46
Sheet 1 of 46 BAR BENDING SCHEDULE Contract: Department: Name of Work: Reinforcement Detail of P.C. Girder Contractor: Mark Shape 8 0.393 10 0.614 12 0.884 16 1.572 20 2.456 25 3.838 32 200 c/c 6.287 Dia (mm) No. of Bars Total Bars Cut Length (m) Total Length (m) Spacing (mm) Lap (m) Unit Wt (Kg/m) Total Weight (Kg) 3000 5470 850 12000 4570 12000 1420 1025 12000

Bar+Bending+Schedule

Embed Size (px)

DESCRIPTION

Bar bending Schedule in Excel worksheet format.

Citation preview

Page 1: Bar+Bending+Schedule

Sheet 1 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of P.C. Girder Contractor:

Mark Shape Remarks

8 0.393

10 0.614

12 0.884

16 1.572

20 2.456

25 3.838

32 200 c/c 6.287

Dia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(m)

Unit Wt(Kg/m)

Total Weight(Kg)

3000

5470850

12000

4570

12000

14201025

12000

Page 2: Bar+Bending+Schedule

Sheet 2 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of P.C. Girder Contractor:

Mark Shape RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(m)

Unit Wt(Kg/m)

Total Weight(Kg)

40 200 c/c 9.824 2410

5170

850

470

160050

193-378 avg

160050

100

160050

12000

Page 3: Bar+Bending+Schedule

Sheet 3 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of P.C. Girder Contractor:

Mark Shape RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(m)

Unit Wt(Kg/m)

Total Weight(Kg)

Total: 0.00

100

160050

265

120

470

265

170

210

975

350

135

1515

150

Page 4: Bar+Bending+Schedule

Sheet 4 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark Remarks

101 20 38x2 76 8.645 657.020 120 c/c -- 2.470 1622.84

102 20 60x2 120 6.000 720.000 120 c/c -- 2.470 1778.40

103 12 3x2 6 4.460 26.760 -- -- 0.888 23.76

104 12 3x2 6 8.605 51.630 -- -- 0.888 45.85

105 12 29x1 29 1.960 56.840 200 c/c 750 0.888 50.47

105a 12 38x1 38 1.960 74.480 150 c/c 750 0.888 66.14

106 20 2x4 8 2.410 19.280 -- 1200 2.470 47.62

Dia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

7145

750

4500

750

4460

2110

300

1960

300

1960

300

7105

750

Page 5: Bar+Bending+Schedule

Sheet 5 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

107 12 17x1 17 7.365 125.210 150 c/c -- 0.888 111.19

108 12 38x1 38 3.206 121.830 150 c/c -- 0.888 108.19

109 12 29x1 29 4.330 125.570 200 c/c -- 0.888 111.51

110 20 2x4 8 3.182 25.460 -- -- 2.470 62.89

111 25 8+8 16 7.365 117.840 -- -- 3.860 454.86

112 12 13x1 13 7.365 95.750 200 c/c -- 0.888 85.03

113 16 3x1 3 4.090 12.270 -- -- 1.580 19.39

6165

600

3023

183

3060

1270

3023

159

6165

600

6165

600

2570

760

Page 6: Bar+Bending+Schedule

Sheet 6 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

114 12 21x1 21 2.065 43.370 125 c/c -- 0.888 38.51

115 25 5x1 5 8.515 42.580 -- -- 3.860 164.36

115a 20 5x1 5 8.515 42.580 -- -- 2.470 105.17

116 29x1 29 3.599 104.370 200 c/c -- check dia #VALUE!

117 29x1 29 2.484 72.040 200 c/c -- check dia #VALUE!

118 2x4 8 2.484 19.870 -- -- check dia #VALUE!

119 8x2 16 7.365 117.840 200 c/c -- check dia #VALUE!

545

760

6115

1200

6115

1200

200

2129

1270

2092

200

6165

600

2092

200

Page 7: Bar+Bending+Schedule

Sheet 7 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

120 14x1 14 2.210 30.940 200 c/c 1000 check dia #VALUE!

121 18x1 18 2.210 39.780 150 c/c 1000 check dia #VALUE!

122 20x1 20 4.170 83.400 150 c/c -- check dia #VALUE!

123 16x1 16 3.920 62.720 200 c/c -- check dia #VALUE!

124 8x1 8 4.894 39.150 200 c/c -- check dia #VALUE!

125 11x1 11 4.562 50.180 150 c/c -- check dia #VALUE!

126 7x1 7 3.110 21.770 150 c/c -- check dia #VALUE!

1960

300

1960

300

29701000

200

2970750

200

4594

300

4562

2810

300

Page 8: Bar+Bending+Schedule

Sheet 8 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

127 5x1 5 3.110 15.550 200 c/c -- check dia #VALUE!

