146
I Cit 51 I ILIJZL 652 6, 42 I BALLISTIC MiSSIL E DEFE NSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) for 20U The Missile Defense Agency (MDA) presents the 2012 BMDS Accountability Report (BAR) to Congress to enhance the transparency. accountability, and oversight of the BMDS program. (b)(6) I OLE 51 I ILIAC SSE 5146 I

BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

  • Upload
    builien

  • View
    258

  • Download
    3

Embed Size (px)

Citation preview

Page 1: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Cit 51 I ILIJZL 652 6 , 42 I

BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) for 20U

The Missile Defense Agency (MDA) presents the 2012 BMDS Accountability Report (BAR) to Congress to enhance the transparency. accountability, and oversight of the BMDS program.

(b)(6)

I OLE 51 I ILIAC SSE 5146 I

Brackiny
Typewritten Text
12-F-1159 Doc 1
Page 2: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oft Of I ICiiib tgUI! 014£ I

Missile Defense Agency Ballistic Missile Defense System (BMDS) Accountability Report

(BAR) For 2012

February 15, 2012

This document contains information exempt from mandatory disclosure under the Freedom of Information Act.

[5 U.S.C. 552(b)(3) and (5) apply.]

F 8 R 8 FFI @L liS lJQIQ 8 E fisT

Page 3: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil GIIICiiits tgJI§ 61415 I

TABLE OF CONTENTS Page

l.O Introduction ......................................................................................................................... 3 2.0 Definition of Baselines ......................................................................................................... 5 3.0 Variance Reporting ............................................................................................................. 6 4.0 Reportable Variances .......................................................................................................... 7 5.0 Program Change Summary ................................................................................................ 8 6.0 Updated Baselines for BMDS Product Development and Initial Production

Programs and Selected Materiel Solutions Analysis (MSA) Acquisition Activity and Technology Development PrograBJS ........................................................................... 9 6.1 C2BMC Spiral6.4 .......................................................................................... SUdes 1-7 6.2 THAAD Increment 1.0 and AN/TPY-2 Increment 1.0

6.2.1 THAAD Increment 1.0 ..................................................................... Slides 8-15 6.2.2 AN/TPY-2 Increment 1.0 ............................................................... Slides 16-24

6.3 Aegis BMD 6.3.1 Aegis BMD 4.0.1/SM-3 Block 113 ................................................. Slides 25-31 6.3.2 Aegis Ashore .................................................................................. Slides 32-39 6.3.3 Aegis BMD 5.0 .............................................................................. Slides 40-47

6.4 GMD (Initial Homeland Defense) .............................................................. Slides 48-55 6.5 Targets

6.5.1 IRBM .............................................................................................. Slides 56-62 6.5.2 MRBM ........................................................................................... Slides 63-69 6.5.3 SRBM ............................................................................................. Slides 70-76 6.5.4 Targets Common Components ....................................................... Slides 77-81

6.6 Israeli Programs 6.6.1 David's Sling Weapons System ..................................................... Slides 82-87 6.6.2 Arrow 3 .......................................................................................... Slides 88-94 6.6.3 Arrow 2 Block 4 ........................................................................... Slide.s 95-101

6.7 MSA Acquisition Activity and Technology Development Phase Program Examples 6. 7.1 Precision Tracking and Space Surveillance (PTSS ) ................... Slides 102-107 6.7.2 Aegis SM-3 Block liB ................................................................ Slides 108-113

Appendixes

A: MDA Contract Performance Summary ................................................................... 130 B: Missile Defense Executive Board (MDEB)- Report of Activities for CY 2011 .... 131 C: Resource Baseline Methodology ................................................................................ 134 D: Acronyms ...................................................................................................... .............. 136 E: Multiple Sources for Security Classitication ........................................................... .l45 F: Classified Baselines (Section 6.0)

2 FQiil QFiiiQI I L UBii QliLlf

Page 4: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PPH!IIAIY t!f0151 8fflsT

1.0 Introduction

ln its annual BMDS Accountability Repoti (BAR), the. Missile Defense Agt!.ncy (MDA) presents baseline parameters used to guide and track development of ballistic missile defense capabilities. Unless noted, information in this report is through January 27, 2012. This report presents program baselines for BMDS component dements in MDA's Product Dt!velopment and Initial Production acquisition lifecycle phases. The BAR also presents resource, schedule, and technical variances from the previously reported baselines. This report is in response to Sections 231 and 232 of the National Defense Authorization Act (NOAA) for fiscal ye.ar (FY) 2012, Public Law (P.L.) 112-81.

This 2012 BAR updates baselines for MDA component element programs from the 2011 'BAR. The 2012 BAR also incorporates suggestions provided by the Government Accountability Office (GAO) to include: 1) addition of information to explain the major changes experienced by each program over the past year; 2) addition of a buy/delivery information for each program that has advanced to Product Development or Initial Production; 3) a description of cost items not included in program Resource Baselines; and 4) a description of confidence levels for cost estimates. In addition, Appendix A includes Earned Value Management (EVM) data for the BMDS component element programs to show trends in cost and schedule performance on current work under contract.

BMDS component element baselines are aligned with the President's Budget (PB) submission for FY 2013 (PB 13). PB 13 directed budget reductions to the BMDS across the Future Years Defense Program (FYDP) of approximately $3.9 billion. This reduction, as well as the Continuing Resolution during FY 201 1 and through the second quarter of FY 2012, impacted MDA's ability to execute program plans and drove changes to some BMDS program content and schedule. Changes also occurred in BMDS component element programs expected to establish baselines in 2011. For example, in the 2011 BAR, MDA reported intent to establish baselines for Ground-based Missile Defense (GMD) Enhanced Homeland Defense; Terminal High Altitude Area Defense (THAAD) 2.0; ANffPY-2lncrement 2.0; and Upgraded Early Warning Radar (UEWR) Increment 2.0; and Command and Control, Battle Management and Communications (C2BMC) Spiral8.2, and report them in the 2012 BAR. However, because of the reductions and associated delays, MDA deferred establishing these program baselines to FY 2012 with first baseline reporting anticipated in the 2013 BAR. This BAR presents the content and schedule program impacts to current BMDS component element programs in the MDA Product Development phase and Initial Production phase.

MDA is working with the operational test and evaluation community to update the Test baselines and produce the Integrated Master Test Plan (IMTP) version 12.1. The component element program test baselines are ret1ected in the IMTP and therefore are not delivered in this BAR. Due to the impacts of the FY 2012 appropriations in late December 2011, MDA will release of the updated IMTP in early March 2012.

In addition to the required reporting of BMDS component element program baselines in Product Development or Initial Production, this BAR continues to include updated program plans for Precision Tracking Space System (PTSS) and Standard Missile (SM)-3 Block fiB.

3 FQiil QFliiQI I L UBii QJILli

Page 5: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil GIIICiiits tgJIS Of 415 I

These programs are critical to the future of the BMDS and have widespread exteroal interest. PTSS is currently in MDA's Materiel Solution Analysis acquisition lifecycle phase and SM-3 liB recently transitioned into the Technology Development phase.

MDA is developing a flexible target family with the ability to interchange Re-Entry Vehicles across Medium Range Bal1istic Missile (MRBM), Intermediate Range Ballistic Missile (IRBM), and Intercontinental Ballistic Missile (ICBM) target classes. This strategy allows MDA to emulate a wide range of threat capabilities with fewer unique target configurations. In order to accomplish this, MDA has rea}jgned the BMDS targets' portfolio by parsing common components from the Short Range Ballistic Missile (SRBM), MRBM, and IRBM programs. This new Targets Common Components program provides additional insight of cost, schedule, and acquisition strategy for reentry vehicles and associated objects. MDA conducted development baseline reviews for the new and revised programs and approved the baseHnes in February 2012. Also, MDA will revise the acquisition strategyl(b)(3):10 usc §130,(b)(5) 1 {b)(3):1 0 usc §130,{b)(5)

The 2012 BAR improves management visihility and insight into the Aegis BMD 5.0 program. The updated Aegis BMD 5.0 baselines consolidate activity required to adapt the Aegis BMD combat system computer programs to operate on land (i.e., support the Aegis Ashore program) and to expand system capability to support BMDS responses to evolving threat operational characteristics and raid sizes. These upgrades are identified as Aegis BMDS 5.0 Capability Upgrade (CU) in this report

The 2012 BAR also improves management visibility and insight into the Aegis Ashore program. The expanded Aegis Ashore baselines include planned BMDS program content such as: site activation, military construction, site-specific systems engineering, and non-tactical communications. These contributions to Aegis Ashore are managed outside the Aegis Ashore Program Office, but are necessary to successfully complete the baseline.

The BMDS Sea-Based X-band radar (SBX) program completed development and production and is now in operations and sustainment. Furthermore, MDA comple.ted transfer of the SBX capability to the Navy on December 21, 2011 so SBX is no longer reported in BAR.

Several BMDS component element programs transitioned to a new acquisition lifecycle phase or rebaselined within their cmTent phase. The decision memorandums approving the corresponding new baselines are included in Section 6.0. These programs are:

• THAAD Increment 1.0 entered Initial Production (Batteries 3, 4, and 5) with the December 2010 USD(AT&L) Acquisition Decision Memorandum (ADM) thereby establishing new program baselines for the Initial Production Phase.

4 FQiil QFliiQI I L UBii QJILV

Page 6: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil GIIICiiits tgJIS Of 415 I

• ANffPY-2 Increment 1.0 entered Initial Production (radars 9 and 10) in concert with THAAD.

• Aegis SM-3 Block IB, and Aegis Weapon System (AWS) 4.0.1 reestablished program baselines with the June 2011 MDA Director Development Decision Memorandum (DDM). The MDA Director and the Assistant Secretary of the Navy (ASN) (Research. Development & Acquisition (RDA)) directed the program baselines to be updated to address baseline changes caused by the design modification of the Throttleable Divert and Attitude Control System (TDACS) to meet service life requirements.

!\-IDA updated the strategy for delivering capability to the Warfighter. Tbjs change has not altered the content of the BMDS program baselines, but does provide capability to the Warfighter sooner. Previously, MDA's strategy was to align BMDS development to BMDS "Capability Deliveries." These Capability Deliveries occurred in 2-3 year increments and included the hardware and software systems projected for delivery inside that window. Since the 2011 BAR, J\..fDA has migrated to a more rapid incremental delivery strategy. Under this strategy, MDA delivers capability to the Warfighter as it is ready; making the delivery increments smaHer and more frequent. BaseJines are no longer tied to a single BMDS Capability Delivery; they are now aligned with multiple incremental deliveries. As a result this report shows new nomenclature for the ANffPY-2 and GMD baselined program increments, but program content did not change except as specifically indicated.

2.0 Definitions of Baselines

MDA's baselines are expected outcomes that serve as parameters to guide development of ballistic missile defense capabiJjtjes. Their implementation enhances the Agency's transparency, accountability, and oversight. The six BMDS program baselines are:

• The schedule baseline is a timeline for key product development milestones and tasks, such as key decision points and product deliveries.

• The technical baseline is an engineering management tool used by MDA to control the technical aspects of BMDS product development. Eaeh product baseline is comprised of a listing of capability needs derived from the Warfighters' Prioritized Capabilities List (PCL) 1, enduring capabilities, current and future capabilities, and knowledge points. Together these elements form a product functionality trace and define the way points the program must achieve to proceed successfully through development.

• The test baseline is a schedule of major flight and ground tests, key modeling and simulation events, and the primary goals associated with those tests and events2

1 The United States Strategic Command (USSTRATCOM) published the Air and Missile Defense PCL tor Program Objective Memorandum (POM) FY 2014 on October ll. 2011 (known as the 201 I PCL) which provides atlditional Warlighter priorities to the 2009 PCL. The 2012 BAR provides Technical Baselines which trace capability requirements to both the 2009 and 20 I I PCL where applicable. The 2009 PCL captured "Needs" and "Enduring Capabilities", whereas the 2011 PCL iJentifics ''Priorities' ' which are found in Appendix B. Table B-10 of the 2011 PCL. ! As noted earlier, the Test baselines are deferred to the IMTP 12.1 report to Congress.

5 po p o p mcJ 0 I USE can ]f

Page 7: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil GIIICiiits tgJIS 61415 I

• Tbe operational capacity baseline (OCB) is an engineering management database containing the MD A-approved operational configuration of BMDS hardware and software versions fielded for Warfighter use. OCBs present information on the fielding plans, capabilities and limitations, and supporting activities for operational capability deliveries.

• The resource baseline is the expected investment in the delivery of a BMDS product. Resource baselines are represented as Program Acquisition Unit Cost (PAUC), Average Procurement Unit Cost (APUC), Program Acquisition Cost (PAC) and/or Average Unit Cost (AUC). (A detailed discussion of the resource baseline methodology is presented in Appendix C.)

• The contract baseline is a timeline for a set of MDA contracts designed to deliver integrated BMDS capabilities. The timeline highlights the steps in the contracting process from Request for Proposals through Proposal Receipt, Negotiations Complete, Contract Award, and Contract Execution.

