Baart sarkarGovernment of India kond`Iya ivaVut p`aiQakrNa
Central Electricity Authority piScama xao~Iya ivaVut saimait
Western Regional Power Committee ef -3 emaAayaDIsaI xao~ AMQaorI (pUva-) mauMba[- - 400 093
F-3 MIDC Area Andheri (East) Mumbai - 400 093
Aa[- esa Aao 9001-2008
ISO 9001-2008
dUrBaaYa Phone 022- 28221681 28200194 2820019528200196 fOsa Fax 022 ndash 28370193 Website wwwwrpcnicin E-mail opc-wrpcnicin
saM Paxaoivasap`caa Pa`sasa-kaya-vaRt 2013-14 11806 idnaaMk 28112013
saovaa maoM ivaYaya- pxaoivasaimait mauMba[- kI Pa`caalana evaM samanvaya saimait kI 453 vaIM baOzk ka
kaya-vaRt
mahaodya
piMScama xao~Iya ivaVut saimait mauMba[- kI Pa`caalana evaM samanvaya saimait kI idnaaMk 15112013 kao WRLDC MUMBAI maoMoM Aayaaoijat 453 vaIM baOzk ka kaya-vaRt AapkI saUcanaaqa- saMlagna hO
Qanyavaad
BavadIya
saMlagna ]Paraotanausaar ( laxmaI kant isaMh razaoor)
kRto AQaIxaNa AiBayaMta (p`caalana)
MINUTES OF 453RD MEETING OF OPERATION amp COORDINATION SUB-COMMITTEE OF WRPC HELD ON 15th NOVEMBER 2013
AT WRLDC MUMBAI
The 453rd meeting of Operation amp Co-ordination Sub-Committee of WRPC was held on 15th November 2013 at WRLDC Mumbai The list of participants is enclosed at Annex-I
Shri S D Taksande Member Secretary WRPC extended warm welcome to the members and participants of the 453rd OCCM
He informed that
1 400kV Parli-Pune Ckt -1 amp Ckt-2 charged on 08112013 and 10112013
respectively
2 Synchronization of SR- NEW grid will be done by December 2013 end provided
all prerequisites are completed
3 CGPL Mundra all units got desynchronized on 14th November 2013 as
incoming coal conveyor belt got a major fire The recovery procedure is in full
swing amp it is expected all units will be synchronized by 25th November 2013
4 1800 MW generating capacity has been added during last month which include
Korba West(IPP) Unit -1 of 600 MW D B Power unit No-1 of 600 MW and JPL
Ext Unit-2 of 600 MW
5 Black Start Mock Drill at Kawas Gas Power Station(NTPC) has successfully
performed on 15102013
6 Protection Audit at TAPS 1amp2 3amp4 carried out on 13112013 by the group
nominated by WRPC
7 SPS at APL Tiroda and CGPL commissioned and operational with inputs from
Wardha PGCILSS however SPS at Tiroda needs change due to
commissioning of 400 kV Wardha ndash Chandrapur Ckt
8 Meeting on Reserve shutdown of NTPC coal units and issues of declaration of
separate DCs on domestic and imported coal by NTPC is scheduled on
27112013 and decision of running of coal fired NTPC units will be reviewed
accordingly
9 ESIL has been granted transmission licensee in ISTS transmission line
availability certification will be issued by WRPC on monthly basis
Minutes of 453rd OCC meeting held on 15th November 2013
He informed that Western Regional Grid registered maximum demand of 39233 MW
during October 2013 which was about 405 less than the registered demand of
40890 MW met during the same month last year (In September 2013 it was 38807
MW) The unrestricted demand was 39272 MW as compared to 41479 MW during the
last year The decrease in unrestricted demand is of the order of 5 (In September
2013 it was 39562 MW) He further informed that frequencies remain between 497 to
502 Hz for 8919 of the time during October 2013 amp remain below 497 Hz for 101
Above 502 Hz for 980 Frequency didnrsquot touched 488 Hz during the month
He stated that important issues would be taken up for discussion before resorting to
regular agenda items Thereafter following important issues were taken up for
discussion
Member Secretary then requested to SE(Operation) WRPC to take up the regular
agenda items
ITEM No 1 CONFIRMATION OF THE MINUTES
Superintending Engineer(Opn) WRPC stated that the minutes of 452nd meeting of
Operation amp Coordination Sub-Committee of WRPC held on 17th October 2013 at Navi
Mumbai were forwarded vide letter No WRPCOPNOCC-Minutes2013-1410713 dated
24102013
CE SLDC MPPTCL Jabalpur vide letter dated 0811203 commented on following
items
C - TECHNICAL MINIMUM REQUISITION FOR COAL FIRED CENTRAL SECTOR GENERATING STATIONS
SLDC MP representative informed that sub-committee that the requisition to ensure
technical minimum schedule of NTPC coal based units by MP is not possible as they
have to follow the merit order principle He further informed that SLDC has to submit
the report of merit order dispatch followed by MP to MPERC amp Govt of MP as and
when required by them He further infirmed that due to heavy rains the demand of MP
could not pick up and running of Hydel Stations including Indira Sagar was also
restricted even in the period of spill over from reservoir He stated that in view of the
above MP shall continue to give their requisition as per their demand and merit order
Minutes of 453rd OCC meeting held on 15th November 2013
dispatch principle and WRLDC may enhance the schedule to the technical minimum
