Beech Road Safety Working Group Interim Report - June 2020 Executive summary This interim report on the work of Beech Road Safety Working Group has been prepared at the request of Beech Parish Council. Speeding traffic remains a major concern for most villagers. Volunteers formed BRSWG following a meeting in January 2020. Having adopted terms of reference based on a schedule of work developed by BPC, the team has diligently researched options for feasible solutions to the issue of speeding traffic. The working group divided its efforts into four workstreams in order to focus activity and make progress across all areas of inquiry. Reference to the workstreams is made throughout the report. They are: 1: Pathways 2: Speed management 3: Campaigning and lobbying 4: Funding. The working group adopted a two-fold strategy, one designed to move pedestrians off the road; the second designed to reduce traffic speeds. Three options were considered for moving pedestrians onto footpaths; four options were considered regarding reducing traffic speeds. It was recognized at the outset that failure to enforce the speed limit arose from lack of police resources which appear to be particularly acute in the Alton and Rural sector. Furthermore, officers from Hampshire County Council frequently cite police resistance as a reason for not considering traffic calming schemes that have demonstrably saved lives elsewhere in the country. Police resistance to speed limit reductions arises again from lack of resources. In order to break the vicious circle of blame laying, the working group decided that it should support a campaign targeting Hampshire Constabulary and the Police and Crime Commissioner calling for fairer allocation of resources locally. Paradoxically, with money now available for police recruitment, the number of local officers has actually declined. The campaign is ongoing and has received front page coverage in the Alton Herald after a letter was sent to the Chief Constable with support from the chairs of eighteen towns and parishes, along with six district councilors, all based in Alton. In response the Chief Constable has promised that concerns raised in the letter will be reviewed by the Assistant Chief Constable and encourages engagement with the district police commander. Our voice is being listened to and the working group intends to follow up these opportunities. Funding is a key consideration but it is proving difficult to identify available funds during the current health crisis. Worse, given the impact of Covid-19 on the economy it is likely that finding funds externally will not become easier in the coming months. We are focusing on what is feasible. The report makes a number of recommendations. A summary of these is included at page 15. The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent upon council officers returning to their offices where key information is stored. The team’s membership commands a wide range of skills relevant to the delivery of this project. They remain willing to carry out the role for which Beech Parish Council asked that they volunteer. Sir Charles Cockburn Bt. Chair, Beech Road Safety Working Group 21 June 2022

Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

BeechRoadSafetyWorkingGroupInterimReport-June2020

ExecutivesummaryThisinterimreportontheworkofBeechRoadSafetyWorkingGrouphasbeenpreparedattherequestofBeechParishCouncil.Speedingtrafficremainsamajorconcernformostvillagers.VolunteersformedBRSWGfollowingameetinginJanuary2020.HavingadoptedtermsofreferencebasedonascheduleofworkdevelopedbyBPC,theteamhasdiligentlyresearchedoptionsforfeasiblesolutionstotheissueofspeedingtraffic.

Theworkinggroupdivideditseffortsintofourworkstreamsinordertofocusactivityandmakeprogressacrossallareasofinquiry.Referencetotheworkstreamsismadethroughoutthereport.Theyare:1:Pathways2:Speedmanagement3:Campaigningandlobbying4:Funding.

Theworkinggroupadoptedatwo-foldstrategy,onedesignedtomovepedestriansofftheroad;theseconddesignedtoreducetrafficspeeds.Threeoptionswereconsideredformovingpedestriansontofootpaths;fouroptionswereconsideredregardingreducingtrafficspeeds.

ItwasrecognizedattheoutsetthatfailuretoenforcethespeedlimitarosefromlackofpoliceresourceswhichappeartobeparticularlyacuteintheAltonandRuralsector.Furthermore,officersfromHampshireCountyCouncilfrequentlycitepoliceresistanceasareasonfornotconsideringtrafficcalmingschemesthathavedemonstrablysavedliveselsewhereinthecountry.

Policeresistancetospeedlimitreductionsarisesagainfromlackofresources.Inordertobreaktheviciouscircleofblamelaying,theworkinggroupdecidedthatitshouldsupportacampaigntargetingHampshireConstabularyandthePoliceandCrimeCommissionercallingforfairerallocationofresourceslocally.Paradoxically,withmoneynowavailableforpolicerecruitment,thenumberoflocalofficershasactuallydeclined.ThecampaignisongoingandhasreceivedfrontpagecoverageintheAltonHeraldafteraletterwassenttotheChiefConstablewithsupportfromthechairsofeighteentownsandparishes,alongwithsixdistrictcouncilors,allbasedinAlton.

InresponsetheChiefConstablehaspromisedthatconcernsraisedintheletterwillbereviewedbytheAssistantChiefConstableandencouragesengagementwiththedistrictpolicecommander.Ourvoiceisbeinglistenedtoandtheworkinggroupintendstofollowuptheseopportunities.

Fundingisakeyconsiderationbutitisprovingdifficulttoidentifyavailablefundsduringthecurrenthealthcrisis.Worse,giventheimpactofCovid-19ontheeconomyitislikelythatfindingfundsexternallywillnotbecomeeasierinthecomingmonths.Wearefocusingonwhatisfeasible.

Thereportmakesanumberofrecommendations.Asummaryoftheseisincludedatpage15.

TheworkinggroupaimstodeliverafinalreportinAutumn2020thoughhittingthistargetwillbelargelydependentuponcouncilofficersreturningtotheirofficeswherekeyinformationisstored.

Theteam’smembershipcommandsawiderangeofskillsrelevanttothedeliveryofthisproject.TheyremainwillingtocarryouttheroleforwhichBeechParishCouncilaskedthattheyvolunteer.SirCharlesCockburnBt.Chair,BeechRoadSafetyWorkingGroup21June2022

Page 2: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

2

1. Background1.1Sinceitsinceptionin1999,BeechParishCouncil(BPC)hasbeenawarethatthespeedoftrafficthroughBeechrepresentsvillagers’greatestcommunity-relatedconcern.MedsteadRoadisnarrowandwindingwithoccasionalhighbanks.Itoftenlackssufficientroadwidthtoaccommodatetwovehiclesandapedestrian.ThesamedescriptionappliestoKingsHill

1.2Apartfromawell-maintainedshortsectionoffootpathattheeasternendofMedsteadRoad,leadingtotheA339junction,therearenofootpaths.Thefootpathistheroadandpedestrians,cyclistsandequestriansallfeelveryvulnerableduetospeedingtraffic.

1.3BPChasmadetwopreviousconcertedeffortstoaddressthisproblem.Bothresultedinactionbeingtaken(eg,whitelinesbeingpaintedontheroadmarginstogivemotoriststheappearanceofanarrowerroad,inhopeofreducingspeeds;morerecently,whitelineswerepaintedonthecarriagewaytocreatesectionsofvirtualfootpath:onealongsideBushyLeazeWood;theotheronKingsHill;bothontheSouthsideofthecarriageway.

1.4Concernamongvulnerableroadusershasnotdiminished.Villagerscontinuetodrive150metrestotheVillageHallratherthantaketheriskofwalkingalongMedsteadRoad.

1.5SpeedsthroughthevillagehavebeensubjecttomeasurementusingaSIDcameraandthedataanalysed.Speedshavenotdiminished,thoughtheyarebelowthenationalaverage.

1.6Beechisanactivecommunitywithawell-establishedNeighbourhoodWatch(NHW).Asspeedingvehiclesremainedanissue,aCommunitySpeedWatch(SW)wasestablishedin2016andrunbyvolunteersovertwoyears.SWisabouteducation,ratherthanenforcement.

1.7Thevolunteersunanimouslydecidedtoceaseactivitiesaftertwoyearswhendatashowedthepercentageofdriversspeedingthroughthevillageatover35mph,thelowestfigureSWwasallowedtorecordandreport,remainedunchangedat35%.

1.8TheSWvolunteersconcludedthattheireducationaleffortswerehavingzeroeffect.Theyadvisedtheywouldonlyrecommencetheiractivitieswhensomethingsubstantialchanged,ideallyregardingenforcementorconstructionofphysicaltraffic-calminginfrastructure.