3.0 Variance and Change Reporting

Variances are defined as deviations (expected or actual) from established BMDS schedule, technical, and resource baselines. Variances are tracked and managed because they retlect directly on how well the Agency is delivering BMDS capabilities to the Warfighter. The thresholds used to report variances in the 2012 BAR are:

• (b)(3):10 usc §130,(b)(5)

Section 4.0 of this BAR summarizes above-threshold variances from the previously reported BMDS Product Development and Initial Production component program baselines. Section 5.0 summarizes significant content changes to BMDS program baselines. Section 6.0 reports all program baselines and plans, summarizes significant c.banges from the previously reported baselines, and describes the re.sultant program impacts. Section 6.0 also compares the current Product Development and Initial Production program baselines with the previously reported baselines by showing all changes. Changes for each base.Iine in Section 6.0 are highlighted with a strikethrough (red line) over the changed item or event and the updated item or event entered in red and red font. Items shown in black and black font are unchanged.

6 FQiil QFiiiQI I L UBii QJILlf

Page 8: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil Of I ICiiits llBIS 61415 I

4.0 Reportable Variances

St!ction 4.0 summarizes above-threshold variances from tht! previously reported BMDS Product Development and Initial Production component program baselines.

4.1 Schedule: (b)(3):1 0 usc §130

7 FQiil QFliiQI I L UBii QJILli

Page 9: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PPH!IIAIY t!fBf!l 8I fisT

(b)(3) 10 usc §130

{b){3):10 usc §130

5.0 Program Change Summary

Section 5.0 summarizes significant content changes to BMDS program baselines.

5.1 Resource: {b)(3) 10 usc §130,(b){5)

8 FQil QFiiiQI I L UBii OJILli

Page 10: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

fOR OfflfCIAL OS£ 614£1

6.0 Updated Baselines for BMDS Product Development (PD) Programs and selected Materiel Solutions Analysis (MSA) Acquisition Activity and Teehnology Development Programs

Section 6.0 includes the unclassified program baseline charts. Classified program baseline charts are provided in Appendix F (a separate classified annex). See Appendix D for a list of acronyms used in Section 6.0.

9 FQiil QFliiQI I L UBii QJILli

Page 11: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8ft 8PPI8lats t;91!!J 8! ftsf

6.1 C2BMC Spiral 6.4

Slide 1 F91t 9FFI9Lbls lJQI!l 8HWJ

Page 12: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F8R 8FFH!lbzts tJBJ!! 8£ llfl

C2BMC Spiral 6.4 2012 BMDS Accountability Report (BAR) Significant Change Summary -

(b)(3):1 0 usc §130,(b)(5)

Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012

Jb)(6) I ll(b)(6) I '""s-l-id_e_2 ____ ....s----------' F8R 8FFH!!!LIIS 881!! 8Ffl51

Page 13: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P 8 R 8 :M.ii 81±'!15 ljfYI!J 8 F llrU

C2BMC Spiral 6.4 2012 BMDS Accountability Report (BAR) Schedule Baseline -

(b)(3):10 usc §130,{b)(5)

Approved Original Signed Date 1 Feb 2012 Approved Original Signed Date 31 Jan 2012

i<b)(6) I U(b){6) I ~------------~----------------~

Approved Original Signed Date 31 Jan 2012 l{b){6) I

Slide3

Page 14: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

t78ft 8ff18:k'.IIY 19QB 8F llrY

C2BMC Spiral 6.4 .....iiiiiiiiiiiiii- 2012 BMDS Accountability Report (BAR) ------------- Technical Baseline -

See Classified Appendix F

Slide4 FOR 8PFU!EIIY 1901!1 8I IWJ

Page 15: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 6ft 61 I 1611115 t'!Sts 6H151

C2BMC Spiral 6.4 2012 BMDS Accountability Report (BAR) Operational Capacity Baseline -

Approved Original Signed Date 1 Feb 2012 {b)(6)

Slide 5

Approved Original Signed Date 1 Feb 2012 (b){6)

F91t 9FFI9IJAs lfQiii 9HWJ

Page 16: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oll Of I I GilliS USE Of JISI

C2BMC Spiral 6.4 2012 BMDS Accountability Report (BAR) Resource Baseline -

{b)(5)

Approved Original Signed Date 13 Jan 2012 Approved Original Slgned Date 17 Jan 2012 Approved Oriainal Sianed Date 18 Jan 2012

Jb)(6) I l(b)(6) I (b){6) I Shde 6 POR 3PPH!!!IIIIS !§§IS 0Iff91

Page 17: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

POD OPPI@LIIS fff!ll!! OHM

C2BMC Spiral 6.4 2012 BMDS Accountability Report (BAR) -

Development and Operations

(Other Transaction Authority­

OTA) (CPAF)

Part 6 Phase II Awarded: 15 Feb 02 PoP End: 31 Mar 12 31-eee-t-1 Latest Mod: 22 Nov 1 1~

Business Case Analysis

(BCA)

C2BMC Follow-on Contract

Awarded 1QFY12 PoP: 1 Jan 2012 -

31 Dec 2016

Approved Original Signed Date 13 Jan 2012

l(b)(6) I Slide 7

0 -Ftttt:tfe Current Contract Capability Development,

Operations & Sustainment, Test

Approved Original Signed Date 17 Jan 2012 (b)(6)

FOR OPFI@!I!IE 1§819 8~ tEl

Approved Original Signed Date 17 Jan 2012 (b)(6)

Page 18: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

r ott tsiiiCIJ tts ests er ctsi

6.2.1 THAAD 1.0

Slide8 F9R 9FFI91Itds UBiii 8Hl!rTJ

Page 19: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

(b)(3)1 0 usc §130,(b)(5)

(b)(6)

Attachm~nt: As stat~d

Page 20: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

THAAD Element Criteria for Full Production (U) ·1QFY13-

Exit Criteria Baseline

1 Verified Requirement

1a THAAD System Specification Rev V. traced to BMD System Specification Build C Technical

1b Approved Capability Production Document Technical

2 Design is stable

2a Weapon System Production Qualification complete for all components and subassemblies Technical

3 Test results support confidence that the user needs will be met

3a ATEC Operational Assessment Report (OAR) - Effectiveness. Suitability, and Survivability Assessment Test

3b Beyond Low Rate Initial Production Report (BLRIP) from the Director. Operational Test and Evaluation (DOT&E) lAW Title 10, USC

Test (Section 2399)

4 Projected quantities are affordable

4a Approved MDNCARD Resource

4b Independent Cost Estimate, Completed by CAPE Resource

4c Full funding for Procurement and Operations and Sustainment Resource

4d Training Aids . Devices, Simulators, and Simulations (TAOSS) Funded Resource

5 Manufacturing processes are in control

5a No stgnificant manufacturing risks Technical

5b Industrial Capabilities Assessment completed Technical

6 Plans for operations are in place

6a Supportability Strategy coordinated w/ ARSTAFF. approved by PM (lAW AR 700.127) Operational

6b Materiel Fielding plan coordinated with ARST AFF (lAW AR 700-142) Operational

6c Approved STRAP and Training Support Plan Operational

P8R 8PPIOIJI4t ~8! ltll!i

Page 21: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PFI@Ltts ~819 8! 181

2012 BMDS Accountability Report (BAR)

Significant Change Army & Ignition System Safety Review Board (ISSRB) required MDA to demonstrate proouction hardware configuration in ground and flight test prior to granting Materiel Release. (Met by FTT -12. Oct 2011)

Production Lots 1 & 2 negotiation and contract award continued 6 months longer than planned.

Due to reprioritization of DoD re uirements in a constrained budget environment, (b)(3) 1 o usc §130,(b){5)

l<b)(3):10USC I

IMTP v12.1 modified flight and ground test events.

r X3l 10 usc §130,(bXSJ

THAAD 1.0 Significant Change Summary -

Impact to Baseline Schedule/Operational Capacity: Requirement drove a 9 month delay in

Materiel Release.

Schedule/0 erational Capacity:L..I(b_l<_3)_:1 a_u_s_c_§_13_o...;.,(b_l<S_l ______ _. (b)(3):1 0

Resource: avorable contract negotiation resulted in reduced procurement unit cost for THAAD Fire Control & Communication (TFCC) and Launcher.

Contract: Revised award date reflected on baseline chart.

Approved Original Signed Date 2 Feb 2012 Approved Original Signed Date 2 Feb 2012

l(b )(6) I U{b)(6) I ~------~----------------~ Slide 9 FOR Offll!LIIS 88!! 8~ 891

Page 22: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8FPI@Ltts t<J8@ 8!fl51

Status: 27Jan2012 01 ! 02 I 03 04 01 02 I 03 1 04 01 02 J 03 , 04 01

Program Phase Product Devetopm ot Phase • DBR 1

D . . p . • Initial Production I I r9i; . M11te 8CISIOO 01nts~ 10FY06 ~~td3ri~~ ~ .....-

Design Reviews I JROC 4CPD Dec 2008 I

MDNArmy BoD I •l I • !-' • ll 1-tr • I • • MDA Capability Del. eco

BMDS Knowledge • SRBM capablltty I I I I Points ~ 2QF1 07 .-· I cr;.

El Kp • Mobility, Element Integ & Objective • Ra!lar • guaAQeoJ A ement s ~ Flight lntercept30FY08 Sollware I Ci$;riiiiiRatiQn ,J,

Software Build I ' I • SNCX1 1 TFCOB5.2 l 1

4 Rdr 64.2.4 4 THA.AO System 1311.0

Lchr 84.2 , 1 1

Capability Development

1 l 1 THAAD Communlcati~ns Jnhanc~"lants

Endo/Exo Capability (SRBM; 1 I I I ] I Jeute.l v'UIL atluii aer I E~e~ent Verif;catiol · GG

1ST~ 10.0! tS~S 11.0 ISTS 111.1 1ST~ 11.2

Model & Simulations !Salvotl• (Mass Raid\• • <Debris Processing) (Mea~sbili~) I_ JFTM·34 . JC-1 0 I CV·24 4 FTX-06

I FDEJLUT I

GTD·03 ~TX-64a GTI·04b ~GTI-04d ~T~ t--t I I : ~

I ·~6~6~ FTT-ll!.·l I + FTT~1 4 I LfTT~

Test & BMDS Evaluation

IMTP ~12.1

Ground Test

Flight Test (b)(3):t o usc §130

THAAD 1.0

Approved Oriainal Sianed Date 19 Jan 2012 (b)(6)

Approved Original Signed Date 24 Jan 2012 (b)(6) I

Shde 10 FOil OF:IiiCLbis rOJii OJJis!F

Aooroved Oriainal Sianed Date 24 Jan 2012 l(b)(6) I

Page 23: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Sit Of I I€11& SSE 6i 4£1

THAAD 1.0 Technical Baseline -

See Classified Appendix F

Slide 11 F81l OPPI@JiiiiS t98tg Of 4151

Page 24: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

f8ft 81 fl@L!ti MOl§ 8£ US!

THAAD 1.0 Operational Capacity Baseline -

See Classified Appendix F

Slide 12 F 8 R 8 FFUIIttali l!JQiil Q J 'kH

Page 25: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PPU!!L8S 881!1 8Eftsl

THAAD 1.0 2012 BMDS Accountability Report (BAR) Resource Baseline -

2012 2013 2014 2015 2016 2017 FYDP TOTAL TO COMPLETE TOTAL

COSTSTY$M PRIOR FY I I BL I FY 12 BAF\ FY11 BL I FY1 2 BAR FY11 BL I FY 12 BAR FYI I BL I FY12 BAR FY11 BL I FY12 BAF\ FY 11 BL I FY12 BAR FY I! BL I FY12BAR FY11 BL I FY12 BAR FY11 BL I FY 12 6AF\ Hardware Oovelopmenl 3.474 ~ 125 -i&+ 169 -59- 148 -.;or 33 - ~ ~ 475 - 3-:r'/'T 3.949 Hardware Procurement 64S 'H!- 51 -44 14 - 16 - 2 -r- - - ~ 83 -roo 731 Software Development 485 * 25 -as 27 * 20 ~ '31' ~ 1-re 72 - 'ee3 567 Tesling 2 ,926 12&- 49 ~ 69 +r 75 22 - - - = 214 - - 3:-t119 3 .140

Development Total 7.533 ~ 251 - 279 - 258 1!tt 57 -.i'l' - - ~ 844 - ~ 8~ 8.~77 Production and Dedovment 1,108 894- 709 ~ 461 - 566 9!!" 447 '3e" 49~ •a:• s <181' 3 137 ? 119 4~ 6364 Miliary C<Jnstruot""' 26 26 26 Oporations and Support - 44 44 ~ 56 "ffo 7& 110 95 1l'T ~~ ~ 97 '1219 .143 3,581 3.581 4;o30 .t,vz.< Dispa*"A 178 178 Total Cost Estimate 8667 1,155- 1,004 1- 796 ,.,...... 902 1 12!t 589 1rt' 574 "M' 561 4.TGe 4,425 '3;!181 5,878 16,- 18.969 ConteM Not Included In MOACost Estlm:He: Mi litary Pay, Mal ntanence & Svstai nment o f Common EqtJipment, POl., ProdlJCtion & Sust ainment of the AN/TP¥2

(b)(3):10 usc §130

(b)(3):10 usc §130

Approved Original Signed (b)(6)

Slide 13

Date 19 Jan 2012

TIME PHASED ESTIMATE CHART TV SM - ----------- -----

1,200

1,000

BOO

600

V> 400 c::

.Q

~ 200

'\1").