levels in case of requisition from beneficiaries being lower than the technical minimum
as mentioned in para 1 above SLDC MP representative requested Member Secretary
to record the comments of MP in the minutes of 452nd OCC meeting but the same is
not included in the above minutes It is therefore requested to include the comments of
MP in the minutes of 452nd OCC meeting It is also to mention that SLDCrsquos view on
scheduling of technical minimum in case consolidated requisition by all beneficiaries is
less than technical minimum of stations was also narrated by SLDC representative in
the OCC meeting
Member secretary WRPC informed that the decision taken in 24th WRPC meeting in the matter of RSD of NTPC station was intimated to OCC members and as WRPC is apex forum of WRPC its decision cannot be overridden by OCC sub-Committee Also there were concern constraint expressed by beneficiaries in WRPC meeting and after due deliberation WRPC took above decision till any firm decision Therefore decision of WRPC is binding till further directives are received from WRPC forum
This item was confirmed without any modification
915 FREQUENT TRIPPING OF 220 kV AURAIYA MALANPUR AND AURAIYA MEHGAON
SLDC MPPTCL requested to included following
ldquoSE (Opn) requested MP to submit updated status of frequent tripping of 220 kV
Auraiya ndashMalanpur and Auraiya-Mehgaon Circuits on Single phase to earth fault
SLDC MP representative informed that the Shutdown was taken on Malanpur-Auraiya
Line on 0809 and 10102013 for patrolling work and replacement of flash over disc
He further informed that after availing shut down there is no tripping occurred on the
Malanpur ndash Auraiya line He informed in the meeting that the shut down on Mehgaon ndash
Auraiya line has been planned on 18102013 and 19102013 for patrolling work and
replacement of flash over discrdquo
OCC agreed to included above in the minutes of 452nd OCC meeting
Minutes of 452nd OCCM were confirmed with above modifications
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
OCTOBER 2013
SE(Operation) WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during October 2013
Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft copy) concentrated broadly on the performance of the grid for month of October 2013
as below
Frequency Particulars WRLDC presented the following highlights of grid operation during the month of
October 2013
During October 2013 the system frequency was below 497 Hz for 101 of time
against 151 of time during September 2013 The system frequency was within the
IEGC range of 497 Hz -502 Hz for 8919 of the time against 8924 of time during
September 2013 The average monthly frequency was 5003 Hz during October 2013
whereas it was 5002 Hz in the month of September 2013 Regarding operation in high
frequency range frequency during the month of October 2013 was above 5020 Hz for
980 of time against 925 of time during September 2013
The detailed frequency particulars are enclosed at Annex- 21
The Sub-Committee noted Inter-regional exchanges status
There was a net inter-regional export of 222327 MUs by WR against net export
schedule of 236673 MUs
The Sub-Committee noted as above 23 Voltage Profile
Voltage profile at some of 765400 kV sub-stations during the month of October
2013 furnished by WRLDC is enclosed at Annex-23
During the month the deviations of voltages from the accepted limit on either
side were recorded at the following locations in WR grid -
Minutes of 453rd OCC meeting held on 15th November 2013
SNo 765400kV Sub-
station Max Voltage
observed (kV)
Date of incidence Min voltage
observed (kV)
Date of incidence
1 Indore 425 101013 - -
2 Itarsi 426 111013 - -
3 Karad 440 031013 - -
4 Dhule 437 171013 - -
5 Asoj 420 041013 - -
6 Kasor 424 141013 - -
7 Bhilai 430 071013 - -
8 Jetpur 421 251013 - -
9 Bina 424 101013 - -
10 Gwalior 417 291013 - -
11 Nagda 427 301013 - -
12 Khandwa 433 311013 - -
13 Seoni 802 031013
14 765kV Bina 807 261013 - -
15 765 kV Gwalior 803 201013 - -
bull Minimum voltages beyond IEGC range were not observed at above substations
WRLDC intimated that since about 30th October it is observed that voltages at Indore
Nagda Bina and Gwalior had been reducing gradually to about 395kV between
0800hrs-1100hrs On 30102013 the voltage at Indore reduced to 385kV at
0838hrs The typical voltage profile at Indore is shown below (plotted from SCADA
the spikes are due to change of data from non-current state to current state)
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
MINUTES OF 453RD MEETING OF OPERATION amp COORDINATION SUB-COMMITTEE OF WRPC HELD ON 15th NOVEMBER 2013
AT WRLDC MUMBAI
The 453rd meeting of Operation amp Co-ordination Sub-Committee of WRPC was held on 15th November 2013 at WRLDC Mumbai The list of participants is enclosed at Annex-I
