduced if the added cost of the post maintenance operation is not considered.
If the mountings manufacturing cost of the automatic tracing type is further reduced, the
advantage of increased power generation amount is more obvious. Meanwhile, if the array
synchronizing is well solved and the maintenance workload is reduced, the automatic
tracing type is more competitive than the fixed installation type.
And there is a problem must be considered, that is the tracing system always suffers from
mounting system fault, in this project, a simple and reliable mounting system is more
practical.
31
.:i~OO~. BENAZIRABAD SOLAR POWER (SMC-PYT) LTPAdd: House 176, Street 13, Defence Officers' HousingSocietv, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.3.2.3 Determination of Mounting
By comparing the fixed type and the automatic tracing type, the scale of the project is larger,
the fixed type has lower investment. the mounting system is basically free from maintenance,
and the land occupation area is relatively less; while, although the automatic tracing type
increases certain power generation amount, the primary investment is relatively higher, the
certain maintenance is required in the post running process, and the running cost is
relatively higher. In addition, the requirement on the electromechanical control and
mechanical transmission components is higher, the automatic tracing type lacks the
reliability verification of the practical application in the site area or the similar special climate
environment. the manufacturer of tracing system with reliable and stable matured
technology is relatively little. Therefore, it's recommended to adopt the fixed type Mounting.
Mounting system is applicable for the photovoltaic array system on the open fields. The
steadiness and safety of this system is compliable with the structural mechanics and
construction acts.
For different foundation solutions, such as concrete with pre-buried bolt, direct buried and
ground screw, the system can be modified to install. Material used include hot galvanized
steel and anodized aluminum alloy, with great anti-corrosive suitable for outdoor using.
As per practical requirements, the system is able to be planned and customized in the
factory to avoid welding and cut on the spot, saving time and cost.
For this project, we will adopt fixed type mounting, and it has following features.
• Easy Installation
Planning and machining in the factory to save time and cost.
• Steady and Safety
Design and check the structure according to the structural mechanics and construction
acts.
• Excellent Duration
For outdoor using, all the material selected with high class anti-corrosion protection.
• Great Flexibility32
,.;,~1~~'t~a~~L~
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
The ground array can be planned from kilo-watt to megawatt.
The appearance of a fixed type mounting is as below figure.
Figure 3-3 Appearance of Fixed Type Mounting
Below table is a typical fixed type mounting's specification.
Table 3-6 Parameter of Fixed Type Mountings
Item Detail
Install Site , Open Field
20 degree
up to 40m/s
i AS/NZS 1170 & 01N 1055 & Other
: Galvanized Steel
, NaturalI
I Galvanized
More than 25 years
Yes
Tilt Angle
Max Wind Speed
Standards
Main Material
Color
Anti-corrosive
Duration
Anti theft protection
33
,~~, '~~
a~~~i)BENAZIRABAD SOLAR POWER (SMC-PYT) LTD
Add: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.3.3 Inverters
3.3.3.1 Classification of Inverters
Inverter is an important part of PV solar power plant, it converts direct current input from PV
panels into alternative current output and send it to transformer. The inverters are classified
into two types, one is string inverter, and the other is central inverter.
3.3.3.2 Comparison of Inverters
String inverter's capacity covers from 1kW to 50kW, it's usually desiqned for outdoor and
protect degree is higher than IP45. String inverter normally adopts small body and easy to
installation and replacement. Because string inverter connects less PV strings, so the MPP
mismatch loss will be reduced.
Meanwhile, String inverters have some problems. First is reliability, because large capacity
string inverters have at least one fan in the cabinet, and it's much harder to maintenance the
fan than replace the whole inverter. Second is efficiency, string inverters integrated a boost
circuit and an inverter circuit, because there are two step conversions, so the efficiency will
be affected, Third is dispatching, because large capacity PV power plant need install
hundreds string inverters, it's hard to dispatch so many inverters. Last is harmonic and Low
Voltage Ride Through (LVRT), so many inverters will inject harmonic into the public, it needs
to be designed very carefully, and string inverters generally don't have the ability of LVRT
which is required in 11kV solar power plant.
Central inverter's capacity usually covers from 50kW to 630kW, and it's normally designed
for indoor use. Central inverter has more efficiency, and now some type's euro efficiency is
even up to 98.7%. Adopting central inverters in large PV power plant is much easier to
monitoring and dispatching due to fewer nodes. Central inverters have better output power
quality, fewer inverters lead to less harmonics, central inverters have ability of LVRT, it's
very important in MV/HV grid connection.
Central inverter also has some shortcoming. Central inverter usually has two MPP inputs,
but it connects to more than 50 strings, this will cause PV modules' MPP mismatch loss,
Central inverter is hard to repair, and routine maintenance would decrease power
generation significantly for a while because central inverter connects a lot of PV modules,
34
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
."._,---------------------------------3.3.3.3 Determination of Inverters
In this project, central inverter is better for the capacity of 20MWp. It has more reliability,
higher efficiency, more generation yield, lower cost and more widely used in large scale PV
power plant.
Usually 500kW inverter is a main stream product in large scale power plant inverter, but its
protection degree is usually IP2X, an additional inverter room is needed. Nowadays,
container inverter is more common because it can be set in the wild, less civil work is
needed. A container inverter is often one 10 feet or 20 feet container, and it contains two
500kW inverters. It connects to an outdoor 1000kVA double split transformer to boost up the
AC voltage with very short cables, so this solution's AC cable loss will decrease greatly.
A typical 1MW container inverter's appearance is as below.
Figure 3-4 1MW Container PV grid-connected inverter appearance
• I
The typical 1MW Container Inverter's technical specification can refer to below tables.
35
BENAZIRABAD SOLAR POWER (SMC-PVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 3-5 Efficiency variation for various AC loads
System Load Rate (%)
Table 3-7 1MW Container Inverter Technical Specifications
Model 1MW Container PV Inverter
Parameters
Max. DC input power (KW) 1100Input
Max. DC input voltage (VDC) 1000
Max. DC input current (A) 2400
MPPT voltage (V) 500-850
MPPT efficiency 99.9%
Startup voltage(V) 520
Input strings terminal 16
Rated AC output power (KW) 1000Output
Maximum AC output current(A) 2040
Rated AC voltage (three phase) (V) 315
Output voltage range +/-10%
36
BENAZIRABAD SOLAR POWER (SMC-PYTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Rated AC frequency (Hz) SO/60
Total harmonic distortion(THD) <3%
Power factor >0.99
Power factor adjustment range -0.9-+0.9
Standby consumption(W) <300
Nighttime consumption(W) <160
EfficiencMax. efficiency >98.6%
y EU efficiency >98.3%
OthersProtection grade IPS4
Isolation type No Transformer
Human-machine interface LCD touch screen
Environment temperature -2soC-+SSOC(>4SoC
derating)
Environment humidity 0-9S%, no condensation
Cooling Forced Air Cooling
Noise <6Sd8@five meters
Protection DC input over-voltagel
under-voltage protection,
over-temperature protection,
output over-voltage
protection, island failure
protection, insulation fault
protection
37
, ,~~1I" BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Reference dimension (Width x 3029x2438x2896
Depth x Height) (mm)
Reference weight 6.5T
Communication port RS485
3.4 PV Power Plant Design
3.4.1 Preliminary Outline of PV Power Plant
About 120 acres lands will be provided for this 20MWp PV power plant project. In our
proposal, 80 acres area is needed, and the plant includes PV arrays, Inverters,
Transformers, 11KV or 66KV Substation, comprehensive building, access road, fence and
gates.
PV arrays are divided into twenty 1MWp sub-array, and each sub-array's layout is similar.
1MW Inverter and Transformer will be installed on the north or south side of sub-array in
order to decrease the cable loss and shading loss. A preliminary outline scheme of this
project is as below.
38
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 3-6 Outline of PV Power Plant
Old Road
Solar PV Array
JLIf New Road
e(JJ
•Step-uptransformer
Inverter room
The 20MWp PV array is composed of twenty 1MWp PV sub-arrays, and each sub-array will
be constructed individually. Commission and power generating will benefit from this
implement strategy because the completed sub-array can be commissioned and start to
generating while other SUb-arrays are under construction. The PV sub-array layout can refer
to below figure.
39
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 3-7 1MWp PV generating sub-array layout
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII~ :::: :::: :::::::::: ::
I'11"111" " """!1!!11!!!,, I 'II " I ""I!II ! , I n" .",,""11" "" , " ,,!
I
'"11111 1'11' 1111111111111.1111"1111111:1 " b tin' ! "'"'111111''''''"'''''i'ili"i"iii"iliijiiii!ii!i'!Ii"i'!i'i'!i'i'~iiii"irii iii" iiM'iii i 11111111111]'"
iii!1ilili ililiiiiiiiii
'::::::: :::: :::::::::_••••• ~ ii ••• ii •••••••
•••• •• •••• A. __ .::::::: :::::. ::::::::
'''''''' ,! "" mil' , '" 11111""1'"1111111 I 111111 '''11'''''"1111111
'iI" '" ' iii i!!!ijl!t"jil",,,'!1,,"'~:::::::::::::::::::::'i"i1 Iii iii! iili11111111111 IIIIIIIIWIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
I
~~~~'!':u::'!' ":-:.~.::..-.-. - ---- -- - --.......................... · ..~~.- - --- -- ----• ~;.~.~;;;; :;;~ • .;;; ,ii;;;:;
. ..::.:..:::::.::::: .:::...................
I I IiII iii ill II I II Ii lidI
111111Illi Ii il I Ii Ii Ilg 11111111II Ii II1IIII1I 1'1 iII II I II II ill I II II II d Iii Iii ill I !llllliii....................................... , ..;;; •.;;;.;;; ;.;;:.i' ..
::::::: ::.:;::::: :::::.· .i; ••;; ;;i;;ii ••;i.
. :::::::,:::: ::::::::
.;;::.::::::;; ;l.au,
11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111t111l1111'1 IIltlll'"lIfHDfffllll 1111111,11'" '1'1""'1 111"'''11111'" 1""1111'111
'"111 "!!,," "I" ,,'"!!'""" II "' IIIII";III'Ifj'IIItB"Wlil UII'I!!I" 'gl! 'Imillllllfl_I ill Ii IIIIII II I Ii Ii ilUlAI11111 Ii Ii jjj III Iii I) ill II iiil nidi II Ii illii IIIIiI Ii Iii I lillJld1I ill II Iii i II I II Ii i IIIiiI ilill Ii Ii iii iii III I). i II II IIII illPI II II III ill III Ii III Ii illillill................................... ' , .._ ... _ .._.- -_. __ ..... . : ::: ::::.:::::::::::: .
• .iI; ••• i.i; •••••••••• .11111111111111111111111111111111111111111111111111111111111111111111111: :::;.!:":::!::::;.~:;:........ , . ....................- ---. - _. ---............................... .
11111111"" 1111111111IIfDtHlfIIII 11111";"1111101111111111111111 111111"'II" "'I!II!!
111'" 1I1II 1 t "'""'111"111'1"1111"'1'111111 11111.111" '111111111""11111111111.11
I eERm~-----X
91.73._1
3.4.2 PV Array Design
PV array is composed by PV strings, and one PV string is lots of PV modules in series. The
number of series is decided by many factors.
1. Maximum open-circuit voltage of PV strings (Vocmax)
The maximum open-circuit voltage is limited by two factors. One is lEG standard
requirement, the maximum absolutely voltage of PV array is less than 1000V. The
other is the local lowest ambient temperature, because lower temperature will increase
the open-circuit voltage of PV module.
40
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
2. Minimum Maximum Power Point (MPP) voltage of PV inverters (Vmppmin)
Minimum MPP voltage is decided by inverter's MPP input range, PV string's MPP
voltage will decrease when it is used in hot summer place like Pakistan, and the
temperature coefficient is an important factor to be considered in PV array design.
3. Maximum MPP voltage of PV inverters (Vmppmax)
Maximum MPP voltage is also decided by inverter's MPP input range. PV string's MPP
voltage will increase in winter, but it's not a key factor in countries like Pakistan.
The PV module's voltage temperature coefficient is -0.33%rC, open-circuit voltage at STC
is 37.4Vdc and MPP voltage at STC is 30.7Vdc. Referring to the metrological data in
previous section, we suppose the highest operating temperature of modules in summer is
70°C, the lowest operating temperature in winter is O°C, and normal operating temperature
in winter is 30°C. Under these conditions we can get the available module quantities in PV
strings, the result can refer to below table.
Table 3-8 PV module quantities in strings
Numbers in series Vocmax«1000V)
21 859Vdc 513Vdc
22 900Vdc 537Vdc
23 941Vdc 562Vdc
24 • 982Vdc ' 586Vdc
: 635Vdc
665Vdc
696Vdc
726Vdc
As the calculation result, 21-24pcs PV modules is available in the string design. For
convenient of installation, higher inverter efficiency and safety, we choose 22pcs modules to
constitute one string, and two strings will be installed on one mounting kit.
Figure 3-8 Vertical Layout of PV String
III III I~III II t Illll ~III III I141
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety. Stadium Road, Karachi. PakistanTel: 92-21-34833590 Fax: 92-21-34833590
The mounting type in this project is fixed tilt type, the fixed tilt system leads to a simple and
reliable installation. With optimized tilt angle, the maximum power yield can be guaranteed
for the whole year. In this project, we utilize simulation software PVsyst to calculate the
estimated yield of various tilt angles.
In this project. 2pcs PV modules will be installed vertically on one bracket. and the length is
about 3.3m Considering the lowest land occupied and lowest shading loss. the pitch
between PV rows is designed as Sm.
Figure 3-9 Tilt angle calculation of PVsyst
Shading limit angle: 2.1.3·Ground area occupation ratio: A(coll) I A(ground) = 0.55
o~~~~--~--~----~~~--~--~--~--~--~~'_~--_'--~o
16
2
2 4 6 8 10 12 14
, Sheds Parameters, Pitch 16.00 m
Coil. band width Va m
Top Inactive band Va m
Bottom inactive band ro:oo- m
:r Electrical effect Define IjI.. " .._ __ ._ __ .__._ _.__._ .
[[..::..~.:~~~;..?~~~~~~~~~::::11
1_ Shading Graph
Orientation parameters
Nb.ofsheds rlOO ...:J...:J
Shed tilt optimisation At Nawab Shah, Array orientation = o·l1Sd-r-_100....,..S_h..,edr-s.;_ • ....,C_Ol_I.,W_i<lt_h....=_l_;.3 ...m..:,_I"..;..3C.;_;t.;_ivT-e.;_tl4.;_"r-d_._;;0.,;..o_m.:...c:..;o:..."..:;.sta=nt..;..'i_m_;it,;.a~ng::;;le;,..=...;2:..;1.;:;.l_·...,..._...,,............,
__ - Pure transposition (one only plane)-- Irradiation I'lith mutual shadings (constant limitangle. 21.3')---- .... With electrical shading effect for Cell = 12.5 em and, 1 strings in width
j.§
1.10
Ti~ = 10'1:1\':1111:$%
'8
~ 1.05
~~
10 20Sheds plane titt
30
42
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
To reduce the shading loss from previous row and gain more yield, PV array should not be
shaded from 9:00 to 16:00 especially in 21st Dec. In this project, 20° angle and 6m pitch
need to be reviewed in simulation software. With the help of Google Sketchup, the shading
figures of 9:00 and 16:00 in 21st Dec of local array model are simulated as below.