2012 2013 2014 2015 2016 2017

•Opercations and Suppott Produc-tion and Oeployment •oeveropment Total

I d££ 222222& Ell£ Lib

Approved Original Signed Date 24 Jan 2012 ,.;,A~p~p;:.:.r.:.ov.:.:e::.:d:=O:n::· g;;;;in;;;;;a;;;;;l SF'-i""g.:.:.ne""'d~ Date 3 Feb 2012 l(b)(6) I (b)(6)

FOil O:iFICVAi H()li OJJVu

Page 26: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 81 FI81fds tJOI! 8ffi(J

THAAD 1.0 2012 BMDS Accountability Report (BAR) Contract Baseline -

As of 27Jan2012

Development (CPAF)

Awarded: 4 Aug 00 PoP End: 39 Sep 11

29 j un 12

Production (CPAF/CPIF/

C PF F/FFPIFPI)

FUF Basic: Awarded: 22 Dec 06 PoP End: 21 Aug 12

Awarded: 31 Mar 10 PoP End: 31 Mar 14

Approved Original Signed Date 19 Jan 2012 (b)(6)

Slide 14

... ....;--:-=-='-::~-:---'---r- -- --,---- ---,..-- ----,..- -----... -----1 ' Option#1 : Option#2: Option#3: Option#4: Option#5: e o

~~~~~~.!!!lU---- ___ ,___ ---'--- ____ , __ -----'- ------'

Approved Original Signed Date 24 Jan 2012 (b)(6)

FOR OFFICEHS 8015 8 " M

Page 27: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F8R 8FFI@LIIS tJI919 8Ifl51

THAAD 1.0 BMDS Accountability Report (BAR)

<' I FV1Q

CIA Contract Action ( T Collective Training lJ Long Lead (Components) NET New Equipmeilt Training

Interceptor Deljveries & Av Batter #1 &' #2 (50 I Curr~nt F

• 11 12 Defn Lot 1 · lot ---···-•···-······ ---···+···-··-· 3 9

UCA 1 4QFY10 · -----•-· -- ---------------•----LL I 4QFY09 ·CIA Lot2 CIA Lot 4 V············· ····

I CIA Lot 5

I I I I I I

Q4 Ql

Cum Del 12 (b)(3):10 usc §130

b)(3):10 usc §130

Approved Original Signed Date 19 Jan 2012 (b)(6)

Slide 15

Approved Original Signed Date 24 Jan 2012 (b)(6)

FOR OFFI@LIIS t§E'JFJ OI fl91

Buy/Delivery/Inventory Summary •

Note: Procurement buys continue 2 3 311 . 3 n g gg g st 52 through FY~ total procurement objective of IQillJ

Page 28: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 16

I OR Ofli ILIA£ OS£ 614£1

6.2.2 AN/TPV-2 Increment 1

FOil OFPI@EltS "BI!!J Sflth

Page 29: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I OR Of I ICME USE Ohbl

AN/TPY-2 Increment 1

Significant Change

(b)(3) 10 usc §130,(b)(5)

IMTP v12.1 modified flight and ground test events resulting in a net increase for AN/TPY-2 participation.

MDA adjusted criteria for production decision KP-3. New criteria requires completion of Critical Design Review for Superdome replacement.

Delivered CX-1 software in 30FY11.

Significant Change Summary -

Impact to Baseline

Schedule: Shortened time to complete radar deliveries. Resource: Reduced radar buy resulted in an increase of less than 5% to

Prog.ram Acquisition Unit Cost and Average Procurement Unit Cost.

Resource: Minor impacts. Schedule/Technical: r:::l<b~)(3~):"::":'1 o:-:-u~sc~§l""::'1~3o~.<b~)(~5)-------------...,

r )(3):10 usc §130.(b)(5)

Operational Capacity: No delivery milestones to the warfighter were impacted.

Schedule/Technical : (b)(3) 1 o usc §130,(b)(5)

(b)(3):1 0 usc §130,(b)(5)

Operational: No delivery milestones to the warfighter were impacted.

Operational: Reduced the limitations reported in the 2011 BAR.

Approved Original Signed Date 19 Jan 2012 Approved Original Signed Date 19 Jan 2012

l(b)(6) I ll(b)(6) I ......._ _______ __._ ______ __, FOB QFFICLtAs TIBiil ?JJisli Slide 17 "" "" ""

Page 30: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

1 ea et t tetalS t9BE ernst

AN/TPY-2 Increment 1 2012 BMDS Accountability Report (BAR)

Approved Original Signed Date 19 Jan 2012 (b)(6)

Approved Original Signed Date 19 Jan 2012

lrb)(6) I '--ISL..Iid-e-18 ______ __. ______ -.J FOR OFFI@Ef1S l§§f§ 8If1SI

Schedule Baseline -

Approved Oriainal Sianed Date 25 Jan 2012 l(b)(6) I

Page 31: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oit Of I ICLIL USE 61 4£1

AN/TPY-2 Increment 1 ---------- Technical Baseline -

See Classified Appendix F

Slide 19 F8R 8FPICI28S tJ81§ 8ULI

Page 32: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oit Of I ICZ& USE 6i 4£1

AN/TPY-2 Increment 1 --------- Operational Capacity Baseline -

See Classified Appendix F

Slide 20 F8R 8FFUIItttli lJQfi 8flkU

Page 33: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8ft 8Pfl@Ltl5 t!li!IISl 8HM

AN/TPY-2 Increment 1 2012 BMDS Accountability Report (BAR)

Approved Original Signed Date 19 Jan 2012 (b)(6)

Slide 21

700

600

SilO

400

c: 0 300

~ 200

~ 100

2012 2013

Original Signed Date 19 Jan 2012

F8R 8Ffi@Ltl5 H8J!IJ O~H

Resource Baseline -

Tune Phased Esttmate Chart TV $M

2014 2015 2016 2017

Approved Original Signed Date 3 Feb 2012 l(b)(6) I

Page 34: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Development &Production (CPAF/ CPIT

Jl'PIF)

Contnct: x0047 Awanled: Ol1\pr 03 PoP f.Jul: 31 Dec 12

Awarded: 23 Sep 10

--J>eve~·t-

Radar Sustainment IDIQ Contract (ePIF/CmwPIF:l ~

Awudtd:31 Od 11 PoPENI: ._,yn3l0ctl3

Slide 22

16ft 6111Cbd5 USE 6HfSI

AN/TPY-2 Increment 1 -

Approved Original Signed Date 25 Jan 2012

Page 35: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

2012 BMDS Accountabilit

Approved Original Signed Date 19 Jan 2012 (b)(6)

Slide 23

r en errrerats esc er an

AN/TPY-2 Increment 1

Approved Original Signed Date 20 Jan 2012 (b)(6)

Page 36: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 24

FOR 8FFJ@l£IIS f9819 OHISY

6.3.1 Aegis BMD 4.0.1 SM-3 Block IB

FOil QFFICL' k TII3:1i OJiktf

Page 37: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

...... ~U~I~C~CII!&~""'-!- S!Ilu~u....~b""BI!!Pieb!ti'u~- lftirtP.PJI!I!tu!i~OIPt ii!S!ll!!IJC!liiP.illftiC~h~t.l!ll4 _!1- II!MPP.. J!!I- '!!¢•

JUN 2 2 2011

MEMORANDUM FOR PROGRAM MANAGER, AEGIS BMD 4.0.1/SM-3 BLOCK ill, MISSILE DEFENSE AGENCY (U)

SUBJECT: (U) Development Decision Memorandum for Aegis BMD 4.0.1/SM-3 Block IB Baseline Review

Reference: (U) Joint MDA Director/ASN (RDA) memorandum dated June 30, 2010, Subj: Development Decision Memorandum for Aegis BMD 4.0.1/SM-3 Block ffi Baseline Review

(U) The attached schedule, technical, iest, operational, resource, and contracts baselines and activities are approved for Aegis Ballistic Missile Defense (BMD) 4.0.1/Standard Missile 3 (SM-3) Block IB.

(U) Changes to the BMDS baseline are managed through the Missile Defense Agency (MDA) Program Change Board (PCB) in accordance with MDA Directive 5000.04. PCB­approved changes that affect the Aegis BMD 4.0.1/SM-3 Block ffi acquisition, development or fielding, will be implemented and documented by the Aegis BMD 4.0.1/SM-3 Block IB Program Office. Baseline variations will be reported to MDA Director; Assistant Secretary of the Navy (ASN(RD&A)); and in the annual BMD System Accountability Report.

(U) The following pre-production activities are directed to occur during the remainder of the Aegis BMD 4.0.1/SM-3 Block IB Product Development Phase. Activities associated with Under Secretary of Defense (USD) for Acquisition, Technology, and Logistics (AT &L) production decisions are shown below as well:

• Independent Cost Estimate by Director, Cost Assessment and Program Evaluation (D, CAPE)

o Before Materiel and Procurement decisions for Production Lots 1 and 2

o Before Production Lot 2 and Beyond decision • FHght Test Mission (FIM)-16 flight test round -

Permit To Ship • FY 2011 Tests (FfM-16 El and E2) • Production Lot 1 Materiel Procurement Authorization (MPA)

decision by USD (AT&L) fo~~b)£~:10 usc I (FY 2012 Defense Wide Procurement (DWP) funds)

• Navy Combat System and Weapon Certification

l(b)(3)'10 usc §130,(bX51

4Q FY2011 3Q FY2013

3Q FY20Il 4Q .FY2011

lQ FY2012 2QFY2012

-- 1sl? f8hi £0012 £1!!8 2 ¢8!! IE ib 1 &l 6! &ti&C!IJiJCIJES - £12 I

Page 38: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

~ ' BTl • SSIR.,...D ' " .... d 1

(b)(3):10 usc §130,(b)(5)

(U) The criteria to exit the Product Development Phase (Attachment 7) are also approved. A Development Baseline Review is expected in 4QFY12 prior to an USD (AT &L) production decision to enter Production Phase.

(U) This memorandum supersedes Reference.

(b)(6)

Assistant Secretary of the Navy Research, Development & Acquisition

Attachments:

(b)(6)

Lieutenant General, U'SA Director

1. Aegis BMD 4.0.1/SM-3 Block ffi Schedule Baseline. This document is "EW 'Q " 2. Aegis BMD 4.0.1/SM-3 Block ffi Technical Baseline. This document is "BEFJ. -::·:-" 3. Aegis BMD 4.0.l!SM-3 Block ffi Test Baseline. This document is 'I SOC." 4. Aegis BMD 4.0.1/SM-3 Block ffi Operational Capacity Baseline. This document is

5. Aegis BMD 4.0.1/SM-3 Block IB Resource Baseline. This document is' ~ _ ~ ·"

6. Aegis BMD 4.0.1/SM-3 Block IB Contract Baseline. This document is". 2 68." 7. Aegis BMD 4.0.1/SM-3 Block IB Exit Criteria. This document is 'TO Ot"

cc: DASN (Ships) MDNDX MD AIDE MD A/DO MONDA MDA/DP MDA/DT MONDS MDNAB TWS/1.0 IWS/3.0 OPNAV N86

2

~ st kb t....S •• &6 BJ.SI. I .. iiibt JJ tJI &llddlii:Ct.ts . ~ &lid 4

Page 39: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I OR Of I ICML 63£ Of 4£1

Significant Change Impact to Baselines

FTM-16 E2 failed on 1 Sep 2011. Schedule:

SM-3 Block IB Initial Spares and Production Engineering will be aligned to Procurement vice ADT&E in FY 2013 and beyond.

(b)(3):10 usc §130,(b)(5) -

~(b~)(3~):~1 0~U~SC~§~1~30~,(b~)(r-5)--------------------------------------------------~

Resource: Increased development costs in FY12. The Program Acquisition Unit Cost did not increase as the increase was offset by increased procurement quantities .. _______,

Resource: SM-3 Block IB All Up Round (AUR} Average Procurement Unit Cost increased by 10%. The decision to use procurement funding for initial spares is an administrative change to the program baseline and does not constitute real cost growth. Therefore the increase in APUC is not listed in Section 4 of the BAR.

Operational Capacity: l<bl(3):1 o usc §130,(b)(5) I Resource: "To Complete" costs increased.

Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012 l(b)(6) I Jb)(6)

~------------------~--------~ Slide 25

Page 40: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Fill QJiWil&bls l!lOii QJFW '

2012 BMDS Ac~!:Ji!! ~po~B~ D 4 • Q • 1 / s M-3 81 Q C ~ch~§e Baseline -Status: 27 .JAN 2012 _[ J

(b)(3)10USC§130,(b)(5) FY10 FY11 F

o• I 02 I o 3 I 04 I o• I o2 I o3 I 04 I ~ Program Phase

BMOS Knowledge Points

ilbll3l 10 I

SM·3 BLK IB

T&E

(b)(3):10 usc §130,(b)(5)

Produ« O~etopmf!n.t

Design Reviews • 4,0. 1 W ih:tcat IPR

Decis ion Points .A. MDA Capability Del . OSR BMDS Operatlonai Cnoacitv aasel lne ~ert

-M&AIUSN-Bo&- .A. .A. .A. .A. 1.4 - 4.0.1 vs Group C I ™J:..El) ~ 2.1 .•

l<bllil~to I ~~ R (OT')D~

2. 1 ,2 • P<o-d Qu I (Ptoc:tT~ TCil:.

t.1 ~an ac.t1

Approved Original Signed Date 2 Feb 2012 Approved Oriainal Sianed Date 2 Feb 2012 t)(6) I ll(b)(6) I 'I.S-I-id_e_2_6~cr~it":""ic~a i~M~il:-es-to-n-es-H~i~gh~li~gh-te-d~i-n ~Ye-:-:11-ow---==:---' F 8 R OFFif!!E liS l§EJJ9 Of fl5 I

Approved Oriainal Sianed Date 2 Feb 2012 (b)(6) I

Page 41: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

f8ft 81 ft@LIIS MOM 8PU5i

_.._..._ 2012 BMDS Ac~;:b~J ~po~B~ D 4 • Q • 1 / s M-3 8 1 QC ~eeL~/ Baseline -

See Classified Appendix F

Slide 27 P8R 8FFI81(tli l!JQJj 8flkH

Page 42: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oit Of I IC£1£ SSE Of 4£1

See Classified Appendix F

Slide 28 I Ott Of I ICE& OS£ 014£1

Page 43: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F 0 R 0 FFI 01£' k lt!Olii 0 ffi;TJ

......iiiiiiiiiiilllll- 2012 BMDS Ac~!;:b2! ~po~B~ D 4 • Q • 1 / s M-3 81 Q C ~es!~ Baseline -(b)(5)

Approved Oriainal Sianed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012 Approved Oriainal Sianed Date 1 Feb 2012 r )(6) I (b)(6) I (b)(6) I Slide 29 F~R ~Fiiliii!!II!!J il!fQiii OffW1i

Page 44: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8ft 8PPI@LIIS 1'§1§119 8I ltsf

(b)(3) 10 usc §130,(b)(5)

Approved Original Signed Date 1 Feb 2012 Approved Oriainal Sianed Date 2 Feb 2012 ~pproved Oriainal Sianed Date 1 Feb 2012 r)(6) 1 I 1rb)(6) I ~S-I id_e_3_0 ________ _,_ ____ _, FOil OFFIQL'Ai TI(Jii OJ Ikti (b)(6)

Page 45: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

! Missile Buy Date

Approved Original Signed Date 25 Jan 2012 (b)(6)

Fill iFFi iiil:bls UOiii if Jtrn

FY12

Approved Original Signed Date 25 Jan 2012

ll(b)(6) I '-'S-Iid_e_3_1 ________ .J------' FOR Offll!E£15 t§JfiJ OifiSI

Page 46: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

POD OPPJ@lats f99Ji!!J OI ftsl

6.3.2 Aegis Ashore

Slide 32 F91t 9FFHiiLbiY lJQiii 8JJVJ

Page 47: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

tett tstliCLilS 63£ eHISI

Aegis Ashore -llllliiiiiiiiiiiiiiilll- 2012 BMDS Accountability Report (BAR) Significant Change Summary -

Significant Change

Completed design reviews and program definition which led to an updated system configuration and acquisition strategy.

• {b)(3):10 usc §130

integration risk • (b){3):10 usc §130

In order to improve visibility of total Aegis Ashore costs, incorporated Military Construction, Site Activation, On Site Systems Engineering, and Non-tactical Communications with the Aegis Ashore Resource Baseline.

Approved Original Signed Date 1 Feb 2012 (b){6) I Slide 33

Impact to Baselines

Schedule: Ad"usted fabrication and site re aration schedule events. 1~?~~=10 usc (b){3):10 usc §130

Resource: Updated cost estimate to reflect system configuration and acquisition strategy.

Contract: Adjusted contract strategy consistent with the approved acquisition strategy.

Resource: • For the FY11 BAR these costs were part of the BMDS program but not aligned

with the Aegis Ashore Resource Baseline. • Inclusion of these costs drive an increase to both Program Acquisition Unit Cost

(PAUC) and Average Procurement Unit Cost (APUC). The increase to APUC is solely due administrative realignment of content and not due to cost growth. The PAUC. . d mcrease 1s ue to two comoonents:

{b)(4),{b)(5)

Aooroved Oriainal Sianed Date 1 Feb 2012 {b){6) I

FQB WliFICL' k n Oli WJJfwV

Page 48: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I t'Jft GIIIC£119 @IBIS t'JI JISt

Aegis Ashore

Slide 34 F81t 8FFI8Ltds liBiii 8ffitU

Page 49: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Ott Of I ICIJ l£ 63£ Of CCI

Aegis Ashore - iiiiiiiiiiiill- 2012 BMDS Accountability Report (BAR) _..._ ___________ Technical Baseline -

See Classified Appendix F

Slide 35 I on or t rezzz esc OitEI

Page 50: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PPI@Ltl5 ~819 8! IlK

Aegis Ashore 2012 BMDS Accountability Report (BAR)

Approved Original Signed Date 25 Jan 2012 (b)(6)

Slide 36

Approved Original Signed Date 25 Jan 2012 (b)(6)

F8R 8Ffi@Ltl5 19819 8Ifl91

Operational Capacity Baseline -

Page 51: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oft Of I I€11115 f!lSE OHISI

Aegis Ashore -lllllliiiiiiiiillllll- 2012 BMDS Accountability Report (BAR) Resource Baseline -

(b)(5)

Approved Original Signed Date 25 Jan 2012

l(b)(6) I Slide 37

Approved Original Signed Date 25 Jan 2012 (b)(6)

FWil WliFUillibli li81ii 8 HliU

Approved Original Signed Date 1 Feb 2012 (b)(6)

Page 52: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

ron orrtf!!lLits tJBJ:i!iJ or tts1

Aegis Ashore 2012 BMDS Accountability Report (BAR) Contract Baseline -

{b)(3):1 0 usc §130,{b){4),{b){5)

Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 26 Jan 2012

l{b){6) I Jb){6) I l{b){6) I Shde 38 Iii 8 .. 811111 1!11!!1111 il!!ll!lllii 81i1Jf1i

Page 53: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I en ei I Iliats llBE e1 ttst

Aegis Ashore 2012 BMDS Accountability Report (BAR)

(b)(3) 10 usc §130,(b)(5)

Approved Oriainal Sianed Date 25 Jan 2012 r)(6) 1

Slide 39

Approved Original Signed Date 25 Jan 2012 (b)(6)

F8R 8PPI8L'tls HOiil 8f fiSt

Buy/Delivery/Inventory Summary •

Page 54: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

lOR Of IICML USE O!Cbi

2012 BMDS Accountability Report (BAR)

6.3.3 Aegis BMD 5.0

Slide 40 P8R 8FFHifk'*lJQfi 8flkV

Page 55: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil Of I t@flliS @§IS Of JISt

Aegis BMD 5.0 -llllliiiiiiiiiiillll- 2012 BMDS Accountability Report (BAR) ------------- Significant Change Summary -

Significant Change

Added Aegis Ashore computer program, Aegis BMD 5.0 CU information, and government purchase costs to capture the full baseline 9 integration effort.

NAVSEA changed lead ship's scheduled maintenance period and expanded scope of yard work.

IMTP 12.1 changed the test program.

(b)(3)10 usc §130,(b)(5)

Impact to Baselines

Schedule: Reflect Aegis Ashore and Aegis BMD 5.0 CU development and test activities. Technical: Aegis BMD 5.0 CU Capabilities added. Operational Capacity: Aegis BMD 5.0 CU Capabilities and Limitations added. Resource: Cost estimates for Aegis Ashore computer program, Aegis BMD 5.0 CU, and

government purchase added to the program baseline. Inclusion of these costs drove an increase to Program Acquisition Unit Cost (PAUC) and Average Procurement Unit Cost (APUC). The increase is due to the expanded program content and not the result of real cost growth. Therefore the PAUC and APUC increases are not reported as variances in Section 4 of the BAR.

Contracts: Added CLINs for Aegis BMD 5.0 CU and Aegis Ashore.

Schedule/Technical: Reduced and shifted test window, impacted test dates, knowledge pointsJ and the certification date for ship.

Contracts: Contract POPs changed to reflect new finish dates. Operational Capacity: Shifted test dates.

Schedule: Added ground tests and modified flight tests. Technical: Knowledge Points changed to reflect different test dates. Operational Capacity: Changed test dates.

Schedule/Operational Capacity: Aegis BMD 5.0 installation schedule modified to reflect the Navy fielding and decommissioning plan.

Approved Original Signed Date 1 Feb 2012 Approved Original Signed Date 1 Feb 2012 J b)(6) I U(b)(6) I ~------------------~------~ Slide 41

Page 56: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 8ft 8£ Pl@Ltts 1!;819 8F 1151

Aegis BMD 5.0 2012 BMDS Accountability Re ort (BAR) Schedule Baseline -

Approved Original Signed Date 1 Feb 2012

Jb)(6) I Slide 42

Approved Original Signed Date 1 Feb 2012 (b)(6)

FOR 8PFI@LIE f!819 8Ffl91

Approved Original Signed Date 31 Jan 2012 l(b)(6) I

Page 57: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8ft 8PP18k'Jis l!fQH 8P lk't

Aegis BMD 5.0 ......iiiiiiiiiiiiiiii- 2012 BMDS Accountability Report (BAR) ------------- Technical Baseline -

See Classified Appendix F

Slide 43 rsn srrt@!lias lJ[gl§ or ttst

Page 58: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Sit 62116£& USE 614£1

Aegis BMD 5.0 ___ ..__ 2012 BMDS Accountability Report (BAR) Operational Capacity Baseline -

See Classified Appendix F

Slide 44 F8R 8FFI81Jtli WQfi 8flk"J

Page 59: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil Of I I GilliS t!lBL Of (JSI

Aegis BMD 5.0 2012 BMDS Accountabilit Re ort BAR

Approved Original Signed Date 25 Jan 2012

J b)(6) I Slide 45

Approved Original Signed (b)(6)

Resource Baseline -

Page 60: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

ron orrt@tats w;sH or 1191

Aegis BMD 5.0 2012 BMDS Accountability Report (BAR) Contract Baseline -

(b)(3):10 usc §130,(b)(5)

Approved Oriainal Sianed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 26 Jan 2012 Jb)(6) I lrb)(6) I l(b)(6) I Shde 46 FOR OPPI@llhts HJIS or ft91

Page 61: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

lOR blllCML OS£ OICbl

Aegis BMD 5.0 _llllliii.__ 2012 BMDS Accountability Report (BAR) Buy/Delivery/Inventory Summary •

Aegis BMDShips FV10

5.0/5.0 cu 0

Approved Original Signed Date 25 Jan 2012 rb)(6) I

Slide 47

FV11 FY12

0 1

Approved Original Signed Date 25 Jan 2012 (b){6)

I OR OPfi@LdS "8J!IJ O~ fi!Jl

(b){3) 10 usc §130,(b){5)

Note: Aegis Ashore installs are recorded by the Aegis Ashore Program.

Page 62: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 48

F 0 ft 8 PF18l4tls l!fOM 8 F1 Iff

6.4 GMD Initial Homeland Defense (IHD)

FOR OFPI@EIIS 1JBJ!IJ OfiiSI

Page 63: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I ett et I 16£115 USE er tiS I

GMD Initial Homeland Defense Significant Change Summary -

Significant Change Impact to Baseline (b)(3):10 usc §130,(b)(5) Schedule:

• Return-to-Intercept testing and hardware development content added: • Failure Review Board and resolution testing • Design resolution, hardware development and testing

·l<b)(3):1 0 usc §130,(b)(5)

• Baseline content deferred to future capability increment/s • Ground Systems obsolescence mitigation • Fort Greely non-critical communications infrastructure upgrades • (b)(3):10 usc §130,(b)(5)

Resource: • Resources realigned from deferred content to fund Return-to-Intercept activities

• Ground Systems obsolescence mitigation • Fort Greel non-critical communications infrastructure u • (b)(3):1 0 usc §130,(b)(5)