Shri S D Taksande Member Secretary WRPC extended warm welcome to the members and participants of the 453rd OCCM
He informed that
1 400kV Parli-Pune Ckt -1 amp Ckt-2 charged on 08112013 and 10112013
respectively
2 Synchronization of SR- NEW grid will be done by December 2013 end provided
all prerequisites are completed
3 CGPL Mundra all units got desynchronized on 14th November 2013 as
incoming coal conveyor belt got a major fire The recovery procedure is in full
swing amp it is expected all units will be synchronized by 25th November 2013
4 1800 MW generating capacity has been added during last month which include
Korba West(IPP) Unit -1 of 600 MW D B Power unit No-1 of 600 MW and JPL
Ext Unit-2 of 600 MW
5 Black Start Mock Drill at Kawas Gas Power Station(NTPC) has successfully
performed on 15102013
6 Protection Audit at TAPS 1amp2 3amp4 carried out on 13112013 by the group
nominated by WRPC
7 SPS at APL Tiroda and CGPL commissioned and operational with inputs from
Wardha PGCILSS however SPS at Tiroda needs change due to
commissioning of 400 kV Wardha ndash Chandrapur Ckt
8 Meeting on Reserve shutdown of NTPC coal units and issues of declaration of
separate DCs on domestic and imported coal by NTPC is scheduled on
27112013 and decision of running of coal fired NTPC units will be reviewed
accordingly
9 ESIL has been granted transmission licensee in ISTS transmission line
availability certification will be issued by WRPC on monthly basis
Minutes of 453rd OCC meeting held on 15th November 2013
He informed that Western Regional Grid registered maximum demand of 39233 MW
during October 2013 which was about 405 less than the registered demand of
40890 MW met during the same month last year (In September 2013 it was 38807
MW) The unrestricted demand was 39272 MW as compared to 41479 MW during the
last year The decrease in unrestricted demand is of the order of 5 (In September
2013 it was 39562 MW) He further informed that frequencies remain between 497 to
502 Hz for 8919 of the time during October 2013 amp remain below 497 Hz for 101
Above 502 Hz for 980 Frequency didnrsquot touched 488 Hz during the month
He stated that important issues would be taken up for discussion before resorting to
regular agenda items Thereafter following important issues were taken up for
discussion
Member Secretary then requested to SE(Operation) WRPC to take up the regular
agenda items
ITEM No 1 CONFIRMATION OF THE MINUTES
Superintending Engineer(Opn) WRPC stated that the minutes of 452nd meeting of
Operation amp Coordination Sub-Committee of WRPC held on 17th October 2013 at Navi
Mumbai were forwarded vide letter No WRPCOPNOCC-Minutes2013-1410713 dated
24102013
CE SLDC MPPTCL Jabalpur vide letter dated 0811203 commented on following
items
C - TECHNICAL MINIMUM REQUISITION FOR COAL FIRED CENTRAL SECTOR GENERATING STATIONS
SLDC MP representative informed that sub-committee that the requisition to ensure
technical minimum schedule of NTPC coal based units by MP is not possible as they
have to follow the merit order principle He further informed that SLDC has to submit
the report of merit order dispatch followed by MP to MPERC amp Govt of MP as and
when required by them He further infirmed that due to heavy rains the demand of MP
could not pick up and running of Hydel Stations including Indira Sagar was also
restricted even in the period of spill over from reservoir He stated that in view of the
above MP shall continue to give their requisition as per their demand and merit order
Minutes of 453rd OCC meeting held on 15th November 2013
dispatch principle and WRLDC may enhance the schedule to the technical minimum
levels in case of requisition from beneficiaries being lower than the technical minimum
as mentioned in para 1 above SLDC MP representative requested Member Secretary
to record the comments of MP in the minutes of 452nd OCC meeting but the same is
not included in the above minutes It is therefore requested to include the comments of
MP in the minutes of 452nd OCC meeting It is also to mention that SLDCrsquos view on
scheduling of technical minimum in case consolidated requisition by all beneficiaries is
less than technical minimum of stations was also narrated by SLDC representative in
the OCC meeting
Member secretary WRPC informed that the decision taken in 24th WRPC meeting in the matter of RSD of NTPC station was intimated to OCC members and as WRPC is apex forum of WRPC its decision cannot be overridden by OCC sub-Committee Also there were concern constraint expressed by beneficiaries in WRPC meeting and after due deliberation WRPC took above decision till any firm decision Therefore decision of WRPC is binding till further directives are received from WRPC forum
This item was confirmed without any modification
915 FREQUENT TRIPPING OF 220 kV AURAIYA MALANPUR AND AURAIYA MEHGAON
SLDC MPPTCL requested to included following