128 8x1 8 3.970 31.760 150 c/c -- check dia #VALUE!

129 6x1 6 3.720 22.320 200 c/c -- check dia #VALUE!

130 3x2 6 4.920 29.520 -- -- check dia #VALUE!

131 12 4x2 8 2.744 21.950 150 c/c -- 0.888 19.49

132 12 21x2 42 1.580 66.360 200 c/c -- 0.888 58.93

133 12 21x2 42 1.966 82.570 200 c/c 576 0.888 73.32 1.04

2810

300

1620/39201000

200

1620/3920750

200

1000

520

3400

750

120

710

405

300240

1000

Page 9: Bar+Bending+Schedule

Sheet 9 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

134 20 3x2 6 5.664 33.980 -- -- 2.470 83.93

135 12 5+5(2) 20 3.720 74.400 -- -- 0.888 66.07

136 16 2x2 4 3.695 14.780 150 c/c -- 1.580 23.35

137 12 2x2 4 3.695 14.780 200 c/c -- 0.888 13.12

138 12 40x1 40 3.920 156.800 150 c/c -- 0.888 139.24

139 12 40x1 40 4.030 161.200 150 c/c -- 0.888 143.15

140 12 55x1 55 5.405 297.280 -- -- 0.888 263.98

Page 10: Bar+Bending+Schedule

Sheet 10 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Right Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

141 12 40x1 40 2.155 86.200 150 c/c -- 0.888 76.55

Total: #VALUE!

Page 11: Bar+Bending+Schedule

Sheet 11 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark Remarks

101 20 38x2 76 8.645 657.020 120 c/c -- 2.470 1622.84

102 20 60x2 120 6.000 720.000 120 c/c -- 2.470 1778.40

103 12 3x2 6 4.460 26.760 -- -- 0.888 23.76

104 12 3x2 6 8.605 51.630 -- -- 0.888 45.85

105 12 29x1 29 4.715 136.740 200 c/c -- 0.888 121.43

106 20 2x4 8 2.410 19.280 -- -- 2.470 47.62

107 12 11x1 11 7.365 81.020 150 c/c -- 0.888 71.95

Dia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

Page 12: Bar+Bending+Schedule

Sheet 12 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

108 12 38x1 38 3.604 136.950 150 c/c -- 0.888 121.61

109 25 5x1 5 8.515 42.580 -- -- 3.860 164.36

110 20 2x4 8 2.431 19.450 -- -- 2.470 48.04

111 25 8+8 16 7.365 117.840 -- -- 3.860 454.86

112 12 9x1 9 7.665 68.990 200 c/c -- 0.888 61.26

113 16 3x1 3 3.770 11.310 -- -- 1.580 17.87

114 12 21x1 21 1.845 38.750 125 c/c -- 0.888 34.41

Page 13: Bar+Bending+Schedule

Sheet 13 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

115 25 5x1 5 8.515 42.580 -- -- 3.860 164.36

116 12 29x1 29 3.595 104.260 200 c/c -- 0.888 92.58

117 10 29x1 29 2.484 72.040 200 c/c -- 0.620 44.66

118 20 2x4 8 2.484 19.870 -- -- 2.470 49.08

119 10 8x2 16 7.365 117.840 200 c/c -- 0.620 73.06

120 12 8x1 8 2.210 17.680 200 c/c -- 0.888 15.70

121 16 11x1 11 2.210 24.310 150 c/c -- 1.580 38.41

Page 14: Bar+Bending+Schedule

Sheet 14 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

122 16 15x1 15 4.266 63.990 150 c/c -- 1.580 101.10

123 12 11x1 11 4.016 44.180 200 c/c -- 0.888 39.23

124 12 8x1 8 4.069 32.550 200 c/c -- 0.888 28.90

125 16 11x1 11 3.737 41.110 150 c/c -- 1.580 64.95

126 16 7x2 14 3.604 50.460 150 c/c -- 1.580 79.73

127 12 5x2 10 4.045 40.450 200 c/c -- 0.888 35.92

128 16 8x2 16 4.285 68.560 150 c/c -- 1.580 108.32

Page 15: Bar+Bending+Schedule

Sheet 15 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

129 12 7x2 14 4.035 56.490 200 c/c -- 0.888 50.16

130 25 3x2 6 4.764 28.580 -- -- 3.860 110.32

131 12 13x2 26 2.807 72.980 150 c/c -- 0.888 64.81

132 12 21x2 42 1.580 66.360 200 c/c -- 0.888 58.93

133 12 21x2 42 1.966 82.570 200 c/c 576 0.888 73.32

134 20 3x2 6 5.664 33.980 -- -- 2.470 83.93

135 12 5+5(2) 20 3.920 78.400 -- -- 0.888 69.62

Page 16: Bar+Bending+Schedule

Sheet 16 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

136 16 2x2 4 3.695 14.780 150 c/c -- 1.580 23.35

137 12 2x2 4 3.695 14.780 200 c/c -- 0.888 13.12

138 12 40x1 40 3.920 156.800 150 c/c -- 0.888 139.24

139 12 40x1 40 4.030 161.200 150 c/c -- 0.888 143.15

140 12 55x1 55 5.405 297.280 -- -- 0.888 263.98

141 12 40x1 40 2.155 86.200 150 c/c -- 0.888 76.55

142 25 10x8 80 8.000 640.000 -- 1500 3.860 2470.40

Page 17: Bar+Bending+Schedule

Sheet 17 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Left Abutment Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

