Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Before Starting the Project Listings for the CoCPriority Listing
The FY 2019 CoC Consolidated Application requires TWO submissions.Both this Project Priority Listing AND the CoC Application MUST besubmitted prior to the CoC Program Competition deadline as required bythe FY 2019 CoC Program Competition NOFA.
The FY 2019 CoC Priority Listing includes the following:
- Reallocation forms – must be completed if the CoC is reallocating eligible renewal projects tocreate new projects as described in the FY 2019 CoC Program Competition NOFA. - New Project Listing – lists all new project applications created through reallocation, the CoCBonus, and DV Bonus that have been approved and ranked or rejected by the CoC. - Renewal Project Listing – lists all eligible renewal project applications that have been approvedand ranked or rejected by the CoC. - UFA Costs Project Listing – applicable and only visible for Collaborative Applicants that weredesignated as a Unified Funding Agency (UFA) during the FY 2019 CoC Program Registrationprocess. Only 1 UFA Costs project application is permitted and can only be submitted by theCollaborative Applicant. - CoC Planning Project Listing – Only 1 CoC planning project is permitted per CoC and can onlybe submitted by the Collaborative Applicant. - YHDP Project Listing – lists the eligible YHDP renewal project for the CoC that must beapproved and ranked or rejected by the CoC. - HUD-2991, Certification of Consistency with the Consolidated Plan – Collaborative Applicantsmust attach an accurately completed, signed, and dated HUD-2991. Things to Remember:
- All new, renewal, and YHDP projects must be approved and ranked or rejected on the ProjectListings. - Collaborative Applicants are responsible for ensuring all project applications are accuratelyappearing on the Project Listings and there are no project applications missing from one or moreProject Listings. - If a project application(s) is rejected by the CoC, the Collaborative Applicant must notify theproject applicant(s) no later than 15 days before the CoC Program Competition applicationdeadline outside of e-snaps and include the reason for rejection. - For each project application rejected by the CoC the Collaborative Applicant must select thereason for the rejection from the dropdown provided. - If the Collaborative Applicant needs to amend a project application for any reason after rankinghas been completed, the ranking of other projects will not be affected: however, theCollaborative Applicant MUST ensure the amended project is returned to the applicable ProjectListing AND re-rank the project application BEFORE submitting the CoC Priority Listing to HUDin e-snaps.
Additional training resources are available online on the CoC Training page of the HUDExchange at: https://www.hudexchange.info/resource/2916/project-priority-listing-coc-consolidated-application/
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 1 09/28/2019
1A. Continuum of Care (CoC) Identification
Instructions:For guidance on completing this form, please reference the FY 2019 CoC Priority ListingDetailed Instructions and FY 2019 CoC Priority Listing Navigational Guide on the HUDExchange at https://www.hudexchange.info/programs/e-snaps/. Submit technical question to the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/program-support/my-question/.
Collaborative Applicant Name: Georgia Department of Community Affairs
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 2 09/28/2019
2. Reallocation
Instructions:For guidance on completing this form, please reference the FY 2019 CoC Priority ListingDetailed Instructions and FY 2019 CoC Priority Listing Navigational Guide on the HUDExchange at https://www.hudexchange.info/programs/e-snaps/. Submit technical question to the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/program-support/my-question/.
2-1. Is the CoC reallocating funds from one ormore eligible renewal grant(s) that will expire
in calendar year 2020 into one or more newprojects?
Yes
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 3 09/28/2019
3. Reallocation - Grant(s) Eliminated
CoCs that are reallocating eligible renewal project funds to create a newproject application – as detailed in the FY 2019 CoC Program CompetitionNOFA – may do so by eliminating one or more expiring eligible renewalprojects. CoCs that are eliminating eligible renewal projects entirely mustidentify those projects on this form.
Amount Available for New Project:(Sum of All Eliminated Projects)
$761,778
Eliminated ProjectName
Grant NumberEliminated
Component Type AnnualRenewalAmount
Type of Reallocation
CaringWorks Housi... GA0280L4B011804 PH-RRH $240,540
Regular
GCADV Rapid Re-ho... GA0315L4B011803 PH-RRH $521,238
Regular
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 4 09/28/2019
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2019 CoC Priority ListingDetailed Instructions and FY 2019 CoC Priority Listing Navigational Guide on the HUDExchange at https://www.hudexchange.info/programs/e-snaps/. Submit technical question to the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/program-support/my-question/.
* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2019 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2019 Grant InventoryWorksheet to ensure all information entered on this form is accurate.
Eliminated Project Name: CaringWorks Housing Solutions BOSGrant Number of Eliminated Project: GA0280L4B011804Eliminated Project Component Type: PH-RRH
Eliminated Project Annual Renewal Amount: $240,540
3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)Applicant notified Collaborative Applicant staff that they would not be renewingthis project on 7/30/19. They submitted a letter, and the requested Notice ofIntent-Non-Renewal of Project form to DCA. The project applicant determinedthat they made the decision to focus their work on permanent supportivehousing and behavioral health services.
On 9/9/10, DCA sent formal acknowledgement of the Board's approval toeliminate this project and reallocate these funds to new projects.
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2019 CoC Priority ListingDetailed Instructions and FY 2019 CoC Priority Listing Navigational Guide on the HUDExchange at https://www.hudexchange.info/programs/e-snaps/. Submit technical question to the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/program-support/my-question/.
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 5 09/28/2019
* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2019 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2019 Grant InventoryWorksheet to ensure all information entered on this form is accurate.
Eliminated Project Name: GCADV Rapid Re-housing for Victims ofDomestic Violence
Grant Number of Eliminated Project: GA0315L4B011803Eliminated Project Component Type: PH-RRH
Eliminated Project Annual Renewal Amount: $521,238
3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)Applicant notified Collaborative Applicant staff that they would not be renewingthis project on 7/29/19. They submitted an email notice, and the requestedNotice of Intent-Non-Renewal of Project form to DCA. Assistance to homelessfamilies through this project was administered by sub-recipients. The projectapplicant determined that they did not want to reapply and would insteadsupport those sub-recipients making direct application as direct recipients underthe 2019 CoC Competition.
On 9/9/10, DCA sent formal acknowledgement of the Board's approval toeliminate this project and reallocate these funds to new projects.
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 6 09/28/2019
4. Reallocation - Grant(s) Reduced
CoCs that are reallocating eligible renewal project funds to create a newproject application – as detailed in the FY 2019 CoC Program CompetitionNOFA – may do so by reducing one or more expiring eligible renewalprojects. CoCs that are reducing eligible renewal projects entirely mustidentify those projects on this form.
Amount Available for New Project(Sum of All Reduced Projects)
$0
Reduced ProjectName
Reduced GrantNumber
AnnualRenewalAmount
AmountRetained
Amount availablefor new project
Reallocation Type
This list contains no items
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 7 09/28/2019
Continuum of Care (CoC) New Project Listing
Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review theCoC Priority Listing Detailed Instructions and CoC Priority Listing Navigational Guide, both ofwhich are available at: https://www.hudexchange.info/resource/2916/project-priority-listing-coc-consolidated-application/
To upload all new project applications that have been submitted to this CoC Project Listing,click on the ""Update List"" button. This process may take a few minutes based upon the numberof new projects submitted by project applicant(s) to your CoC in the e-snaps system. TheCollaborative Applicant may update each of the Project Listings simultaneously. TheCollaborative Applicant can wait for the Project Listings to be updated or can log out of e-snapsand come back later to view the updated list(s). To review a project on the New Project Listing,click on the magnifying glass next to each project to view project details. To view the actualproject application, click on the orange folder. If there are errors identified by the CollaborativeApplicant, the project can be amended back to the project applicant to make the necessarychanges by clicking on the amend icon. The Collaborative Applicant has the sole responsibilityfor ensuring all amended projects are resubmitted, approved and ranked or rejected on thisproject listing BEFORE submitting the CoC Priority Listing in e-snaps.
EX1_Project_List_Status_field
ProjectName
DateSubmitted
CompType
Applicant Name
BudgetAmount
GrantTerm
Rank PH/Realloc
PSH/RRH
Expansion
RapidRehousing f...
2019-08-1910:41:...
PH OpenArms,Inc.
$79,936 1 Year X Both RRH
RapidReHousing P...
2019-08-2014:00:...
PH SouthGeorgiaPar...
$164,465 1 Year X Reallocation
RRH
Ruth'sCottageRa...
2019-08-2618:07:...
PH TiftonJudicialC...
$141,015 1 Year X DVBonus
RRH
CowetaandTroup ...
2019-08-2713:26:...
PH Community Action...
$190,594 1 Year X PHBonus
RRH
STRIVERapidRe-H...