ldquoSE (Opn) requested MP to submit updated status of frequent tripping of 220 kV
Auraiya ndashMalanpur and Auraiya-Mehgaon Circuits on Single phase to earth fault
SLDC MP representative informed that the Shutdown was taken on Malanpur-Auraiya
Line on 0809 and 10102013 for patrolling work and replacement of flash over disc
He further informed that after availing shut down there is no tripping occurred on the
Malanpur ndash Auraiya line He informed in the meeting that the shut down on Mehgaon ndash
Auraiya line has been planned on 18102013 and 19102013 for patrolling work and
replacement of flash over discrdquo
OCC agreed to included above in the minutes of 452nd OCC meeting
Minutes of 452nd OCCM were confirmed with above modifications
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
OCTOBER 2013
SE(Operation) WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during October 2013
Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft copy) concentrated broadly on the performance of the grid for month of October 2013
as below
Frequency Particulars WRLDC presented the following highlights of grid operation during the month of
October 2013
During October 2013 the system frequency was below 497 Hz for 101 of time
against 151 of time during September 2013 The system frequency was within the
IEGC range of 497 Hz -502 Hz for 8919 of the time against 8924 of time during
September 2013 The average monthly frequency was 5003 Hz during October 2013
whereas it was 5002 Hz in the month of September 2013 Regarding operation in high
frequency range frequency during the month of October 2013 was above 5020 Hz for
980 of time against 925 of time during September 2013
The detailed frequency particulars are enclosed at Annex- 21
The Sub-Committee noted Inter-regional exchanges status
There was a net inter-regional export of 222327 MUs by WR against net export
schedule of 236673 MUs
The Sub-Committee noted as above 23 Voltage Profile
Voltage profile at some of 765400 kV sub-stations during the month of October
2013 furnished by WRLDC is enclosed at Annex-23
During the month the deviations of voltages from the accepted limit on either
side were recorded at the following locations in WR grid -
Minutes of 453rd OCC meeting held on 15th November 2013
SNo 765400kV Sub-
station Max Voltage
observed (kV)
Date of incidence Min voltage
observed (kV)
Date of incidence
1 Indore 425 101013 - -
2 Itarsi 426 111013 - -
3 Karad 440 031013 - -
4 Dhule 437 171013 - -
5 Asoj 420 041013 - -
6 Kasor 424 141013 - -
7 Bhilai 430 071013 - -
8 Jetpur 421 251013 - -
9 Bina 424 101013 - -
10 Gwalior 417 291013 - -
11 Nagda 427 301013 - -
12 Khandwa 433 311013 - -
13 Seoni 802 031013
14 765kV Bina 807 261013 - -
15 765 kV Gwalior 803 201013 - -
bull Minimum voltages beyond IEGC range were not observed at above substations
WRLDC intimated that since about 30th October it is observed that voltages at Indore
Nagda Bina and Gwalior had been reducing gradually to about 395kV between
0800hrs-1100hrs On 30102013 the voltage at Indore reduced to 385kV at
0838hrs The typical voltage profile at Indore is shown below (plotted from SCADA
the spikes are due to change of data from non-current state to current state)
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
He informed that Western Regional Grid registered maximum demand of 39233 MW
during October 2013 which was about 405 less than the registered demand of
40890 MW met during the same month last year (In September 2013 it was 38807
MW) The unrestricted demand was 39272 MW as compared to 41479 MW during the
last year The decrease in unrestricted demand is of the order of 5 (In September
2013 it was 39562 MW) He further informed that frequencies remain between 497 to
502 Hz for 8919 of the time during October 2013 amp remain below 497 Hz for 101
Above 502 Hz for 980 Frequency didnrsquot touched 488 Hz during the month
He stated that important issues would be taken up for discussion before resorting to
regular agenda items Thereafter following important issues were taken up for
discussion
Member Secretary then requested to SE(Operation) WRPC to take up the regular
agenda items
ITEM No 1 CONFIRMATION OF THE MINUTES
Superintending Engineer(Opn) WRPC stated that the minutes of 452nd meeting of
Operation amp Coordination Sub-Committee of WRPC held on 17th October 2013 at Navi
Mumbai were forwarded vide letter No WRPCOPNOCC-Minutes2013-1410713 dated
24102013
CE SLDC MPPTCL Jabalpur vide letter dated 0811203 commented on following
items
C - TECHNICAL MINIMUM REQUISITION FOR COAL FIRED CENTRAL SECTOR GENERATING STATIONS
SLDC MP representative informed that sub-committee that the requisition to ensure
technical minimum schedule of NTPC coal based units by MP is not possible as they
have to follow the merit order principle He further informed that SLDC has to submit