Figure 3-10 Shading figure of 9:00 in 21st Dec
Figure 3-11 Shading figure of 16:00 in zr" Dec
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
From these figures, we can see that there is no shading from 9:00 to 16:00, which means
shading loss is effectively limited with less land occupy by above design.
3.4.3 Electrical Design
3.4.3.1 Overview
In this 20MWp PV power plant project, generating power will be injected into 11KV Jamrau
Head gird or looping 66KV IN-OUT circuit between Jamrau-Sanghar 66KV, and delivered
by HESCO in Sindh Province. Considering the scale of power plant and transmission
voltage, an 11KV/66KV One and Half breakers outgoing solution will be adopted.
The 20MWp solar power generation system will be divided into twenty 1MWp solar
subsystems. The voltage of each 1MW solar subsystem is stepped up to 11kV through a
0.315/11kV 1000kVA step-up transformer. Each ten solar subsystems are combined
together to form a ring with 11kV cables and connect to the 11kV Bus Bar in the substation.
A 7.5MVar Switched Shunt Capacitor will be set to improve the power factor as per the
guidance of NTDC Grid Code. Auxiliary power will be provided by 11kV busbar and another
400V external power. The delivery point is indentified as the outgoing point of 11KV or 66KV
outgoing line gantry. 11kV power distribution is arranged indoors in a single row manner.
The 11kV AC metal armor withdrawable high-voltage booster station cabinet is used and
both incoming and outgoing line are set with vacuum circuit breaker.
��4.3.2 Transformers
Oil-immersed transformer has the advantage of high voltage level, wide range using, the
disadvantage is oil leaking, and causing environment pollution.
For large transformers used in power distribution or electrical substations, the core and coils
of the transformer are immersed in oil which cools and insulates. Oil circulates through ducts
in the coil and around the coil and core assembly, moved by convection. The oil is cooled by
the outside of the tank in small ratings, and in larger ratings an air-cooled radiator is used.
Where a higher rating is required, or where the transformer is used in a building or
underground, oil pumps are used to circulate the oil and an oil-to-water heat exchanger may
also be used.
.. ":,'"~~~~~
BENAZIRABAD SOLAR POWER (SMC-pYT) LIPAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
In this project, we use 0.315/11 kV oil-immersed transformer as each 1MWp array's step-up
transformer. A typical 11kV oil-immersed transformer's appearance is as below.
Figure 3-12 11kV oil-immersed transformer's appearance
Oil-immersed type transformer features low noise, low loss, rational structure, high quality
material, scientific design, strict production technology and advanced test method. It also
has following additional advantages:
1. High mechanic strength, great anti-short circuit capability, excellent anti-lightning
impulse capability and high reliability.
2. Excellent overload capability.
3. Low loss, energy-saving, economic and maintenance free.
4. Nice appearance, small size, less installation space occupation and low engineering
cost.
5. Each performance index and technical specification excels that specified in China GB,
internationallEC and industrial standards.
corrosion to the oil and prolong service lifetime of the transformer.
Hermetically sealed corrugated tank structure is adopted, thus to effectively prevent air
1l6.
BENAZIRABAO SOLAR POWER (SMC-PYT) LTOAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Table 3-9 Specification of 11kV 1MVA Transformer
Applicable standard &tolerances
Service areaGeneral data
Service condition
Insulating Oil
Rated power (kVA)
Rated Frequency (Hz)
Phases (0)
IEC 60076
Outdoor
Altitude: 1000m max. Above sea level
, Max. Ambient Temperature: 50°C
IIEC 60296
500,500 (1000)
50
3
HVwinding, 11000
(V) IlVwinding '315.315(V)
Rated voltage
Ratings
Tapping range of HV side
(%)
Tap changing method
Connection symbol
Cooling method
Insulation level
Temperature
Rise rC)
Top Oil
Winding
AverageCharacteristics
0, ±2.5, ±5
. Off Circuit Tap changer
: Oyn11 yn11
! ONAN
Bil 75 AC 28
55
No-load loss (W) 1500
load 10ss(W) 9000
Impedance Voltage (%) 5
Oil (Kg) 910Masses
Total (Kg)
Earthing terminal
Oil Filling Hole and Plug
Oil drain valveAccessories
lifting lugs
Oil level gauge
Rating plate
3797
46
BENAZIRABAD SOLAR POWER (SMC-PYIl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Dial type thermometer
Pressure Relief Valve
Pad Mounted Transformer
Hermetically Sealed Type
3.4.3.3 Switchgear Equipments
KYN28-12 metal-clad withdrawable switchgear is suitable for 3-phase AC 50Hz/7.2-12kV
single busbar and single busbar section system. Apply to distribute electricity power and
implement system control, protection, supervision monitoring. The switchgear complies with
the standards IEC298, GB3906. The operating condition is as below:
• Ambient temperature: -10- +40
• Altitude: 1000m (max).
• Relative humidity: daily average less than 95%, monthly less than 90%.
• Shock of earthquake: less than 8 magnitudes.
• This product should not be used under conditions of fire, explosion, earthquake and
chemical corrosion environments.
Characteristic of 11 kV switchgear equipment:
• Metal-clad and partition completely, effectively pre-vent faults spreading.
• The low voltage section is completely separated from the high voltage sections.
• Enclosure protection degree is IP4X, protect against electric shock and ingress of solid
foreign bodies.
• Simple but effective interlocking prevents maloperation.
• Space is provided for multiple cable connections. Installation and maintenance is
convenient.
• Withdrawable part of the same design are mutually interchangeable, exchange of VCB
is very simple.
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
-"'-~'---------------------------------Figure 3-13 Appearance of 11kV switchgear
•-r
1iHl
r •
'IJ
Table 3-10 Specification of breakers
No_ Type and main parameters
Vacuum Circuit Breaker 12kV, 1250A, 31.5kA
Remarks
Outgoing line
2 Vacuum Circuit Breaker 12kV, 1250A, 31.5kA i Incoming line
3 Vacuum Circuit Breaker 12kV, 1250A, 31.5kA I Shunt Capa~i~~~_. _
4 Vacuum Circuit Breaker 12kV,1250A, 31_5kA 1 Auxiliary power
3.4.3.4 Protection Equipments
The relay electrical independent contact is applied to the outlets of the protection devices
Relay protection and automatic safety devices should be reliable, selectable, flexible and
speedy.
48
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Table 3-11 Relay Protection Devices
Protection Devices
Feeder Protection Relay
2
3
Zero-sequence over current
Multiplex-voltage over current
Low voltage/Over voltage protection
Overload4
Line Protection Relay
Line Differential
2
3
4
5
Directional Zero-sequence over current
Multiplex-voltage over current
Low voltage/Over voltage protection
Overload
SVC Protection Relay
Zero-sequence over current
2
3
4
Multiplex-voltage over current
Over voltage protection
Loss of voltage protection
Station Transformer Protection Relay
HV side Zero-sequence over current
2
3
4
5
6
7
LV side Zero-sequence over current
HV side Multiplex-voltage over current
Transformer overload
Transformer temperature alarm
Transformer temperature trip
Low voltage/Over voltage protection
Fault Recording Automatic Protection
A set of systematic microcomputer fault recording device is configured for the PV electric
field to record 11kV/66kV bus voltage, line current and switching value of protective action in
order to simplify the motion analysis of faults and protection devices.
Microcomputer Maloperation-preventive Locking Device
··f·.·._
,i~~J . :.~.~a~~~~" BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
A set of microcomputer maloperation-preventive locking device is configured for the
monitoring system, with functions such as preventing maloperation of Disconnector, closing
Disconnecting link on load, hanging ground bar with electricity, transmitting power through
ground wire, intrusion into electrified spacings, and device self-checking,
The main board capacity is configured according to the main electrical connection remotely
and the device quantity is configured according to the main electrical connection locally. The
"five-prevention host machine" is equipped with serial communication interfaces, which
accept the circuit breaker, Disconnecting link, earth switch contacts and realize
"five-prevention" locking of the circuit breaker, Disconnecting link and earth switch of the
monitoring system.
The "five-prevention" unit is equipped with intelligent operation order expert system. The
"five-prevention" host machine can examine, print and transmit operation order as well as
execute "five-prevention" compulsive locking. The remote operation of circuit breaker,
electric Disconnector and electric earth switch is locked from the monitoring system by the
communication interfaces. The circuit breaker is locked by the electric coding lock. Manual
Disconnector, earth switch, temporary earth wire and net door are locked by the mechanical
coding lock. The mechanical coding lock is added to the local control box (mechanical box)
of circuit breaker, electric Disconnector and electric earth switch.
Relaying Protection Information Management Sub-station
To satisfy the requirements of NTDC relaying protection dispatching information net, the
photovoltaic power plant has been supplied with one set of relaying protection information
management sub-station, which can realize both-way communication with the relaying
protection device by collecting all kinds of protection information to transmit to the
dispatching terminal and receiving orders from the dispatching terminal to give orders of
protection fall-in, constant value modification etc. This system transmits relevant information
about relaying protection to HESCO in Sindh via the dispatching data net. The relaying
protection information management sub-station communicates with each protection device
within the station by the RS485 communication interface, accessing to power dispatching
data net through Ethernet interface and uploading data to dispatching center according to
IEC60870-5 protocol.
Power Quality Monitoring System
50
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
."'0;0" .• , _
To meet the requirements of Voltage fluctuation and flicker of power quality; the photovoltaic
power plant shall be supplied with power quality monitoring equipment to in real-time
monitor whether or not the power quality index of photovoltaic electric field can meet the
requirements; if not, a power quality management equipment shall be installed in the
photovoltaic electric field to assure qualified power quality.
The basic monitoring value includes: frequency, voltage/current effective value, total power,
reactive power and power factor. The basic monitoring index includes: grid frequency,
voltage/current effective value, total active/reactive/power factor, three-phase fundamental
voltage/current effective value, fundamental voltage/current phase, fundamental
power/power factor, voltage deviation, three-phase voltage unbalance, three-phase current
unbalance, harmonic wave of three-phase current (3 - 25 times), including total harmonic
distortion of voltage and current, harmonic ratio, amplitude, phase, active power and
reactive power of each harmonic wave, etc .. The senior monitoring index includes: simple
harmonic wave voltage fluctuation, flicker, swells, sag, short-term interruption, temporary
overvoltage and transient overvoltage. Other functions include: parameter setting, record
storing, online statistics, event trigger recording and GPS time setting.
This project is installed with a set of power quality monitoring unit to meet the relevant
requirements of Voltage fluctuation and flicker of power quality.
3.4.3.5 Metering system
The electrical measurement system of power station is set according to the requirements of
the design technical specifications for electrical measurement and power metering device,
and all the electrical measurements shall be included in the computer monitoring system. No
regular electrical measurement instrument will be set in the central control room; however,
some necessary measurement instruments will be installed on the switchgear.
Non-electrical measurement signals will also be included in the computer monitoring system
to realize online monitoring.
The metering gateway of this project is set at the11 kV or 66KV outgoing ousbar, whichever
is applicable. And a check point is set at the current side equipped with two intelligent
multi-functional watt-hour meters which are grade 0.2s for active and grade 2 for reactive.
According to The Design Specifications for Electrical Measurement Instruments and
Devices of Electrical Installation and The Technical Management Regulations for Power1fc 51
BENAZIRABAD SOLAR POWER (SMC-pYT) LTOAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Metering Device, the secondary side of the voltage transformer of buses at all levels shall be
set with special power metering circuit, of which the wire section shall assure that the
secondary voltage drop of each watt-hour meters end shall not be larger than 0.2%Ue, and
a special voltage metering device shall be installed. Thus, the design volume of the 132kV
outgoing line current transformer is grade 0.2s, and measurement grade 0.5. The design
volume of voltage transformer is grade 0.2, measurement grade 0.5 and protection grade
3P.
3.4.3.6 Telecommunication equipment
Design Basis:
1) IEC-Recommended Documents by International Electrical Commission;
2) ITU- T-Telecommunication Standard of International Telecommunications Union
Each 1MWp power generating unit is installed with information collectors at each combiner
box, which is serially connected to the monitoring unit of inverter room by controlling cable.
All the monitoring units of each inverter room are accessed by optical fiber module with
optical port in the form of bus to the photovoltaic power station monitoring system at the
central control room, which can monitor the operating date of each combiner box and
inverter.
The switch stations of photovoltaic power plant are designed based on the principle of
"no-man on duty" (less-men on duty).
According to the principle of substation accessing system for power system, the main
communication mode of the accessing system of photovoltaic power plant 11kV substation
is optical fiber communication, and standby communication local call.
The main communication channel between the photovoltaic power plant 11 kV substation
and HESCO's Substation is optical fiber communication, with the optical fiber
communication equipment adopting SOH transmitting system. The optical cables are
planned to use underground method to bury. Speech channel and data information can be
accessed to local dispatching site by this channel. And communication frequency will be set
synchronized with HESCO.
52
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13. Defence Officers' HousingSociety, Stadium Road, Karachi. PakistanTel: 92-21-34833590 Fax: 92-21-34833590
The communication equipment of photovoltaic power generating projects uses special DC
uninterruptible power, which is supplied by a set of rectifying charging device with storage
battery floating charge. The central control room is installed with a set of special
high-frequency switch power for communication, with a volume of 48V/100A.
The communication equipment of this project uses special DC uninterruptible power, which
is introduced from the DC control power system inside the power station.
3.4.3.7 Control and data acquisition system
Control and data acquisition system (SCADA) of the solar power station takes
microcomputer protection and computer supervisory system as the main body,
supplemented with other intelligent devices. The solar power station is equipped with a set
of computer monitoring system, which has the telecontrol function and will realize the
monitoring, control and regulation of the power station in accordance with the requirements
of dispatch and operation. The real-time date and information collected by the station will be
sent to the superior dispatch center after data processing.
Figure 3-14 Comprehensive monitoring diagram
Table 3-12 Monitoring parameters
Device type Monitoring parameters
DC junction PV array output DC voltage, PV array output DC current, PVarray
box output DC power, each line input total power, total generating
capacity, junction box output current, output voltage, junction box
power output, current monitoring tolerance alarm, cable short circuit
fault alarm, air switch state, the fault information, etc.
53
.~
:"""":~''''~~':,'
d:=l?L
BENAZIRABAP SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Device type Monitoring parameters
DC voltage, DC current, DC power, AC voltage, AC current, an
inverter temperature, clock, frequency, power factor, current power,
the power per day, accumulative total generating capacity, total CO2
emission reduction, grid over-voltage, grid low-voltage, grid high
frequency, grid low frequency, DC over-voltage, DC low voltage,
inverter overheating, inverter overload, inverter short circuit, radiator
overheat ,inverter Island fault, Communication fault, etc.
High voltage protection action Signal, protective devices fault
signal ,transformer heavy gas tripping, over temperature trip,
transformer oil high temperature alarm Signal, pressure release
tripping Signal, low voltage power supply control signal, the circuit
breaker fault trip Signal, the oil temperature of the transformer, fuse
signal, load switching signal, load switch tripping signal, a grounding
knife position, etc.
Environment Wind speed, wind direction, sun radiation, environment temperature,
detector solar module temperature, etc.
Inverter
Step up
transformer
Video system Video signal, control signal, operating instruction, etc.
Entrance Lock status, on and off time, the number, card number, etc.guard
In addition, the monitoring device can be stored once every five minutes, power plant
operation data stored in more than 25 years of continuous operation of data and fault
records.