2019-09-1316:56:...
PH SafeHarborChild...
$134,668 1 Year 70 Reallocation
RRH
GMWCRapidRehous...
2019-09-1410:47:...
PH GeorgiaMountain...
$169,735 1 Year D74 DVBonus
RRH
F.A.I.T.H.'s Rapi...
2019-09-1810:00:...
PH FAITH INRABUNCO...
$170,067 1 Year D73 DVBonus
RRH
Volunteers ofAme...
2019-09-1816:10:...
PH Volunteers ofAme...
$427,110 1 Year 71 Reallocation
RRH
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 8 09/28/2019
BoS CoCCoordinat...
2019-09-2409:22:...
SSO GeorgiaHousing&...
$200,000 1 Year 37 Reallocation
Pathwayof HopeR...
2019-09-2514:32:...
PH TheSalvationArm...
$644,910 2 Years 72 PHBonus
RRH
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 9 09/28/2019
Continuum of Care (CoC) Renewal Project Listing
Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the"CoC Priority Listing Detailed Instructions" and the "CoC Project Listing Instructional Guide",both of which are available at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources.
To upload all renewal project applications that have been submitted to this Renewal ProjectListing, click on the "Update List" button. This process may take a few minutes based upon thenumber of renewal projects that need to be located in the e-snaps system. The CollaborativeApplicant may update each of the Project Listings simultaneously. The Collaborative Applicantcan wait for the Project Listings to be updated or can log out of e-snaps and come back later toview the updated list(s). To review a project on the Renewal Project Listing, click on themagnifying glass next to each project to view project details. To view the actual projectapplication, click on the orange folder. If there are errors identified by the CollaborativeApplicant, the project can be amended back to the project applicant to make the necessarychanges by clicking on the amend icon. The Collaborative Applicant has the sole responsibilityfor ensuring all amended projects are resubmitted and appear on this project listing BEFOREsubmitting the CoC Priority Listing in e-snaps.
The Collaborative Applicant certifies thatthere is a demonstrated
need for all renewal permanent supportivehousing and rapid
re-housing projects listed on the RenewalProject Listing.
X
The Collaborative Applicant does not haveany renewal permanent
supportive housing or rapid re-housingrenewal projects.
EX1_Project_List_Status_field
ProjectName
DateSubmitted
GrantTerm
Applicant Name
BudgetAmount
Rank PSH/RRH
CompType
ConsolidationType
ExpansionType
DouglasCountySHP
2019-08-1616:33:...
1 Year DouglasCountyCo...
$99,599 54 PSH PH
PCCIRapidRe-Hou...
2019-07-3112:03:...
1 Year ProjectCommunity...
$536,778 59 RRH PH
PCCIRapidRe-hou...
2019-07-3111:52:...
1 Year ProjectCommunity...
$231,406 52 RRH PH
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 10 09/28/2019
ConsolidatedBala...
2019-08-2309:47:...
1 Year ActionMinistries...
$661,402 64 RRH PH
MUSTMinistries B...
2019-08-2419:16:...
1 Year MUSTMinistries
$112,776 67 RRH PH
Cherokee CountyP...
2019-08-2420:01:...
1 Year MUSTMinistries
$71,904 8 PSH PH
BrunswickHomeles...
2019-08-2711:46:...
1 Year GatewayBehaviora...
$386,985 20 PSH PH
HomelessPreventi...
2019-08-2214:59:...
1 Year City ofHinesville
$110,528 48 RRH PH
PADVGwinnettHou...
2019-08-2612:22:...
1 Year PartnershipAgain...
$559,808 68 RRH PH
HUDRuralRapidR...
2019-08-2316:00:...
1 Year NewHorizonsComm...
$100,467 63 RRH PH
Red HillAdaptive...
2019-08-2316:02:...
1 Year NewHorizonsComm...
$54,223 26 PSH PH
S.H.A.R.E. House...
2019-08-2613:17:...
1 Year S.H.A.R.E.House,...
$155,189 57 RRH PH
GwinnettPSH2019
2019-08-2217:15:...
1 Year TravelersAid of ...
$179,343 55 PSH PH
HUDRapidRehousi...
2019-08-2716:19:...
1 Year Macon-BibbEconom...
$258,614 56 RRH PH
RRHYouthProject
2019-08-2816:17:...
1 Year Advocates forBar...
$325,704 69 RRH PH
RenewalProjectA...
2019-08-2918:17:...
