18
Backpanel Connector Development October 23, 2002

Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

Backpanel Connector DevelopmentOctober 23, 2002

Page 2: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

� Design Objectives

� Product Design Overview

� Prototype Testing

� Project Status

Page 3: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 3> Metral High Power – July 19, 2002 3

2mm High Power - Design Objectives

� Right angle header on daughtercard to be offered in 1x2 and 2x2 press-fit configurations (same Metral 2x2 receptacle to be used for both)

� FCI will also tool a Millipacs 2x2 receptacle in early 2003. This will mate with the same 2mm headers (1x2 and 2x2) as the Metralversion.

� Same press-fit hole size as Metral (0.65-0.80 finished hole diameter)

� Current carrying capacity (single 12mm module, all lines powered):

� 2x2 configuration: 72A (18A per line); verified by pre-production product

� 1x2 configuration: 80A (40A per line); not yet verified

Page 4: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 4> Metral High Power – July 19, 2002 4

2mm High Power - Design Objectives

� Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances)

� Receptacle is UL 60950 compliant (Finger Probe)

� 3 possible mating lengths (2 longest being tooled initially) equal to those of Standard Metral 8.0, 6.5, and 5.0mm header pins; mating length is controlled on the receptacle side

� Same module size as 5-row Standard/1000/2000 Metral (10.8mm press height)

� All footprint hole spacing is on even multiples of 2mm

Page 5: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 5> Metral High Power – July 19, 2002 5

2mm High Power - Product Design Overview

� All contacts are flat except for minimal forming on the header’s mating interface

� Because minimal forming is necessary, less formable / higher conductivity materials may be used

� Air is able to access a large percentage of header contact surfaces. This will allow heat to escape more easily.

� Air is able to flow through the fully mated system

� EON is the same geometry as used in Metral Converged Headers

� FCI patent filed on May 23

Page 6: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 6> Metral High Power – July 19, 2002 6

2mm High Power - 2x2 header

air flow passages

Page 7: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 7> Metral High Power – July 19, 2002 7

2x2 header top and bottom contacts

Page 8: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 8> Metral High Power – July 19, 2002 8

2mm High Power - 1x2 header

air flow passages

Page 9: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 9> Metral High Power – July 19, 2002 9

1x2 header contact

Page 10: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 10> Metral High Power – July 19, 2002 10

2mm High Power - Metral 2x2 receptacle

air flow passages

Page 11: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 11> Metral High Power – July 19, 2002 11

Metral 2x2 receptacle contacts

Page 12: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 12> Metral High Power – July 19, 2002 12

2x2 contact system, Metral version

Page 13: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 13> Metral High Power – July 19, 2002 13

1x2 contact system, Metral version

Page 14: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 14> Metral High Power – July 19, 2002 14

2mm High Power, Metral 2x2 version -Beside Metral 1000 (fully mated)

Page 15: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 15> Metral High Power – July 19, 2002 15

2mm High Power - Prototype Testing

� Prototype assemblies were made using

SLA housings and wire EDM & gold plated

STB-style terminals

� Test boards were designed following

practices commonly used for PwrBlade

products

� 2.4mm thick boards

� Double-sided 5 oz. & double-sided 2 oz.

copper traces were tested

� Temperature rise vs. Applied current

measured at 12 thermocouple locations

(6 on contacts near mating areas and 6

on nearby PCB traces)

Page 16: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 16> Metral High Power – July 19, 2002 16

2mm High Power - Prototype Testing

Double-sided 5oz. copper traces

Page 17: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 17> Metral High Power – July 19, 2002 17

2mm High Power - Prototype Testing

Double-sided 2oz. copper traces

Page 18: Backpanel Connector Development October 23, 2002 · Voltage rating: 150 V per UL 60950 and IEC 664-1 & 61984 specifications (1.6mm minimum creepage and clearance distances) Receptacle

> Titre de la présentation - Date - Références - 18> Metral High Power – July 19, 2002 18

2mm High Power, Metral version -Project Status

� PACE Phase 0 (Concept) review: completed March 8, 2002

� PACE Phase 1 (Product Development) review: completed April 12, 2002

� Capital expenditures for tooling: approved May 23, 2002

� PACE Phase 2 (Process Development) review: completed June 19, 2002

� PACE Phase 3 review (Pre-Production release): October 15, 2002

� PACE Phase 4 complete (Qualified Production available): March, 2003