The SCADA system of the power substation includes computer supervisory system, relay
protection and automatic system as well as dispatching automatic system. The main
functional characteristics of each system are as follows:
3.4.3.7.1 Computer Supervisory System
The Content of Computer Supervisory System
The integrated monitoring system is adopted for the collection, display and transmission of
data by the solar power station. The system, based on intelligent electrical equipments, with
serial communication bus (field bus) as its communication carrier, makes a real-time web
with solar battery module, combiner box, grid-connected inverter, online intelligent detection
and monitoring devices of electrical system and auxiliary system. Collect general electric
S4
BENAZIRABAP SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
,." ...•".",----------------------------------data of the above system to monitor through the flow of information data within the web.
Based on the collected data to analyze and process in order to set up a real-time database
and historical database and achieve operation optimization, control and specialized
management of the power station such as report production, target management, constant
value analysis and management, equipment failure prediction and detection, and equipment
maintenance.
The Structure of Computer Supervisory System
The computer supervisory system is an open layering distributed structure which is divided
into such 3 layers as station level, network level and bay level. The station level functions as
the center of supervision, measurement, control and management and connects with bay
level by optical cables and STP. The bay levels are disposed respectively in the
corresponding switch cubicle based on different types of the electrical equipments. The bay
levels can achieve the tasks of supervision of the bay level equipments and control of
breakers independently as the station level and network fail to work. The computer
supervisory system communicates with the scheduling center via telecontrol workstation.
The station level equipments consist of host operator workstation, telecontrol workstation,
network switch, communication management unit, printer, and GPS clock. The network level
equipments consist of network devices and protocol conversion interface. The bay level
equipments consist of collecting and processing unit for the whole-distributed intelligent
combiner box data, supervision unit for grid-connected inverter, collecting device of
environmental parameters and the secondary equipments regarding protection,
measurement and calculation serving the primary equipments.
Main functions of Computer Supervisory System
i. Data collection and processing
ii. Security detection and man-machine interface
iii. Operation outfit control, switch-on-off operation of breaker and HESCOnnecter
and station service control.
iv. Data communication
v. Self-diagnosis of system
55
.~i+· :',:~a~~L~
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
vi. The system software is characterized of fine modifiability which can be updated
by regulating and altering the functions of the software.
vii. Auto report and printing
viii. Clock system
Two industrial personal computers are selected as the controlling equipment of the station
level, one of which is main engine and another is the operator workstation configured with a
printer and a set of language alarm device.
3.4.3.7.2 Monitoring of Solar Generation Equipments and Inverter
1. Solar power generation equipments include solar array, DC combiner box,
grid-connected inverter and DC cabinet.
2. No specialized supervision and protection is arranged for solar battery module. The
combiner box measures and collects the real-time data of solar module. The combiner
box shares a set of monitoring system with inverters with its signal gathered via inverter
monitoring system. Inverter monitoring system is in charge of the analysis and
processing of signals and the fault diagnosis and alert for the battery packs,
Operational data and the results are transmitted directly via traffic control level for the
operators to carry out remote supervision and control.
3. The functions of solar battery module and monitoring system of inverter configuration
are as follows:
i. The computer supervisory system monitors and manages the solar battery
module clusters and inverters and displays such parameters as its operation, fault
types, real-time power, and electrical energy accumulation on LCD. Soft grid
connection of electric system with solar battery module and inverters are
controlled by the computer. Operators can supervise and control the solar battery
modules and inverters with keyboard and have man-machine conversation via
keyboard, LCD and printer.
ii. On-site monitoring device is installed for the solar battery modules and inverters,
which can be used for the computer monitor in the centralized control room.
Protection and detection devices of the solar battery modules and inverters are
1~ 56
BENAZIRABAD SOLAR POWER (SMc-pyn LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
configured by the inverter manufacturer On temperature protection, overload
protection, grid fault protection, sensor fault signal, etc. Protection device turns to
inverter circuit breaker and emit signals after being active.
iii. Remote monitor system for the solar battery module and inverters is operated in
the central control room and only the operators with permission can carry out the
operation since the computers in the central control room are limited by access
right. The displayed contents include: DC voltage, DC current, DC power, AV
voltage, AC current, AC power, inner temperature of inverters, clock, frequency,
power factors, present generated output, daily generating capacity, total
generating capacity, and graphs of daily generated output. The operating status
of all inverters is monitored, the faults are reported by sound-light alarm and the
fault causes and time can be checked.
iv. Line protection switch, ampere meter and voltmeter are equipped in the AC
cabinet. On-off state and signals of current & voltage are transmitted directly to
the station level and then monitored by the operators serving at the PV power
station.
3.4.3.7.3 Monitoring of Substation
The power station is equipped with twenty box-type transformers and 11kV substation
rooms. The transformer of the substation is equipped with load switch and high-voltage
pull-out fuse on its high-voltage side and automatic air switch on its low-voltage side. 11kV
switch cubicle is single bus configuration. Incoming and outgoing side is equipped with
whole-set indoor vacuum breaker. The above mentioned load switch, automatic air switch,
breaker, zero-load pressure-regulating tap can be controlled locally and supervised centrally
via computer supervisory system with the actuating signals sent to the central control room.
3.4.4 Lightning Protection and Grounding Design
3.4.4.1 Lightning Protection Design
The risk of causing damage due to lightning is assessed in accordance with IEC 62305-2
(EN 62305-2), the results will be considered in the design. For solar power protection goal is
to protect the plants from the plant and photovoltaicarrays fire (direct lightning)d1~;
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
and protection of electrical and electronic systems (inverter, remote diagnosis system, the
generator trunk) against lightning electromagnetic pulse (LEMP) effects.
i. DC side lightning protection:
The DC side lightning protection is realized by properly grounding of the PV
module frames and the string inverters.
ii. AC side lightning protection:
AC side lightning protection will be installed at AC distribution box
iii. Low-voltage distribution Lightning:
In order avoid over-voltage to damage (ow devices, it is necessary to installed
lightning protection at low distribution devices (overvoltage category III according
to DIN VDE 0110-1:1997-04); C-Ievel overvoltage protection device, according to
the EDIN VDE 0675--6:1989-11, --6/A1 1996 - 03 and -6/A2 :1996-10 standard}.
iv. Low-voltage SPD features:
a) Conjunction with the front-class arresters used
b) High speed current discharge
c) Electrical and thermo sensitive components control isolation device
d) Window displays a red flag to reflect the failure
e) Versatile Link Terminal
v. Building and MV Equipment Lightning Protection
For buildings in plant, according to the relevant provisions of Building Lightning
Protection, use the reinforced of ferroconcrete to grounding or set Lightning
protection zone on the roof.
Zinc oxide surge arrester shall be installed at MV-sidelneutral-point of main
transformer in order to prevent over voltage on the electrical equipment.
58
BENAZIRABAD SOLAR POWER {SMC-PVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.4.4.2 Grounding Design
Grounding and connection of neutral lines are as following:
1. Work grounding - in the normal or accident conditions, in order to ensure reliable
operation of electrical equipment must be a point in the power system grounding. This
including the grounding of inverter, main transformer, PT's and CT's neutral points.
2. Grounding for system protection - to prevent insulation damage caused by electric
shock, and to protect human body from electric shock. This including the grounding of
equipment frames and supports, racks, grounding of the lightning rods, etc.
3. Screening grounding. This grounding is for EMC purpose.
4. System neutral connection. The 400V AC system utilize direct grounding (or bolted
grounding) method. 11kV is grounded by grounding resistor or reactor.
5. PV plant Lightning Protection main grounding network design
Adopted ring grounding way (horizontal grounding electrode) and vertical earthing
electrode system, the network size is designed by local situation. Each metal bracket
will be connected to the grounding system by grounding flat steel. Through mesh
grounding system, Equipotential surface is achieved, which can significantly reduce
the over voltage occurred of cables between PV system and plant building on lightning.
6. Selection 50x5 galvanized flat for outdoor horizontal main grounding grid ,vertical
grounding electrodes using 050, length 2500mm, wall thickness 3.5mm galvanized
steel pipe. Site vertical grounding quantity according to the scene.
7. Vertical grounding electrodes top from the ground about 0.7m, the vertical grounding
electrodes spacing is not less than 5m to prevent mutual shielding; horizontal
grounding electrodes buried depth -0.8m.
8. All PV module array connect the main grounding grid by 40x4 galvanized flat steel.
Outdoor grounding grid from the exterior wall of the building is not less than 1.5m, and
try to avoid pipe trench.
9. All of the grounding grid edge should be made circular angle.
59
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
3.4.5 Automatic Fire Alarm System
The power station is installed with a set of automatic fire alarm system using centralized
alarm method, including fire detector, manual alarm button, firefighting communication,
linkage control and central fire alarm controller etc. The detecting bus uses two-line bus: fire
detector and linkage control uses the same line of bus; central fire alarm controller can show
the fire alarm area and detected area to execute linkage control.
This project will not set special firefighting control rooms according to operating duty
allocation condition. The firefighting control center is set at the central control room. The
central control room also has the function of firefighting control room, and the operator on
duty also takes charge of the responsibilities of a firefighter.
The whole station is installed with a set of fire alarm system. Major control room, relaying
protection room, battery storage room, 11kV distribution unit room, station service room is
equipped with fire alarm detecting devices. The fire alarm system is connected to
uninterruptible power.
3.4.6 Video Security Monitoring System
The video monitoring equipments include network video server and cameras. And
Benazirabad Solar Power (SMC-PVT.) Ltd strongly recommends the working cooperation
with the door status and the shelter light. When the door opens, the door status cause the
light on, and then, the camera will focus on the situation in around the door to take the video
record. If the door open intrusion is not authorized, the siren will alarm and the video data
will be transmitted to the center as a proof.
These type devices can be supervised by switch via the IP communication protocol
translation port. As the system require, we configuration 10 IR bullet camera, and 5 IR dome
cameras. Below figure is video monitoring diagram.
60
;ri_h.a~~~" BENAZIRABAD SOLAR POWER (SMC-PVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety. Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 3-15 Video monitoring diagram
r----------------------------~
Perimeter
IIIIIIIIIIIIII
... ' Ift Dome I~.I Camera II
SUrveillance Spol. I
Surveillance Platform
Console Server
S.,;tdl ."-"
Perimeter IL- :--~----:
,.----_TT1.___m: _Switch
- -~
~ DomeCamera
.
DomeCamera
Survelltance spot. Surveillance Spots
-----------------------------
3.4.7 Weather Protection of Major Equipments
The province of Sindh is situated in a subtropical region; it is hot in the summer and cold in
winter. Temperatures frequently rise above 46°C between May and August, and the
minimum average temperature of 2°C occurs during December and January. The annual
rainfall averages about 7 inches, falling mainly during July and August. The southwesterly
monsoon wind begins to blow in mid-February and continues until the end of September,
whereas the cool northerly wind blows during the winter months from October to January.
And the identified sites are mostly in dusty situation, so great attentions must be paid to dust
protection.
Major of 20MWp PV power plant equipments are designed for this weather condition, the
main specification is as below
Table 3-13 Environment Specification of Major Equipments
Environment Specification
PV Modules
Operating Module Temperature
Operating Humidity
Junction Box Protection Grade
; -40 °C to +85 °C
: 0-95%RHI
.IP67
61
,:,r;wll..,•• ~,~. _I _ ••• : ~;~t
BENAZIRABAP SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Environment Specification
Wind Loads 3800 Pascal
Snow Loads 5400 Pascal
Harsh Environments Test ! salt mist and ammonia corrosion testing:I
i IEC 61701, DIN 50916:19~5:2
PV Inverters
Ambient TemperatureI •
I -25°C-+55°C(>45°C derating)II
Operating Humidity · 0-95%, no condensation
Protection Grade IP54
Altitude 2000m. -------------
Step-up Transformer
Ambient Temperature Up to 50°C
Altitude 1000m
Cooling method ONAN......... _- ._. ~._ ....
Switchgear
Ambient Temperature • Up to 50°C
Altitude · 2000m
Protection Grade i IP4X i
i .. -_ .._-_._-- .. !
Because PV power plants usually built in dusty environment, it's very important to clean the
PV module and inverters. In O&M period, an inspecting team will be formed up to check the
soiling of PV modules and make sure soiling loss is as little as possible. And the filter of
container inverter will be regularly changed. All the cables will be set in the pipe or buried
under soil in order to protect them from UV and rodents.
3.4.8 Sewage Drainage System
Sewage of the 20MWp PV power plant mainly comes from complex building. In the
southwest side of the complex building, one set of sewage treatment facility will be set up for
the treatment of domestic sewage of whole power plant.
Sewage from complex building drains through sewage collection network into check wells,
and flows to the sewage treatment facility near the complex building.
62
BENAZIRABAP SOLAR POWER (SMC-pyn LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
After the treatment of the treatment facility, the water quality meets the requirement of
wastewater discharge standard, and then it will be reused to pouring of green land around
the power plant.
3.5 Interconnection Study
The interconnection study is currently being carried out in detail by relevant consultants
engaged by the main sponsor. It will be provided in due course of time after approval from
NTDC.
63
BENAZIRABAD SOLAR POWER (SMC.pVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
4 Simulation Result
4.1 Solar Irradiation and Average Temperature
The solar irradiation and temperature data of local site are shown in below tables.
Table 4-1 Monthly Solar Irradiation
Monthly Average Solar Irradiation(kWh/mz)
e Source Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Meternorm 121.9 131.5 180.0 187.6 209.5 207.9 193.5 180.6 176.9 158.4 128.5 114.1 1990.3
Table 4-2 Monthly Average Temperature
Monthly Average Temperature(OC)
Source Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Meternorm 15.18 19.04 25.29 30.14 35.06 34.85 33.66 32.32 31.24 28.27 21.94 lB.71 27.01
From above tables, we can see that the solar resource is very rich in Sindh province, but hot
weather will limit the efficiency of power plant.
4.2 Simulation Result
A number of software, with varying degrees of accuracies, is used for the simulation of the
solar power plant. PVsyst is a PC software package for the study, sizing and data analysis of
complete solar module systems. It provides analysis of tilt, azimuth and the technology to be
used, it's popular worldwide. Calculated by PVsyst, the annual production for different data
is shown below. The basic information of 20MWp PV power plant is in below table.
Table 4-3 Information of 20MWp PV Power Plant
1. Location Sindh, Pakistan
Operating Voltage 500 - 850 V
2. System Type
3. Inverter
Grid Connected
64
BENAZIRABAP SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Unit Nominal Power 1MWAC
Number of inverters 20
Total Power 20MWAC
Technology Poly-Crystalline Silicone
Unit Power Nominal 255Wp
Number of modules per string 224.PVarray
Number of strings 3600
Total Number of Modules 78431
Nominal (STC) 20MWp
According to Meteonorm solar irradiation and other data, the annual production of first year
is 34142MWh, with a performance ratio of 78.0% (1691kWh/kWp !Year).
Figure 4-1 Normalized Productions
Normalized productions (per Installed kWp): Nominal power 20196 kWp
Br---'---~--;---:----r---r---r---'---,---.--:----,
•
Lc : Collection L~SS(PV-array losses) 1.09 kWlVkWpldayLs : System Loss (inverter, ...) 0.22 kWM<Wplday
7 Vf: Produced useful energy (Inverter C>Utpul) 4.63 kWlVkWplday
65
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 4-2 Performance Ratio
Performance Ratio PR
Jan Feb Mar Apr May Jun Jui Aug Sop Oct Nov Dec
4.3 Power Plant Factor
The simulated annual utility time is 1691 hours including considering of 98% availability and
0.6% power consumption rate, so the first year's power plant factor is about 19.49%, and 25
years' average power plant factor is 17.72%.