143 25 14x8 112 9.900 1,108.800 -- 1500 3.860 4279.97

144 10 110x8 880 1.917 1,686.960 150 c/c 19170 0.620 1045.92

Total: 14517.03

Page 18: Bar+Bending+Schedule

Sheet 18 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Abutment Pile & Pier Pile Contractor:

Mark Remarks

101 20 9x2x2 36 5.620 202.320 -- -- 2.470 499.73

102 12 31x2 62 4.780 296.360 150 c/c -- 0.888 263.17

103 12 31x2 62 3.290 203.980 150 c/c -- 0.888 181.13

104 16 4x2x2 16 4.090 65.440 -- -- 1.580 103.40

105 12 19x2x2 76 1.815 137.940 150 c/c -- 0.888 122.49

106 12 2x2x2 8 6.120 48.960 -- -- 0.888 43.48

107 12 2x2x2 8 1.670 13.360 -- -- 0.888 11.86

Dia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

Page 19: Bar+Bending+Schedule

Sheet 19 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Abutment Pile & Pier Pile Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

108 25 10x4 40 10.500 420.000 -- 1500 3.860 1621.20

109 25 14x4 56 12.350 691.600 -- 1500 3.860 2669.58

110 10 144x4 576 1.917 1,104.190 150 c/c 19170 0.620 684.60

Total: 6200.64

Page 20: Bar+Bending+Schedule

Sheet 20 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms Contractor:

Mark Remarks

101 12 11x4 44 9.120 401.280 125 c/c 800 0.888 356.34

102 12 11x4 44 12.400 545.600 125 c/c -- 0.888 484.49

101a 10 10x4 40 9.070 362.800 125 c/c 750 0.620 224.94

102a 10 10x4 40 12.400 496.000 125 c/c -- 0.620 307.52

103 12 11x2 22 9.520 209.440 125 c/c 0.888 185.98

104 12 11x2 22 12.400 272.800 125 c/c -- 0.888 242.25

103a 10 10x2 20 9.470 189.400 125 c/c 0.620 117.43

Dia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

800+400

750+400

3000

5470850

12000

4570

4570

Page 21: Bar+Bending+Schedule

Sheet 21 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

104a 10 10x2 20 12.400 248.000 125 c/c -- 0.620 153.76

105 12 42x2 84 6.000 504.000 150 c/c -- 0.888 447.55

106 12 42x3 126 9.870 1,243.620 150 c/c 0.888 1104.33

107 20 42x2 84 12.000 1,008.000 150 c/c -- 2.470 2489.76

108 16 396 396 6.295 2,492.820 150 c/c -- 1.580 3938.66

109 16 479 479 6.295 3,015.310 125 c/c -- 1.580 4764.19

110 12 50x2 100 1.590 159.000 125 c/c -- 0.888 141.19

800+750

Page 22: Bar+Bending+Schedule

Sheet 22 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

111 16 2x2 4 5.995 23.980 -- -- 1.580 37.89

112 12 2x2 4 5.995 23.980 -- -- 0.888 21.29

113 25 4x2 8 3.100 24.800 -- -- 3.860 95.73

114 12 6x2(2) 24 3.700 88.800 250 c/c -- 0.888 78.85

115 12 20x2 40 3.830 153.200 200 c/c -- 0.888 136.04

116 20 4x2 8 6.295 50.360 -- -- 2.470 124.39

117 25 4x2 8 3.100 24.800 -- -- 3.860 95.73

Page 23: Bar+Bending+Schedule

Sheet 23 of 23

BAR BENDING SCHEDULE

Contract: Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms Contractor:

Mark RemarksDia(mm)

No. of Bars

Total Bars

Cut Length(m)

Total Length(m)

Spacing(mm)

Lap(mm)

Unit(Kg/m)

Total Weight(Kg)

Shape(mm)

118 12 6x2(2) 24 3.700 88.800 250 c/c -- 0.888 78.85

119 12 20x2 40 3.830 153.200 200 c/c -- 0.888 136.04

120 25 3x2 6 6.295 37.770 -- -- 3.860 145.79

25 2x2x2 8 3.750 30.000 -- -- 3.860 115.80

Total: 16024.79