1 Year LowndesAssociate...
$149,138 66 RRH PH
CaringWorksBoS ...
2019-09-1107:08:...
1 Year GeorgiaHousing&...
$630,109 35 PSH PH
ACAPSH forClayt...
2019-09-1211:46:...
1 Year AnotherChanceof...
$131,132 41 PSH PH
AARCRapidRe-Hou...
2019-09-1313:05:...
1 Year AsianAmerican Re...
$169,034 65 RRH PH
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 11 09/28/2019
GHFAStatewide HM...
2019-09-1314:46:...
1 Year GeorgiaHousing&...
$663,400 32 HMIS
AVITAS+CR_C
2019-09-1607:18:...
1 Year GeorgiaHousing&...
$258,334 22 PSH PH
DaltonWhitfield...
2019-09-1607:03:...
1 Year GeorgiaHousing&...
$299,129 C9 PSH PH FullyConsolidated
ComprehensiveAID...
2019-09-1608:18:...
1 Year GeorgiaHousing&...
$77,741 36 PSH PH
CarrolltonHousin...
2019-09-1607:14:...
1 Year GeorgiaHousing&...
$392,323 42 PSH PH
DaltonWhitfield...
2019-09-1607:20:...
1 Year GeorgiaHousing&...
$96,831 9 PSH PH Individual
AIDSAthensPSHP
2019-09-1410:58:...
1 Year AIDSAthens
$69,888 43 PSH PH
HighlandRIversC...
2019-09-1607:05:...
1 Year GeorgiaHousing&...
$239,849 C23 PSH PH FullyConsolidated
McIntoshTrailCS...
2019-09-1612:00:...
1 Year GeorgiaHousing&...
$279,753 46 PSH PH
GatewayBHSS+CR
2019-09-1612:03:...
1 Year GeorgiaHousing&...
$616,941 16 PSH PH
UnisonBHSS+CR
2019-09-1611:57:...
1 Year GeorgiaHousing&...
$389,177 1 PSH PH
ActionMinistries...
2019-09-1611:53:...
1 Year GeorgiaHousing&...
$167,460 3 PSH PH
CSB ofMiddleGeo...
2019-09-1612:05:...
1 Year GeorgiaHousing&...
$38,251 39 PSH PH
NewHorizonsCSB ...
2019-09-1614:00:...
1 Year GeorgiaHousing&...
$229,345 19 PSH PH
NewHorizonsCSB ...
2019-09-1614:01:...
1 Year GeorgiaHousing&...
$75,004 15 PSH PH
OconeeCSBS+CR
2019-09-1613:59:...
1 Year GeorgiaHousing&...
$88,842 53 PSH PH
AlbanyAreaCSBS+CR
2019-09-1613:48:...
1 Year GeorgiaHousing&...
$148,880 21 PSH PH Individual
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 12 09/28/2019
MiddleFlintBHS ...
2019-09-1614:04:...
1 Year GeorgiaHousing&...
$173,024 60 PSH PH
AlbanyCSBS+CR_C
2019-09-1613:54:...
1 Year GeorgiaHousing&...
$352,161 C21 PSH PH FullyConsolidated
AlbanyCSBS+CR2
2019-09-1613:53:...
1 Year GeorgiaHousing&...
$203,281 50 PSH PH Individual
MUSTMinistries B...
2019-09-1614:07:...
1 Year GeorgiaHousing&...
$243,808 5 PSH PH
RiverEdgeCSBS+...
2019-09-1613:56:...
1 Year GeorgiaHousing&...
$984,515 45 PSH PH
McIntoshTrailCS...
2019-09-1614:09:...
1 Year GeorgiaHousing&...
$358,980 38 PSH PH
RiverEdgeCSBS+...
2019-09-1614:10:...
1 Year GeorgiaHousing&...
$781,247 30 PSH PH
SouthGA CSBS+CR2
2019-09-1614:14:...
1 Year GeorgiaHousing&...
$157,702 2 PSH PH
McIntoshTrailCS...
2019-09-1614:08:...
1 Year GeorgiaHousing&...
$183,436 11 PSH PH
SouthGA CSBS+CR
2019-09-1614:15:...
1 Year GeorgiaHousing&...
$382,151 17 PSH PH
OconeeCSBS+CR2
2019-09-1613:58:...
1 Year GeorgiaHousing&...
$192,354 49 PSH PH
PinelandCSBS+CR
2019-09-1613:57:...