1.9InJune2019aproposalwasputtoBPCtoallocateexpenditureof£12.5ktotheconsultancyarmofHampshireHighwaystoproduceastudyonroadsandfootpaths.Itsaimwouldbetoidentify,considerandcostpotentialsolutionstothespeedingissuewhileseekingoptionstomovepedestriansofftheroad.BPCrejectedthatproposal.

1.10InJanuary2020BPCheldawell-attendedpublicmeetingatBeechVillageHallwiththeaimoffindingvillagerswillingtotakeontheworkofproducingthestudy.Dissentingvoicessuggestednoprogresscouldbemadeunlessmoneycouldbefoundtopayforanysolutions;othersbelievedthatfindingfeasiblesolutionswhichcouldcommandthesupportofvillagerswouldhelpdrivetheprocessoffundraisingforanagreedsolution.

1.11VolunteersagreedtoformaWorkingGroup(WG)todevelopanddeliverthestudy.2. BRSWG-termsofreference;aims,objectives;membership;reporting2.1InFebruary2020,thefirstmeetingofBeechRoadSafetyWorkingGroup(BRSWG)washeld.AChairandSecretarywereappointed.NoTreasurerwasappointed,asnofundswouldbeheld.BPCinstructedthatnomoneycouldbespentwithoutprioragreement.

Page 3: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

3

2.2ItwasagreedthattheScheduleofWork(SoW)proposedintheslidesshownattheBVHpresentationwouldprovidetheWG’stermsofreference.TheSoWincluded:

a)EstablishownershipoflandborderingthefulllengthofMedsteadRoadandKingsHill.Wheresuchlandisn’tcontrolledbyHampshireCountyCouncil(HCC),establishwiththeownerswhethertheirlandmaybeincludedinanyfootwayscheme.

b)Deviseanidealroadsafetyscheme(trafficcalmingmeasuresand/orroadsidefootways),oroneormoreoptions,forthefulllengthofMedsteadRoadandKingsHill.

c)Considerwhetheranyfootwaysshouldincludeprovisionforotherusers(e.g.cyclists),andsosetanoutlinespecificationforfootways.

d)Establishwhetheranyexistingornewoff-roadfootpathscanplayapartinthescheme.

e)Considerwhatphysicaltrafficcalmingelementsarerequired.

f)Obtainoutlinecostingforallschemeelements.

g)Narrowdownandrefinefeasibleoptions,includingcheckingacceptabilitywithHCC.

h)Determinethedefinitivescheme,probablytobedeliveredinphasesovertime.

i)Establishavailablesourcesoffunding.

j)Establishacombinedfundinganddeliveryprojectplan.

2.3Aim-ourprimeaimwouldbetoproduceareportforBeechParishCouncilsettingoutfeasibleoptionsfordealingwiththeissuesofvulnerableroaduserssharingtheroadswithspeedingtraffic,supportedwithcostedrecommendationsforaction.

2.4Objectives-tofullyinvestigateeachoftheissuesraisedinourtermsofreferenceandtomakerecommendationsuponthebasisoffeasibility,includingcost.

2.5Nextsteps-theWG’sreportwouldbeconsideredbyBPC.Recommendationswouldthenbeputtoavillagereferenduminaformalconsultationprocess.

2.6Deliverydate-thereportandvillageconsultationprocesstobecompletedbyJuly2021,meaningthatourreportshouldbedeliveredduringAutumn2020.(Delayref)

2.7Strategy-WG’sstrategywastwo-fold:first,wewouldseekoptionsforgettingpedestriansofftheroads,particularlyinthevillagecentreandonKingsHill;second,wewouldseekoptionstoreducetrafficspeedsinthevillage.

2.8Membership-fourmembersattendedthefirstmeetingandinsubsequentweeksfivefurthermembersjoinedtheWG.Threemembershavesinceresigned:twoowingtoworkpressures;thethirdfollowingdisagreementoverthedesignofroadsafetyposters.

2.9Experience-members’expertiseandexperienceincludesprojectmanagement;dataanalysis;highwaysdesign;campaigningandlobbying;speedawarenesscoursedesign;SpeedWatch.

2.10Workstreams-fourdistinctworkstreamswereestablishedenablingindividualteammemberstofocusondevelopinganswerstoquestionsraisedinourtermsofreference,thusdividingtheworkloadandensuringprogresswouldbemadeacrossalltheissues.Theyare:1:Pathways2:Speedmanagement3:Campaigningandlobbying4:Funding.

2.11Reporting-updatereportsontheWG’sactivitiestoBPCmeetingshavebeendeliveredonamonthlybasisinpersonbytheChair.

Page 4: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

4

2.12Meetings-theWGhasheldface-to-facemeetingsinFebruaryandMarchandon-linemeetingsinAprilandMay(twomeetings).Ournextmeetingisplannedon29June2020.

2.13Minutes-formalminuteshavebeentakenandsubmittedtotheParishClerkandChairofBPC,alongwithsupportingdocuments.

2.14Declarationofinterest-BRSWGreportstoBPC.Allinterestsaredeclared.3. Worksteam1:Footpaths3.1.1TheWGacceptedBPC’sviewthatitwouldbeadvisabletomovepedestriansofftheroadwhereverpossible,soavoidingtheneedtosharethecarriagewaywithmotorvehicles.

3.1.2Thusfar,wehavelookedatthreepossiblesolutions,oneofwhichcouldgetearlyapprovalbutwouldrequiremoremoneythanisavailableatthispointtotheParishCouncil.Forsimplicity,wethinkofthemas1)KingsHilltoVillageCentrepath;2)the1970sroadwideningandfootpathscheme;3)theSouthPerrottoption.

3.1.3Option1:KingsHilltoVillageCentreTheWG’sfirstprioritywastoestablishwhetherafootpathcouldbecreatedwhichwouldbringresidentsfromKingsHilltothevillagecentreandVillageHallwhileavoidingwalkingalongMedsteadRoad.(SeeSoWcanddat2.2above)

3.1.4SucharoutewouldinvolvetravellingfromKingsHillthroughBushyLeazeWood(BLW)tothemainentranceonMedsteadRoad.Withgoodsightlinesatthatpoint,itispossibletocrossMedsteadRoadandwalkuptheWellhouseRoadloop(formerlyknownasGrangeRoad)andtheninrelativesafetyalongWellhouseRoad(ideallyenhancedbytwovirtualfootpathwhitelines)tothepedestrianentranceofBeechVillageHallandGreen.

3.1.5InquirieswithSeongGi,owneroftheprivatelyownedwoodlandbordering1KingsHill,MedsteadRoadandthewoodlandownedbyForestryEngland,revealedthathewaswillinginprincipletoallowapathwaytobeconstructedacrosshisland.

3.1.6Thispathwouldcommencenearthedrivewayto1KingsHill,runningthroughthewoods,alongalineroughlyparalleltoMedsteadRoad,tothemainentrancetoBLWontheSouthsideofMedsteadRoad.ThepathwouldenablepedestrianstoavoidafairlynarrowsectionofMedsteadRoadandwouldlinktoexistingvirtualfootpathsatbothends.

3.1.7TheWGisawareofanestimatefromPoulsomforconstructinga1,300metrelong,1.3-1.5metrewidepaththroughSeongGi’swoodstotaling£53,750+VAT.ThisestimateisalludedtoinanemailbuttheWGhasnotseentheoriginal.(SeeAppendixA:estimate)3.1.8IssuesrelatedtopursuingOption1

a)Thoughwehavebeeninformallyassuredofhiscommitment,WGisnotawareofanywrittencommitmentbySeongGiorhislegaladviserstoallowaccesstohisland.

b)SeongGi’slanddoesnotquiteextendtotheMainEntrancetoBLW,fallingsome50metresshort.ItmightbepossibletobridgethatgapusinglandadjacenttotheroadownedbyHampshireHighways(HH)butpermissioncannotbeassumed.

c)Thequalityoftheun-metaledsurfaceof‘GrangeRoad’whichis‘adopted’but‘notmaintained’isverypoorinplacesandoftendeterioratesfollowingheavyrain.ThiscouldfurtherdeterthosepedestriansalreadyputoffbytheclimbtoWellhouseRoad.