~~~~~~~--------~·-(b)(3)10 usc §130,(b)(5) Schedule: ·l(b)(3)10 usc §130,(b)(5)

Resource: ·l(b)(3):10 usc §130,(b)(5)

Approved Original Signed Date 24 Jan 2012 Approved Original Signed Date 24 Jan 2012 J b)(6) I J b)(6)

~------------------------~--~ Slide 49

Page 64: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

GMD lnHfaTlfOiiieland Defense 2012 BMDS Accountabilit

Approved Original Signed Date 30 Jan 2012 {b){6)

Slide 50

Approved Original SJgned Date 31 Jan 2012 (b)(6)

FOil OFFUUJzls lJ(Jiii 81 JIYU

Schedule Baseline -

Page 65: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Sit Of I ICil& 83£ Of 4£1

GMD Initial Homeland Defense --------- Technical Baseline -

See Classified Appendix F

Slide 51 P8 R 8 FFHilltlli l!J[Jiil iJ Ikz:

Page 66: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PPI@IJtls l!f9~ 8fli5Y

GMD Initial Homeland Defense ------- Operational Capacity Baseline -

See Classified Appendix F

Slide 52 P81l 8iilii8Ittls \iQfi MfJisU

Page 67: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Fit It Qjij'I(Qifbls URi QJ FW

GMD Initial Homeland Defense

Approved Original Signed Date 24 Jan 2012 (b)(6)

Slide 53

Approved Original Signed Date 24 Jan 2012 (b)(6)

FOil OFFI@IhE !92l!flJ Of fiH

Approved Original Signed Date 26 Jan 2012 (b)(6)

Page 68: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8FPI@LtfSlJ81!! 8!fl91

GMD Initial Homeland Defense 2012 BMDS Accountability Report (BAR)

Status Date 27 Jan 12

Prime Contract (CPAF)

Awarded: 1 Jan 01 PoP : 31 Bee 11 30 Dec 12

Operations &

Sustainment ~~-~~~ (CPFF)

Awarded: 1 Jan 09 PoP : l B Fe b 11 29 Feb 12

Core Completion Contract

(CPFF: 1 Jan 09 - 10 Mar 10 CPAF: 11 Mar 10 · 31 Dec 11) Awarded: 30 Dec 08

(DSC) Development & Sustainment Contract Fin~ l •· (C Contract with

Multiple Fee Structures)

Awarded: 30 Dec 11 Planned Award. JQVF¥11 PoP~ 29 Dec 18

:0

Approved Original Signed Date 24 Jan 2012

J b)(6) I Slide 54

Approved Original Signed Date 24 Jan 2012 (b)(6)

Contract Baseline -

(b)(4),(b)(5)

(b (4),(b)(5)

Approved Original Signed Date 25 Jan 2012 {1:5)(6)

Page 69: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 8ft @51 PU!!IIifS 1§819 8I 1151

GMD Initial Homeland Defense 2012 BMDS Accountability Report (BAR) Buy/Delivery/Inventory Summary •

(b)(5)

Approved Original Signed Date 24 Jan 2012 Approved Original Signed Date 24 Jan 2012

Jb)(6) I Jb)(6) I 4.S-Iid_e_S_S ___________ ...J----' FOR 8FPI8IAIY 8019 Sf fkU

Page 70: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 56

FQil QifiM:filtbk l!JDiii QJ flr\J

6.5.1 Intermediate Range Ballistic Missile

(IRBM)

l Oil 8PPI@Il flY 801!! 8f fl!fil

Page 71: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

ron orrtf!!Ltts -.,s"' or ttsl

Significant Change

Restructured IRBM program and moved Common Components to a new, separately managed program baseline.