the report of merit order dispatch followed by MP to MPERC amp Govt of MP as and
when required by them He further infirmed that due to heavy rains the demand of MP
could not pick up and running of Hydel Stations including Indira Sagar was also
restricted even in the period of spill over from reservoir He stated that in view of the
above MP shall continue to give their requisition as per their demand and merit order
Minutes of 453rd OCC meeting held on 15th November 2013
dispatch principle and WRLDC may enhance the schedule to the technical minimum
levels in case of requisition from beneficiaries being lower than the technical minimum
as mentioned in para 1 above SLDC MP representative requested Member Secretary
to record the comments of MP in the minutes of 452nd OCC meeting but the same is
not included in the above minutes It is therefore requested to include the comments of
MP in the minutes of 452nd OCC meeting It is also to mention that SLDCrsquos view on
scheduling of technical minimum in case consolidated requisition by all beneficiaries is
less than technical minimum of stations was also narrated by SLDC representative in
the OCC meeting
Member secretary WRPC informed that the decision taken in 24th WRPC meeting in the matter of RSD of NTPC station was intimated to OCC members and as WRPC is apex forum of WRPC its decision cannot be overridden by OCC sub-Committee Also there were concern constraint expressed by beneficiaries in WRPC meeting and after due deliberation WRPC took above decision till any firm decision Therefore decision of WRPC is binding till further directives are received from WRPC forum
This item was confirmed without any modification
915 FREQUENT TRIPPING OF 220 kV AURAIYA MALANPUR AND AURAIYA MEHGAON
SLDC MPPTCL requested to included following
ldquoSE (Opn) requested MP to submit updated status of frequent tripping of 220 kV
Auraiya ndashMalanpur and Auraiya-Mehgaon Circuits on Single phase to earth fault
SLDC MP representative informed that the Shutdown was taken on Malanpur-Auraiya
Line on 0809 and 10102013 for patrolling work and replacement of flash over disc
He further informed that after availing shut down there is no tripping occurred on the
Malanpur ndash Auraiya line He informed in the meeting that the shut down on Mehgaon ndash
Auraiya line has been planned on 18102013 and 19102013 for patrolling work and
replacement of flash over discrdquo
OCC agreed to included above in the minutes of 452nd OCC meeting
Minutes of 452nd OCCM were confirmed with above modifications
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
OCTOBER 2013
SE(Operation) WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during October 2013
Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft copy) concentrated broadly on the performance of the grid for month of October 2013
as below
Frequency Particulars WRLDC presented the following highlights of grid operation during the month of
October 2013
During October 2013 the system frequency was below 497 Hz for 101 of time
against 151 of time during September 2013 The system frequency was within the
IEGC range of 497 Hz -502 Hz for 8919 of the time against 8924 of time during
September 2013 The average monthly frequency was 5003 Hz during October 2013
whereas it was 5002 Hz in the month of September 2013 Regarding operation in high
frequency range frequency during the month of October 2013 was above 5020 Hz for
980 of time against 925 of time during September 2013
The detailed frequency particulars are enclosed at Annex- 21
The Sub-Committee noted Inter-regional exchanges status
There was a net inter-regional export of 222327 MUs by WR against net export
schedule of 236673 MUs
The Sub-Committee noted as above 23 Voltage Profile
Voltage profile at some of 765400 kV sub-stations during the month of October
2013 furnished by WRLDC is enclosed at Annex-23
During the month the deviations of voltages from the accepted limit on either
side were recorded at the following locations in WR grid -
Minutes of 453rd OCC meeting held on 15th November 2013
SNo 765400kV Sub-
station Max Voltage
observed (kV)
Date of incidence Min voltage
observed (kV)
Date of incidence
1 Indore 425 101013 - -
2 Itarsi 426 111013 - -
3 Karad 440 031013 - -
4 Dhule 437 171013 - -
5 Asoj 420 041013 - -
6 Kasor 424 141013 - -
7 Bhilai 430 071013 - -
8 Jetpur 421 251013 - -
9 Bina 424 101013 - -
10 Gwalior 417 291013 - -
11 Nagda 427 301013 - -
12 Khandwa 433 311013 - -
13 Seoni 802 031013
14 765kV Bina 807 261013 - -
15 765 kV Gwalior 803 201013 - -
bull Minimum voltages beyond IEGC range were not observed at above substations
WRLDC intimated that since about 30th October it is observed that voltages at Indore
Nagda Bina and Gwalior had been reducing gradually to about 395kV between