4.4 Analysis of Solar Source
4.4.1 MonthIy Report
Base on solar irradiation data of Meteonorm, simulation calculating through PVSYST 6.39,
the annual production of first year of 20MWp PV power plant in Identified site is 34142MWh,
with a performance ratio of 78.0% (1691 kWh/kWpNear). The calculating result of each
month in first year is as following figure.
66
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
..,,, ..•_,-------------------------Figure 4-3 Monthly yield of 20MWp Power Plant
3500 -r-
~IMonthly Yield
s:s: 2500:2:::c~ 2000III...IV
~ 1500c:1...~ 1000o
D..
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec.__ _-_ .._ _ .._.- _ .._._ .._._---------_._----_._-----_._--------
From above-mentioned figures, the monthly production is various, because of solar
irradiation, temp., etc. The production of Mar, Apr, May, is higher, and that of Jul, Aug is
lower due to hot weather. The daily production also varies in each month, some days higher,
and some days lower. Thus, the generated electricity of 20MWp PV power plant is
dynamically changing.
67
BENAZIRABAD SOLAR POWER (SMC-pVn LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
4.4.2 Loss Coefficient
Below figure is 20MWp loss diagram of first year.
Figure 4-4 Loss Diagram of 20MWp PV Power Plant
1990 kWhlm'
I,.'
Horizontal global Irradiation+9.0% Globallnc:ldenlln coil. plane
. ·1.98% Near Shadings: irradiance loss
::·2.66% lAM factor on global
. :' ·3.00% Soiling loss factor
2007 kWhlm' • 127757 m' coil. Effective Irradlance on collector.
efficiency at STC = 15.86% PV conversion
40676 MWh\'--, -0.33%
i,1,.- -010%
I' .
I .·1.00%
:"'" -0.71%35730 MWh
1..
:-1.42%\."000%\ . -\"" 0.00%\.... 0.00%
""0.00%35225 MWh
I1-151%
'\l' " -0.55%
'-1.05%
34142 MWh
Array nominal energy (at STC efflc.)PV loss due to irradiance level
·10.25% PV loss due to temperature
Module quality lossModule array mismatch lossOhmic wiring lossArray virtual energy at MPP
Inllerter Loss during operation (effiCiency)Inllerter Loss aver nominal inv. poIIIIef
Inverter Loss due to power thresholdInverter Loss aver nominal inll. IIOItageInllerter Loss due to \101 tage thresholdAvailable Energy at Inverter Output
System unallailabilityAC ohmic lossExternal !ranslo loss
Energy injected into grid
Several uncertainties exist in the calculation of annual energy yield of the PV solar station.
Uncertainties and their deviation values taken into account in the analysis are based on our
teams experience with previous solar projects as well as industry experts. These are
uncertainties due to i) irradiance, ii) conversion to inclined surface, iii) soiling, iv) spectral
uncertainty, v) albedo, vi) reflection, vii) deviation from module specifications, viii) inverter
and transformer losses, ix) mismatch, x) ohmic losses, and xi) shading losses.
\1~68
<~._.,~. BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
In accordance with solar module efficiency, DC junction and inverter efficiency, AC on-grid
efficiency, the total efficiency of solar power generation project is determined. Where:
1. Solar module efficiency is the loss of solar array excluding energy conversion, and
includes the matching loss of modules, surface dust blocking loss, available solar
Irradiation loss, temperature influence loss, etc.
2. The efficiency of solar module varies with the working temperature. When their
temperature rises, the module efficiency tends to decrease. Considering that the
monthly temperature and local annual average temperature is 27.01C, the temperature
coefficient of polycrystalline solar module at peak power is -0.42%/K, so the power loss
coefficient caused by working temperature of each month can be obtained. Based on
above description and calculation, the loss caused by module working temperature is
considered to be 8-11 %.
3. DC junction and inverter conversion efficiency mainly consider LV line loss and inverter
efficiency.
4. AC on-grid efficiency refers to the transmission efficiency of inverter output to HV grid
including the efficiency of boosting transformer and AC line efficiency.
5. Solar module pollution due to dust or accumulated snow can reduce the module
efficiency. According to statistics, the efficiency loss in the dusty place is about 3-6%.
In the site where this project is located, regular manual washing is considered and the
loss coefficient is 3%.
Table 4-4 The Loss Diagram of solar power plant
Items Percentage Remarks
Solar module
Irradiation loss in morning and night.I; 0.3-1%,I
The low Irradiation in morning and night, inverter cannot
startup
Efficiency loss caused by difference of module electricalPerformance difference of modules 1-2%
characteristics, connected to same inverter
Module working temperature lossHigh temperature will make the efficiency of PV module
. 8-11%decrease.
69
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Inverter and DC side
Loss of inverter and DC connection 2.5% The European efficiency of inverter is 98.3%.
Step-up transformer and AC side
AC and Step-up transformer loss 1.5% Evaluation based on length .load and capacity
Other potential losses
Dust coverage loss of module 3%-6% Supposed PV module get regular cleaning
4.4.3 Uncertainty of simulation
The result of simulation can reflect the general annual energy yield, but there are many
uncertain factors to affect the yield.
1. Meteorology
Because the meteorological data from Meteonorm is a synthesized data, the specific
year's data may have deviation due to special meteorological phenomena. So the
specific year's yield may have a little deviation.
2. Soiling loss
The simulated yield is calculated by the specific condition, like regularly cleaning of PV
modules. But if the cleaning was suspended by some reasons or the special weather
make the PV module get soiled, and the soiling loss may get larger than what we
supposed.
3. Downtime due to PV plant error
Although the equipment in the PV plant get reliability more than 99.9%, the PV plant
still will get down due to equipment failure. In the period of equipment maintenance, the
yield will be affected.
4. Downtime due to grid failure
uncertain.
Because grid failure can't be forecasted, so the yield loss due to grid failure is
1~5. Force majeure
70
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Force majeure such as earthquake, flood, hurricane, war and other majeure can affect
the PV plant operating, so it's difficult to estimate the impact on the yield.
4.5 25 Years Generated Calculation
4.5.1 Derating Curve of Module
Power degradation of solar modules is the annual depreciation of the capacity of solar
module to produce electricity. This is usually spread over and calculated on average for the
life time of the project which is typically 25 years.
The solar module has derating coefficient during using period. The derating curve is shown
in below figure.
Figure 4-5 Derating curve of module
..-_._--------------_ ... _-.._._----.-._-_._----_._------
1 6 11 16 21
Module output percent
90.0%
80.0% '
70.0%
60.0%
.----.----~-~----..-.. , -.,~----.------------------_ --
4.5.2 25 Years Simulation Calculation
The annual average generating capacity Qt=((l1t-1 +l1t)/( I1t-2+l1t-1))* Qt-1
Qt: the annual average generating capacity
tyear. t=0,1 ,2 .. N
I1t-1: t-1 year module efficiency
I1t-2: t-2 year module efficiency
71
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Ilt: t year module efficiency
Qyt-1: t-1 year generating capacity
According to above formula, the annual simulation calculation and PR during 25 years
calculated as shown in below table.
Table 4-5 Simulation Generation and PR of 20MWp during 25 years
Year Simulation Generation (MWh) Performance Ratio
1st 34,142.0 78.0%
2nd 33,509.4 76,6%
3rd 33,284.1 76,0%
4th 33,058.8 75.5%
s" 32,833.5 75.0%
s" 32,608.2 74.5%
7'h 32,382.9 74.0%
8th 32,157.6 73.5%
9th 31,932.3 73.0%
ro" 31,707.0 72.4%
11th 31,481.7 71.9%
12'h 31,256.4 71.4%
13th 31,031.1 70.9%
14th 30,805.8 70.4%
is" 30,580.5 69.9%
is" 30,355.2 69.3%
17th 30,129.9 68.8%
rs" 29,904.6 68.3%
rs" 29,679.3 67.8%
zo" 29,454.0 67.3%
21st 29,228.7 66.8%
22nd 29,003.4 66.3%
23rd 28,778.1 65.7%
i~24th 28,552.8 65.2%
72
BENAZIRABAD SOLAR POWER (SMC·pVTl LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel:92-21-34833590 Fax:92-21-34833590
Total
28,327.5
776,184.6
64.7%
For 20MWp PV solar power plant, the simulation generated electricity of first year is
34142MWh, the accumulated generated electricity in 25 years is 776184MWh, and the
annual average generated electricity is 31047MWh. The PR is 78.0% at first year, and
decreased to 64.7% at zs" years.
73
BENAZIRABAO SOLAR POWER (SMC-PVT) LTOAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
.""~"---------------------------------5 O&M Proposal
5.1 Plant O&M organization and responsibility
5.1.1 Plant O&M organization
Table 5-1 Plant O&M Organization
No Job Title Fixed number of staff Part time
1 Staff Engineer 1 p
2 Electrical Engineer 1 p
3 Administrative staff 1p----
1 person part time attendance,
consumption of statisticians, and5 Operator 2p warehouse keeper; 1 person part time life
logistics purchasing, financial management
and file manager..... , ...
6 Security 3p..._-
5.2 Preparation of Solar Product Inspection and
Mai ntenance
5.2.1 Personnel
Inspection personnel should be trained and get certificate.
Inspection team should be build-up of 2 to 3 person.
5.2.2 Tools
spanner, Rust brush, hammer, generator, electric welder.
74
BENAZIRABAD SOLAR POWER (SMC·pVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 5-1 Tools
Spanner Rust brush
wrench monkey wrench
hammer electric welder
generator steel brush
5.2.3 Instrument preparation
Instrument: Theodolite, Grounding resistance test instrument, Rebound test instrument,
level gauge, etc.
75
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 5-2 Testing Instrument
-,theodolite
Rebound test instrument
5.2.4 Labor protection products
Glove, overall, safety belt, helmet, etc
Figure 5-3 Products of Labor Protected
GroundinQ resistance test instrument
level gauge
Glove overall safety belt helmet
5.3 Solar product inspection and maintenance details
5.3.1 PV array and cable connection inspection
5.3.1.1 PV array inspection
• Check whether the PV arrays are damaged. Change them in time if there are any
damage.
76
,;;.,
as?2i~))BENAZIRABAD SOLAR POWER (SMC-PYT) LTD
Add: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel:92-21-34833590 Fax: 92-21-34833590
Figure 5-4 PV Array Damage
• Check whether there are any fragmentation or looseness of the PV array.
• Check and clean the leaves, straw and other covers which may shelter from the
sunshy.
• Check whether there are any smear or birds' excrement, and clean them.
• Check PV panel in windy, snow, and frozen weather, clean the PV panel in time in
to avoid it from snow and ice.
• Check whether PV array are damaged by human or animal.
5.3.1.2 PV Array Cleaning Methods
5.3.1.2.1 Time Selection
PV panel cleaning should be in early morning, evening, night or in rainy days. To prevent
artificial shadow making power lOSSor components burned of PV array, cleaning operation
must be carried out in sun dim period. Because of precipitation in rainy weather, cleaning
process is relatively efficient and thorough.
77
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
5.3.1.2.2 PV Array Panels Routine Cleaning Steps
• Whisk. Clean the floating dust and leaves on the PV surface with a dry duster or
cloth. If there are no attachments on the PV surface, the following step can be
ignored.
Figure 5-5 Dust Whisking
• Scratch. If there is any rigid foreign body on the PV panel, such as dirt, bird
dropping and plant branches, medium-hardness scraper, not high-hardness
scraper, should be used to clean the PV panel to prevent destruction of the PV
surface. The surface where there is no rigid foreign body should not be scraped.
Figure 5-6 Scrape dirt
• Wash. If there are any residues of staining substances such as bird droppings,
plant juices on the PV surface, or the air is very humid, dust cannot be wiped, we
need to get rid of them by washing. Generally if water can make the PC panel
clean, then just use water to clean them. When using water, pay attention to the
circuit connection point to avoid electrical short circuit. Considering solar sites are
usually build far away in remote areas, sprinkling can should be used to save water.
After spraying water to pollutants on the PV panel, wipe it with the scouring pad or
cloth. In case of oily substances, use mixed detergent or soap and water to clean
the stained region, after pollutants penetrating the oil, wipe it with the scouring pad1~7S
';,1,
C:3::::1?L
BENAZIRABAD SOLAR POWER (SMC-PVTl LTDAdd: House 176, Street 13. Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
5.3.1.3
or cloth. If it still cannot be removed, then use a small amount of alcohol, gasoline
and other non-alkaline organic solvent to wipe, and then use the mixed detergent
or soap and water solution to wash away the residual oil solvents.
Figure 5-7 Pollutant Cleaning
Junction Box Electrical Connection Inspection
• Check the PV board cable is well connected, without damage, shedding, if that
happens, cover it with insulating tape to protect the loose wire, reconnect the cable
or change to PV panel.
• Check the connector and solar controller input cable of the junction box is well
connected, without fever phenomenon; if there is any the burning phenomenon,
replace the junction box.
Figure 5-8 Junction Box Check
BENAZIRABAD SOLAR POWER (SMc-pyn LTPAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
5_3.2 PV Array Structure Inspection and Maintenance
5.3.2.1 Concrete Footing Checking
• Check whether the solar concrete footing and the encapsulation is off, loose or
cracking. If that happens, let people from civil work department do reinforcement
and preservatives work.
• Check whether the concrete footing is obvious sinking ,rooting, or sliding;
• Check whether the soil around solar foundation is collapse or protruding.
• Check whether there is any stagnant water around the solar foundation.
• Treatment: Ask civil engineering departments to construct a drainage ditch or
construct concrete floor.
• Check whether there are any loosing or missing screws of the solar structure.
• Treatment: If there are any loosing screws, tighten it with a spanner. If there are
any missing screws, find new ones to tighten the PV structure.
5.3.2.2 PV Structure Check
5.3.2.2.1 The Main Structure Inspection and Progress Methods:
• Check whether the main components of the structure are deformation or rust. If
they are, change the rust components or do the rust treatment.
80
BENAZIRABAD SOLAR POWER (SMC-pYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Figure 5-9 Structure Rust
• Check whether the PV weld connection of the structure is cracking. If it is, replace
it with new component.
5.3.2.3 Bolt Inspection and Progress Methods
• Check whether there are any bolts or nuts missing, install new ones as the original
size and make them tighten.
• Check whether the bolts and nuts are rust, use the same size bolts replace them if
they are.
• Check whether the bolts are loosening.
Figure 5-10 Bolts Loose
Treatment: Check sampling 20 bolts on the top, middle and bottom part of the structure. If
any of them are loose, fasten them with torque wrench to make sure they meet the design
1't 81
requirements.
"'1!!'~.,,:,~ BENAZIRABAD SOLAR POWER (SMC-PYT) LTD
Add: House 176. Street 13. Defence Officers' HousingSociety. Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
~ Note: The torque wrench using methods. Set the torque value, and then bolt.The "click" will sound when the actual bolt torque value reaches the set value.
Bolt torque requirements: MI2 bolt 40N.M (4.8 level), M16-120N • M, the M20-150N •
M, M24-375N· M (6.8 level).
5.3.2.3.1 Structure Paint Inspection and Maintenance
Solar PV structure paint can protect from rust in a certain degree, painting cycle of solar
structure is three years. If there is any paint off, blistering, cracking, and mechanical damage,
process it in time,
Treatment: Remove the problem paint parts, clean and paint again.