Page 5: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

5

d)ThereisnofootpathonWellhouseRoadandthespeedoflocaltrafficalongithasalreadycausedconcernamongvillagers.SightlinesaremostlybetterthanthoseinMedsteadRoad,particularlyasthelatternearsthevillagecentreEastofthebridlewaycrossingnearNo.95.

e)Thoughsignshavebeenplacedatthetopof‘GrangeRoad’todissuadedriversfromfollowingsatnav,deliverydriversstillsometimesuseitasathroughroad.Thereisnospaceforbothpedestrianandvan,andinplacesnowhereforapedestriantogoifsoconfronted.

f)Conversely,animprovedsurfacedesignedtoassistpedestriansmightbringwithitunwantedencouragementtodriverstouse‘GrangeRoad’asathoroughfare.

g)Thepreciselinefortheproposedpathhasyettobeestablished.Poulsom’sestimatewasprovidedfollowingasitevisiton11March2020.ItisdependentuponaccesstoSeongGi’slandbeinggainedviatheBLWmainentrance,whichbelongstoForestryEngland.Permissiontousethisentrancecannotbeassumedandmaynotbeforthcoming.

h)TheWGarrangedtoview‘GrangeRoad’withHHofficers;thiswascancelledduetoCovid-19.

3.1.9Recommendation-TheWGbelievesthatOption1shouldbepursuedfurtherasitcouldhelpdeliverSoWb,c,d,fandg(see2.2above).However,itwouldinvolvefundraising.

3.1.10Option1a:FootpaththroughBushyLeazeWoodTheKingsHillpathcouldbeextendedfurtherEastrunningpastthemainentrancetoBushyLeazeWoodparallelwithMedsteadRoadtothepointwherethebridlewaycrossesfromBLWtowardsBeechRecreationGround.

3.1.11TheWGhasmadecontactwithForestryEnglandtoestablishwhetherpermissionwouldbegrantedtoputapathacrossitsland,linkingtheentranceofthebridlewayadjacentto95MedsteadRoadtothemainentrancetoBLW.Permissionwasrefused.

3.1.12ForestryEnglandhasrecentlyundergoneamajorre-structuring,addedtowhichthedisruptioncausedbyCovid-19mayhaveresultedinourproposalnotbeinggiventhefullestconsideration.Itmaybepossibletorequestareviewofthisdecisioninthefuturebutisclearlyunlikelytomakeprogressintheshortterm.

3.1.13AnalternativewouldbetoextendapatheastwardsonlandownedbyHH,adjacenttoMedsteadRoad.However,thelandinquestioniswooded,veryunevenandcontainsanumberoftroughsactingassoak-aways,whichcaptureflood-waterfromMedsteadRoad.Thiswillmakeconstructingafootpathaparticularlytoughtaskandpotentiallyverycostly.

3.1.14.AvirtualfootpathisalreadyinplacealongtheSouthcarriagewayofMedsteadRoad.Thispathtakestheformoftwowhitelinespaintedonthecarriagewayandrunsalongapartoftheroadwheresightlinesinbothdirectionsarequitegoodandtheroadwideenoughtoaccommodateapedestrianandtwocars.ItlinksthebridlewaytoBLWmainentranceandsoimitatestheproposedroutethroughthewood.However,itdoesnotachievetheobjectiveofgettingvulnerableroadusersofftheroadand,thoughresearchneedstobedonetojustifythisview,itdoesnotappeartobemuchused,possiblybecauseatrackthroughBLWisavailable.3.1.15Recommendation-TheWGdoesnotproposetopursueOption1aanyfurther.

3.2.1Option2:1970sroadwideningandfootpathschemeSoWa)requiresthattheWGshould“EstablishownershipoflandborderingthefulllengthofMedsteadRoadandKingsHill.Wheresuchlandisn’tcontrolledbyHampshireCountyCouncil(HCC),establishwiththeownerswhethertheirlandmaybeincludedinanyfootwayscheme.”Intheearly1970sHampshireCountyCouncil(HCC)devisedaschemetowidenMedsteadRoadandinstallafootpathontheSouthsideoftheroadrunningthroughthecentreofthevillageWesttothebridlewaywhereBLWcommences;andalsoalongtheSouthsideofKingsHill.

Page 6: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

6

3.2.2Underthisschemetherequiredlandwouldbecompulsorilypurchased.Onceitbecameclearthattheirlandwouldbeacquired,someownersenteredintonegotiationswithHCC;inexchangeforagreedcompensation,theCountyacquiredanoptiontobuildafootpathoverpartofthoseowners’properties.Thisoptionwasknownasa‘dedication’ofland.

3.2.3Otherownersrefusedtonegotiate.WhileCPOsweredrawnup,itisnotclearthatalltherefusniks,orindeedany,wereactuallyservedwithaCPO,meaningthatsomepropertieshavefrontagesthataresubjectneithertotheownershipof,nordedicationtoHCC.

3.2.4Unawareof‘dedications’,theWGputconsiderabletimeandresourceintotryingtoestablishownershipoflandbut,whilewearenowclearerabouttheextentofHampshireHighways-ownedland,ithasprovedimpossibletoestablishwithcompleteaccuracywhetherthereisanunbrokenlineoflandownedby,ordedicatedto,HCCtoenableconstructionofafootpath.

3.2.5InearlyMaytheWGChairreceivedanemailfromMrColinBengree,avillagerwithsomeinsightintothehistory,whichineffectattackedtheWG’smethodology.TheWGhadsetouttoestablishinformationabout‘ownership’ofland,whichwebelievedwouldbeheldbytheLandRegistry.WithhelpfromHHwegainedaccesstotherelevantrecordsbutwerenotmuchwiser.

3.2.6TheWG’sapproachwasunderminedbythediscoverythat‘dedications’,oroptionsacquiredoverland,arefrequentlynotrecordedbytheLandRegistry.Ownershipwouldthereforebeirrelevantwhereanunregistereddedicationexisted,sinceHCCwouldhaveacontinuingrighttoconstructafootpathoverthededicatedland,theoreticallyinperpetuity.

3.2.7FollowingMrBengree’sintervention,theWGmadecontactwiththerelevantHHofficer,MrMarkHousby.HebelievesafootpathcouldinfactbebuiltalongHCCownedanddedicatedland.

3.2.8Howeverhecannotestablishtheexistenceofanunbrokenline;norcanheclarifywhatlandisactuallyHH-owned(iecompulsorilyacquired),whatlandisdedicated,andwhatlandissubjecttoneitherqualification,becausehedoesnothaveaccesstotherelevantdocumentsasheiscurrentlyinCovid-19lockdown.

3.2.9MrHousbyhasundertakentosearchHH’sdeedssafeonhisreturntotheofficesothatwecanfinallyestablishthedetailedposition.ItispossiblehewillreturntotheofficeinJuly2020.

3.2.10NofurtherprogresscanbemadeonthisoptionaheadofMrHousby’sinvestigation.

3.2.11IssuesrelatingtoOption2

a)Dedicationsweresupposedtobeattachedtotheoriginaldeedsofthepropertiesinquestionbutquiteoftenduringtheinterveningyearsthesehavebecomedetached.SomepresentdayownersmaynotbeawareofthededicationheldbyHCCovertheirland;norwouldsuchdedicationsberevealedbyaLandRegistrysearch.

b)Otherownersareawarebutmayhavereceivedacopyofaletterdated1979addressedtotheownerof75MedsteadRoadfromalocalsolicitorhavingobtained“…confirmationfromtheHampshireCountyCouncilEstatesOfficerthattheCouncilnolongerwishtoacquirethesmallpieceofyourfrontagebecausetheroadwideningschemehasnowbeenshelved”.Itispossiblethatsomepropertyownersarerelyingonthat40yearoldreassurance.

c)MarkHousby,inemailconversationwithColinBengree,raisedtheissueofrelyingon40yearolddedications,particularlywherelandownersmightbeunawareoftheirexistenceandwhohadinsomecasesconstructedgaragesandotherinfrastructureacrossdedicatedland.

Page 7: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

7

d)TheWG’sviewisthatwewouldlosesupportamongvillagersifwerecommendaproposalthatwouldresultintheirbeingforcedtoteardownexpensivelyconstructedinfrastructureinordertobuildafootpathonthebasisofdedicationsmadeover40yearsago.