1 Year GeorgiaHousing&...
$172,049 18 PSH PH
RapidRe-Housing...
2019-09-1620:43:...
1 Year CitizensAgainst...
$272,206 61 RRH PH
PH SPCCaseManager
2019-09-1710:15:...
1 Year Dalton-Whitfield...
$31,679 7 PSH PH
ACAPSH forGwinn...
2019-09-1711:14:...
1 Year AnotherChanceof...
$178,771 25 PSH PH
DouglasRRH2019
2019-09-1716:29:...
1 Year TravelersAid of ...
$122,252 62 RRH PH
GwinnettRRH2019
2019-09-1716:30:...
1 Year TravelersAid of ...
$546,976 58 RRH PH
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 13 09/28/2019
Viewpoint Health...
2019-09-1809:22:...
1 Year GeorgiaHousing&...
$508,626 4 PSH PH
GeorgiaMountain...
2019-09-1809:09:...
1 Year GeorgiaHousing&...
$134,662 12 PSH PH
AVITACommunity P...
2019-09-1809:06:...
1 Year GeorgiaHousing&...
$142,775 6 PSH PH
ViewpointS+CR_C
2019-09-1809:22:...
1 Year GeorgiaHousing&...
$528,280 13 PSH PH
TravelersAid of ...
2019-09-1809:20:...
1 Year GeorgiaHousing&...
$398,940 C14 PSH PH FullyConsolidated
DouglasCSBS+CR4
2019-09-1809:09:...
1 Year GeorgiaHousing&...
$308,746 29 PSH PH
Advantage BHSS+C...
2019-09-1808:50:...
1 Year GeorgiaHousing&...
$151,128 27 PSH PH
DouglasCSBS+CR2
2019-09-1809:08:...
1 Year GeorgiaHousing&...
$665,956 44 PSH PH
Advantage BHSBOS...
2019-09-1808:50:...
1 Year GeorgiaHousing&...
$315,874 31 PSH PH
DaltonWhitfield...
2019-09-1809:00:...
1 Year GeorgiaHousing&...
$107,979 40 PSH PH Individual
DaltonWhitfield...
2019-09-1809:04:...
1 Year GeorgiaHousing&...
$94,319 10 PSH PH Individual
TravelersAid of ...
2019-09-1809:21:...
1 Year GeorgiaHousing&...
$196,668 14 PSH PH Individual
TravelersAid of ...
2019-09-1809:24:...
1 Year GeorgiaHousing&...
$202,272 51 PSH PH Individual
HighlandRiversC...
2019-09-1809:12:...
1 Year GeorgiaHousing&...
$116,046 47 PSH PH Individual
HighlandRiversC...
2019-09-1809:10:...
1 Year GeorgiaHousing&...
$123,803 23 PSH PH Individual
HighlandRiversS...
2019-09-1809:15:...
1 Year GeorgiaHousing&...
$252,143 28 PSH PH
LookoutMountain...
2019-09-1809:15:...
1 Year GeorgiaHousing&...
$248,740 24 PSH PH
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 14 09/28/2019
Balanceof State...
2019-09-2409:19:...
1 Year GeorgiaHousing&...
$100,003 34 HMIS
BoS CoCCoordinat...
2019-09-2409:20:...
1 Year GeorgiaHousing&...
$189,176 33 SSO
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 15 09/28/2019
Continuum of Care (CoC) Planning Project Listing
Instructions:Prior to starting the CoC Planning Project Listing, Collaborative Applicants should carefullyreview the "CoC Priority Listing Detailed Instructions" and the "CoC Project Listing InstructionalGuide," both of which are available at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources.
To upload the CoC planning project application that has been submitted to this CoC PlanningProject Listing, click on the "Update List" button. This process may take a few minutes as theproject will need to be located in the e-snaps system. The Collaborative Applicant may updateeach of the Project Listings simultaneously. The Collaborative Applicant can wait for the ProjectListings to be updated or can log out of e-snaps and come back later to view the updated list(s).To review the CoC Planning Project Listing, click on the magnifying glass next to view the projectdetails. To view the actual project application, click on the orange folder. If there are errorsidentified by the Collaborative Applicant, the project can be amended back to the projectapplicant to make the necessary changes by clicking on the amend icon.
Only one CoC Planning project application can be submitted by a Collaborative Applicant andmust match the Collaborative Applicant information on the CoC Applicant Profile. Any additionalCoC Planning project applications must be rejected.