5.3.2.3.2 Cable Tray and Its Suppot1lnspection Maintenance
The main alignment mode is buried. The tray should be solid in cable tray mode sites,
Checking contents:
• Check whether the cable tray is solid or bending;
·w • Check whether the tray support is solid, tilt or sink;
Treatment: If loose, make it fastened tight. If bending, tilting or sinking, rectify it in time.
Note: If there are no cable trays, check the PVC pipe buried.
5.3.2.4 Grounding System Check
• Check whether the lightning ground network is destroyed; if the lightning ground
system is destroyed, then notify the civil engineering department to rectify it in
time;
• Check whether the resistance of the grounding system is qualified;
82
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
Method: Test the grounding resistance with Ground Resistance Tester, test value should be
less than the standard value (prevail to specific projects requirements, typically 4 ohms); if
test value is greater than the required standard value, analyze the reasons and notify civil
engineering department to correct it to ensure that the grounding resistance value meet the
required standard.
5.3.3 Inverter Maintenance Management
5.3.3.1 Inverter Operation
1. Be strictly install the inverter equipments in accordance with the maintenance manual
of the inverter device connection requirements and installation. During installation, you
should carefully check, the required wire meets ; whether two components and
terminals in transit loose; whether the insulation should be insulated at good; whether
the system grounding are compliance.
2. Be strictly Using in accordance with the inverter operation and maintenance manual,
keep the start or close the inverter correctly especially in the pre-boot ; pay attention
when operating switch in the correct order, the header and LED indication is normal.
3. The inverters generally integrate the open circuit, overcurrent, overvoltage, overheating
automatic protection, So when this is occurred, without manual shutdown; Automatic
Protection points are generally set at the factory, no need to adjust by human.
4. High-voltage inverter cabinet, the operator generally not open the door, the door should
be locked in peacetime.
5. In the indoor temperature exceeds 30 degrees, the heat cooling measures should be
taken to prevent equipment failure, extend equipment life.
Each inverter manufacturer will have specific requirements for inspection, testing,
services, and documentation to meet its warranty obligations. Typical requirements
for inverter inspections include:
• Record and validate all voltages and production values from the humanmaci?:.
83
BENAZIRABAD SOLAR POWER (SMC-PVT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
interface (HMI) display.
• Record last logged system error.
• Clean filters.
• Clean the inside of the cabinet.
• Test fans for proper operation.
• Check fuses.
• • Check torque on terminations .
• Check gasket seal.
• Confirm warning labels are in place.
• Look for discoloration from excessive heat buildup.
• Check integrity of lightning arrestors.
• Check continuity of system ground and equipment grounding.
• Check mechanical connection of the inverter to the wall or ground.
• Check internal disconnect operation.
• Verify that current software is installed.
• Contact installer and/or manufacturer about any issues found.
• Document findings for all work performed.
5.3.3.2 Inverter Maintenance and Repair
1. Regularly check each part of the inverter connection is solid, without loosening, in
particular, should carefully check the fans, power modules, input and output terminals
and grounding.
BENAZIRABAD SOLAR POWER (SMc-pyn LTDAdd: House 176. Street 13. Defence Officers' HousingSociety. Stadium Road. Karachi. PakistanTel: 92-21-34833590 Fax: 92-21-34833590
2. Once the equipments shut down with warnings. do not restart immediately. you should
investigate the reason and repair before restart. check the inverter should be strictly in
accordance with the requirements of maintenance manual steps.
3. Operator must go through specialized training. and should be able to judge the general
failure to achieve the causes and can be ruled out, such as the wire can be trained to
replace the contents, components. and damage to the circuit board, untrained
personnel, the job may not use the device operation.
4. Cause of the accident is unclear, should make a detailed record of accidents, and
promptly notify the production of sales outlets to be solved.
5.3.4 Transformer operation
Use the following procedures for transformer shutdown:
• For inverters connected to the transformer, turn the on/off switch to off.
• Turn the ac disconnect off for the inverters connected to the tranformer.
• Turn the dc disconnect off for the inverters connected to the transformer.
• Install lockout devices on the disconnects.
• Turn off the transformer switch, which is either a dedicated stand-alone
switch or is located in the switchgear.
• Install a lockout device on the transformer switch.
• Repeat for all transformers to completely isolate them from the switchgear.
5.3.5 SCADA Inspection and Maintenance
Monitoring and Control system(SCADA)manufacturers will have specific requirements
forinspections, testing. service, and documentation to meet their warrantyobligations.
Typical maintenance or startup requirements for SCADA include:
• Taking voltage readings of power supplies,
85
BENAZIRABAD SOLAR POWER (SMC-PYT) LTDAdd: House 176, Street 13, Defence Officers' HousingSociety, Stadium Road, Karachi, PakistanTel: 92-21-34833590 Fax: 92-21-34833590
• Validating current transducer readings by comparing to calibrated equipment, and
Validating sensor reading by comparing to calibrated equipment.
To confirm proper functionality of the SCADA, the values measured by the SCADA must
be verified against values from devices with traceable calibration records. Comparing the
irradiance, temperature, and power measurements recorded by the SCADA to values
obtained from calibrated instruments will help identify sensor calibration issues that could
result in the SCADA data being incorrect.
The PV industry as a whole is getting better at SCADA installation and documentation,
but it is still typical for SCADA plans to be omitted or insufficiently detailed. As a result of
such an omission, plan checkers often do not check for errors in the SCADA design and
inspectors have nothing to compare the as-built with for compliance. If the SCADA will be
tied into the building information technology system, O&M personnel should be aware that
building networking upgrades or routine maintenance can cause connectivity issues .
•
86
ANNEXG
TECHNICAL & ANNUAL RETURN STATEMENTS
Project Technical, Financial and Other Information
1) Location and Land Detail
The main sponsor had got the LOI from the Government of Sindh on 2nd April, 2015 andapproximately 120 acres land in Shaheed Benazirabad will be allocated by theDepartment of Energy, Government of Sindh to the special purpose vehicles for 20MWpProject. The co-ordinates for the project are as below.
Latitude: 26.440556 NLongtitude: 68.847778 E
2) Technology and Plant Details
a) General Information
1 Name of License Benazirabad Solar Power (SMC-PVT.) Ltd2 Registered Office House 176 Street 13 National Stadium Colony
--Defence Officers Housing Society Karachi Sindh
3 Plant Location Shaheed Benazirabad, Sindh, Pakistan_ .. - _._ ...
4 Type of Generation Solar Photovoltaic (PV)Facility
b) Solar Power Generation Technology and Capacity
1 Type of Technology Poly-Crystalline Photovoltaic (PV) Cell2 System Type Grid Connected
1-----3 Installed Capacity 20MWp
- - ---_ -------------
c) Technical Details of Equipment
,---
Solar Modules1 Type of Module Poly-crystalline Silicon2 Type of Cell 6 inch Silicon Solar Cell3 Dimension of each Module 1636 x 986 x 35 mm [64.41 x 38.82 x 1.38 in]---_-4 Module Surface Area 1636mm*986mm=1.6131 m2
5 Number of Panels 78431pcs6 Total Module Area 89 Acres7 Total Land Area Used 120 Acres8 Panel's Frame Aluminum alloy--
J>~9 Weight of each Module 18.5kg~--
\l \ fl"
Not Exceeding 0.7% per annum of initial power10 Module Output Warranty output (except first year), 10 Years not less than
90%, 25 Years not less than 80%_.
Number of Solar Cells in6011
each Module12 Efficiency of Module 15.50%13 Maximum Power (Pmax) 255W14 Voltage at Pmax (Vmp) 30.3V15 Current at Pmax (Imp) 8.27A16 Open Circuit Voltage (Voc) 37.7V17 Short Circuit Current (Isc) 8.69A18 Maximum System Voltage 1000VPV Array1 Number of Sub-array 202 Modules in String 223 Total Number of Strings 3600-_.4 Modules in Sub-array 3960.__ ..
5 Total Number of Modules 78431PV Capacity1 Total 20MWpPV Inverter1 Capacity of each Unit 500kW2 Inverter Module ZXDT50 S5013 Manufacturer ZTE-4
Input Operating Voltage500Vdc- 850Vdc (MPPT Range)
Range..._-5 Number of Inverters 40
- .
6 Total Power 20MW7 Efficiency 98.6% Europe Efficiency8 Max Input DC Voltage 1000Vdc9 Max Input DC Current 1120Adc10 MPPT Range 500Vdc- 850Vdc_ .._--11 Output Voltage Range 252Vac-362Vac_.12 Rated Output Voltage 315Vac13 Rated Frequency 50Hz/60Hz14 Power Factor >0.99 @ full Load
15Operating Temperature
-30'C-55'CRange
f--
16 Relative Humidity 0%-95%17 Operating Elevation Max 6000m, derating when higher than 3000m18 Warranty 5 years19 Grid Operating Protection Overvoltage Protection, Anti-islanding Protection. ,.-- -
DC Junction Box .,.1>-c;p, r
1 Number of Junction Box 320
2 Input Circuits in each Box 16A*16
Maximum Input Current3 16A
for each Circuit
4 Maximum Input Voltage 1000V
5 Protection Grade IP65
6 Over current Protection Fuse/MCCB
7 Output Switch MCCB
8 Surge Protection Yes
Data Collection System1 Weather Data Pyranometer, Thermomoeter.
1) DC input Voltage & Current of each
Inverter/Junction Box
2) Total DC power generated by PV array
3) AC output Voltage & CUrrent of each2 System Data Inverter/Junction Box
4) AC output power and energy of each Inverter
5) Frequency
6) Power Factor
7) Temperature inside inverter station
MV Step-up Transformer1 Rating 1000kVA
2 Type of Transformer Oil-immersed 0.315kV/11kV Transformer-
3 Input Voltage 0.315kVac
4 Output Voltage 11kVac
5 Efficiency 99%
Outdoor Cubicle Control Room1 Data Record Continuous logging with data logging software
2 Control Room Computerized data acquisition system
Control Room SystemInterface hardware & software, industrial type PC
3 and server, which will be robust & rugged suitableDetail
to operate in the control room environment
Mounting Structure
1 StructureSupport structure is formed by vertical purlins and
horizontal steel beam
2 Tilt of Array Frame 23°-PV module size is 1636 x 986 x 35 mm. Support is
3 Array Specification put in two rows, 2*11 PV modules. 3640 supports
are needed
Foundation Pillars/Piling1 Number of Foundations 28800
2 Foundation Structure Reinforced concrete pile or Spiral steel piles'-
3) Fuel: Type, Imported/Indigenous, Supplier, Logistics,
Pipeline etc.
Since the project is a solar power plant, no fuel is involved.
4) Emission Values
This project will conform to the environmental protection laws, regulations and standard of
Pakistan and World Bank/lFC standards of environmental protection.
Since the project is a solar power plant, no emissions are involved.
5) Cooling Water Source: Tube Wells, Sea/River/Canal,• Distance from Source etc
Since the project is a solar power plant, no cooling water are involved.
6) Interconnection with National Grid Company, Distance &
Name of nearest Grid, Voltage Level (Single Line Diagram)
An interconnection study for the project has been conducted by Power Planners
International Ltd. The report is investigating the grid connection scheme for the project
and it is expected that the project will connect to the HESCO grid at the nearest possiblepoint.
7) Infrastructure: Roads, Rail, Staff Colony, Amenities
The site lies 46km east of Nawabshah. Sea freight may be shipped to Karachi harbor and
be transported to Nawabshah via highway, then be transported to the site by trucks.
8) Project Cost, Sources and amounts of Equity and Debt
a) Project Cost
The total project cost is expected in the range of USD 23,600,000 with Engineering,
Procurement & Construction Cost of USD 27 million. The cost is budgetary nature at this
stage and will be finalized upon final receipt of EPC proposal. The breakup of the Project
Cost is summarized as follows:
USD
1 Total EPC Cost 23,600,000
2 Other Costs (Development, Non-EPC, Insurance, Financing) 3,102,680
3 Interest during Construction 217,200
Total Project Cost 27,000,000-
b) Financial Plan:
The total project cost of approximately USD 27,000,000.00 is to be financed with acombination of debt and equity. Based on initial discussions with the financial institutions,the company is likely to finance the project on the basis of a Debt: Equity ratio of 75:25.The debt amount is expected to be in foreign currency with interest payable quarterly onthe basis of 3-Month prevailing KIBOR plus 300 basis points. The term of the loan isexpected to be 10 years plus construction period. Principal repayment and interestpayment is expected to be on the basis of 40 quarterly installments starting fromscheduled commercial operations. All equity injection required for the Project will bearranged by the Main Sponsor. A summary of the financial plan is provided below:
USD million1 Total Equity (25%) 6,750,0002 Total Debt (75%) 20,250,000
Total Financing 27,000,000
9) Project Schedule with Milestones
Activity/Milestone TimelineSubmission of Gird Study May 2016Approval of Gird Study June 2016Approval of Generation License June 2016Approval of Upfront Tariff June 2016Signing of EPAIIA October 2016Financial Close December 2016Project COD January 2018
'---
10)ESSA (Environmental and Social Soundness Assessment)
The energy sector of Pakistan is relying heavily on imported fuels for generation ofelectricity. The development of solar power generation projects could reduce dependenceon fuels for thermal power generation and increase diversity in Pakistan's electricitygeneration mix thereby reducing greenhouse gas emissions. The operationalenvironmental impacts of solar power generation are almost zero and largely consist ofthe minor impact that the O&M practices introduce. Whilst there is an impact to theenvironment through the siting of a solar project, there is in no way the same level of
impact that results from the construction of a conventional thermal plant. The emissions toland, water or air are almost insignificant and use of solar power, in comparison of a plantthat emits pollutants, Pakistan can reduce its CO2 production levels, closer to agreedemission levels and contribute to the global effort to reduce CO2.
An Initial Environmental Examination (lEE) has been conducted for the Benazirabad SolarProject by Ecochange Pvt. Ltd. The lEE demonstrates that such solar projects will havenumber of positive impacts and negligible negative impacts to the existing environment.
11)Sociallmpact
This 20MWp PV power plant project will create employment opportunities for the localpeople. Even indirect job opportunities will be created outside the project boundary. Theproject would improve the basic infrastructure and the people of nearby villages can alsouse these amenities. Main Sponsor will give priority to the skilled, un-skilled labor of thenearby villages. Overall, it is expected that there will be marginal impacts on thesocio-economic conditions of the locality and the impact will be mostly positive.
12)Safety Plans, Emergency Plans
a) Health, Safety & Environment (HSE) Protection
The Company will be committed to ensuring the highest standard when it comes to thehealth and safety of people and protection of the environment. This shall apply to alllocations of the office space as well as the construction site. Commitment will remain inplace to continuously improve HSE at the workplace, and contractors will be required tofollow such an example by adopting the Company's policy or developing their ownequivalent.
b) Health, Safety & Environment Policy
The Company is committed to comply with all applicable HSE legislation. Every person inthe scope of the Project will be obliged to comply with all legal requirements as well as allHSE policy. Any person who fails to comply with these requirements will be denied accessto the project site. Emergency procedures will be regularly communicated and exercisedwith all employees, contractors/subcontractors and any other stakeholder in the project'spermanent and temporary workspaces.
c) Environment
The company will actively encourage our employees and contractors/subcontractors tocontribute to waste reduction. In the permanent workspaces, a predefined set ofmeasures to reduce consumption of electricity, water and paper will be put in place.Employees and contractors/subcontractors shall ensure proper waste disposal and allemployees and contractors/subcontractors shall be required to demonstrate a high levelof care when handling solar modules, inverters and cables to minimize waste frombreakage. Hazardous materials shall be identified before they enter the site and the
proper disposal of any hazardous waste will be monitored and ensured.
