Project Number
Owner
Prime Contractor
Project Name
DatePhone
GA DEPARTMENT OF TRANSPORTATION
US 41; SR 3; US 411 STPOO-0002-00(626)
(770)422-7520Subject
CWM Job NumberSheet Number
Prepared By
C. W. MATTHEWS 1
CJD 10/13/16
12109
RAMP “B” & “F” CLOSURE & DETOUR
Circle 75
Cobb County
E4150/E4160/X2403
2224
3/1/2017Juan Velasquez678-233-0744
Circle 75 Temporary Closure
BRIDGE 1LOCATION
SR 54 CLOSED TOTRAFFIC 10/25 9:00PM
THRU 10/28 5:00AM
SR 54
SR 54
SR 54
SR 54
SR 54
SR 54
SR 54
SR 54
SR 54 CLOSED TOTRAFFIC 10/25 9:00PM
THRU 10/28 5:00AM
SR 85
Banks Rd
Corinth Rd
ROADCLOSED
ROADCLOSED
SR 54
GEORGIA DEPARTMENT OF TRANSPORTATION
SR 54 FAYETTEVILLE RD
2303
9/11/2019Juan Velasquez
SR 54 Bridge 1 Jacking Detour Plan