EX1_Project_List_Status_field List Updated SuccessfullyProject Name Date Submitted Grant Term Applicant Name Budget Amount Comp Type2019 Continuumof...
2019-09-2023:42:...
1 Year Pamela Turner $75,000 CoC PlanningProj...
GA-501 CoCPlanni...
2019-09-2409:24:...
1 Year GeorgiaDepartmen...
$598,625 CoC PlanningProj...
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 16 09/28/2019
Continuum of Care (CoC) YHDP Renewal ProjectListing
Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review theCoC Priority Listing Detailed Instructions and CoC Priority Listing Navigational Guide, both ofwhich are available at: https://www.hudexchange.info/resource/2916/project-priority-listing-coc-consolidated-application/
To upload all new project applications that have been submitted to this CoC Project Listing,click on the ""Update List"" button. This process may take a few minutes based upon the numberof new projects submitted by project applicant(s) to your CoC in the e-snaps system. TheCollaborative Applicant may update each of the Project Listings simultaneously. TheCollaborative Applicant can wait for the Project Listings to be updated or can log out of e-snapsand come back later to view the updated list(s). To review a project on the New Project Listing,click on the magnifying glass next to each project to view project details. To view the actualproject application, click on the orange folder. If there are errors identified by the CollaborativeApplicant, the project can be amended back to the project applicant to make the necessarychanges by clicking on the amend icon. The Collaborative Applicant has the sole responsibilityfor ensuring all amended projects are resubmitted, approved and ranked or rejected on thisproject listing BEFORE submitting the CoC Priority Listing in e-snaps.
ProjectName
DateSubmitted
ApplicantName
BudgetAmount
CompType
GrantTerm
Rank PSH/RRH Consolidation Type
This list contains no items
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 17 09/28/2019
Funding Summary
InstructionsFor additional information, carefully review the "CoC Priority Listing Detailed Instructions" andthe "CoC Priority Listing Instructional Guide", both of which are available at:https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources.
This page contains the total budget summaries for each of the project listings for which theCollaborative Applicant approved and ranked or rejected project applications. The CollaborativeApplicant must review this page to ensure the totals for each of the categories is accurate. The"Total CoC Request" indicates the total funding request amount the Collaborative Applicant willsubmit to HUD for funding consideration. As stated previously, only 1 UFA Cost projectapplication (for UFA designated Collaborative Applicants only) and only 1 CoC Planning projectapplication can be submitted and only the Collaborative Applicant designated by the CoC iseligible to request these funds.
Title Total Amount
Renewal Amount $17,887,936
Consolidated Amount $1,290,079
New Amount $1,746,490
CoC Planning Amount $598,625
YHDP Renewal Amount $0
Rejected Amount $651,010
TOTAL CoC REQUEST $20,233,051
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 18 09/28/2019
Attachments
Document Type Required? Document Description Date AttachedCertification of Consistency withthe Consolidated Plan
Yes GA-501 Certificat... 09/26/2019
FY 2017 Rank (from ProjectListing)
No
Other NoOther No
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 19 09/28/2019
Attachment Details
Document Description: GA-501 Certification of Consistency with theConsolidated Plan
Attachment Details
Document Description:
Attachment Details
Document Description:
Attachment Details
Document Description:
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 20 09/28/2019
Submission Summary
WARNING: The FY2017 CoC Consolidated Application requires 2submissions. Both this Project Priority Listing AND the CoC Consolidated
Application MUST be submitted.
WARNING: The FY2017 CoC Consolidated Application requires 2submissions. Both this Project Priority Listing AND the CoC Consolidated
Application MUST be submitted.
Page Last Updated
Before Starting No Input Required
1A. Identification 09/25/2019
2. Reallocation 09/25/2019
3. Grant(s) Eliminated 09/25/2019
4. Grant(s) Reduced No Input Required
5A. CoC New Project Listing 09/26/2019
5B. CoC Renewal Project Listing 09/26/2019
5D. CoC Planning Project Listing 09/25/2019
5E. YHDP Renewal Project Listing No Input Required
Funding Summary No Input Required
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 21 09/28/2019
Attachments 09/26/2019
Submission Summary No Input Required
Applicant: Georgia Balance of State CoC GA07-501Project: GA-501 CoC Registration FY2019 COC_REG_2019_170541
Project Priority List FY2019 Page 22 09/28/2019