13)System studies: Load Flow, Short Circuit, Stability,
Reliability
Load flow, short circuit, stability and reliability study for the project has been conducted byPower Planners International Ltd. The report is investigating the grid connection schemefor the project and it is expected that the project will connect to the HESCO grid at thenearest possible point.
14)Plant Characteristics: Generation Voltage, Frequency,
Power Factor, Automatic Generation Control, Ramping Rate,
Time(s) Required to Synchronize to Grid
Please refer to Plant Technical Details in Section 2 above.
15)Control, Metering, Instrumentation and Protection
Please refer to Plant Technical Details in Section 2 above.
16)Training and Development
• Training is part of the scope of works to be conducted under the EPC contractor. The EPCContractor shall also carry out the training of the Employer's Personnel in the operationand maintenance of the Complex.
Report No. PPI-192.11l6
INTERCONNECTION STUDY
For
20 MW Solar Power ProjectBy
ZTE Power (Pvt.) Limited.}~,""
.a-"
(May 2016)
POWER PLANNERS INTERNATIONAL LTD.
UK Office:Registered in England & Wales No. 6363482
Pakistan Office:64-F-1, Wapda Town,Lahore 54770, PakistanPhone: +92-42-35182835;Fax: + 92-42-35183166
3-Sylvester Road,Sudbury Town, Middlesex,HAO 3AQ, UKPhone & Fax:+44-(0)208-9223219
Email: [email protected]
Executive Summary.:. The study objective, approach and methodology have been described and the
plant's data received from the client M/s ZTE Power (Pvt.) Limited is validated .
•:. The expected COD of the project is January 2018. Therefore the month of June
2018 has been selected to carry out the study as it will allow the maximum impact
of the project to be judged .
•:. The net output will be 16 MW after deducting the losses inside the solar park such
as inverter loss, cables loss etc .
•:. The HESCO system data as available with PPJ for other studies have been used .
•:. The nearest substation of HESCO is Jamrau Head 66/ II kV. The following
scheme of interconnection of Solar Power Plant by ZTE Power to evacuate its
maximum AC power of 16 MW is envisaged and studied in detail:
• Scenario - 1: Three direct 11 kV circuits each of 6 krn length using Osprey
conductor to be laid from the switching station of ZTE Solar-PP till Jamrau
Head 66111 kV substation.
• In this context three 11 kV breaker/line bays need to be added in the 11 kV
switchgear hall of Jamrau Head 66111 kV Substation
• Scenario - II: The scheme of interconnection has been developed by
looping ZTE Solar in-out of the single 66 kV circuit between Jamrau Head
and Sanghar and studied in detail to evacuate the maximum AC power of
16MW .
•:. Detailed load flow studies have been carried out for the peak load conditions of
June 2018 for the proposed scheme under normal and N-1 contingency conditions
to meet the reliability criteria .
•:. Steady state analysis by load flow reveals that proposed scheme is adequate to
evacuate the maximum AC output power of 16 MW of the plant under normal and
contingency conditions with the proposed reinforcements .
•:. It is also revealed that the interconnection of ZTE solar power plant at Jamrau
Head has helped to boost the voltage and resolved the issue of voltage sag under
some outages in the network feeding into this area .
•:. The short circuit analysis has been carried out to calculate maximum fault levels
at the ZTE Solar Power Plant at 11 kV, and the substations of66/1lkV and 132/11
~• •• •,.,,:,(,POWER PLANNERS INTERNATIONAL PAGE 2 OF 30
kV in its vicinity. We find that the fault currents for the proposed scheme are
much less than the rated short circuit capacities of switchgear installed at these
substations. There are no violations of exceeding the rating of the equipment due
to contribution of fault current from the ZTE Solar Power Plant.
The maximum short circuit level of 11 kV bus bar of ZTE Solar Power Plant II
kV for Scenario - I is 3.77 kA and 0.0005 kA for 3-phase and l-phase faults
respectively and for Scenario - II is 1.25 kA and 1.47 kA for 3-phase and l-phase
faults respectively. Therefore an industry standard switchgear of the short circuit
rating of 12.5 kA is considered adequate with enough margin for future increase in
fault levels due to future reinforcements in this area .
•:. The dynamic stability analysis of proposed scheme of interconnection has been
carried out. The stability check for the worst case of three phase fault right on the
11 kV bus bar of the ZTE solar power plant substation followed by the final trip of
II kV circuits emanating from this substation, has been performed for fault
clearing of 9 cycles (180 111S) as understood to be the maximum fault clearing time
of 11 kV protection system. The system is found strong enough to stay stable and
recovered with fast damping. The proposed scheme successfully passed the
dynamic stability checks for system disturbances .
•:. The proposed scheme of interconnection has no technical constraints or problems,
it fulfills all the criteria of reliability and stability under steady state load flow,
contingency load flows, short circuit currents and dynamic/transient conditions;
and is therefore recommended to be adopted.
{fj••• •,.,':';'POWER PLANNERS INTERNATIONAL PAGE 3 OF 30
Report Contents
1. Introduction
1. I. Background
1.2. Objectives
1.3. Planning Criteria
2. Assumptions of Data
2.1 Solar Power Plant Data
2.2 Network Data
3. Study Approach & Methodology
3.1 Understanding of the Problem
3.2 Approach to the Problem
4. Development of Scheme of Interconnection
4.1 The Existing Network
4.2 The Scheme of Interconnection of Solar Power Plant
4.3 Proposed additions at 11 kV in Jamrau Head 66111 kV substation
5. Detailed Load Flow Studies
5.1. Base Case 2018, Without Solar Power Plant
5.2. Peak Load Flow Case with ZIE Solar Power Plant
5.3. Conclusion of Load Flow Analysis
6. Short Circuit Analysis
6. I Methodology and Assumptions
6.2 Fault current calculations without ZTE Solar Power Plant
6.3 Fault current calculations with Solar Power Plant interconnected
6.4 Conclusion of short circuit analysis
7. Transient Stability Analysis
7.1 Assumptions & Methodology
7.1.1 Stability Models
7.1.2 System Conditions
7.1.3 Presentation of Results
7.1.4 Worst Fault Cases
7.2 Transient stability simulation results - Scenario - I
{f;• •• •I"~ POWER PLANNERS INTERNATIONAL PAGE 4 OF 30
7.3 Scenario - II
7.4 Conclusion of Dynamic Stability Analysis
8. Conclusions
Appendices
Appendix -A: Generation & Transmission Plan
Appendix -B: Sketches & SLDs for Chapter 4
Appendix -C: Plotted Results of Load Flow for Chapter 5
Appendix -D: Results of Short Circuit Calculations for Chapter 6
Appendix -E: Plotted Results of Stability Analysis for Chapter 7
Appendix -F: Dynamic Data for Stability
(fj• •• •,.,~ POWER PLANNERS INTERNATIONAJ~ PAGE 5 OF 30
1. Introduction
1.1 Background
The site of proposed project is near Jamrau Head close to Sanghar in Sindh
located in the concession area of Hyderabad Electricity Supply Company
(HESCO). The installed capacity of the plant is 20 MWp and the net output after
deduction of losses in the solar park is about 16 MW of electrical power which
will start commercial operation by January 2018. The electricity generated from
this project would be supplied locally to the Jamrau Head 66/11 kV Grid and to
the HESCO network through Jamrau Head 66111 kV grid located in the vicinity of
this project.
1.2 Objectives
The overall objective of the Study is to evolve an interconnection scheme between
ZTE Solar Power Project and HESCO network, for stable and reliable evacuation
of 16 MW of electrical power generated from this plant, fulfilling N-1 reliability
criteria. The speci fie objectives are:
I. To develop scheme of interconnections at II kV for which right of
way (ROW) and space at the terminal substations would be available.
11. To determine the performance of interconnection scheme during steady
state conditions of system, normal and N-I contingency, through load-
flow analysis.
in. To check if the contribution of fault current from this new plant
increases the fault levels at the adjoining substations at II kV, 66 kV
and 132 kV voltage levels to be within the rating of equipment of these
substations, and also determine the short circuit ratings of the proposed
equipment of the substation at the ZTE Solar Power Plant.
IV. To check if the interconnection withstands dynamic stability criteria of
post fault recovery with good damping after 3-phase faults on the
system.
(fj• •• •,.,::",POWER PLANNERS INTERNATIONAL PAGE 6 OF 30
1.3 Planning CriteriaThe planning criteria as per Grid Code required to be fulfilled by the proposed
interconnection is as follows:
Steady State:
Voltage ± 5 %, Normal Operating Condition
± 10 %, Contingency Conditions
50 Hz, Continuous, ± I% variation steady state
49.2 - 50.5 Hz, Short Time
0.80 Lagging; 0.9 Leading (for conventional
synchronous generators but would not be
applicable to solar PP)
Frequency
Power Factor
DynamiclTransient:
• The system should revert back to normal condition after dying out of
transients without losing synchronism with good damping. For 11 kV the total
maximum fault clearing time from the instant of initiation of fault current to
the complete interruption of current, including the relay time and breaker
interruption time to isolate the faulted element, is equal to 180 ms (9 cycles).
• For the systems of 132 kV and above the total normal fault clearing time from
the instant of initiation of fault current to the complete interruption of current,
including the relay time and breaker interruption time to isolate the faulted
element, is equal to 100 ms (5 cycles).
• For the systems of 132 kV and above, in case of failure of primary protection
(stuck breaker case), the total fault clearing time from the instant of initiation
of fault current to the complete interruption of current to isolate the faulted
element, including the primary protection plus the backup protection to
operate and isolate the fault, is equal to 180 111S (9 cycles).
{fj• •••,.,':';POWER PLANNERS INTERNATIONAL PAGE 7 OF 30
2. Assumptions of DataThe detailed electrical parameters would be designed at the EPC stage. However for
the purposes of this study, following assumptions have been made:
2.1 Solar Power Plant data
The Solar Power plant has been modeled according to the following block diagram
IRRAD rro~ PnlM oOOle COnY'tltu ModelPVEU andPVGU
Rest ofSystem
;:;.
i
I- .. t>Imd(n
...Voltage
"'PSSlE-+
'------' ~,~
WT4..pdc(n
....
The way this works is that the irradiance profile from the sun is used as an input to the
panel module which then calculates the DC power at that value of the irradiance. This
value is then input to the electrical model of the solar power plant (inverter module)
which then goes on to calculate the AC power supplied by the solar power plant.
Due to the presence of the inverter module, from the point of view of the network, the
solar power plant is considered a voltage source convertor.
Dynamic Data:
Converter time constant for IQcmd seconds = 0.02 s
Converter time constant for IQcmd seconds = 0.02 s
Voltage sensor for LV ACR time constants = 0.02 s
Voltage sensor time constant = 1.1 s
(fj• •• •,.,::'"POWER PLANNERS INTERNATIONAL PAGE 8 OF 30
2.2 Network data
The 11 kY, 66 kY and 132 kY networks available for interconnection to ZTE Solar
Power Plant arc shown in sketches in Appendix-B.
The PEPCO/HESCO system data of National Grid have been assumed in the study as
already available with PPI.
{fj• •.-,.,,!; POWER PLANNERS INTERNATIONAL PAGE 9 OF 30
3. Study Approach and Methodology
3.1 Understanding of the Problem
The 16 MW (AC) Solar Power Plant by ZTE Solar is going to be a Photovoltaic (PV)
based solar project embedded in the 11 kV distribution network of Jamrau Head. It
would run almost all the months of the year though with some variation in its output
due to variation in the strength of light in winter and in rainy season.
The existing nearest grid station available for interconnection is Jamrau Head 66/11
kV Substation. The addition of this source of power generation embedded in local
distribution network of this area shall provide relief to Jamrau Head 66111 kV
substation feeding the local network and also helps 11 kV network in terms of
improving line losses and voltage profile. The 11 kV network surrounding Jamrau
Head has significant load demand, therefore most of the power from the ZTE Solar
Power Plant will be utilized locally in meeting this load demand.
The adequacy of HESCO network of 66kV and 132 kV in and around the proposed
site of ZTE Solar Plant would be investigated in this study for absorbing and
transmitting this power fulfilling the reliability criteria.
3.2 Approach to the problem
The consultant has applied the following approaches to the problem:
• A base case network model has been prepared for June 2018, whieh is the next
peak load case after the installation of solar plant by ZTE Power Ltd. The case
comprises of all 500kV, 220kV, 132 kV and 66 kV system, envisaging the
load forecast, the generation additions and transmission expansions for that
year particularly in HESCO.
• The project is expected to be completed by January 2018. Therefore the month
of June 2018 has been selected to carry out the study as it will allow the
maximum impact of the project to be judged.
• Interconnection scheme without any physical constraints, like right of way or
availability of space in the terminal substations, have been identified.
• Performed technical system studies for peak load conditions to confirm
technical feasibility of the interconnections. The scheme has been subjected to
(fj• •• •,.,r: POWER PLANNERS INTERNATIONAL PAGE 10 OF 30
standard analysis like load flow and short circuit, and transient stability study
to check the strength of the plant and the proposed interconnection scheme
under disturbed conditions.
• Determine the relevant equipment for the proposed technically feasible
scheme.
• Recommend the technically most feasible scheme of interconnection.
f&~;.,.,,! POWER PLANNERS INTERNATIONAL PAGE 11 OF 30
4. Development of Scheme of Interconnection
4.1 The Existing NetworkThe nearest existing HESCO interconnection facilities at the time of commissioning
of ZTE Solar Power Project would be as follows:
o Jamrau Head 66/11 kV Substation
o Sanghar 132/66/11 kV Substation
The existing 66 kV and 132 kV network available around these grid stations is shown
in Sketches in Appendix-B.
Given the physical proximity of Jamrau Head to ZTE Solar Power plant, the most
feasible interconnection of the ZTE Solar Power Plant will be
• Scenario - 1: Three direct 11 kV circuits each of 6 km length using Osprey
conductor to be laid from the switching station of ZTE Solar-PP till Jamrau
Head 66/ I I kV substation.
• Scenario - 11: The scheme of interconnection has been developed by
looping ZTE Solar in-out of the single 66 kV circuit between Jamrau Head
and Sanghar and studied in detail to evacuate the maximum AC power of
16MW.
There is one 66/11 kV transformer with 2.5 MVA augmented to 20 MVA capacity at
Jamrau Head and one 132/66 kV transformer with 7.5 MVA augmented to 20
MV A capacity at Sanghar Substation to evacuate the maximum AC power of 16 MW
of ZTE So lar.
Sanghar 132 kV grid station is connected to a strong 132 kV network in the vicinity.
A strong system helps in stable operation of a power plant.
4.2The Scheme of Interconnection of Solar Power PlantK.eeping in view of the above mentioned 66 kV and 132 kV network available in the
vicinity of the site of the ZTE Solar Power Plant, the interconnection scheme has been
developed as shown in Sketches in Appendix B. Even though two 11 kV circuits
using Osprey conductor would be sufficient to evacuate power from ZTE Solar PP, an
additional circuit has been added to fulfill N-l contingency criteria.
f~~J.,.,,! PO\'<!ER PLANNERS INTERNATIONAL PAGE 12 OF 30
4.3 Proposed additions at 11 kV in Jamrau Head 66/11 kV SubstationThree breaker/panels of 11 kV along with respective protection equipment would be
required to be added in 11 kV switchgear hall of Jamrau Head 66/11 kV substation to
provide connection to direct 11 kV circuits from this Solar Power Plant.
