Upload
gwendolyn-purdue
View
214
Download
0
Tags:
Embed Size (px)
Citation preview
Back to Webpage
Kurt Lidlgruber’s
Manufacturing Industry References
Services to Investors & Contractors
Contract pricing optimization
Project ManagementQuality Control
Contract/Claim/Document Management
Optimization studies
Weak Point Analysis / Problem solving
Start up / Commissioning
New Investment Research
(including Contract award negotiations)
Process / Plant Engineering
Site Management
Technical Assistance
Interface Contractor / Investor
(Construction & Equipment Manufacturing)
Project Control/Scheduling
Tender / Contract preparation
Cement AutomotiveSteel Cellulose / Paper
etc.
Back to Main Page
Construction Industry
Manufacturing Industry References
Services
Contract pricing optimization
Project ManagementQuality Control
Contract/Claim/Document Management
Optimization studies
Weak Point Analysis / Problem solving
Start up / Commissioning
New Investment Research
(including Contract award negotiations)
Process / Plant Engineering
Site Management
Technical Assistance
Interface Contractor / Investor
(Construction & Equipment Manufacturing)
Project Control/Scheduling
Tender / Contract preparation
Cement AutomotiveSteel Cellulose / Paper
etc.
Back to Main Page
References - ManufacturingCement
Steel
Heidelberg Cement GroupHOLCIM
ISCOR
HADEED
Delta Steel
Cellulose / Paper
Cellulose d’ CameroonCellulose d’ Ardennes
Qena Cement, etc.
Back to Manufacturing Industry
Lenzing AG
Back to Main Page
References - Construction
Sinoma International
ASEC
…………………..
Cement
AutomotiveSteel
Cellulose / Paper
F.L. Smith
Polysius
KHD
Kobe
VOEST Alpine
LURGIBELLELI
VOITH
Back to Construction Industry
Heidelberg Printing
VOEST Alpine - MCE
VOEST Alpine - MCE
Jagenberg
Back to Main Page
Contact Information
E-Mail: [email protected] (preferred)
Mobile: +43 676 504 9008
Personal Details
Curriculum Vitae
Back to Main Page
Personal Details
Austrian
Contact information
born July 8, 1956
Previous AssignmentsPresent Assignment
Senior Project Manager
Kurt Lidlgruber
Married
Diplomas = PM, HNC, CAD, CNC, …
Mechanical Engineering
Languages German (Mother tongue), English (excellent), French (poor)
Software Experience MS Applications, MS Project, Primavera, ACAD, Visio, etc.
Curriculum Vitae
Back to Main Page
On-going / Recent Activities
Contact information Previous AssignmentsPersonal Details
May – November, 2012
Project: Private Residence
Extension
Renovation
New Internal Infrastructure & Thermal Improvement
Assignment: May 15, 2012 – November 30, 2012
Location : Steyr, Austria
Superior : Owner
Tasks : Overall Project Responsibility (Architecture, Commercial & Technical)
Curriculum Vitae
August, 2012 - …..
Task: Support German Patent right Owner to promote market introduction of new techniques to achieve cost effective reduction of new Quarry Investments or to optimize existing Quarries by achieving technical/environmental & commercial improvements
Assignment: Ongoing
January - July 2012
Task: Support confidentially Global Turnkey Contractor on obtaining new Projects
Back to Main Page
Last Assignment
Contact information Previous AssignmentsPersonal Details
October 2006 – December 31, 2011)
Position : Senior Project Manager – HC Group Greenfield Projects (Former CIS Countries)
1 x 5,000 tpd Clinker Production Line (2.0 mio tpa Cement), Tula – Gurovo, Russia
1 x 5,000 tpd Cement Facility (2.0 mio tpa Cement), Shetpe, Kazakhstan (cancelled)
1 x 5,000 tpd Cement Facility (2.0 mio tpa Cement), WOLGA, Saratov, Russia (cancelled)
Assignment: October 1, 2006
Location : Project Office: Moscow-Podolsk, Russia
Site Offices: Tula – Gurovo, Russia Caspi - Shetpe, Kazakhstan
Superior : HTC Head of Projects, & Steering Committees
Tasks : Overall Project Responsibility (Commercial & Technical)
Curriculum Vitae
Back to Main Page
Previous Assignments
Contact information Present AssignmentPersonal Details
Period Position for Location
Oct. 06 – Dec. 11 Senior Project Manager New Investment Projects Moscow, Russia
Jan – Sep. 06 Executive Manager International Projects 2 x 10,000 tpd Clinker & Cement Plant Hofuf, KSA
Jul. 01 – Jan. 01 Project Manager 6000 tpd Clinker & Cement Plant Guangzhou, China
Apr. 00 – Jun. 01 Project Manager Cement Plant 1,4 mio tpa Cairo / Qena, Egypt
Aug. 99 – Mar. 00 Ass. Project Manager / Site Manager British Museum – Architectural changes London, UK
May 99 – Jul. 99 Claim / Site Manager Electro Precipitator Viadana, Italy
Mar. 99 – Apr. 99 Project Manager Cement Plant Rehabilitation Study Fushe Kruja, Albania
Jul. 97 – Jan. 99 Assistant Project Director Cement Plant 1,4 mio tpa Saigon, Vietnam
Jun. 95 – Apr. 97 Deputy Site Manager / Commissioning Eng. Cement Plant 1,4 mio tpa Hofuf, KSA
Feb. 94 – May 95 Site Manager Architectural Improvements Austria, Germany
Apr. 93 – Jan. 95 Supervisor Papermills Europe
Jan. – Mar. 93 Technical Assistant Steel Plant Warri, Nigeria
Sep. 91 – Aug. 92 Site Manager Steel Plant Jubail, KSA
Jun. – Aug. 91 Master Foreman Maintenance Paper Mills Austria
Dec. 89 – Jun. 91 Acting Maintenance Manager Crane Factory Austria
Jul. – Nov. 89 Mechanical Supervisor Steel Plant Pretoria, South Africa
Sep. 88 – Jun. 89 Quality Control Heating Systems Austria
Feb. 82- Aug. 88 Maintenance Manager Iron Ore Mine Bong Town, Liberia
Feb. – Nov. 81 Shift Leader Maintenance Cellulose Plant Edea, Cameroun
Apr. 79 – Jan. 81 Site Manager LNG Erection Austria
Curriculum Vitae
Back to Main Page
Reference
Contact information Back to Previous Assignment
Back to Main Page
Reference
Contact information Back to Previous Assignment
Back to Main Page
Reference
Contact information Back to Previous Assignment
Back to Main Page
Reference
Contact information Back to Previous Assignment