IMTP v12.1 modified dates that IRBM targets are required.

r )(3):10 usc §130.(b)(5)

Modified acquisitiori._<b_l<3_):_1 o_u_sc_§_13_o_.<b_l<5_l ______ __,

MDA modified accounting rules for target unit cost to afford better insight for the recurring and non-recurring costs for each target type. Common Target Support is no longer distributed into each target non-recurring costs, and sunk costs are included for both non-recurring and AUG calculations. Also reallocated costs of the components that are common among programs from the MRBM Resource Baseline to the Common Components Resource Baseline.

IRBM Significant Change Summary -

Impact to Baseline

Resource: Reallocated Common Component costs to a new Common Components program.

Technical: l<b)(3):1o usc §130,(b)(5) l<b)(3):10 usc §130,(b)(5)

Schedule: Adjusted target delivery dates.

Contract: RFP release planned for March 2012 with tentative award date 4QFY12.

Schedule: Added booster deliveries and ICBM integration to the schedule.

Resource: Included recurring and non-recurring costs for a new booster for the near-term ICBM missions.

Technical: (b)(3):1o usc §130,(b)(5)

Resource: Adjusted the non-recurring I Average Unit Cost table to show both the value reported in the FY11 BAR and an adjusted value that applies the same accounting rules used for the FY12 calculations. The deltas represent the difference between the FY12 calculations and the adjusted FY11 values.

Approved Original Signed Date 3 Feb 2012

J b)(6) I Approved Original Signed Date 3 Feb 2012

(b)(6)

Slide 57 F81l8FFI@Ihl5l§81!!J 8Ffl91

Page 72: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

i OK Of I ICME 63£ OIC£1

IRBM 2012 BMDS Accountability Report (BAR) Schedule Baseline -

(b)(3):1 0 usc §130,(b)(5)

Approved Original Signed Date 3 Feb 2012 Aooroved Oriainal Sianed Date 3 Feb 2012 Approved Oriainal Sianed Date 3Feb2012

Jb)(6) I l l(b)(6) I Jb)(6) I Slide 58 FOR OFFit!Ett9 HEJf!J Qfflgf

Page 73: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Ott 6 1 liCE& COL GiC£1

IRBM Technical Baseline -

See Classified Appendix F

Slide 59 F 811 8 PFU!!Itili l!JQfi 8 flkzr

Page 74: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

lOR OIIIC£115 @l§£ 8Htn

IRBM 2012 BMDS Accountability Report (BAR) Resource Baseline -

Approved Original Signed Date 3 Feb 2012 Approved Original Signed Date 3 Feb 2012 Approved Original Signed Date 3 Feb 2012 r)(6) I ll(b)(6) I LI.S-Iid_e_6_0 __________ __,_ __ _.. F8R 8FPI8L'IIY HOH 8f twi

l(b)(6) I

Page 75: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

osc HQOJ47-J J-C-0006

[k.m] !FFP. FPAF. FPIF. CPAI.',

CPFF. CP(F) Award: l6ffl1 n.&\Yial J1 Poj)!~ 28 te.b 1£

ATKTech. Services [fJ

ICI>'J-'"F)

W9113M-06-D-0002

T/0 Awarded: 17 Apr09 PoP:'6'"Fl'lT11 30 Sept 11

l:ete5t I 1o~. 39 Jol 19

Sandia Nacional Lillis [g.-hi

MfPR/SOW

MIT/lin"uln LAb li. j]

MIPRJSOW

Original Signed

Slide 61

FQil Qjiji)tilt'lcls l'tJDii QJJt:lJ

IRBM

Page 76: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil SP'Pl@LIIS 81§1:1!1 Sf I¥Ji

IRBM 2012 BMDS Accountability Report (BAR)

Approved Original Signed Date 3 Feb 2012 (b)(6)

Slide 62

Approved Original Signed Date 3 Feb 2012 (b)(6)

FOil OIIFICLWd UJii OJFist'

Buy/Delivery/Inventory Summary •

Page 77: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 63

I Ott OLIICME USE O:CEI

6.5.2 Medium Range Ballistic Missile

{MRBM)

I OR Of I ICML USE OICEI

Page 78: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

FiR 8PPI 8IAIS 1!!1/Slll 8I fisT

Significant Change

IMTP v12.1 modified dates that MRBM targets are required. r ){3) 10 usc §130.(bX5)

Restructured MRBM program and moved Common Components to a new, separately managed program baseline.

r X3P O usc §130,(bX5)

MDA modified accounting rules for target unit cost to afford better insight for the recurring and non­recurring costs for each target type. Common Target Support is no longer distributed into each target non­recurring costs, and sunk costs are included for both non-recurring and AUG calculations. Also reallocated costs of the components that are common among programs from the MRBM Resource Baseline to the Common Components Resource Baseline.

MRBM Sianificant Chanae Summarv -

Impact to Baseline

Schedule: Adjusted target delivery dates.

Contract: RFP release planned for March 2012 with tentative award date 4QFY12.

Resource: Reallocated Common Component costs to a new Common Components program.

Technical: l<bJ(3) 10 usc §130,(b)(5J 1 (b)(3):1o usc §130,(b)(5) 1

Resource: l(b)(3) 10 usc §130,(b)(5)

(b)(3)10 usc §130,(b)(5) I

Resource: Adjusted the non-recurring I Average Unit Cost table to show both the value reported in the FY11 BAR and an adjusted value that applies the same accounting rules used for the FY12 calculations. The deltas represent the difference between the FY12 calculations and the adjusted FY11 values.

me a 2 2 s ;: ; Approved Original Signed Date 2 Feb 2012 Approved Original Signed Date 2 Feb 2012

(b)(6) I r~ I ~----------------------j-----~ P8ft 8PPI@Ilil5 ~BE 624£1 Slide 64

Page 79: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P81t 8PFI@IJ115 ~0~ 8! Its¥

MRBM

Date 3 Feb 2012

Slide 65

Page 80: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

f8R 8PFU!!L tis l!f9E 8F Jtsf

MRBM Technical Baseline -

See Classified Appendix F

Slide 66 P8R 8PFI@Et15 t99!@ 8HISI

Page 81: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

ttnt tn Itetnz esz o£4zt

MRBM 2012 BMDS Accountability Report (BAR) Resource Baseline -

Approved Original Signed Date 3 Feb 2012 Approved Original Signed Date 3 Feb 2012 Approved Oriainal Sianed Date 3 Feb 2012

Jb)(6) I lrb)(6) I '-I.S-Ii-de-67 ___________ ,_ __ __, FtHt 8FFUiiLbiYlHJiii 8HirlJ

Jb)(6) I

Page 82: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Prfme Contract [a, b, c, f)

(CPAF)

HQ0006-04-D-0006 Awarded: 9 Dec 2003

PoP: 8 Dec 2013

Hardware Delivery Order

(CPAF} 0 022

Awarded: 15 Oct 08 PoP: 08 O~c 13

letest Mod . 29 Ap1 19

0027 Awarded: 20 Jul 11

PoP: 30 Sep 13

+E!G ~ttlf-e---r;a~et

[0;-ej

TBD MRBM T1/T2

Approved Original Signed (b)(6)

Slide 68

P8R 8Ffl@Ltts 19819 8HIS1

MRBM

Date 3 Feb 2012

Page 83: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

2012 BMDS Accountabilit

Approved Original Signed Date 3 Feb 2012 (b)(6)

Slide 69

F8ft 8FFI@Ltl5 t981!9 8Ifl51

MRBM

Approved Original Signed Date 3 Feb 2012 (b)(6)

Page 84: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 70

I OllOI I IC£115 63£ GIJLI

6.5.3 Short Range Ballistic Missile (SRBM)

Page 85: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Significant Change

IMTP v12.1 modified dates that SRBM tar ets are required and added a requirement to (b)(3)1o

~ '

(b)(3)10 usc §1 30,(b)(5)

(b)(3):1 0 usc §130,(b)(5)

MDA modified accounting rules for target unit cost to afford better insight for the recurring and non-recurring costs for each target type. Common Target Support is no longer distributed into each target non-recurring costs, and sunk costs are included for both non-recurring and AUC calculations.

I 8il8ITICLIIS (gJJS 8HISI

SRBM Significant Change Summary -

Impact to Baseline

Schedule: Adjusted target delivery dates. Resource: Included non-recurring costs forth~~~~ Technical: Added technical description forth (b)(3l 10 usc

Resource: Adjusted cost estimates for the additional scope for thel~~b<;l!?aa , I l<b)(3)10 usc §1 30,(b)(5) I This drove an increase to AUG as reported in BAR Section 4.

L..<b_l<3"""!'):_1 o_u_sc_§:-1-:3o=-.(b":"":)(=-5)-=--.-~------__.it is not reported as a variance in BAR Section 4.

Resource: Adjusted the non-recurring I Average Unit Cost table to show both the value reported in the FY11 BAR and an adjusted value that applies the same accounting rules used for the FY12 calculations. The deltas represent the difference between the FY12 calculations and the adjusted FY11 values.

Approved Original Signed Date 2 Feb 2012 Approved Original Signed Date 2 Feb 2012

l(b )(6) I ~(b )(6) I ~-----------~----~ Slide 71 F8R 8FFI8IILIY LlJII 8HIYU

Page 86: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 72

FQR QJiW8ktL UDiii QJ fts:TJ

SRBM 2012 BMDS Accountability Report (BAR)

Date 3 Feb 2012 Approved Original Signed Date 3 Feb 2012 (b)(6)

FOR OFFI81Ais HOH Offi3U

Schedule Baseline -

Page 87: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PFU!!L tis l!f9~ 8Pll5f

SRBM Technical Baseline -

See Classified Appendix F

Slide 73 F81l 8iilii8Itbk tJQfi MJJIYU

Page 88: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Approved Original Signed Date 3 Feb 2012 (b)(6)

Slide 74

P8It 8PW@Ltts tJ819 8I ltsf

SRBM

Approved Original Signed Date 3 Feb 2012 (b){6)

F91t 9FFUiiiJzls lHJii 9JFkli

Resource Baseline -

Approved Original Signed Date 3 Feb 2012 (b){6)

Brackiny
Typewritten Text
Page 89: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Approved Original Signed Date 3 Feb 2012

Jb)(6) I Slide 75

:FQR QJii?Hiltbi!lb UBii QlfkTJ

SRBM

Approved Original Signed Date 3 Feb 2012 Jb)(ti)

Contract Baseline -

Approved Oriainal Sianed Date 3 Feb 2012 r)(6) 1

Page 90: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

2012 BMDS Accountabilit

Approved Original Signed Date 3 Feb 2012 (b)(6)

Slide 76

4 8ft 8£11812115 (;191!! 8HIB

SRBM

Approved Original Signed Date 3 Feb 2012 (b)(6)

I OR Of iiCLi£ OS£ 61421

Page 91: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 77

POR OPPI@LtfY "@9819 OHfYl

6.5.4 Targets Common Components

FOil OFFICL' k TIC:Ii OJiklf

Page 92: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

DA

DEPARTMENT OF DEFENSE

M IS SILE DEFENSE AGENCY 5700 18not STREET

FORT B E L VOIR, V IRGINfA 22060·5573

FEB 0 3 2012

MEMORANDUM FOR PROGRAM DIRECTOR, TARGETS AND COUNTERMEASURES

SUBJECT: (U) Development Decision Memorandum for Targets and Counterm~asures Common Components Baseline Reviev,·

(U) The attached schedule, technical. resource. and contracts baselines and activities ar~ approved for Targets and Countermeasures ( TC) Common Components Program. There is no test baseline because the tests the Common Components office supports are descdbed in the relevant program test baseline.