:~~J.,.,'! POWER PLANNERS INTERNATIONAL PAGE 13 OF 30
5. Detailed Load Flow Studies
5.1 Base Case 2018, Without Solar Power Plant
A base case has been developed for the peak load of June 2018, using the network
data of ZTE Solar PP and HESCO network.
The results of load flow for this base case are plotted in Exhibit 0.0 of Appendix-C.
The system plotted in this Exhibit shows 66 kV and 132 kV network feeding Jamrau
Head connected to its surrounding substations through Sanghar, Kandari and
MirpurKhas.
The load flow results show that the power flows on all circuits are within their
specified normal current carrying rating. The voltages are also within the permissible
limits.
For N-I contingency conditions we have performed the following cases
Exhibit-O.l
Exhibit-0.2
Exhibit-0.3
Exhibit-O.4
Exhibit-O.S
Exhibit-0.6
Exhibit-0.7
Exhibit-0.8
Kandari to Sanghar 132 KV Single Circuit Out
Jamnawaz to Kandari 132 KV Single Circuit Out
MirpurKhas to Jamnawaz 132 KV Single Circuit Out
MirpurKhas to Kandari 132 KV Single Circuit Out
Sanghar to Shahpurc 132 KV Single Circuit Out
Shahpurc to N.S.Sngr 132 KV Single Circuit Out
N.S.Sngr to Nawabshah 132 KV Single Circuit Out
Nawabshah to N.S.Site 132 KV Single Circuit Out
In Exhibit 0.7 we see that the voltage at N.S.Sngr 132kV falls very low due to outage
of N.S.Sngr to Nawabshah 132kV Single Circuit. The interconnection of proposed
solar power plant at Jamrau Head will help to boost the voltage and resolve this issue.
However in all other cases the power flows on all circuits remain within their ratings
and voltage profile are also within permissible limits. Thus we find that there are no
capacity constraints in terms of MW or MV A flow in the 66 kV or 132 kV network
available in the vicinity of ZTE Solar Power Plant for its connectivity under normal
and contingency conditions prior to its connection.
5.2 Peak Load Flow Case with ZTE Solar Power Plant
(fj• •• •,.,::,"POWER PLANNERS INTERNATIONAL PAGE 14 OF 30
Scenario - I
We have considered the scenario of June 2018 so that we can judge the maximum
impact of the project on the system.
The scheme of interconnection modeled in the load flow for ZTE Solar Power Plant is
developed by laying down three direct 1I kV circuits each of 6 km length using
Osprey conductor from the switching station of ZTE Solar-PP till Jamrau Head 66/1 I
kV substation. The results of load flow with ZTE Solar Power Plant interconnected as
per proposed scheme are shown in Exhibit l.0 in Appendix-C. The power flows on
the circuits are seen well within the rated capacities and the voltages on the bus bars
are also within the permissible operating range of ± 5 % off the nominal.
We find no capacity constraints on II kV, 66 kV or 132 kV circuits under normal
conditions i.e. without any outages of circuits.
N-I contingency analysis has been carried out and the plotted results are attached in
Appendix - C as follows;
Exhibit- }.}
Exhibit-l.2
Exhibit-I.3
Exhibit-l.4
Exhibit-l.5
Exhibit-I.6
Exhibit-I.7
Exhibit-l.8
Exhibit-l.9
ZTE Solar to Jamrau Head 1I KV Single Circuit Out
Kandari to Sanghar 132 KV Single Circuit Out
Jamnawaz to Kandari 132 KV Single Circuit Out
MirpurKhas to Jamnawaz 132 KV Single Circuit Out
MirpurKhas to Kandari 132 KV Single Circuit Out
Sanghar to Shahpurc 132 KV Single Circuit Out
Shahpurc to N.S.Sngr 132 KV Single Circuit Out
N.S.Sngr to Nawabshah }32 KV Single Circuit Out
Nawabshah to N.S.Site 132 KV Single Circuit Out
We had observed in the case of Exhibit-0.7 of ""Without ZTE Solar PP" that the
voltage at N.S.Sngr 132kV falls very low due to outage of N.S.Sngr to Nawabshah
l32kV Single Circuit. But now we see that the interconnection of ZTE solar power
plant at Jamrau Head has helped to boost the voltage and resolved this issue.
In all the above contingency cases, we find that in the event of outage of any circuit,
the intact circuits remain within the rated capacity.
Also the bus bar voltages are well within the rated limits in all the contingency events.
(fj• •• •,.,:-:"POWER PLANNERS INTERNATIONAL PAGE 15 OF 30
Thus there are no constraints in this scheme.
Scenario - II
We have considered the scenario of peak load case of June 2018 so that we can judge
the impact of the project on the system.
The scheme of interconnection has been developed by looping ZTE Solar in-out of
the single 66 kV circuit between Jamrau Head and Sanghar and studied in detail to
evacuate the maximum AC power of 16 MW.
The results of load flow with ZTE Solar Power Plant interconnected as per proposed
scheme are shown in Exhibit 2.0 in Appendix-C. The power flows on the circuits are
seen well within the rated capacities and the voltages on the bus bars are also within
the permissible operating range of ± 5 % off the nominal.
We find no capacity constraints on II kV, 66 kV or 132 kV circuits under normal
conditions i.e. without any outages of circuits.
N-l contingency analysis has been carried out and the plotted results are attached in
Appendix - C as follows;
Exhibit-2.l
Exhibit-2.2
Exhibit-2.3
Exhibit-2.4
Exhibit-2.5
Exhibit-2.6
Exhibit-2.7
Exhibit-2.8
Kandari to Sanghar 132 KV Single Circuit Out
Jamnawaz to Kandari 132 KV Single Circuit Out
MirpurKhas to Jamnawaz 132 KV Single Circuit Out
MirpurKhas to Kandari 132 KV Single Circuit Out
Sanghar to Shahpurc 132 KV Single Circuit Out
Shahpurc to N.S.Sngr 132 KV Single Circuit Out
N.S.Sngr to Nawabshah 132 KV Single Circuit Out
Nawabshah to N.S.Sitc 132 KV Single Circuit Out
In all the above contingency cases, we find that in the event of outage of any circuit,
the intact circuits remain within the rated capacity.
Also the bus bar voltages are well within the rated limits in all the contingency events.
Thus there are no constraints in this scheme.
5.3 Conclusion of Load Flow Analysis
iJ• •• •,.,:; POWER PLANNERS INTERNATIONAL PAGE 16 OF 30
From the analysis discussed above, we conclude that the proposed interconnection
scheme of both scenarios is adequate in normal and for all the performed
contingencies conditions. The power flows on all circuits remain within their ratings.
Also we see that the interconnection of ZTE solar power plant has helped to boost the
voltage and resolved the issue of voltage sag under some outages in the network
feeding into this area.
Thus we find that there are no capacity constraints in terms of MW or MY A flow in
the II kY, 66 kY or 132 kY network available in the vicinity of ZTE Solar Power
Plant for its connectivity under normal and contingency conditions. The
interconnection of ZTE solar PP provides overall relief to the network.
~&~;,.,::"POWER PLANNERS INTERNATIONAL PAGE 17 OF 30
6. Short Circuit Analysis
6.1 Methodology and AssumptionsThe methodology of IEC 909 has been applied in all short circuit analysis in this
report for which provision is available in the PSS/E software used for these studies. .
The maximum fault currents have been calculated with the following assumptions
under IEC 909:
• Set tap ratios to unity
• Set line charging to zero
• Set shunts to zero in positive sequence
• Desired voltage magnitude at bus bars set equal to 1.l0 P.U. i.e. 10 % higher
than nominal, which is the maximum permissible voltage under contingency
condition.
For evaluation of maximum short circuit levels we have assumed contribution in the
fault currents from all the installed generation capacity of hydel, thermal and nuclear
plants in the system in the year 2015 i.e. all the generating units have been assumed
on-bar in fault calculation's simulations.
6.2 Fault Current Calculations without ZTE Solar Power Plant
In order to assess the short circuit strength of the network of 11 kV and 132 kV
without ZTE Solar Power Plant for the grid of HESCO in the vicinity of the site of the
Plant near Jamrau Head, fault currents have been calculated for balanced three-phase
and unbalanced single-phase short circuit conditions. These levels will not only give
us the idea of the fault levels without ZTE Solar Power Plant and later on how much
the contribution of fault current from the Solar Power Plant may add to the existing
levels, but also we get a feel of the strength of the proposed node to connect this
Power Plant depending on its relative short circuit strength.
The results are attached in Appendix - D.
The short circuit levels have been represented graphically on the bus bars of 11 kV,
66 kV and 132 kV along with fault current contributions from the incoming circuits,
which are shown in the Exhibit 3.0 attached in Appendix-D.
iJ• •• •,.,'f': POWER PLANNERS INTERNATIONAL PAGE 180F30
Both 3-phase and l-phase fault currents are indicated in the Exhibit which are given
in polar coordinates i.e. the magnitude and the angle of the current. The total fault
currents are shown below the bus bar.
The tabular output of the short circuit calculations is also attached in Appendix-D for
the 11 kVand 132 kV bus bars of our interest i.e. 11 kV, 66 kV and 132 kV circuits
lying elose to Jamrau Head. The tabular output is the detailed output showing the
contribution to the fault current from the adjoining sources i.e. the lines and
transformers connected to that bus. The phase currents, the sequence currents and the
sequence impedances are shown in detail for each faulted bus bar.
The total maximum fault currents for 3-phase and I-phase short circuit at these
substations are summarized in Table 6.1. We see that the maximum fault currents do
not exceed the short circuit ratings of the equipment at these 11 kV, 66 kV and 132
kV substations whieh normally are 20 kA, 25 kA.
Table - 6.1Maximum Short Circuit Levels without ZTE Solar PP 2018
3-Phase fault J-Phase faultSubstation
current, kA current, kA
Jamrau Head llkV 1.72 0.00002
Jamrau Head 66kV 0.623 0.700
Sanghar 66kV 0.822 0.895
Sanghar132kV 6.36 4.44
Kandari 132kV 8.67 6.26
Jamnawaz 132kV 8.81 6.34
Mirpurkhas 132kV 12.30 9.75
Shahpurc132kV 5.00 3.35
Nawabshah 132kV 6.23 4.23f---
Sakrand 132kV 7.81 5.50
6.3 Fault Current Calculations with Solar Power Plant interconnected
Scenario - I - Three direct 11 kV osprey conductors from Jamrau
Head 66/11kV to ZTE Solar
fot.~;.,.,'! POWER PLANNERS INTERNATIONAL PAGE190F30
Fault currents have been calculated for the electrical interconnection of proposed
scheme. Fault types applied are three phase and single-phase at 11 kV bus bars of
ZTE Solar Power Plant itself and other bus bars of the 66 kV and 132 kV substations
in the electrical vicinity of Jamrau Haed. The graphic results are indicated in Exhibit
3.l.
The tabulated results of short circuit analysis showing all the fault current
contributions with short circuit impedances on 132 kV and 11 kV bus bars of the
network in the electrical vicinity of ZTE Solar Power Plant are placed in Appendix-D.
Brief summary of fault currents at significant bus bars of our interest are tabulated in
Table 6.2.
Table-6.2Maximum Short Circuit Levels with ZTE Solar PP 2018
3-Phase fault 1-Phase faultSubstation
current, kA current, kA
ZTE Solar PP 3.77 0.0005
Jamrau Head 11kV 4.48 0.00047
Jamrau Head 66kV 1.15 1.45
Sanghar 66kV 1.90 2.00
Sanghar 132kV 6.41 4.58
Kandari 132kV 8.71 6.36
Jamnawaz 132kV 8.84 6.41
Mirpurkhas 132kV 12.33 9.82
Shahpurc 132kV 5.02 3.39
Nawabshah 132kV 6.25 4.26
Sakrand 132kV 7.83 5.52
Comparison of Tables 6.1 and 6.2 shows slight increase in short circuit levels for
three-phase and single - phase faults due to connection of Solar Power Plant on the
132 kV and 11 kV bus bars in its vicinity. This increase is limited from the point of
view of the fact that the Solar Power Plant is a voltage source convertor. We find that
even after some increase, these fault levels are much below the rated short circuit
values of the equipment installed on these substations.
~• •.-,.,~ POWER PLANNERS INTERNATIONAL PAGE 20 OF 30
The maximum short circuit level of 11 kV bus bar of ZTE Solar Power Plant 11 kV is
3.77 kA and 0.0005 kA for 3-phase and I-phase faults respectively. Therefore an
industry standard switchgear of the short circuit rating of 12.5 kA should be installed
at 11 kV switching station of the Solar Power Plant leaving enough margin to
accommodate fault current contribution from any future reinforcements taking place
in that area.
Scenario - II - Looping ZTE Solar in-out of the single 66 kV circuit
between Jamrau Head and SangharFault currents have been calculated for the electrical interconnection of proposed
scheme. Fault types applied are three phase and single-phase at II kV bus bars of
ZTE Solar Power Plant itself and other bus bars of the 66 kV and 132 kV substations
in the electrical vicinity of Jamrau Haed. The graphic results are indicated in Exhibit
3.2.
The tabulated results of short circuit analysis showing all the fault current
contributions with short circuit impedances on 132 kV and I I kV bus bars of the
network in the electrical vicinity of ZTE Solar Power Plant are placed in Appendix-D.
Brief summary of fault currents at significant bus bars of our interest are tabulated in
Table 6.3.
Table-6.3Maximum Short Circuit Levels with ZTE Solar PP 2018
3-Phase fault I-Phase faultSubstation
current, kA current, kA
ZTE Solar PP 1.25 1.47
Jamrau Head llkV 4.50 0.00002
Jamrau Head 66kV 1.14 1.43
Sanghar 66kV 2.06 2.06
Sanghar 132kV 6.47 4.56
Kandari 132kV 8.76 6.35
Jamnawaz 132kV 8.87 6.40
Mirpurkhas 132kV 12.37 9.81
Shahpurc 132kV 5.03 3.38
Nawabshah 132kV 6.25 4.25
Sakrand 132kV 7.83 5.52
(fj• •• •,.,,:,(POWER PLANNERS INTERNATIONAL PAGE 21 OF 30
Comparison of Tables 6.1 and 6.3 shows slight increase in short circuit levels for
three-phase and single - phase faults due to connection of Solar Power Plant on the
132 kV and 11 kV bus bars in its vicinity. The maximum short circuit level of II kV
bus bar of ZTE Solar Power Plant 11 kV is 1.25 kA and 1.47 kA for 3-phase and 1-
phase faults respectively. Therefore an industry standard switchgear of the short
circuit rating of 12.5 kA should be installed at II kV switching station of the Solar
Power Plant leaving enough margin to accommodate fault current contribution from
any future reinforcements taking place in that area.
6.4 Conclusion of Short Circuit AnalysisThe short circuit analysis results show that for the proposed schemes of
interconnection of ZTE Solar Power Plant, we don't find any problem of violations of
short circuit ratings of the already installed equipment on the 132 kV and II kV
equipment of substations in the vicinity of the Solar Power Plant due to fault current
contributions from this plant due to three-phase faults as well as single phase faults.
The maximum short circuit level of 11 kV bus bar of ZTE Solar Power Plant 11 kV
for Scenario -1 is 3.77 kA and 0.0005 kA for 3-phase and l-phase faults respectively
and for Scenario - II is 1.25 kA and 1.47 kA for 3-phase and l-phase faults
respectively. Therefore an industry standard switchgear of the short circuit rating of
12.5 kA should be installed at II kV switching station of ZTE Solar Power Plant
leaving enough margin to accommodate fault current contribution from any future
reinforcements taking place in that area.