3.2.12Recommendation-Option2shouldremaininplaceuntilclarificationhasbeenreceivedfromMarkHousby,followingwhichadecisioncanbemadeonwhethertopursueitfurther.Evenifacontinuouslineofownedordedicatedlandexists,constructionofafootpathontheSouthsideofMedsteadRoadandKingsHillisunlikelytocommandthesupportofallvillagers.3.3.1Option3:The‘SouthPerrott’optionThisschemecomesfromthevillageofSouthPerrottontheDorset/Devonborders.TheA356runsthroughthevillagewithacarriagewaythatappearsnowiderthanMedsteadRoadandisboundedbyhighstonewalls.Formuchoftheroutethroughthevillagethereisnofootpath.AswithMedsteadRoad,thefootpathistheroadwithnoroomtoaccommodatevehiclestravellinginoppositedirectionsandpedestriansformuchofitslength.

3.3.2Thistrafficcalmingschemecreatedafootpathalongtheroadwitha20ml(3/4”)raisedcurbandadifferentcolouredsurfacehighlightingthevirtualfootpaththuscreated.Withthecentrelineremovedtheschemeappearstodriverstobelittlewiderthanasingletrackroad.Itispossibleforvehiclestopassoneanotherbymountingthefootpath.However,itisunderstoodthatthismanoeuvretendsnottohappenatspeedowingtothedrivers’sensethattheyhavemountedanareareservedforpedestrians,whichisreinforcedbythelowkerbanddifferentcolouredsurface.

3.3.3TheSouthPerrottscheme(seephotoatAppendixB)hasbeeninplaceforsome8-10yearsandsomaybeconsideredasuccess.ItsA-roadstatusappearsnottohavebeenabartoitsdesign,meaningthatthemodelshouldbeapplicabletoMedsteadRoadwithitsC-roadstatus.

3.3.4TheWGhasengagedwithvillagersinSouthPerrotttofindoutmoreaboutthescheme’sinstallationandrenewal,alongwiththeinitialandongoingcosts.Thatworkisongoing.

3.3.5Recommendation-TheWGbelievesthatOption3)shouldbeinvestigatedfurthersinceisofferstheopportunitytofulfillSoWsb),c),d)ande).ItalsoavoidstheissuesarisingfromSoWa);asthefootpathwouldbebuiltonthecarriagewaytherewouldbenoneedtoacquireprivateland.4. Workstream2:SpeedManagement

4.1.1TheWG’stwo-foldstrategyisa)togetpedestriansofftheroadandb)toslowthespeedofmotortrafficalongtheroads,particularlyMedsteadRoadwhichisaratrun.

4.1.2SpeedsoftrafficonMedsteadRoadaremeasuredbyaSIDcamerawhichismovedaroundanumberofsites.Datafromthecameraisdownloadedandanaylsedonamonthlybasis.

4.1.3Datahasalsobeengatheredoveratwo-yearperiodbySpeedWatchandremainsavailable.

4.1.4Wealsohaveaccesstothetrafficcountandspeeddatafromearlier7daysurveys,dated2000,2002,and2009whichprovidehistorictrends.ThesesurveyswerefundedbyBPC.

4.1.5Therearetwowaysofreducingtrafficspeedsthoughthevillage:thefirstwouldinvolvetheinstallationofphysicaltrafficcalminginfrastructure,suchasspeedhumpsandplatforms,chicanesinvolvingshiftsofright-of-waypriority,andbarriersgivingprioritytovehiclesexitingthevillage(asinSelborne);thealternativeistoreducethespeedlimit,thoughacombinationoftrafficcalmingandspeedlimitreductionispossible(asinSelborne).

4.1.6Itiswellestablishedthatphysicalinfrastructureisthemosteffectivemeansofensuringthatspeedsarereduced,butthissolutioncanbeveryexpensiveanditisknownthatHCCisstrongly

Page 8: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

8

resistanttotheinstallationofroadhumps,partlyduetotheirimpactonbuses(MedsteadRoadisonalittleusedscheduledbusroute,andschoolbusrouteuseddailyintermtime),partlybecausetheemergencyservicesdon’tlikethem.MedsteadRoadisakeythroughroute.

4.1.7Thespeedlimitthroughoutthevillageis30mphfromtheAbbeytothejunctionwithSnodeHill,where,inexplicably,itrisesto40mph,justmetresshortofthedangerousA339junction.

4.1.8TheWGbelievesthatifspeedswerereducedto20mphinthecentreofthevillagefromtheexistingfootpathtothebridlewaycrossingnexttoBLW,andfromthecornerby1KingsHilltoAltonAbbey,pedestrianswouldfeellessthreatenedbypassingvehicles.Onboththesestretchesofroadthereisnoalternativebuttowalkalongthenarrow,winding,high-bankedcarriageway.

4.1.9ShoulditproveimpossibletoconstructafootpathalongthenarrowstretchesofMedsteadRoadandKingsHill,reducingthespeedlimitfortrafficmightaloneprovideasolutiontotheconcernsofvulnerableroadusers,thoughenforcementwouldberequiredtoensurecompliance.

4.1.10ThesectionofMedsteadRoadrunningfromthecornerbelow1KingsHillandthebridlewaycrossingadjacentto95MedsteadRoadcouldremainattheexisting30mphlimitprovidedafootpathisconstructedthroughtheprivatelyownedsectionofBLW.

4.1.11SpeedsalongWellhouseRoad-almostexclusivelyvehiclesbelongingtoresidentsanddeliverydrivers-havebeenofconcerntopedestrians,dogwalkersandequestrians,forwhomthelinktothebridlewayfromAltontoTheddenusestheroadaftertraversingtheRecreationGround.

4.1.12WellhouseRoadhasnofootpath.UnlikesectionsofMedsteadRoadandKingsHill,therehasbeennohistoricschemetoinstallafootpathanditisbelievedthatthevergesareentirelyownedbytherespectiveresidentiallandowners.Pedestrianshavenorighttowalkalongtheverges,thoughthesedoofferarefugefromspeedingvehiclesformuchoftheroad’slength.

4.1.13ThereisspacealongmostofWellhouseRoadtoconstructafootpath.However,thiswouldrequireeitherthecooperationofresidentsortheimpositionofCPOsbyHCC.Inanyevent,thepleasingrurallookandfeelofWellhouseRoadwouldbechangedbytheimpositionofafootpath.Furthermore,BPCwouldmostlikelyhavetofundtheacquisitionofthenecessaryland.

4.1.14Ifa20mphspeedlimitcanbeachievedalongsectionsofMedsteadRoadandKingsHill,theWGbelievesthata20mphlimitshouldalsobeintroducedthroughoutWellhouseRoadtoo.

4.1.15TheWGbelievesavirtualfootpath(twowhitelines)shouldalsobeinstalled,notleasttoremindlocaldriversthatwherenofootpathexists,pedestrianshaveright-of-way.

4.1.16Thebenefitstovulnerableroadusersofreducingspeedlimitsto20mphinresidentialareasiswellunderstood.DepartmentofTransportAdvisory7/93showsthatapedestrianhitbyamotorvehicleat20mphhasa1in20chanceofbecomingafatality.At30mphthechancesriseto9in20;andat40mph,aspeedatorabovewhich950vehiclesdrovethroughBeechduringoneweekinMay2020,thechancesofbecomingapedestrianfatalityriseto17in20.

4.1.17RecommendationTheWGbelievesitshouldinvestigatethecreationof20mphzonesinthecentreofthevillageonMedsteadRoad,KingsHillandWellhouseRoad.4.2.Issuesrelatingtoreducingthespeedlimitto20mph

a)HCCintroducedanumberof20mphpilotschemesin2012.In2018,followingareviewHCCdecidednotcontinuethesepilots,thoughsignificantlynonehavebeenremoved.LocallytheseschemesremaininplaceinMedsteadandSelborne.Atbothsites,villagerscomplainthatthelimitisnotenforcedbutacceptthatitislargelyself-enforcingandthataveragespeedshavedeclined.