(U) Changes to the BMDS baseUne are managed through the Missile Defense Agency (MDA) Program Change Board (PCB) in accordance with MDA Directive 5010.18, Acquisition Management. PCB-approved changes that <:~ffect the TC acquisition will be implemented by the TC Program Office. Baseline variations will be reported to the Director. MDA, and incll!ded in the annual BMDS Accountability Report.

(b)(5)

Th~ Common Components office. like rhe IRBM, MRBM, and SRBM programs, ,.,.ill supporl the development of the BMDS and remain in the Product Development Phase indefinitely.

li!!tassillcd t; . l<bl<6l I Derived from: BMDS SCG, J90CT2010 Declassify on: 190CT2035

rx·J

Lieutenant General, USA Director

23 . Sl!IBLIG !GilGIIIC!.IEdi.SJILI I iil..i . iii i@!L!L. .iiilLZ!Ldlll 22

FQR QFFI'iU:k lel&i 9P IbN

Page 93: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Attachments: I. f\:,1) IC ~ehedule BaseliRe. TAis doc"u-.:tent is '?. (U) TC Teeknienl Bnseline. This documenl ts · . 3;--fU) TC Rese~:~rce BaseliRe. fllis document ts 4: (U) TC Co.Atreet-Baseline. This docttment is · ,

cc: MONO X MD A/DE MD A/DO MD AIDA \1DA/DP MDA/DT MDNDS

·.~IJ r,J /JJ

u.-w/J)

.. . v./J)

i!2! ! Cil.!!Y! . ill 16il011!£1.ii. i .:Cd. Li I Iti. . i . iil.:Cii. i!E. i!.! . li!L. i!£.1! 2Z

.,

Page 94: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 8ft lSI PU!llaJs t#8119 8I fJsTl

Common Components

Approved Original Signed Date 3 Feb 2012 Approved Oriainal Sloned Date 3 Feb 2012 Approved Oriainal Sianed Date 3 Feb 2012 l(b )(6) I l(b )(6) I ~-------------------------L----~

l(b)(6) I Slide 78 F91t 9FFU!ILbls l:iOiii 8HisU

Page 95: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Pill 91iJ?Itiilitt \JQ)j tiiJikzr

Common Components ....-~- 2012 BMDS Accountability Report (BAR) Technical Baseline -

See Classified Appendix F

Slide 79 P8R 8FFI8Itlls 1!JQ:i 9ffiYU

Page 96: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

tenet ttCiltts t!!&ts erttsl

Common Components 2012 BMDS Accountability Re ort (BAR) Resource Baseline -

Approved Original Signed Date 3 Feb 2012 Approved Original Signed Date 3 Feb 2012 l(b)(6) I Jb)(6)

~------------------------~----~ Slide 80

Approved Original Signed Date 3 Feb 2012 (b)(6)

Page 97: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Hardware Delivery Order

UCA-0029 (CPAF)

Award: PoP: 31 Dec 15

Slide 81

I OJt Of I ICillb USE 6 14 62

Common Components -

Page 98: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 82

FiR iJilii81Ats t;SJQ if fl!ff

6.6.1 David's Sling Weapons System

(DSWS)

FOil QFFU!ILbls lJ[JJQ 8fils¥

Page 99: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

- -..._ ....... ~ ............ -- ..._~ ..... ........... .~.-:a.. ....... -.1! ii!I"W

Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012

~(b)(6) I Jb)(6) l Slide 83 F8R 8FFICL' k JJOli QV!Jr

Page 100: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gilbi I ICIJt£ OS£ 614£1

See Classified Appendix F

Slide 84 P81l 8PPI81Ais l!JQ)j 8f Jh\'

Page 101: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Ott Of I 1611& f98£ 014£1

See Classified Appendix F

Slide 85 Fill WFFI61T t I HCF ann 15

Page 102: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Approved Original Signed Date 25 Jan 2012 (b)(6)

Slide 86

P8Il 8PPI@LIIS t9819 8£ liSt

Approved Original Signed Date 25 Jan 2012 (b)(6)

F 81t 8 FFI ilibls TfOI!l 8 I JVJ

-

Approved Original Signed Date 26 Jan 2012 (b)(6)

Page 103: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

PQ A QJiFI ilibh \J(ij)j if II¥' I

See Classified Appendix F

Slide 87 F8R 8flfi@IHIS ft8!@ 8ffl51

Page 104: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Cit Of I IlliilS t:l&L Of 4191

6.6.2 Upper Tier I Arrow 3

Slide 88 FOB OFFICL' L JJ[Jii OJFkl:

Page 105: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I en 62 I ICliilS USE 6! llSI

2012 BMDS Accountability Rep~(EP e r Ti e r I A r r 0 w ~gnificant Change Summary -(b)(3):10 usc §130

Approved Original Signed Date 25 Jan 2012 (b)(6)

Approved Original Signed Date 25 Jan 2012 l(b)(6) I

'--L.----------1---------' y e p OBFICLWs: TI?Iii 8HWJ Slide 89 .,

Page 106: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

fl8R 8flf"I@lllts tf8!1!1 8Pltsf

.....!iiiiiiiilllll- 2012 BMDS Accountability Rep~J~P e r Tier I A rr 0 w 3 Schedule Baseline -

See Classified Appendix F

Slide 90 F8R 8PPI@Ii its "81! 8! PIS!

Page 107: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

PQR QPi'c16JL1Hs URi QHk\'

--iiiiiiiiil..- 2012 BMDS Accountability Rep~rt~pe r Tier I Arrow 3 Technical Baseline -

See Classified Appendix F

Slide 91 F 0 R 8 FFI 8Etl! l!f818 8 fflfl

Page 108: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Approved Original Signed Date 25 Jan 2012 (b)(6)

Slide 92

F 9 R 9 J.iliil8kds ttJ§ll!l 8 f fisT

er Tier I Arrow 3

Approved Original Signed Date 25 Jan 2012 Approved Oriainal Sianed Date 26 Jan 2012 l(b)(6) I l(b)(6) I

F8 R 8 FFUUJzls lJJ§llii 8 HIYU

Page 109: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Approved Original Signed Date 25 Jan 2012 {b){6)

Slide 93

POR OPPI@tal5 t§f!l~ 0!1152

~f?per Tier I Arrow 3 Contract Baseline -

PQR OPPI@E£15 88~ OHI51

Page 110: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

f8R 8Pifl@lllls l!f9~ 8F Jlsf

--iiiiiiiilllll- 20t2BMDSAccountabllityRep~J~per Tier / ArrOW s~oellverytlnventorysummary •

See Classified Appendix F

Slide 94 F8R 8Pifi@IY 115 ft8!@ 811151

Page 111: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Oil Of I f@lulS USlS Of (lSi

6.6.3 Arrow 2 Block 4

Slide 95 lblt 51 I ICllilS C§E 614£1

Page 112: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F8R 8FFU!!LIIY 1!98119 8Iftsf

Arrow 2 Block 4 2012 BMDS Accountability Report (BAR) Significant Change Summary -

(b)(3):10 usc §130

Approved Original Signed Date 25 Jan 2012 Approved Oriqinal Sicmed Date 25 Jan 2012 l (b)(6) I J b)(6) I ~----------------~------------~ Slide 96 FOR OPPI@LIIY t99f! OHIYI

Page 113: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I GilGI I ICE I£ 88£ 61421

Arrow 2 Block 4 ------------ Schedule Baseline -

See Classified Appendix F

Slide 97 F8 R 8 FFiilt1tl!: \JQfi Af lk"t

Page 114: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I OR Of I ICBM SSE 6i 4£1

Arrow 2 Block 4 ------------- Technical Baseline -

See Classified Appendix F

Slide 98 FiR: iFFISisWs TTBii ilikH

Page 115: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 6ft 61 1 ICE US tg§IS 61 tiS I

Arrow 2 Block 4 2012 BMDS Accountability Report (BAR) Resource Baseline -

(b)(3):10 usc §130

Approved Original Signed Date 25 Jan 2012 Approved Oriainal Sianed Date 25 Jan 2012 Aooroved Oriainal Sianed Date 26 Jan 2012 Jb)(6) I l(b)(6) I '-LS-Iid_e_9_9 _______ .J-------' F8ll 8PPI8L'tls 801!1 8f 1191

l(b)(6) I

Page 116: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P 0 R 8 PFI f!!L tfY t'§fll! 0 F ffY1

Arrow 2 Block 4 2012 BMDS Accountability Report (BAR)

Approved Original Signed Date 2S Jan 2012 (b)(6)

Slide 100

Approved Original SJgned Date 25 Jan 2012 (b)(6)

FOR 8Fflf!!LIISH2JIIJ 8Ffl51

Contract Baseline -

Approved Original Signed Date 26 Jan 2012 (b)(6)

Page 117: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Sit Of I ICLIL SSE 6i 4£1

Arrow 2 Block 4 ----------- Buy/Delivery/Inventory Summary •

See Classified Appendix F

Slide 101 F8R 8FFHilkiiY TsJQfi 8PIWJ

Page 118: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 102

FOR OFFJ@lllE "ff819 OIIEl

6.7.1 Precision Tracking Space System

(PTSS)

F91t 9FFUULIY lfBI!I 8HMJ

Page 119: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 8ft 8IIICI2il9 63£ 8!4l91

Precision Tracking Space System -llllliiiiiiiiiiiiiiillll- 2012 BMDS Accountability Report (BAR) Sigmficant Change Summary -

Significant Change

50% Congressional reduction in FY12 resulted in reprioritization of work

MDA developed an acquisition strategy for launch services. (b)(3):1 0 usc §130,(b)(5)

. ll

Approved Original Signed Date 24 Jan 2012

Jb)(6) I Slide 103

Impact to Plan

Schedule: l<bJCSl l<b)(5) I

Resource: Adjusted program content to executable program Within available resources.

Contract: Updated to include a competitive procurement of launch vehicles and services through the Air Force.

Schedule: Added Production Preparation Decision before CDR. Contract: Updated to show award of the full and open competition contract with

industry for follow-on satellite production .

Approved Original Signed Date 24 Jan 2012 (b)(6)

FOR Offi@EIJS !§319 OHJSI

Page 120: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 81l 8Ill€lii15 f9315 8 HISI

Precision Tracking Space System 2012 BMDS Accountability Report (BAR) Schedule Plan

(b)(3):10 usc §130,(b)(5)

Approved Original Signed Date 24 Jan 2012 Approved Oriainal Sianed Date 24 Jan 2012 AppJoved Oriainal Sianed Date 24 Jan 2012 l(b)(6) I ll(b)(6) I '-'---------~L-----------' FOil ?FFUi'L' I; TJ?Iii ?JIIWH Slide 104 ""' ""' " ""'

l(b)(6) I

Page 121: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F9R 8PPI8Ii\ls t!CQI1 8ftiN

Precision Tracking Space System ---~ 2012 BMDS Accountability Report (BAR) Technical Plan -

See Classified Appendix F

Slide 105 F8R 8FFI@I'I LIS l!f8!@ 8! "'!

Page 122: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F8R 8PPI@Ltl5 f!JBJ!!! 8! liSt

Precision Tracking Space System -lllllliiiiiiiiillllll- 2012 BMDS Accountability Report (BAR) Resource Plan

(b)(5)

Approved Original Signed Date 26 Jan 2012 Approved Original Signed Date 26 Jan 2012 Approved Oriainal Sianed Date 3 Feb 2012 Jb)(6) I ~(b)(6) l (b)(6) I Shde 106 .,a_ '-'A' "'.L a.· &."-'L ' &AJ '-'V.&J '-'.L tAJ.&

Page 123: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 6ft bliiOOtlS USE 6Et21

Precision Tracking Space System 2012 BMDS Accountability Report (BAR) Contract Plan

JHU/APL (CPFF)

HQ0006-07-D-0001 TOs 16 & 21: (PoPs 1 Jun 07-30 Jun 12)

HQ0147-12-R-0004:

Est. PoP 15 Sep 12-30 Sep 20

PTSS Integrated System

Engineering Team (Subcontract to JHU/APL)

Naval Research Lab (MIPR)

Sandia National lab (MIPR)

Space Dynamics Lab (CPFF) HQ0147-11-0-0052

(PoP 17 Aug 11-17 Aug 16)

T0-06: 17 Aug 11 - 17 Dec 11

PoP Extension:

{PoP 18 Dec 11 -31 Oct 13)

MIT/Lincoln Lab (MIPR)

(b)(3):1 0 usc §130,(b) (5)

Satellite Production

Contract (Competition)

Approved Original Signed Date 24 Jan 2012 (b)(6)

Slide 107

Page 124: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Slide 108

P 8 R 8 Ji1iii 81tH; l!IQ Iii 3 l TiT

6.7.2 Aegis Standard Missile 3 Block liB

(SM-3 Blk liB)

P8R 81iFU!ILbls lJ[Jiii 8fJI!fJ

Page 125: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

r XSJ

F8R 8FFIN!AIS "@98@ 8I 1151

Standard Missile 3 Block liB Significant Change Summary -

Significant Change Impact to Program Plan

l(b)(3):10 usc §130,(b)(5)

Schedule: l<bl(3):1o usc §t30,(b)(5) I Resource: Re-phased resources for Technology Development Phase. Contract: Realigned contracts to support new funding allocation.