((;••.-,.,~ POWER PLANNERS INTERNATIONAL PAGE 22 OF 30
7. Transient Stability Analysis
7.1 Assumptions & Methodology
7.1.1 Stability Models
The assumptions about the generator and its parameters are the same as mentioned in
Ch.2 of this report.
We have employed the generic stability models available in the PSS/E model library
for dynamic modelling of the PV -Solar power generator, its electrical model and the
panel as follows;
Generator PVGUI
PVEUI
PANELUI
Electrical Model
Solar Panel Model
We have done studies with the inverter which has reactive support capability of ±
0.95 PF.
7.1.2 System Conditions
We have used the system conditions of June 2018 because in this season the
irradianee from the sun is at its peak and hence the maximum impact of the Solar
Power Plant can be judged.
All the power plants of WAPDAINTDC from Tarbela to HUBCO have been
dynamically represented in the simulation model.
7.1.3 Presentation of Results
The plotted results of the simulations runs are placed in Appendix - E. Each
simulation is run for its first one second for the steady state conditions of the system
prior to fault or disturbance. This is to establish the pre fault/disturbance conditions of
the network under study were smooth and steady. Post fault recovery has been
monitored for nine seconds. Usually all the transients due to non-linearity die out
within 2-3 seconds after disturbance is cleared in the system.
7.1.4 Worst Fault Cases
Three phase faults are considered as the worst disturbance in the system. We have
considered 3-phase fault in the closest vicinity of the Solar Power Plant i.e. right at
the II kV bus bar of the solar power plant substation, cleared in 9 cycles, as normal
iJ• •••,.,'1;' POWER PLANNERS INTERNATIONAL PAGE 23 OF 30
clearing time for II kV i.e. 180 ms, followed by permanent trip of 11 kV single
circuit emanating from this substation.
Transient Stability Simulations' Results
7.2 Scenario - I
7.2.1 Fault at 132 kV at Sanghar
We applied three-phase fault on the Sanghar 132 kV bus bar, cleared fault in 5 cycles
(100 ms) followed by trip of 132 kV circuit between the Sanghar and Kandari 132kY.
We monitored different quantities for one second pre-fault and nine seconds after
clearance of fault (post-fault) conditions and plotted the results attached in Appendix
- E and discussed as follows;
Fig. 1.1 Bus Voltages
The bus voltages of 11 kV bus bars of ZTE Solar-PP and Jamrau Head and 66kV bus
bars of Sanghar and Jamrau Head and 132 kV Bus Bars of Sanghar and Kandari are
plotted. The results show quick recovery of the voltages after clearing of fault.
Fig. 1.2 Frequency
Wc see the system frequency recovers back to normal quickly after fault clearance.
Fig. 1.3 MW/MVAR Output of Solar Power Plant
The pre-fault AC output of Solar Power Plant was 16 MW and it gets back to the
same output quickly after fast damping of the oscillations in its output. However
MV AR output acquires equilibrium at a new value.
Fig. 1.4 Voltage Sensor for LVACR
The value for LV ACR is restored to its pre-fault value after the fault clears.
Fig. 1.5 MW IMV AR Flow from Sanghar to Kandari
Followed by clearing of fault, the trip of 132 kV circuit between Sanghar and Kandari
caused the load of that circuit to flow through the other intact 132 kV circuit between
the Sanghar and Kandari respectively. We plotted the flows of MW and MVAR on
the intact circuit and see that the power flows on this circuit attains to steady state
level with power swings damping down fast.
fig. 1.6 Rotor Angles
The rotor angles of the generators of Kotri GTPS 132kV, Thatta 132kV, Lakhra
I32kV, Jamshoro 220 kV and Hub 500kV have been plotted. The results show that
.:.t.~;,.,~ POWER PLANNERS INTERNATIONAL PAGE 24 OF 30
the rotor angles face very little swings which damp down quickly. The system is
strongly stable and very strong in damping the post fault oscillations.
7.2.2 Fault at 132 kV at Sanghar (Stuck Breaker Case)
We applied three-phase fault on the Sanghar 132 kV bus bar, cleared fault in 9 cycles
(180 ms) followed by trip of 132 kV circuit between the Sanghar and Kandari 132kV.
We monitored different quantities for one second pre-fault and nine seconds after
clearance of fault (post-fault) conditions and plotted the results attached in Appendix
- E and discussed as follows;
Fig. 2.1 Bus Voltages
The bus voltages of II kV bus bars of ZTE Solar-PP and Jamrau Head and 66kV bus
bars of Sanghar and Jamrau Head and 132 kV Bus Bars of Sanghar and Kandari are
plotted. The results show quick recovery of the voltages after clearing of fault.
Fig. 2.2 Frequency
We see the system frequency recovers back to normal quickly after fault clearance.
Fig. 2.3 MW IMV AR Output of Solar Power Plant
The pre-fault AC output of Solar Power Plant was 16 MW and it gets back to the
same output quickly after fast damping of the oscillations in its output. However
MVAR output acquires equilibrium at a new value.
Fig. 2.4 Voltage Sensor for LVACR
The value for LVACR is restored to its pre-fault value after the fault clears.
Fig. 2.5 MW IMV AR Flow from Sanghar to Kandari
Followed by clearing of fault, the trip of 132 kV circuit between Sanghar and Kandari
caused the load of that circuit to flow through the other intact 132 kV circuit between
the Sanghar and Kandari respectively. We plotted the flows of MW and MVAR on
the intact circuit and see that the power flows on this circuit attains to steady state
level with power swings damping down fast.
Fig. 2.6 Rotor Angles
The rotor angles of the generators of Kotri GTPS 132kV, Thatta 132kV, Lakhra
132kV, Jamshoro 220 kV and Hub 500kV have been plotted. The results show that
the rotor angles face very little swings which damp down quickly. The system is
strongly stable and very strong in damping the post fault oscillations.
(f;• •• •,.,~ POWER PLANNERS INTERNATIONAL PAGE 25 OF 30
7.2.3 Fault at 11 kV Near Solar Power PlantWe applied three-phase fault on the ZTE Solar Power Plant 11 kV bus bar, cleared
fault in 9 cycles (180 ms) followed by trip of 11 kV circuit between the ZTE Solar
Power Plant and Jamrau Head llkV. We monitored different quantities for one
second pre-fault and nine seconds after clearance of fault (post-fault) conditions and
plotted the results attached in Appendix - E and discussed as follows;
Fig. 3.1 Bus Voltages
The bus voltages of II kV bus bars of ZTE Solar-PP and Jamrau Head and 66kV bus
bars of Sanghar and Jamrau Head and 132 kV Bus Bars of Sanghar and Kandari are
plotted. The results show quick recovery of the voltages after clearing of fault.
Fig. 3.2 Frequency
We see the system frequency recovers back to normal quickly after fault clearance.
Fig. 3.3 MW IMV AR Output of Solar Power Plant
The pre-fault AC output of Solar Power Plant was 16 MW and it gets back to the
same output quickly after fast damping of the oscillations in its output. However
MV AR output acquires equilibrium at a new value.
Fig. 3.4 Voltage Sensor for LVACR
The value for LVACR is restored to its pre-fault value after the fault clears.
Fig. 3.5 MW IMVAR Flow from ZTE Solar to Jamrau Head IIkV
Followed by clearing of fault, the trip of II kV circuit between ZTE Solar and Jamrau
Head caused the load of that circuit to flow through the other two intact 11 kV circuits
between ZTE Solar and Jamrau Head respectively. We plotted the flows of MW and
MV AR on one of the intact circuit and see that the power flows on this circuit attains
to steady state level with power swings damping down fast.
Fig. 3.6 Rotor Angles
The rotor angles or the generators of Kotri GTPS 132kV, Thatta 132kV, Lakhra
132kV, Jamshoro 220 kV and Hub 500kV have been plotted. The results show that
the rotor angles face very little swings which damp down quickly. The system is
strongly stable and very strong in damping the post fault oscillations.
7.3 Scenario - II
7.3.1 .Fault at 132 kV at Sanghar
(f.j••• •I'I~ POWER PLANNERS INTERNATIONAL PAGE 26 OF 30
We applied three-phase fault on the Sanghar 132 kV bus bar, cleared fault in S cycles
(100 ms) followed by trip of 132 kV circuit between the Sanghar and Kandari 132kV.
We monitored different quantities for one second pre-fault and nine seconds after
clearance of fault (post-fault) conditions and plotted the results attached in Appendix
- E and discussed as follows;
Fig. 1.1 Bus Voltages
The bus voltages of 66kV bus bars of ZTE Solar, Sanghar and Jamrau Head and 132
kV Bus Bars of Sanghar, Shahpurc and Kandari arc plotted. The results show quick
recovery of the voltages after clearing of fault.
Fig. 1.2 Frequency
We see the system frequency recovers back to normal quickly after fault clearance.
Fig. 1.3 M W1M VAR Output of Solar Power Plant
The pre-fault AC output of Solar Power Plant was 16 MW and it gets back to the
same output quickly after fast damping of the oscillations in its output. However
MV AR output acquires equilibrium at a new value.
Fig. 1.4 Voltage Sensor for LVACR
The value for LVACR is restored to its pre-fault value after the fault clears.
Fig. I.S MW IMVAR Flow from Sanghar to Kandari
Followed by clearing of fault, the trip of 132 kV circuit between Sanghar and Kandari
caused the load of that circuit to flow through the other intact 132 kV circuit between
the Sanghar and Kandari respectively. We plotted the flows of MW and MVAR on
the intact circuit and see that the power flows on this circuit attains to steady state
level with power swings damping down fast.
Fig. 1.6 Rotor Angles
The rotor angles of the generators of Kotri GTPS 132kV, Thatta 132kV, Lakhra
132kV, Jamshoro 220 kV and Hub SOOkV have been plotted. The results show that
the rotor angles face very little swings which damp down quickly. The system is
strongly stable and very strong in damping the post fault oscillations.
7.3.2 Fault at 132 kV at Sanghar (Stuck Breaker Case)
We applied three-phase fault on the Sanghar 132 kV bus bar, cleared fault in 9 cycles
(180 ms) followed by trip of 132 kV circuit between the Sanghar and Kandari 132kV.
We monitored different quantities for one second pre-fault and nine seconds after
{fj• •- .,.,~ POWER PLANNERS INTERNATIONAL PAG[~ 27 OF 30
clearance of fault (post-fault) conditions and plotted the results attached in Appendix
- E and discussed as follows;
Fig. 2.1 Bus Voltages
The bus voltages of 66kV bus bars of ZTE Solar, Sanghar and Jamrau Head and 132
kV Bus Bars of Sanghar, Shahpure and Kandari are plotted. The results show quick
recovery of the voltages after clearing of fault.
Fig. 2.2 frequency
We sec the system frequency recovers back to normal quickly after fault clearance.
Fig. 2.3 MW/MVAR Output of Solar Power Plant
The pre-fault AC output of Solar Power Plant was 16 MW and it gets back to the
same output quickly after fast damping of the oscillations in its output. However
MV AR output acquires equilibrium at a new value.
Fig. 2.4 Voltage Sensor for LVACR
The value for LVACR is restored to its pre-fault value after the fault clears.
Fig. 2.S MW IMV AR Flow from Sanghar to Kandari
Followed by clearing of fault, the trip of 132 kV circuit between Sanghar and Kandari
caused the load of that circuit to flow through the other intact 132 kV circuit between
the Sanghar and Kandari respectively. We plotted the flows of MW and MVAR on
the intact circuit and see that the power flows on this circuit attains to steady state
level with power swings damping down fast.
Fig. 2.6 Rotor Angles
The rotor angles of the generators of Kotri GTPS 132kV, Thatta 132kV, Lakhra
132kV. Jamshoro 220 kV and Hub SOOkV have been plotted. The results show that
the rotor angles face very little swings which damp down quickly. The system is
strongly stable and very strong in damping the post fault oscillations.
7.3 Conclusion of Dynamic Stability Analysis
The results of dynamic stability show that the system is very strong and stable for
the proposed schemes for the severest possible faults of 11 kVand 132kV system near
ZTE Solar Power Plant. Therefore there is no problem of dynamic stability for
interconnection of this Solar Power Plant; it fulfils all the criteria of transient stability.
The reactive support from the inverter also helps the system stability.
(f.;••• •,.,~ POWER PLANNERS INTERNATIONAL P/\GE 28 OF 30
8. Conclusions.:. The nearest substation of HESCO is Jamrau Head 66/11 kY. The following
scheme of interconnection of Solar Power Plant by lTE Power to evacuate its
maximum AC power of 16 MW is envisaged and studied in detail:
• Scenario - I: Three direct 11 kY circuits each of 6 km length using Osprey
conductor to be laid from the switching station of lTE Solar-PP till Jarnrau
Head 66111 kY substation.
• In this context three 11 kY breaker/line bays need to be added in the 11 kY
switchgear hall of Jamrau Head 66/11 kY Substation
• Scenario - 11: The scheme of interconnection has been developed by
looping lTE Solar in-out of the single 66 kY circuit between Jamrau Head
and Sanghar and studied in detail to evacuate the maximum AC power of
16MW .
•:. Detailed load flow studies have been carried out for the peak load conditions of
June 2018 for the proposed scheme under normal and N-I contingency conditions
to meet the reliability criteria .
•:. Steady state analysis by load flow reveals that proposed scheme is adequate to
evacuate the maximum AC output power of 16 MW of the plant under normal and
contingency conditions with the proposed reinforcements .
•:. It is also revealed that the interconnection of ZTE solar power plant at Jamrau
Head has helped to boost the voltage and resolved the issue of voltage sag under
some outages in the network feeding into this area .
•:. The short circuit analysis has been carried out to calculate maximum fault levels
at the lTE Solar Power Plant at II kY, and the substations of 66111kY and 132/11
kY in its vicinity. We find that the fault currents for the proposed scheme are
much less than the rated short circuit capacities of switchgear installed at these
substations. There arc no violations of exceeding the rating of the equipment due
to contribution of fault current from the lTE Solar Power Plant.
The maximum short circuit level of 11 kY bus bar of lTE Solar Power Plant 11
kY for Scenario - 1 is 3.77 kA and 0.0005 kA for 3-phase and l-phase faults
respectively and for Scenario - II is 1.25 kA and 1.47 kA for 3-phase and l-phase
faults respectively. Therefore an industry standard switchgear of the short circuit
(f;• •• •,.,~ POWER PLANNERS INTERNATIONAL PAGE 29 OF 30
rating of 12.5 kA is considered adequate with enough margin for future increase in
fault levels due to future reinforcements in this area .
•:. The dynamic stability analysis of proposed scheme of interconnection has been
carried out. The stability check for the worst case of three phase fault right on the
11 kV bus bar of the ZTE solar power plant substation followed by the final trip of
11 kV circuits emanating from this substation, has been performed for fault
clearing of9 cycles (180 ms) as understood to be the maximum fault clearing time
of 11 kV protection system. The system is found strong enough to stay stable and
recovered with fast damping. The proposed scheme successfully passed the
dynamic stability checks for system disturbances .
•:. The proposed scheme of interconnection has no technical constraints or problems,
it fulfills all the criteria of reliability and stability under steady state load flow,
contingency load flows, short circuit currents and dynamic/transient conditions;
and is therefore recommended to be adopted.
(fj• •• •,.,~ POWER PLANNERS INTERNATIONAL PAGE 30 OF 30