Page 9: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

9

b)HCC’sdecisiontodropthe20mphpilotschemeshasbeenattackedby“20’sPlentyforUs”,anationalcampaigningorganisation.ItsHeadofCampaignsSouth,AdrianArendt,haspublishedacritiqueoftheHCCdecisionclaimingthedatadoesnotsupporttheconclusionsreached,amongothermajorflaws.(SeeAppendixC)Inparticular,thecritiqueattacksHCC’sapproachwithregardtoKilledandSeriouslyInjured(KSI)figures.HampshireHighwayswillnotinvestinspeedlimitinginfrastructureorschemeswhichcannotshowtheywillresultinareductioninKSInumbers.

c)IftherearenoKSIs,thenthereisnoproblemandsononeedtofixitsofarasHCCisconcerned.

d)AdrianArendtpointsoutthattheissueisnotaboutspeeds,injuriesanddeaths;itisabouthowweliveandwhetherwechoosetoliveinfear.TheangerfeltbyBeechresidents,particularlythosewholiveonMedsteadRoadandKingsHill,istheresultoffrequentlybeingmadetofeelfearfulbyinconsideratemotorists.

e)HCCisresistanttoreducingspeedlimitsbecauseitisawarethepolicewillnotsupportthenecessaryenforcement.HampshireConstabularyroutinelyobjectstoTrafficRegulationOrders,thenecessaryprecursortoanyspeedreductionmeasure,citinglackofenforcementresources.

f)HCC’sbudgetsareseriouslyconstrainedwhichmeansthatitisseverelylimitedintherangeofsolutionsthatitiswillingtoconsider.Cyclistsinthelocalityarewellawarethatroadsarepoorlymaintained,encounteringfrequentpotholes,brokensurfaceedgingandpotentiallylethalloosegravel,suchasthatseeninMedsteadRoadafteranydownpourofrain.FollowingtheCovid-19emergency,HCCisunlikelytoseeanincreaseinincomefromCouncilTaxorGovernmentgrant.

g)ItisclearthatHCCwillcontinuetoberesistantto20mphspeedlimitschemes.ThispolicyisunlikelytobereviewedunlessenoughpressureisplacedupontheCountybyanorganisedlobby.4.3Enforcementofexisting30mphspeedlimit

4.3.1The30mphspeedlimitisenforcedintwoways:first,throughtheuseofaSIDcameraremindingdriversoftheirspeed,thoughvehicleregistrationnumbersarenotrecorded;second,throughtheoccasional,rarevisitofapoliceenforcementvanequippedwithcamera,whichcananddoesleadtospeedingmotoristsbeingticketedandfinedalongwithpointsdeductions.

4.3.2DataprovidedbytheSIDshowsthatthevisitsbythepoliceenforcementvan,whichdoesnotoperateduringtherushhours,arenotsufficientlyfrequenttodeterspeedingdrivers.

4.3.3Enforcementwasprovidedbytwoothermeans,nownolongeravailabletothevillage.First,anumberof30mphreminderdiscswereremovedfromtheirpostsontheinstructionsofHampshireHighways(HH).Second,SpeedWatchoperatedoveratwo-yearperiodbetween2016-2018whenvolunteersquitbecausedatashowedtheireffortswerenothavingthedesiredeffect.

4.3.4TheWGhasestablishedthatthereminderdiscswereremovedbecausewherea30mphspeedlimitisinplacepurelyduetotheexistenceofregularlypositionedstreetlighting(asitisBeech)suchdiscspreventpoliceenforcement.Itisconsideredthattheexistenceofthestreetlightsaloneshouldbesufficienttoremindmotoriststhattheyareina30mpharea.

4.3.5TheWGaskedHHofficersforevidenceofwhatappearstobeanonsensicalruling.Nonehasbeenforthcoming,onlyanassertionthattheruleisof“long-standing”.

4.3.6TheWGhasphotographedMedsteadRoad/KingsHill.Streetlightsareplacedatthecorrectintervalsbutlamppostsaremostlyinvisible,buriedwithinhedges;sothe‘reminder’effectislost.

4.3.7TheSWteammightbepersuadedtorecommenceactivities,butonlyifeitherpoliceenforcementisimprovedorphysicaltrafficcalminginfrastructureisinstalledtoreducespeeds.

Page 10: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

10

4.3.8SW’senforcementrolewasverylimited.Theteamwasallowedtouseitscameratorecordthespeedofapassingvehiclebutnotthevehicleregistration,whichhadtobewrittendownbyhandintheeventthatavehiclewastravellingat35mphormoreuptoamaximumof49mph.Theteambelievedthatsomevehiclesweretravellingfasterthan49mphbutthecameradidnotshowanyhigherspeed.Driverstravellingatbetween35and49mphwerereportedtothepolice.

4.3.9Driversweresentaletterbythepoliceinformingthemthattheyhadbeenseenspeedingandwarningthemastotheirfuturebehaviour.Asecondoffencefollowedthesameprocess.Athirdoffenceresultedinavisittothedriverbyapoliceofficerwithapersonalwarning.Nofineswereissued,norpointsdeducted.TheWGhaslearnedthatthosewhoreceiveavisitgoontothepolicecomputerandifcaughtspeedingbyapoliceofficeraremorelikelytoreceiveaticket/fine/pointsdeductionbecauserecordsshowstheyhave‘previous’.Thisisnotwidelyknown.

4.3.10OncedriversrealisedthattheywouldreceivenomorethanaslappedwristafterreceivingnotificationfromSW,theycontinuedtospeedthroughthevillage,withonewomangivingthefingertoSWvolunteersasshepassedby,oftenatthemaximumspeedshownbythecamera.

4.3.11ThecostofgoingthroughtheSWenforcementprocessis£300.Itisnotclearwhopays.4.4EncouragingSpeedCompliance-Posters

4.4.1Recentlyithasbecomepossibletoerectposters(semi-permanentsignswithalifeof4-5years)encouragingmotoriststobeawareofpedestriansandothervulnerableroadusers.

4.4.2BoththedesignofpostersandtheirpositioningissubjecttoapprovalbyHHand,ifpositionedonprivateland,subjecttoplanningapprovalbythelocalplanningauthority,EHDC.

4.4.3TheWGsawanopportunityforearlyprogressandhavingagreedposterdesignsataspecialmeetingheldon7May2020,submittedthemforBPCapprovalinrelationtoarequestfora£600allocationoffundstopurchasebothpostersandtwoadditionalposts,havingestablishedthatposterscouldbemountedtoexistingpostsprovidedtheywerenotspeedlimitsorstopsigns.

4.4.4Unfortunately,theagreedposterswerenotthosesubmittedtothe20MayBPCmeeting.

4.4.5IthassincebecomeclearthatthepositioningofthenewpostsissubjecttoHHapproval.

4.4.6TheposterdesignsoriginallyagreedhavenowbeensubmittedbothtoBPCandHH.IthassincebecomeclearthatHH’sprocessforapprovingpostersisnotyetfullyinplace.Atthetimeofwritingitisnotclearwhenapprovalofthere-submitteddesignswillbegranted.

4.4.7Consequently,thehiatuscausedbythesubmissionofthewrongdesignsisunlikelytohaveresultedinanyadditionaldelaytotheinstallationoftheposters,whichareawaitingapproval.

4.4.8OnceHHhasapprovedposterdesigns,volunteerswillhelpinstallthepostersandnewposts.BPChasconfirmedwithitsinsurersthatvolunteersarecoveredtocarryoutthiswork.

4.4.9Onceinstalled,sixposterswillbemovedaroundfoursites.TheSIDwilltracktheirimpact.

4.4.10RecommendationTheWGbelievesthepostercampaignandSIDtrackingshouldgoahead.4.5Encouragingspeedcompliance-ANPRcameras

4.5.1Thoughtherisksarisingfrompedestriansandothervulnerableroaduserssharingtheroadwithmotorvehiclesmovingat30mph(seeaboveat4.1.15)carriagearewellunderstood,theWGconsidersthatevenifnoreductionto20mphcouldbeachieved,persuadingmotoriststoobservetheexistingspeedlimitwouldrepresentagoodoutcome,respondingtoSoWsb,dande(at2.2)

Page 11: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

11

4.5.2PriortotheestablishmentofBRSWG,BPChadbeenaskedtoconsiderthereplacementofitsSIDcamerawithanANPRcamera.Thelatterismoresophisticatedinthatitrecordsregistrationnumbersaswellasthespeedofthevehicleconcerned.Thepriceofthehardwarerisesfromaround£2.5-3.5kfortheSIDto£5-6kfortheANPR.Thereareadditionalcostsrelatedtothemovementofcamerastodifferentpositionsaroundthevillageandthedownloadingofdata.