MDA is leveraging complementary and advanced research efforts to continue technology risk reduction at a reduced rate.

Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012 r )(6) I ~(b)(6) I "-----_,_ __________ _, FOil SFFICL' k TT?Ii SJFklf Slide 109 "" "" ., ""

Page 126: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Ott Of I ICiii£ USE 614£1

Standard Missile 3 Block liB 2012 BMDS Accountability Report (BAR) Schedule Plan

(b)(3):1 0 usc §130,(b)(5)

Approved Original Signed Date 31 Jan 2012 Approved Original Signed Date 31 Jan 2012 Approved Oriainal Sianed Date 31 Jan 2012

~ I ~ I s"'"l-id_e_1_1_0 _ ___,J,._ __________ __, F81t 8FFI81Jzls lHJII 8FJMJ

l(b)(6) I

Page 127: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

F9 R 91iJ?Iilitk \)Qfi if f(srl I

Standard Missile 3 Block liB

See Classified Appendix F

Slide 111 F8 R 9liJ?I01tlls tJQJj if flY\'

Page 128: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I 6ft 6I I ICLtlS 65£ 6Hl51

Standard Missile 3 Block liB 2012 BMDS Accountability Report (BAR) Resource Plan

SM-3118 Time Phased Estimate (As of 01-27-2012)

FY12-FY1 3 TY$M Prior 2012 2013 TOTAL To Complete Total

Hardware Analysis/Development $103 $35 $118 $153 $84 $340 Software Analysis/ Development $34 $34 $0 $34 Demonstrations $3 $3 $0 $3 Demonstrations Item Fabrication $0 $0 Integration $41 $23 $52 $75 $0 $116

Technology Development Total $144 $58 $207 $265 $84 $493 Total Cost Estimate $144 $58 $207 $265 $84 $493

Content Not Included in MDA Cost Estimate: Product Deve lopment Phase

nn ermm , I ns en 71

Time Phased Estimate Chart TY$M 250

200

Ill 150 c

0

~ 100

11).

so

0 2012 2013

•Technology Development Tota l

Approved Original Signed Date 25 Jan 2012 Approved Original Signed Date 25 Jan 2012

l(b)(6) I Jb)(6) I Slide 112 I Oilbii I@ILIL ~HIS O~ fl!l

Page 129: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Fill QFFitil!tbh UDII QJWl

Standard Missile 3 Block liB 2012 BMDS Accountability Report (BAR) Contract Plan

{b)(4),(b)(5)

Approved Original Signed Date 25 Jan 2012 Approved Oriainal Sianed Date 25 Jan 2012 Approved Oriainal Sianed Date 25 Jan 2012 l(b)(6) I Jb)(6) I l(b){6) I

Slide 113 Fill QFFifiiili. iii IUilii iiliili il'

Page 130: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

Contract Info

Raytheon

lockheed

Boeing

Boeing

Orbital

lockheed

Lockheed

P8lt 8PPI8Lll5 l!JOI!!! 8! ftS I

Appendix A: MDA Contract Performance Summary (data as of December 31, 2011 unless otherwise noted)

Price and Budget LOE %'s Program

Cost Trends and Estimate Completion

Target Projected VAC Completion 6Month Cum (Overrun) or Underrun

5ep-12 0 .98 ($0.5)** $0.0 0 .0%

Dec-13 0 .9 6 $12.6 $0.0 0 .0 %

Mar-12 0.96 $1.7 $0.0 0.0%

Oec-13 0.97 $9.4 $0.0 0.0%

Aug-13 0 .98 ($5.2)u ($14.0) -1.3%

$286 $2113 12% Mar-13 ~N/A $0.0 ($11.0) -1 .6%

15% 13 0.98 -1 .2%

$452 $398 0% Mar-12 1.05 $6.5 $0.0 0.0%

$1.98 $1.78 30% Dec-12 1 .00 $46.6 $37.0 2.2%

$1.98 $1.58 68% Mar-1Z 1.03 ($20.6)"* $14.1 0.9%

$18.38 $16.68 41% Mar-14 0 .95 ($1.08)* * ($1.08) -6.2%

$16.98 $15.38 39% Mar-14 0.94 ($1.18)"* ($1.18) -7 .2%

67% 1.12 6.1%

11% Dec-13 0 .95 ($64.7)* (' {$73.6) -3.6%

$219 $204 6% May-15 0.87 ($2.2)'"* ($5.8) -2.8%

$1.68 $1.48 17% Mar-14 0.9 2 ($22.3)* '' {$59.0} -4.3%

$1.69 S1.4B 17% Mar-14 0.92 ($.22.3)** ($59.0) -4 .3%

$28.68 $25.68 $1.058''* $1.128 -4.4%

Month-end Nov 11 data is reported for the following ** CV (Cum Cost Variance) represent the FUNDING IMPACT:

Funding Impact

FY12 or FY13

Minimal

Minimal

Minimal

Minimal

Minimal

M inimal M inimal

Minimal

Minimal

Minimal

Minimal

Minimal

M inimal

Minimal

Minimal

Moderate

Moderate

<5% = Minimal contracts: Aegis SM-3 Development and Production, "sunk" costs relative to the overall overrun Projected Burn >5% or< 10% =Moderate AN/TPY-2, C2BMC, GMD Prime, TC IRBM Air Lunch projection. Previous budgets accounted for Rate % beyond FY > 10% = Significant

these sunk costs. Funding

130 l.il8 R 81ilill!!llllt!IJ ilj(!l Iii I!U il!!il!ii

Page 131: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R 8PPH!!Ilil5 1!!91!1 8 . tiS I

Appendix B- Missile Defense Executive Board (MDEB) - Report of Activities for CY 2011

.-----------....----------------l(b)(5) Meeting Date

24 March 2011

29 June 2011

10 August 2011

Agenda • Hedge Options for Defense of the

Homeland • PATRIOT and Integrated Air and

Missile Defense (IAMD) Battle Command System Business Case Analysis

• Operational Forces Standing Committee (OFSC) Update (Operations and Sustainment (O&S) Program Objective Memorandum (POM)-13 Requirements, PCL, Cobra Dane)

• Funding Responsibilities for Ballistic Missile Defense System Elements

• Policy Committee - Regional Phase Adaptive

Approach (PAA), Hedge Strategyj<b)(3):10 usc §130,(b) 1

l fb)(3):1 0 15) l11 <:r. &11n fh\

• MDA J:Sudget Issues - FY 20ll/2012 Update - POM-13 Summary

• THAAD Buy-to-Budget and Should Cost

• Operational Forces Standing Committee Status - l(b)(3):1 0USC§130 I - ~ervtce U&~ Keqmrements - System Security Level - A

(SSLA) Review Status • AMDI Committee Endorsement of

Charter • PATRIOT Transfer to MDA

(b)(3) 10 usc §130

131 I Oil8PPIQLttslJOii 8HI±Jf

Page 132: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil GIIICiiits tgJIS 61415 I

Meeting Date Agenda (b)(5)

15 September 2m I • Balli~tic Miss-ile Defense System Alternate (Alt) POM

t.:e po p o y wsx 0 x II££ O>IJ Jf

Page 133: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

FQil QFFiilibk UQiii tUJIYT

Meeting Date Agenda Decisions and Recommendations I 7 October 201 I • BMDS Alt POM Excursion No published ADM

• Program Review - IAMD Issues • Warfighter Assessment of BMDS

AltPOM • £MTP Assessment of BMDS Alt

POM • Remote Sensor Study Report Out

26 October 20 II • BMDS Alt PO M Options No published ADM • CAPE Discussion

Table B.l - MDEB Meeting Dates, Agenda, and Decisions and Recommendations for CY 2011

133 FQiil QFiiiQI I L UQiii QliLli

Page 134: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

POR OPPH!!IHIS 80151 8I fisT

Appendix C: Resource Baseline Methodology

The resource baseline is the expected investment in acquiring a capability and includes all costs associated with delivery of a BMDS product, and are derived from time-phased cost estimates in then-year dollars jointly approved by MDA's Program Directors and the Director of Cost Estimating and Analysis. 1 The baselines are expressed in base year dollars inde.xed to the year resource. baselines are approved. For example, cost estimates for new baselines are inde-xed to the base year FY 2011.

Risk is incorporated in the cost estimates that form the basis for information in the resource baseline charts included in this report. The process for incorporating risk utilizes the technical baseline, the schedule baseline, and GAO best practice methodologies. The results of the cost risk analysis are used to develop confidence levels for each program element's baseline. Program executives determine the specific confidence level to be used in the resource baseline chart of the BMDS Accountability Report.

For most BMDS program elements, risk is traded with affordability so that there is an equally likely chance of either a cost underrun or overrun. For test execution, a higher probability of success is chosen for the confidence level. Recently, affordability initiatives resulted in contracts for IRBM, MIDAESS, THAAD, and DSC that were awarded at prices be.Jow the 50% cost estimate cont1dence level, indicating that the confidence measures may be conservative.

While MDA manages costs for all line entries on the resource. baseline, the Agency measures performance using the metrics shown in the unit cost table for each resource baseline chart. MDA metrics measure cost performance three distinct ways. MDA uses Program Acquisition Unit Cost (PAUC) and Average Procurement Unit Cost (APUC) for programs that produce countable interceptors, sensors, launch systems, or fire control systems. The Agency uses Program Acquisition Cost (PAC) for programs that do not produce countable units. For Targets and Countermeasures, MDA uses Nonrecurring Cost (NRC) and Average Unit Cost (AUC). The Targets program is using a building block approach with core components in SRBM, MRBM, IRBM and common components. Targets are assembled from these components to meet test requirements. The IRBM class can also be configured into an ICBM class with the addition of an extended range booster. For SRBM, MRBM and IRBM, the AUC is calculated as the ratio of recurring costs for the booster stack and all up round integration for those targets delivered within the FYDP divided by the number of targets delivered within the FYDP. For AOs and RVs, the AUC for a common component includes the cost of that particular common component delivered within the FYDP divided by the quantity of that common component delivered within the FYDP.

PAUC is a ratio of acquisition cost to numher of units. The numerator of the ratio is the total program acquisition costs detined as the sum of the Development (Research Development, Test and Evaluation (RDT&E) Appropriation), Production and Deployment (Procurement Appropriation), and Military Construction {MILCON Appropriation) costs. The denominator of

1 Cost baselines for targets are treated differently because of uncertainty about the quantity of targets needed for testing beyond the FYDP period. As a result, "to complete" costs are not included in cost baselines for targets.

134 P8R 8PPI@Ii!IS t;QM 8ffi5T

Page 135: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

I Gil GIIICIAE OS£ SIC£ I

the ratio is the total number of operationally configured units produced for testing, qualitication, and operations.

APUC is a ratio of the procurement cost to number of units. The two business rules for reporting APUC, depending on whether RDT &E or Procurement funding is used to acquire units produced for operations, are:

• If Procurement Appropriations funding is used to deliver operational units, APUC is the ratio of Procurement costs divided by the number of Procurement funded units. Test and qualification units are included only if Procurement funds are used to acquire those units. If a program bas used both .RDT &E and Procurement appropriations to purchase operationally configured units, only those units purchased with the Procurement Appropriation will be used to compute APUC.

• For some MDA programs, MDA is authorized to deliver operational capability using only RDT &E funding. For these instances, APUC is calculated by a ratio of the ROT &E funded cost estimate for delivery of the operational units divided by the quantity of operational units.

PAC is the sum of Development (RDT &E Appropriation), Production and Deployment (Procurement Appropriation), and Military Construction (MILCON Appropriation) costs.

For MDA Targets and Countermeasures, the baselines are represented as NRC and AUC. MDA uses these rnetrics for targets because targets are modified to meet specific threat representations and are consumed in testing. The use of Procurement funds is inappropriate for acquiring targets. NRC includes the cost to design and develop a target configuration. AUC is the sum of manufacturing costs for targets using RDT &E funding divided by the number of targets delivered. NRC is provided for each target configuration that is in development during FY 2012- 2017. AUC is provided for each target configuration and includes units delivered during FY 2012- 2017.

