Barriers and issues

facing offshore wind

Garrett Connell - NOW Ireland

Economics of Ocean and Marine

Renewable Energy

HMRC 2012

1

Page 2: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

Ireland’s Offshore Opportunity

• Ireland has a number of opportunities from Offshore Wind

– To export high value green electricity to Europe.

– To create jobs building and operating Irish Offshore wind farms.

– To stimulate the €60bn Supply Chain Opportunity afforded by the development programmes for offshore wind in the Irish Sea and over €300bn in the rest of Europe.

– To create Jobs. The European Commission expects the creation of 2.8m jobs by 2020 from the renewable energy industry in Europe.

2

Page 3: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

3

Source: EWEA 2011.

Cumulative and annual offshore wind installations in Europe

Page 4: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

4

Projects online, under construction and consented. Location of consented capacity.

Source: EWEA 2011.

Page 5: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

Offshore Projects Under Development in Irish Waters

5

SSE Renewables

Lease for 200 turbines on the Arklow Bank

Codling Wind Park

Lease for 220 turbines on the Codling Bank plus application for a further 200 turbines

Oriel Windfarm

Consent for 55 turbines East of Dundalk Bay

FST

Application for 20 turbines on Skerd Rocks

Dublin Array

Application for 145 turbines on the Bray and Kish Banks

• Crown Estate Leasing Round

Under way for a 600 MW zone off the coast of Northern Ireland

Page 6: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

6

Getting to Financial Close – A Due Diligence Checklist

Ticking all of the above boxes would result in

• minimised risk to an investor/bank• maximised risk-adjusted return and value for the offshore wind farm.

Project Stage Regulatory Energy Yield Site Assessment

Grid Costs IncomePre Consent Government

Policy PositionsAtlas / General mesoscale map

Desk Studies Desk Studies/ Application

General Model Market Study

Consented Consents, Licences, Authorisations

Offshore mast /mesoscale map

EIS, Geophysical, Geotechnical

Grid offer, Planning Permissions

FEED based Market Study

Contracted Construction Methodology Approval

Onsite Mast, production garuntees

Geotechnical Curtailment / Constraints

Contracts, Contingencies, Dispute Resolution

PPA/REFIT contract in place

Construction Decommisioning Bonds

Technology Final Design Access CAPEX PPA/REFIT contract in place

Operation EHS Compliance Production Analysis

Scour/AccessOPEX Invoices

Page 7: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

7

• Inherent Resistance to change and risk from stakeholders: Government, industry

incumbents, etc.

• Complexity of aligning support mechanisms, planning, market mechanisms, regulation, targets and statutory bodies

• Regulatory and policy inconsistency and/or vacuum

• Irrational Exuberance and Economic Collapse!

• Clear and Stable Government Policies are Required as a foundation to promote the development of an industry.

Government Policy and Regulatory Barriers to Offshore Development

Page 8: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

8

Consents, Licences, Authorisations

• Foreshore Acts drafted 1933, amended 1992, 1998, 2002, 2005, 2007, 2009, 2011

• Transfer of Foreshore Responsibility from DCMNR to DAFF to DOE

• SEA and OREDP draft published 2010, yet to be finalised.

• New Consenting Legislation drafted 2010, yet to be published.Grid Connection

• Connection Process

• Constraint and Curtailment (5% to 30% of revenue or more?)

• Uncertainty and Firm Access date delays too great a risk for some investors

• Acknowledge limited requirement for wind energy in small Irish market

Page 9: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

9

REFIT Policy

• Offshore REFIT announced February 2008

• Terms and Conditions for offshore REFIT published 2009

• Commitment to bring Offshore REFIT forward for state aid

clearance 2010 into 2011

• Assurances on offshore REFIT throughout 2011

• “Offshore REFIT not being submitted to Brussels for State Aid Clearance at this time”, Pat Rabbitte February 2012.

Page 10: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

10

Getting to Financial Close – A Due Diligence Checklist

A clear Government Commitment and set of Policies is needed to kick start the sector.

Up to now this has been hampered by limited demand in Ireland and concerns over the cost of Electricity, particularly the cost to industry.

Project Stage Regulatory Energy Yield Site Assessment

Grid Costs IncomePre Consent Government

Policy PositionsAtlas / General mesoscale map

Desk Studies Desk Studies/ Application

General Model Market Study

Consented Consents, Licences, Authorisations

Offshore mast /mesoscale map

EIS, Geophysical, Geotechnical

Grid offer, Planning Permissions

FEED based Market Study

Contracted Construction Methodology Approval

Onsite Mast, production garuntees

Geotechnical Curtailment / Constraints

Contracts, Contingencies, Dispute Resolution

PPA/REFIT contract in place

Construction Decommisioning Bonds

Technology Final Design Access CAPEX PPA/REFIT contract in place

Operation EHS Compliance Production Analysis

Scour/AccessOPEX Invoices

Page 11: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

Light at the end of the Tunnel - Energy Export Opportunity • The EU Renewables Directive issued June 2009

encourages interstate trading of renewable power and renewable credits between member states.

• A joint British Irish Council announcement , June 2011, agreed an All Island Approach to renewable energy development. • Acknowledges Ireland’s substantial renewable

energy resources, particularly offshore, providing an opportunity for export.

• Indicates that import of Irish renewable energy is a policy which the UK sees as beneficial.

• An Intergovernmental Agreement between Ireland and the UK is expected this year to facilitate the export of renewables.

• Policy Commitments from the UK have already increased investor certainty in Irish renewable energy.

11

Page 12: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

• How would renewables export work?

- Statistical transfer / market mechanism- Interconnection- Direct connection of wind farms

Statistical transfer can be undertaken using a bilateral agreement between two member states. This would require a similar statutory instrument as used for the REFIT schemes.

A number of recent Government backed studies have all concluded that an integrated and incremental approach to developing an offshore grid network in the Irish Sea is the most appropriate method to facilitate exports, increase the penetration of Renewable Energy and improve the existing onshore grid.

These include:

The Isles Study Eirgrid’s Offshore Grid Study North Sea’s Offshore Grid Initiative

Eirgrid offshore grid study base case scenario

Export Mechanisms

12

Southern Isles Concept

Page 13: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

Delivering on our Opportunity

13

• Develop a positive mindset – our resources are unparalleled .

• Look beyond our shores for the opportunity which exists.

• Ensure our national policies support our industry objectives.

• Create the necessary market mechanism – Ireland / UK / Europe.

• Be the leaders of the change Ireland wants and needs.

Page 14: Barriers and issues facing offshore wind Garrett Connell - NOW Ireland Economics of Ocean and Marine Renewable Energy HMRC 2012 1

The National Offshore Wind Association of Ireland (NOW Ireland) is the representative organisation for offshore wind farm developers in Ireland