4.5.3AtthepricequoteditisbelievedBPCcouldcoverthecostsfromitsownresources.BPChasnotcommittedtothepurchaseofanANPRcamera.

4.5.4TheWGwasmadeawareofcamerasthatappearedinMay2019alongHeathrowAirport’sperimeterroads.TheseareANPRcamerasmountedonpostswithasignwarning“averagespeedcamera”.Theeffectonmotoristbehaviourwasimmediateandon-going.Averagespeedsremainwellbelowthoseexperiencedpreviouslyonaroutemuchusedbycabsanddeliverydrivers.

4.5.5TheWGapproachedthesuppliersoftheHeathrowANPRcamerasandrequestedfullerdetailsontheiroperationandenforcement.ThesupplierswerewellknowntotheWGhavingsuppliedBPC’sSIDcameraalongwith,morerecently,quotesforstandardANPRcameras.

4.5.6Itwasestablishedthatthe‘averagespeed’camerasatHeathrowworkalongthesamelinesasSpeedWatch-ie,twowarningletters,followedbyvisitfromapoliceofficer.EnforcementisthejointresponsibilityofHeathrowAirportLimitedandtheMetropolitanPolice.

4.5.7AkeybenefitofanaveragespeedsystemisthatANPRscanberecalibratedtoreflectalteredspeedlimitsandcouldtakeintoaccountdifferingspeedlimitsthroughthevillage.

4.5.8ThisappearedtobeapromisingsolutionwhichcouldbeachievedwithinBPC’sexistingfinancialresourceswithouttheneedforfurtherfundraising.However,itisavailabletoHeathrowlargelybecausetheroadsconcernedarenotpublicbutownedbyHeathrowAirportLimitedandspecialrulesapply.Itisnotclearwhethersuchcamerascouldbedeployedonpublicroads.

4.5.9Recommendation-Theaveragespeedcameraoptionrequiresfurtherresearch.

4.5.10ThesupplierputusintouchwithapoliceofficerinCountyDurham,EllisHutchinson,whohasmountedanANPRinavanrunbySpeedWatch.Occasionally,PCSOsaredeployedtoo.Thebenefitisthatthecamerarecordstheregistrationnumbers,whichmeansthereisnorequirementforwritingdownnumbers-itseemsmanyerrorsweremadeintranscriptionandlettersweresenttothewrongpeople,withpredictablyunhappyresults.

4.5.11ThissystemdoesnothaveHomeOfficeapprovaland,again,enforcementfollowsthesamelinesasSpeedWatchwithlettersbeingsentbythepolice.Drivereducationremainsthechiefaim,butithasbeenveryeffectiveinreducingspeedslocallysinceitsfirstdeploymentinAugust2019.EllisHutchinsonbelievesthatpeoplegetusedtostaticsignsandthatthevan-mountedANPRcameraiseffectivebecauseitsdeploymentisrandomandbecauseofthevan’sSpeedWatchsign.

4.5.12The£26kcostofpurchasingthevanandcamerawasmetbythreeparticipatingvillages.DurhamConstabularypaidforthevehicle’son-goinginsuranceandrunningcosts.

4.5.13TheWGbelievesthatasystemsuchasthatdeployedinDurhamcouldbeequallyeffectiveinBeechwiththecostsharedaroundanumberofvillages,thoughSWwouldhavetobeinvolved.

4.5.14AsofJanuary2020therearenolongeranyPCSOsintheAltonandRuralsector,whichincludesBeechandneighbouringvillages.Itisunclearwhetheravan-mountedANPRwouldbesupportedbylocalpoliceasitisinDurham.Thisshouldberaisedwithseniorlocalpoliceofficers.

Page 12: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

12

4.5.15Crucially,avan-mountedcamerawouldrequirethere-establishmentofBeechCommunitySpeedWatchandforthatteamtoworkinclosecoordinationwithSpeedWatchteamsinotherlocaltownsandvillages.ItisunclearwhetherthissolutionwouldmeettheSWteam’sstipulations.

4.5.16RepresentationshavebeenmadetotheChiefConstableofHampshireConstabulary,statingdissatisfactionwiththepaucityofthelocalpolicepresence.TheCC’sresponsesuggestsnowmaybeanopportunetimetoraisethequestionofpolicesupportforavan-mountedcamera.

4.5.17Recommendation.TheWGbelievesthatboththepossibilityofinstallinganaveragespeedANPRsystem,whichmightbeachievedatacostofaround£20k,andthepossibilityofacquiringavanmountedsystemshouldbethesubjectoffurtherresearch.Itwillalsobenecessarytoestablishwhetherthemovefromhand-writtenrecordsoftheregistrationnumberofspeedingvehiclestocamerarecordsrepresentssufficientchangetopersuadetheBeechCommunitySpeedWatchteamtorecommencetheiractivitiesonthebasisthatenforcementwillbeimproved.5. Workstream3:Lobbyingandcampaigning5.1TheWGunderstoodfromtheoutsetthatifweweretorecommendanidealsolution(SoWb)thiswouldlikelyrunintodifficulties,owingeithertothelackoffunds,orduetoHHofficersbeingconfrontedwithpolicyrestrictionswhichlimitedtheirabilitytosupportpreferredsolutions.

5.2Itbecameclearthatanyidealsolutionthatinvolvedspeedlimitenforcement,orreduction,wouldalsorequirethesupportofHampshireConstabulary.

5.3ItwasdecidedtheWGshouldengagebothwithrelevantcouncilofficersandwithcouncillors.Researchwasconductedtoestablishwhowieldssufficientpowerorinfluencetobringaboutthechangesthatmightberequiredbyanidealsolutionandcontactestablishedwiththem.

5.4ItwasalsounderstoodthattheWGmighthavetolobbyforpreferredoutcomesandmoneytofundthemandthatacampaignwouldinvolvedeliveryofconsistentmessagestoallaudiences.

5.5Itwasalsorecognisedthatreducingspeedsoftrafficthroughthevillagewouldinvolvemuchgreaterenforcement,and/ortheinstallationofphysicaltrafficcalminginfrastructure.Increasedenforcementwouldinturnrequiretheactivesupportofcouncilofficersandseniorpoliceofficers.Similarly,aspoliceresistancetoimposinglowerspeedlimitsduetolackofresourcesisoftencitedbycouncilofficersasareasonfornotadoptingaparticularscheme,soitbecameclearthatthetargetsofanycampaigntodeliverchangewouldneedtoincludebothpolicymakersandpolice.

5.6Beechhasawell-runandwell-supportedNeighbourhoodWatch.InJanuary2020,inthefaceofrisingcrimelevelslocally,BeechNHWlearnedthattheAltonandRuralsectorwastoloseitsthreeremainingPCSOs.Twofull-timepoliceofficerswerelefttoprovidecommunitypoliceservicesforsome35,000residents,demonstratingthatpoliceresourcesareseriouslystretched.

5.7Paradoxically,therecruitmentof20,000policeofficerspromisedbycentralgovernmentatthe2019generalelectionhasmademattersworse.TwoofthePCSOsappliedforfull-timeposts.Itisknownthatoncetheirtrainingiscompletetheywillbepostedelsewhere.TheremainingveryexperiencedPCSOwaspostedtothetroubledfamiliesprogramme,oneofHampshireConstabulary’sfourpriorities.Resourcesforlocalspeedenforcementaresimilarlystretched.

5.8ItrecentlyemergedthatEHDCfundspaidforthecostofthethreePCSOs.Thisarrangementwasunilaterallyabandonedbythepolice,whostatedtheycouldnolongersupportthestructure.NeitherofficersnorcouncillorsatEHDChaveofferedanexplanationforthepoliceactionandappeartobeinthedarkthemselves.ItseemsclearthatEHDCwouldhavecontinuedthescheme.