0800hrs-1100hrs On 30102013 the voltage at Indore reduced to 385kV at
0838hrs The typical voltage profile at Indore is shown below (plotted from SCADA
the spikes are due to change of data from non-current state to current state)
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
dispatch principle and WRLDC may enhance the schedule to the technical minimum
levels in case of requisition from beneficiaries being lower than the technical minimum
as mentioned in para 1 above SLDC MP representative requested Member Secretary
to record the comments of MP in the minutes of 452nd OCC meeting but the same is
not included in the above minutes It is therefore requested to include the comments of
MP in the minutes of 452nd OCC meeting It is also to mention that SLDCrsquos view on
scheduling of technical minimum in case consolidated requisition by all beneficiaries is
less than technical minimum of stations was also narrated by SLDC representative in
the OCC meeting
Member secretary WRPC informed that the decision taken in 24th WRPC meeting in the matter of RSD of NTPC station was intimated to OCC members and as WRPC is apex forum of WRPC its decision cannot be overridden by OCC sub-Committee Also there were concern constraint expressed by beneficiaries in WRPC meeting and after due deliberation WRPC took above decision till any firm decision Therefore decision of WRPC is binding till further directives are received from WRPC forum
This item was confirmed without any modification
915 FREQUENT TRIPPING OF 220 kV AURAIYA MALANPUR AND AURAIYA MEHGAON
SLDC MPPTCL requested to included following
ldquoSE (Opn) requested MP to submit updated status of frequent tripping of 220 kV
Auraiya ndashMalanpur and Auraiya-Mehgaon Circuits on Single phase to earth fault
SLDC MP representative informed that the Shutdown was taken on Malanpur-Auraiya
Line on 0809 and 10102013 for patrolling work and replacement of flash over disc
He further informed that after availing shut down there is no tripping occurred on the
Malanpur ndash Auraiya line He informed in the meeting that the shut down on Mehgaon ndash
Auraiya line has been planned on 18102013 and 19102013 for patrolling work and
replacement of flash over discrdquo
OCC agreed to included above in the minutes of 452nd OCC meeting
Minutes of 452nd OCCM were confirmed with above modifications
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
OCTOBER 2013
SE(Operation) WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during October 2013
Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft copy) concentrated broadly on the performance of the grid for month of October 2013
as below
Frequency Particulars WRLDC presented the following highlights of grid operation during the month of
October 2013
During October 2013 the system frequency was below 497 Hz for 101 of time
against 151 of time during September 2013 The system frequency was within the
IEGC range of 497 Hz -502 Hz for 8919 of the time against 8924 of time during
September 2013 The average monthly frequency was 5003 Hz during October 2013
whereas it was 5002 Hz in the month of September 2013 Regarding operation in high
frequency range frequency during the month of October 2013 was above 5020 Hz for
980 of time against 925 of time during September 2013
The detailed frequency particulars are enclosed at Annex- 21
The Sub-Committee noted Inter-regional exchanges status
There was a net inter-regional export of 222327 MUs by WR against net export
schedule of 236673 MUs
The Sub-Committee noted as above 23 Voltage Profile
Voltage profile at some of 765400 kV sub-stations during the month of October
2013 furnished by WRLDC is enclosed at Annex-23
During the month the deviations of voltages from the accepted limit on either
side were recorded at the following locations in WR grid -
Minutes of 453rd OCC meeting held on 15th November 2013
SNo 765400kV Sub-
station Max Voltage
observed (kV)
Date of incidence Min voltage
observed (kV)
Date of incidence
1 Indore 425 101013 - -
2 Itarsi 426 111013 - -
3 Karad 440 031013 - -
4 Dhule 437 171013 - -
5 Asoj 420 041013 - -
6 Kasor 424 141013 - -
7 Bhilai 430 071013 - -
8 Jetpur 421 251013 - -
9 Bina 424 101013 - -
10 Gwalior 417 291013 - -
11 Nagda 427 301013 - -
12 Khandwa 433 311013 - -
13 Seoni 802 031013
14 765kV Bina 807 261013 - -
15 765 kV Gwalior 803 201013 - -
bull Minimum voltages beyond IEGC range were not observed at above substations
WRLDC intimated that since about 30th October it is observed that voltages at Indore
Nagda Bina and Gwalior had been reducing gradually to about 395kV between
0800hrs-1100hrs On 30102013 the voltage at Indore reduced to 385kV at
0838hrs The typical voltage profile at Indore is shown below (plotted from SCADA
the spikes are due to change of data from non-current state to current state)
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
