Backlogged Errand Optimizer BEO CSS 590 Project UI Devin McBride David Schmieder Ren Wu

Backlogged Errand Optimizer BEO

  • Upload
    fausto

  • View
    49

  • Download
    0

Embed Size (px)

DESCRIPTION

Backlogged Errand Optimizer BEO. CSS 590 Project UI Devin McBride David Schmieder Ren Wu. BEO Functionality. Management Add Delete View Optimize. Start. Iconic pinned tile Potential for Live Tiles Task at a Glance. Home. Add. Search Map Thumbnail - PowerPoint PPT Presentation

Citation preview

Page 1: Backlogged Errand Optimizer BEO

Backlogged Errand Optimizer

BEOCSS 590 Project UI

Devin McBrideDavid Schmieder

Ren Wu

Page 2: Backlogged Errand Optimizer BEO

BEO Functionality• Management–Add–Delete–View

• Optimize

Page 3: Backlogged Errand Optimizer BEO

Iconic pinned tile

Potential for Live Tiles Task at a Glance

Start

Page 4: Backlogged Errand Optimizer BEO

Home

Page 5: Backlogged Errand Optimizer BEO

Add

• Search• Map Thumbnail• Specify Name,

Description, and estimate

• Potential to default values based on map choice.

Page 6: Backlogged Errand Optimizer BEO

Add Process

Page 7: Backlogged Errand Optimizer BEO

View Process

Page 8: Backlogged Errand Optimizer BEO

Delete Process

Page 9: Backlogged Errand Optimizer BEO

Optimize• Initial goal is fastest

route optimization.• Future implementations

can integrate with calendaring applications to take into account time gaps.

Page 10: Backlogged Errand Optimizer BEO

ScheduleWeek of 4/23 Sprint 1 * Paper Prototype

* UI mockup (1st version)

Week of 4/30 Sprint 2 * Create UI* Generate mock data for 5/7 usability/peer test

Week of 5/7 Sprint 3 * Task Management Completed (add, view, delete tasks)

Week of 5/14 Sprint 4 * Optimization Task Completed

Week of 5/21Week of 5/28Week of 6/4

Sprint 5 * 2nd Peer test* TBD

Page 11: Backlogged Errand Optimizer BEO

The End.