Page 13: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

13

5.9TheWGdecidedthattheconcernsaroundtheremovalofthePSCOscouldbeexploitedtodevelopalocalcampaigntopressforgreaterresourcestobedeliveredtoAltonandRuralbothwithregardtocrimepreventionanddetectionand,crucially,aroundspeedlimitenforcement.

5.10Theobjectofthecampaignwastoraisetheissueofverylowlocalpolicenumbersandpoorlevelsofresourcing,includingspeedlimitenforcementonratrunslocally,includinginBeech.

5.11AsecondobjectivewastoopenupconversationswithlocalSpeedWatchteamsandChairswhoseParisheshadparticularlyproblemswithratrunningvehicles.Thiswouldfacilitatejointrepresentationsbothtocouncilofficersandpoliceofficerswithaviewtoimprovingenforcement.

5.12AkeylongertermobjectiveistoestablishBRSWGasaninfluentialvoiceindrivingpolicychange,whichwillbeimportantinpersuadingcouncilofficerstoagreetosupportourapproachtospeedreductionandenforcement,onceouridealschemehasbeenagreed.Thiswilltaketime.

5.13AlettertoHampshire’sChiefConstable(CC),copiedtothePoliceandCrimeCommissioner,wasdraftedandsentforapprovalandsignaturebytheChairsof18localtownandparishcouncils.

5.14AlleighteenChairssigned.InfollowingupthedraftstoencourageChairstosign,contactwasmadewithlocalSpeedWatchteams,whoseexperiencemostlyechoedthatofBeech.

5.15Thedraftwassentto14Districtand2CountyCouncillorswhosewardslieinAltonandRural.Sixsigned,allwithwardsinthetownofAlton,whoseTownCouncilalsosupportedthedraft.Oftheremaining8districtcouncillors,2declinedtosignandtherestdidnotrespond.Ofthosewhodeclinedtosign,onewasthedistrictcouncillorwhosewardincludesBeech.NeitherCountyCouncillorresponded,includingtheCouncillorwhosewardincludesBeech.

5.16.IttookeightweeksfromthedistributionofthedraftlettertoitsdespatchtotheChiefConstable,whichprovidedtimeforParishCouncilChairstoconsultwithcolleagues.DistrictandCountycouncillorsweregiventwoweekstorespond,havingbeeninformedthatall18TownandParishCouncilChairshadputtheirnamestothedraftletterofcomplaint.

5.17TheChairofBRSWGhasnowreceivedaresponsefromtheChiefConstable,whichacceptsthatrisingcrimeratesandspeedingtrafficcauseslegitimateconcerninruralcommunities.

5.18TheresponsetaskstheAssistantChiefConstable,wholeadsonlocalpolicingandisalsoresponsiblefortheStrategicRuralCrimeBoard,togiveconsiderationtotheconcernssetoutintheletterofcomplaint.Thereisnocommitmenttoincreasingcommunitypolicenumberslocally.

5.19TheChiefConstable’sresponseinvitestheWGChairtomakecontactwiththeDistrictCommander,whilestatingthatruralcrimeisapriorityforhiscommand,withanewRuralCrimeTacticalBoardestablishedto‘bringcommunitiestogether’toshareinformation.

5.20Ineffect,theresponseencouragesengagementwiththeestablishedconsultativeframeworkbetweenthepoliceandlocalauthorityrepresentatives.Thiscouldprovehelpfulinopeningdoors.

5.21TheWGunderstandsthattherelationshipbetweenEHDC,HCCandpoliceisverygood.However,theconcernisthatifrelationsbecometoocosy,thoseinvolvedwillbeincreasinglyreluctanttorefertotheelephantintheroom.Insufficientresourcesarebeingallocatedlocally.

5.22NoamountofconsultativemachinerycandisguisetherealitythatthePCSOshavegoneandAltonandRuralhasonlytwofull-timecommunitypoliceofficerstopolicesome35,000people.

5.23Meanwhile,thereisnexttonospeedlimitenforcement.Onlycontinuingpressurewillresultinmoreresourcesbeingallocatedtodealwithproblemssuchasburglary,speeding,andanti-socialbehaviour,whichtheChiefConstableacceptshasa“devastatingimpactonthequalityoflifeandconfidenceofallourcommunities.”

Page 14: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

14

5.24RecommendationsTheWGshouldcontinuewithitscampaignwhichhasseenearlysuccessinachievingitsstatedobjectives:deliveringclear,consistentmessages;engagingwithotherswhoshareourconcerns;demandingandobtainingareviewofpriorities;developingapositionofinfluenceamongthosewhohavethepowertomakepolicychanges,whichwillhelpdeliveranidealsolutionforthespeedingtrafficproblemsconfrontedbyvillagersinBeech.Inessence,it’sthesqueakywheelthatgetsthegreaseandweshouldmaintainpressureforbetterenforcement.

5.25TheWGconsidersthatalong-termcampaigninggoalshouldbetoseekareviewofHCC’sexisting20mphpolicy.Policesupportwillbeessentialinasuccessfulcampaignfora20mphlimit.

5.26Villagerscanhelpbystickingtothespeedlimitandtravellingat20mphinthevillagecentreandKingsHill,thushelpingtoeducatespeedingdriversusingBeechasaratrun.6. Workstream4:Funding6.1Thisistheleastdevelopedofthefourworkstreams,reflectingtheWGsviewthatweshouldconducttheresearchtoestablishfeasibleoptionsfirstandseekwaysoffundingthemthereafter.

6.2Whereverpossible,theWGhassoughttocostoptionsasitsworkhasprogressed.

6.3ConsiderationhasinvariablybeengiventowhetheranysolutioncouldbepaidfordirectlyfromBPC’slimitedfunds.TheParishCouncilisnowinits21styearofoperationandthereforedoesnothaveaccesstothesubstantialreserveswhichmighthavebuiltupbyalonger-livedparish.

6.4BRSWGunderstandsthatsomemoneyremainsavailableinthedevelopersfundsheldbyEHDCbutthesearelimitedandwouldnotsupportanysolutionwhichinvolvedexpenditureofmorethantensofthousandsofpounds.

6.5BRSWGisawarethatinthepastvillagershavebeenwillingtocontributetheirownfundsforexampleforthebuildingofanexpandedandrenewedvillagehall.IfanidealsolutionproposedbytheWGcouldcommandthesupportofthevillageatareferendum,thenitmaybepossibletotapthispotentialsourceoffunds.ItisunderstoodthatnoreferendumcanbeheldbeforeMay2021.

6.6SomeoftheWG’sworkhasreachedahiatusowingtotheCovid-19lockdownwithdisplacedofficersunabletoprovideadviceorpreciseanddetailedresponsestoquestions.TheimpactofCovid19onpublicfundsislikelytobesubstantialandlonglasting.Itfollowsthatanyidealsolutionthatreliesheavilyonpublicfundingislikelytofaceseveredifficulties.

6.7RecommendationTheWGshouldcontinueitsworktoidentifyanidealbutfeasiblesolution.Whetherthesolutioniscapableofattractingfundswilltoalargeextentdetermineitsfeasibility.Equally,ifnosolutionisproposed,therecanbenoquestionofattractingfunds.Moneyisunlikelytobecomeavailableforaprojectwhosedetailshavenotbeenfullycostedandthoughtthrough.

Page 15: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

15

7.Summaryofrecommendations7.1TheWGbelievesPathwaysOption1)shouldbepursuedfurtherasitcouldhelpdeliverSoWa,b,c,d,fandg(see2.2above).However,thisoptionwouldinvolvesubstantialfundraising.

7.2WithaviewtodeliveringPathways-Option1)theWGshouldseekawrittenin-principlecommitmenttotheconstructionofapathwayacrossSeong-Gi’swoodland.SeeAppendixAforanestimateofcosts.Note,theestimateincludesanaddedsumforaneastwardextensionfromBushyLeazeWoodsentrancetobridleway.

7.3TheWGshouldengagewithHampshireHighwaystoestablishifinprincipleitiswillingtoallowtheconstructionofapathonlandownedbyHCC,eithertobridgethegapbetweenthepaththroughtheprivately-ownedwoodsandtheBLWmainentrance;oralternativelytorunalongthesectionofMedsteadRoadrunningfromthecornernearIKingsHilltoBLWmainentrance.