OCTOBER 2013
SE(Operation) WRPC requested WRLDC to brief the Committee on Grid Operation
experiences during October 2013
Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft copy) concentrated broadly on the performance of the grid for month of October 2013
as below
Frequency Particulars WRLDC presented the following highlights of grid operation during the month of
October 2013
During October 2013 the system frequency was below 497 Hz for 101 of time
against 151 of time during September 2013 The system frequency was within the
IEGC range of 497 Hz -502 Hz for 8919 of the time against 8924 of time during
September 2013 The average monthly frequency was 5003 Hz during October 2013
whereas it was 5002 Hz in the month of September 2013 Regarding operation in high
frequency range frequency during the month of October 2013 was above 5020 Hz for
980 of time against 925 of time during September 2013
The detailed frequency particulars are enclosed at Annex- 21
The Sub-Committee noted Inter-regional exchanges status
There was a net inter-regional export of 222327 MUs by WR against net export
schedule of 236673 MUs
The Sub-Committee noted as above 23 Voltage Profile
Voltage profile at some of 765400 kV sub-stations during the month of October
2013 furnished by WRLDC is enclosed at Annex-23
During the month the deviations of voltages from the accepted limit on either
side were recorded at the following locations in WR grid -
Minutes of 453rd OCC meeting held on 15th November 2013
SNo 765400kV Sub-
station Max Voltage
observed (kV)
Date of incidence Min voltage
observed (kV)
Date of incidence
1 Indore 425 101013 - -
2 Itarsi 426 111013 - -
3 Karad 440 031013 - -
4 Dhule 437 171013 - -
5 Asoj 420 041013 - -
6 Kasor 424 141013 - -
7 Bhilai 430 071013 - -
8 Jetpur 421 251013 - -
9 Bina 424 101013 - -
10 Gwalior 417 291013 - -
11 Nagda 427 301013 - -
12 Khandwa 433 311013 - -
13 Seoni 802 031013
14 765kV Bina 807 261013 - -
15 765 kV Gwalior 803 201013 - -
bull Minimum voltages beyond IEGC range were not observed at above substations
WRLDC intimated that since about 30th October it is observed that voltages at Indore
Nagda Bina and Gwalior had been reducing gradually to about 395kV between
0800hrs-1100hrs On 30102013 the voltage at Indore reduced to 385kV at
0838hrs The typical voltage profile at Indore is shown below (plotted from SCADA
the spikes are due to change of data from non-current state to current state)
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
SNo 765400kV Sub-
station Max Voltage
observed (kV)
Date of incidence Min voltage
observed (kV)
Date of incidence
1 Indore 425 101013 - -
2 Itarsi 426 111013 - -
3 Karad 440 031013 - -
4 Dhule 437 171013 - -
5 Asoj 420 041013 - -
6 Kasor 424 141013 - -
7 Bhilai 430 071013 - -
8 Jetpur 421 251013 - -
9 Bina 424 101013 - -
10 Gwalior 417 291013 - -
11 Nagda 427 301013 - -
12 Khandwa 433 311013 - -
13 Seoni 802 031013
14 765kV Bina 807 261013 - -
15 765 kV Gwalior 803 201013 - -
bull Minimum voltages beyond IEGC range were not observed at above substations
WRLDC intimated that since about 30th October it is observed that voltages at Indore
Nagda Bina and Gwalior had been reducing gradually to about 395kV between
0800hrs-1100hrs On 30102013 the voltage at Indore reduced to 385kV at
0838hrs The typical voltage profile at Indore is shown below (plotted from SCADA
the spikes are due to change of data from non-current state to current state)
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
The maximum and minimum voltages at the above stations (as per SCADA) on
30102013 are mentioned below
400 kV Station Maximum (kV) Minimum (kV)
Indore 420 385
Itarsi 420 386
Nagda 427 387
Bina 419 391
Gwalior 411 387
The following measures are to be implemented
a Bus reactors at Indore(PG) Nagda Itarsi Bina(MP) Bina (PG) and
Gwalior are to be switched off at 0800hrs and to be switched on at
about 0945hrs
b VAR generation at Satpura JaypeeBina to be ensured during the above
period
c The hydel generation at Indira Sagar and Omkareshwar can be
maximized between the above period
d The lines opened to control OV voltage during night hours are to be
taken into service by 0730hrs when the MP demand starts increasing
Similarly the voltages at 400 kV Parli and 400 kV Sholapur are about 390kV in the
afternoon hours when the demand in Maharashtra is high Necessary measures of
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
taking all opened lines into service and switching of bus reactors to be ensured by
MSETCL and WRTS-I
The Sub-Committee noted as above 24 UF Relay Operations
As per WRLDC records during October 2013 the system frequency didnrsquot touch 488
Hz The details of UFR operation received from constituents for the month of October
2013 is enclosed at Annexure 24
GETCO has reported AUFLS on five occasions in October 2013 GETCO had also