135 FQiil QFiilGI 3

I II£5 Qlii y

Page 136: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

A A3 AA AACTV AAFTM A A MDC AAW ABIR ABP ABS ACL ACS ACWP ADSI AFB ALO AMD AMDI ANfrPY-2 AOR APUC ARAV ASB AST ATEC ATRC AUC AUR AWS B BAR BCWP BCWS BETD BLD BLOS BMC BMD BMDS BOA BOD BSC BSFO

I Oil Of I ICLi£ SSE SiC£ I

Appendix D: Acronyms

Arrow-3 Aegis Ashore Aegis Ashore Control Test Vehicle Aegis Ashore Flight Test Mission Army Air Missile Defense Command Anti-Air Warfare Airborne Infra-Red Airborne Processor American Bureau of Shipping Achievable Capabilities List Attitude Control System Actual Cost of Work Performed Air Defense System Integrator Air Force Base Aegis Light Off Air and Missile Defense Air and Mjssile Defense Integration Army Navy!fransportable Radar Surveillance - Model 2 Area of Responsibility Average Procurement Unit Cost Aegis Readiness Assessment Vehicle Acquisition Strategy Board Arrow System Test Army Test and Evaluation Center Aegis Training and Readiness Center Average Unit Cost All Up Round AEGIS Weapon System

BMDS Accountability Report Budgeted Cost of Work Perfonned Budgeted Cost of Work Scheduled Best Estimate Test Date Build Beyond Line of Sight Battle Management Center Ballistic Missile Defense Ballistic Missile Defense System BMDS Overhead Persistent Infrared Architecture Board of Directors Battery Support System Blue Sparrow Fly-Out

136 P 8 n 8 PPI stnls lY OE 8 r JisT

Page 137: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

BSP BVT BY c C2BMC C4 CAAT CAPE CAR CARD CCC CCLS CD CDR CDS CDU CEC CEI CE II CENTCOM CERT CFE CG CLS CM CMAV CNIP CNT COCOM CONOPS COPS CP CPAF CPAP CPD CPIF CPR CPS CR cs CSEDS CSSQT CTL CTTO CTV cv

I Ott Of I ILIA£ tgJIS 614£ I

BMD Signal Processor Booster Vehicle Test Base Year

Command and Control, Batt]e Management and Communications Command, Control, Communications, and Computers Contingency Analysis and Activation Team Cost Assessment and Program Evaluation Capability Assessment Report Cost Analysis Requirement Description Core Completion Contract Consolidated Contractor Logistics Support Capability Delivery Critical Design Review Common Display System Cobra Dane Upgrade Critical Engagement Condition Capability Enhanced I Capability Enhanced II U.S. Central Command Certification Contractor Furnished Equipment Guided Missile Cruiser (U.S. Navy) Contractor Logistics Support Countermeasure Continuous Maintenance Availability C2BMC Network Interface Processor Control Navigation Test Combatant Commander Concept of Operations Constellation Operations Computer Program Cost Plus Award Fee Construction Plans and Profiles Capability Production Document Cost Plus Incentive Fee Cost Performance Report Capability Planning Specification Capability Release Combat System Combat System Engineering Deve1opment Site Combat System Ships Qualification Trials Critical Task List Concurrent Test, Training, and Operations Control Test Vehicle Cost Variance

137 FOP orwcx t I JI£5 @'Jklf

Page 138: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

ex CY

D DA DACS DBR DCMA DOG DDM DDR DoD DOT&E DRS DSWS DT DTC DTDP DVT E EAC EC2BMC ECO ECL ECP EDM EICO EKP EKV E-LRALT EMO EME eMRBM EMRL

~ ESL ET ETEODS ET&E EUCOM EVM F FAU/OP FBM FBX-T

I Oil Of I ICLi£ SSE SiC£ I

Common X-band Radar Software Calendar Year

Defended Area Divert and Attitude Control System Developmental Baseline Review Defense Contract Management Agency Gujded Missile Destroyer (U.S. Navy) Development Decision Memorandum Designated Defended Region Department of Defense Director. Operational Test and Evaluation DRS Technologies David ' s Sling Weapon System Developmental Test Developmental Test Command Developmental Test Design Plan Design Verification Test

Estimate at Completion Enhanced C2BMC Early Capability Delivery Equipment Component List Engineering Change Proposal Engineering Design Module Element Integration & Check Out EC2BMC Knowledge Point Exoatmospheric Kill Vehicle Extended Long Range Air Launch Target Engineering Manufacturing Development Empirical Measurement Event Extended Medium Range Ballistic Missile Engineering Manufacturing Readiness Level Enoineering Release- 4 (b)(3):10 usc

Extema Sensors Laboratory Embedded Test End-to-End Distributed Development System Engineering Test & Evaluation U.S. European Command Earned Value Management

Fleet Avionics Upgrade/Obsolescence Program Forward-Based Mode Forward-Based X-BanJ (Radar) Transportable

138 I' 8 R 8 1'1'1 @Ii\15 lY QJ!i) 8 f JisT

Page 139: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

FCE FOE FFP FGA FMA FMC FOC FOUO FPA FPI FQT FS FTF FTG FTM FTR FIT FIX FUF FY FYDP G GAO OBI aces GCN GCS GEP GEM GFC GFE GGT GMD GOT GROW GS GSE GT GTD GTI GTX H H&T HC HEL HN

F8R 8FFU!L\Is t§QB QHIYY

Fast C AA T East Force Developmental Experimentation Firm Fixed Price Fort Greely, Alaska Foreign Military Acquisition Full Mission Capability Full Operational Capability For Official Use Only Focal Plan Array Fixed Ptice Incentives Functional/ Formal Qualification Test Fixed Site Flexible Target Family Flight Test Ground Based Interceptor Flight Test Standard Missile Flight Test Round Flight Test THAAD Interceptor Flight Test Other Fire Unit Fielding Fiscal Year Future Years Defense Program

Government Accountability Office Ground-Based Interceptor Global Command and Control System GMD Communications Network Ground Control Station Ground Entry Point Global Engagement Manager GMD Fire Control Government Furnished Equipment Government Ground Test (Environment) Ground-based Midcourse Defense Guidance Object Track Generic Rest of World Ground Systems Ground Support Equipment GrounJ Test Ground Test Distributed Ground Test Integrated Ground Test Other

Humidity & Temperature Hazard Classification High Energy Laser Host N<.~tion

l39 IOU 51 I ICIJt£ SSE 614£1

Page 140: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

HPLUS HTK HTV HWIL

I IAMD lAW IBMP IBR ICA ICBM ICE IDIQ IDT IFlCS lLS IM IMDO IMS fMTP INCO LNSURV IOC IPD IPR IRBM IRPT ISG ISTC ISTS I&T J JC JCM JFfM JRE JROC K KP KTR KW L LAD LCCE LDACS

I Gil Of I fEME SSE G. 42 I

High Performance Liquid Upper Stage Hit to Kill Hypersonic Technology Vehicle Hardware-In-The-Loop

Integrated Air and Missile Defense In Accordance With Integrated Ballistic Missile Picture Integrated Baseline Review Industrial Capabilities Assessment Intercontinental Ballistic Missile Independent Cost Estimate Indefinite Delivery Indefinite Quantity In-Flight Interceptor Communication System Data Terminal In-Fl ight Interceptor Communications Sy tern Integrated Logistics Support Insensitive Munitions Israel Missile Defense Organization Integrated Master Schedule Integrated Master Test Plan Installation & Checkout Board of Inspection Survey Initial Operational Capability Initi al Production Decision In-Progress Review Intermediate-Range Ballistic Missile Independent Readiness Review Team Integration and Synchronization Group Integrated System Test Capability Integrated Simulation Tactical Software Integration & TesrJinstallation & Test

Juniper Cobra Joint Capabilities Mix Joint Flight Test Standard Missile Joint Range Extension Joint Requirements Oversight Council

Knowledge Point Contractor Kinetic Warhead

Launch Area Denied Life Cycle Cost Estimate Lightweight DACS

140 P8R 8Ji13181Ais 8019 8FfiYT

Page 141: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

LKE LOE LoR LRALT LRBM LRS&T LUT LV-2 M MBRV MDA MDEB MDR MElT MILCON MMR MMSP MRBM MRL MRT MSC N NIA NOAA NET NJ NORTH COM NMP NSCC NRC 0 O&M O&S OAR OFSC OPlR OSD OSM OSM-S OT OTA OTRR p PA PAA PAC

P8ft 8PPI@LHS tJ8liJ 81115 I

USS LAKE ERIE Level of Effort Launch on Remote Long-Range Air Launch Target Long-Range Ballistic Missile Long-Range Survei1Jance and Track Limited User Test Launch Vehicle - 2

Modified Ballistic Missile Re-Entry Vehicle Missile Defense Agency Missile Defense Executive Board Mission Design Review Multi-Element Integration Testing Military Construction Multi-Mission Radar Multi-Mission Signal Processor Medium-Range Ballistic Missile Manufacturing Readiness Level Medium Range Target Military Sealift Command

Not Applicable National Defense Authorization Act New Equipment Training New Jersey U.S. Northern Command Navy Manning Plan Naval Systems Computer Center Non-Reoccurring Cost

Operations and Maintenance Operations and Support /Operations and Sustainment Operational Assessment Report Operational Forces Standing Committee Overhead Persistent Infra-Red Office of Secretary of Defense Objective Sensor Model Operational Sensor Model - SBX Operational Test Operational Test Agency/Other Transaction Authority Operational Test Readiness Review

Performance Assessment I Project Agreement Phase Adaptive Approach Program Acquisition Cost

141 Jii:ll Q)if) Ql I k UEJii WJ ll ' I

Page 142: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

PACOM PAUC PB PCB PCIL PCL PCNT PDR PDRR PER PEs P.L. PM PMB PMC PMRF POM PoP PPU PRR PRRA PK PssK PSSR PTS PTSS Q Q QA QTY R RDT&E Refurb RFI RFP RR RSC RT RV RVS s SA SAMP SATCOM SBIRS SBX

FOR OfflfCIAL OS£ Oh£1

U.S. Pacific Command Program Acquisition Unit Cost President' s Budget Program Change Board PeripheraJ Component Interface Laboratory Prioritized Capabilities List Propulsion Control Navigation Test Preliminary Design Review Preliminary Design Readiness Review Program Execution Review Probability of Engagement Success Public Law Program Manager Performance Management Basel ine Partial Mission Capability Pacific Mission Capability Program Objective Memorandum Period of Performance Prime Power Unit Program Requirements Review Production Readiness Risk Assessment Probability of Km Probability of Single Shot Kill Pre-Ship Readiness Review Permit to Ship Precision Tracking Space System

Quarter Quality Assurance Quantity

Research, Development. Test and Evaluation Refurbishment Request for Information Request for Proposals Readiness Review Raid Size Capacity Real Time Reentry Vehicle Raytheon Vision System

Situational Awareness Single Acquisition Management Plan Satellite Communications Space-Based Infra-Red System Sea Based X-Band (Radar)

142 FiR QFlili'I I I COli QJJIJH

Page 143: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

SCG SCR SDR SHF SJPRNet SJL SIT SM-3 SRA SRALT SRBM SRR ss SSLA SSSTRP STRATCOM sv sw SY SYS T T2 T&E TA TB TBD TC TCD TDACS TOP TDU TEWA TFCC THAAD TM TOG TOM TOO TPR

~ TSRM TY u UEWR UHF/EHF uRVA

F 8 R 8 iiFI Skbti UIJiil it 'I U

Security Classification Guide System Concept Review System Design Review Super High Frequency Secure Internet Protocol Router Network System Integration Laboratory System Integration Test Standard Missile- 3 Selected Restricted Availability (Ship Availability) Short-Range Air Launch Target Short-Range BaiJistic Missile System Requirements Review/Ship Readiness Review Summary Scree.n System Security Level - A Software System Safety Technical Review Panel U.S. Strategic Command Schedule Variance Software Shipyard System

Transition and Transfer Test and Evaluation Technical Assessment Test Bed(s) To Be Determined Targets and Countermeasures Technology Capability Declaration Thronleable DACS Technical Data Package TDACS Demonstration Unit Threat Evaluation and Weapons Assignment THAAD Fire Control and Communications Terminal High Altitude Area Defense Terminal Modeffechnical Manual Technical Objectives and Goals Target Object Map Target of Opportunity Technical Product Review

l(b)(3> 1 o usc I .§13D • Third Stage Rocket Motor Then Year

Upgraded Early Warning Radar Ultra High Frequency/Extremely High Frequency Unshrouded Re-entry Vehicle Adapter

143 fl8R 8FPI81;'tls 88H 8f llsY

Page 144: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

USCENTCOM USCG USDAT&L USEUCOM USFI USNORTHCOM USPACOM USSTRATCOM v VA VAC VAFB VLS V&V VV&A \-V WF W[P WSESRB WSMR X XBR

I OR OPPICL£15 M8H 8IIIsY

U.S. Central Command U.S. Coast Guard Under Secretary of Defense for Acquisition, Technology and Logistics U.S. European Command U.S. Flight Test, Reference U.S.-lsraeli Caravan Test U.S. Northern Command U.S. Pacific Command U.S. Strategic Command

Virgin ia Variance at Completion Vandenberg Air Force Base Vertical Launching System Verification and Validation Verificarion, Validation, and Accreditation

Wartighter Warfighter Involvement Process Weapon System Explosive Safety Review Board White Sands Missile Range

X-Band Radar

144 POR 0 1 I !Mills 8911 Of fisT

Page 145: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

P8R QJ!il!ililibk Ufili QJikJf

Appendix E: Multiple Sources for Security Classification

• Aegis Security Classification Guide (SCG) Change I with Administrative Change • Air & Missile Defense Prioritized Capabilities List 2009; March 18, 2010 • Air & Missile Defense Prioritized Capabilities List for Program Objective

Memorandum 2014; October I1 , 2011 • Arrow Deployability Program • Arrow System Improvement Program to Include Change I • BMD Target Systems with Change 1 • BMDS ANffPY-2 Radar Forward Based Mode (FBM) SCG • BMDS SCG MDA • Ground Based Midcourse Defense (GMD) SCG to Include Change 1 • Terminal High Altitude Area Defense (THAAD) SCG

145 r gp orms!t I II£5 ii'J Ikli

Page 146: BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV ... · BALLISTIC MiSSILE DEFENSE SYSTEM (BMOS) ACCOUNTABILlTV REPORT (BAR) ... Ballistic Missile Defense System (BMDS) ... Slides

FOil OFii'ltiiktls UQiii 8PIIsY