7.4TheWGrecommendsthatOption1a)eastwardsextensiontobridlewayadjacentto95MedsteadRoadshouldnotbepursued.

7.5TheWGconsideredthatPathwaysOption2)shouldremaininplacependingclarification,aboutownedanddedicatedlandontheSouthsideofMedsteadRoadandKingsHill,hasbeenreceivedfromHCC,followingwhichadecisioncanbemadeonwhethertopursueitfurther.

7.6TheWGbelievesthatOption3)SouthPerrotschemeshouldbeinvestigatedfurthersinceisofferstheopportunitytofulfillSoWsb),c),d)ande).ItalsoavoidstheissuesarisingfromSoWa);asthefootpathwouldbebuiltonthecarriagewaytherewouldbenoneedtoacquireprivateland.

7.7TheWGbelievesitshouldinvestigatethecreationof20mphzonesinMedsteadRoadandKingsHill.

7.8Ifa20mphspeedlimitcanbeachievedalongsectionsofMedsteadRoadandKingsHill,theWGbelievesthata20mphlimitshouldalsobeintroducedthroughoutWellhouseRoad.

7.9Ifno20mphspeedlimitcanbeintroducedonWellhouseRoad,theWGbelievesavirtualfootpathshouldbeinstalledtoremindlocaldriversthatwherenofootpathexists,pedestrianshaveright-of-wayontheroad.

7.10TheWGbelievesthepostercampaignandSIDtrackingshouldgoahead,subjecttoapproval.

7.11Theaveragespeedcameraoptionrequiresfurtherresearch.

7.12TheWGbelievesthatboththepossibilityofinstallinga)anaveragespeedANPRsystem,andb)acquiringavanmountedsystemshouldbethesubjectoffurtherresearch.BeechSWshouldalsobeconsultedabouttheirwillingnesstorecommenceactivitiesusingavanmountedANPR.

7.13TheWGshouldcontinuewithitscampaign,whichhasseenearlysuccessandweshouldmaintainpressurebothforbetterpoliceenforcementandpolicesupportforSpeedWatch.

7.14TheWGconsidersthatalong-termcampaigninggoalshouldbetoseekareviewofHCC’sexisting20mphpolicy.Policesupportwillbeessentialinasuccessfulcampaignfora20mphlimit.

7.15TheWGbelievesvillagerscanhelpbystickingtothespeedlimitandtravellingat20mphinthevillagecentreandKingsHill,thushelpingtoeducatespeedingdriversusingBeechasaratrun.

7.16TheWGshouldcontinueitsworktoidentifyanidealandfeasiblesolution,recognisingthatidentifyingandattractingsufficientfundsforanidealsolutionwillimpactonitsfeasibility.

7.17Letusgetonwithourjob.

Page 16: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

16

8.Conclusions8.1TheWGhasproducedalargeamountofworkinashorttimeinthecurrenthealthemergency.

8.2TheWGmembershipcontainsanappropriaterangeofskillstoenableittocompletethetaskithasbeensetbyBeechParishCouncilandremainswillingtocarryoutthenecessarywork.

8.3TheWG’scampaigningworkstreamhasproducedanearlysuccess,whichwillopendoorstoseniorpoliceofficersenablingustolobbyforbetterenforcementandbettersupportforCommunitySpeedWatch.Thissuccessmustbefollowedup.

8.4TheCovid-19emergencyhasresultedinsomeoptionsnotbeingfullyexplored.Oncethelockdownhasrelaxedweexpecttogetanswerstothequestionsraisedwithcouncilofficers.

8.5OncethedesignshavebeenapprovedbyHampshireHighwaystherecommendedpostercampaignandSIDtrackingschemeopensupanearlyopportunitytodemonstratetovillagersthattheWGisactiveandtakingopportunitiestoeducatedrivers,encouragingthemtocomplywiththespeedlimit.Thesupportofthevillagewillbeneededtodrivetheinstallationandfundingofanidealsolution.ThepostercampaignwillinstilconfidencethatBPCisgoingdowntherighttrack.

8.6QuestionshavebeenraisedconcerningthefutureofBRSWGwithsuggestionsthatthestudyshouldnowbeputbackintothehandsofHampshireHighways.TheWGconsidersthatwhilethereismeritincontinuingtoliaisewithHHwhoareactingbothinaregulatoryandadvisoryrole,itisgenerallyunwisetoaskpeopletomarktheirownhomework.SolutionswillinevitablybebaseduponananalysisofwhatofficersseeasHCC’spolicyatthattime,whichwillrestricttheirvision.IntheviewoftheWG,paucityofvisionwasnotwhatBeechParishCouncilwasseekingwhenmakingitsappealtovillagersatthevillagehallmeetinginJanuary.Wehavegoodideasandhaveonlyjustgotstarted.Deliverywillpickupspeedasofficersreturntowork.Asthisreportdemonstrates,thereareworthwhileoptionswellworthpursuing.

RecommendationLetusgetonwithourjob.

AppendixA-Estimatetoconstructpaththroughwoods

On Fri, 13 Mar 2020 at 10:57, Katy Poulsom <[email protected]> wrote: Dear Tony Following our site meeting on Wednesday, I am pleased to provide you with the following estimate to create a new footpath inside the woodland shown. The woodland is mainly privately owned with a smaller section belonging to the Forestry Commission Measurements given 1.3 km x 1.5 wide footpath To clear the footpath line of trees and overhanging vegetation To provide all plant, labour and materials. To set up compound within the FC section To excavate path tray and cast neatly aside arisings To supply and lay a Geotextile membrane To lay 100mm depth of chalk base and consolidate To overlay 100mm depth of Fittleworth Sandstone and consolidate To supply and install Twin wall UPVC culvert pipe in ditch line that delineates FC property and the private wood Please note the above will be in line with the HCC footpath specification (attached) To leave site tidy. Price £53,750.00 + VAT

Page 17: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

17

AppendixB-SouthPerrot,Dorset:beforeandafter

Page 18: Beech Road Safety Working Group Interim Report - June 2020 · The working group aims to deliver a final report in Autumn 2020 though hitting this target will be largely dependent

18

AppendixC-20’sPlentyforUs:SummaryCritiqueofHampshirePolicy

20’s Plenty for Us calls for Hampshire County Council to withdraw its report on the 20mph Pilot Programme and to press ahead with rolling out 20mph in residential streets across the county.

Introduction 20’s Plenty for Us has conducted a detailed review of the report dated 5th June 2018 into Hampshire County Council’s 20mphPilot Programme1. We draw different conclusions from the Director of Economy, Transport and Environment. Rather than rejecting 20mph, HCC should recognise the benefits that the pilot schemes have already brought to local communities in Hampshire and extend 20mph to all residential streets, including narrow residential rural lanes and town and village centres in the county.

Summary conclusions The report itself has a number of failings:

• draws the wrong conclusions from the data provided;

• local community support for 20mph schemes ignored;

• latest research on 20mph not considered;

• inaccurate references to Department for Transport’s guidelines on setting local speed limits; and

• success criteria of the schemes not set out clearly, making it hard to judge “success”

Most Local Authorities that have introduced 20mph have seen major benefits in terms of community support and engagement, lower speeds, casualties reduced by around 20%2 and increased levels of cycling and walking. It is clear that the pilot schemes are supported by the community and have brought benefits. However, if HCC has not seen the same level of benefits of 20mph as other Local Authorities, then it needs to examine the pilot schemes in detail and learn lessons about how to achieve greater benefits. These could include:

• ensure that the schemes are sufficiently wide and in appropriate places;

• more education to drivers and enforcement, including promoting Community Speedwatch;

• assessing whether more signs or road engineering measures are required; and

• whether there is sufficient budget.

None of the matters are explored in the report.

Recommendation • Withdraw the recommendations to cancel further 20mph schemes;

• Council officers to investigate lessons learned from the pilot schemes;

• Council officers to report back with recommendations about how 20mph schemes can be implemented more successfully; and

• Use the findings to roll out 20mph across all residential streets and in town and village centres.

1 “Review of Residential 20mph Pilot Programme”

2 E.g. Bristol (casualties down 14%); Calderdale (22%); Edinburgh (24%); Newcastle (25%); Portsmouth (20%)