informed UFR operation in the month of September when frequency did not touch 492
Hz Matter was discussed in 452ndOCC and Gujarat was advised to check the relay
setting GETCO representative was requested to review the relay setting to avoid
unintentional operation of UFR
The Sub-Committee noted as above 25 Power Cuts Load Restrictions
The committee noted the details of Power Cuts and Regulatory Measures during
October 2013 as furnished by the state utilities as per the enclosed Annexure-25
The Sub-Committee noted the above 26 Details of Generating Units under Forced outages
Details of generating units under forced outages during October 2013 were discussed The modified details of force outages programme of Generating units are given in Annexure-26
The Sub-Committee noted the above 27 Details of Generating Units under Planned outages The status of planned outage is modified as per intimation by concern members The modified details of generating units under Planned Outages during October 2013 are given in Annexure-27
The Sub-Committee discussed and finalized the planned outages
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No3 OPERATIONAL PLANNING 31 Proposed outage programme of generating units
The maintenance programme of generating units for November 2013 amp December 2013 was discussed The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-31
32 A Outage Programme of Transmission Lineselements
SE(Opn) WRPC informed that for the 454th OCC transmission elements outages planning data must be submitted on or before 03122013 Inter-regional outages proposal must be submitted on 01122013 so that it can be take up with the counterpart of other region as well as NLDC The Committee discussed the maintenance Programme for transmission lineselements for the months of November amp December 2013
The Sub-Committee discussed and finalized the planned outages(enclosed at Annexure-32 A amp Annexure-32 B)
B Line outages planned vs implemented
In 453rd OCC it was decided that the status of lines planned vs lines availed and any
deviation from planning or emergency outages for the concerned month shall be
submitted by WRLDC for discussion in respective OCC Accordingly in the next OCC
WRLDC would furnish the status of complete list of line outages during the month of
November 2013 planned vis-agrave-vis implemented
WRLDC submitted the status of planned transmission element outages vs
actual availed or emergency outages during the October 2013(Attached at Annexure-
32-C2)
The statistics for planned vs availed outage during October 2013 is summarized below
S No Particulars of OCC approved Outage Number
1 Number of transmission element outage approved in 451st OCC meeting
226
2 Number of transmission elements for which reliability consent was available
218
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode
Minutes of 453rd OCC meeting held on 15th November 2013
3 Number of outage availed 90
4 Availed Outage as a of Approved Outage 413
Utility-wise statistics of availed outage as a of approved outage is displayed below
50
87
38 30 28 36
100
5840
100
020406080100120
0102030405060
OCC Approved Outage Statistics for Oct 2013
Approved Availed age
As agreed during the 452ND OCC meeting the respective utilities were requested to
apprise the sub-committee regarding reason for failing to avail approved outages
SE(Operation) WRPC pointed out that out of approved transmission outages bulk
quantum of outages are not availed by constituents even when there is no real time
condition problem He further stated that after approving outages for particular date
for particular line outage on parallel line or for the line in the same corridor is very
difficult owing to consideration of the fact that the approved outage would be availed
by that constituent But non-availing of such outage by any constituent deprives other
constituent requiring important outage Also sometimes the outages for two agencies
are clubbed together with change in dates suitable to one agency In case such
outage is not availed by the agency for whom the dates are suitable other agency
unnecessarily have to shuffle their planmanpower which cause trouble to them
He requested constituents to restrict the proposal on outages to really required The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash NOVEMBER 2013 amp DECEMBER- 2013
Anticipated Power Supply Position for the months of November 2013 amp December 2013
were discussed The details of anticipated regional deficit are given below
(All figures in MW) State Region
November 2013 December 2013 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11381 11640 259 11115 11340 225
MPPTCL 10220 10220 0 11446 11446 0
CSEB 2972 3003 31 2894 2915 21
MSETCL 17250 18300 1050 17200 18200 1000
GOA 425 430 5 409 425 16
DD 355 355 0 345 350 5
DNH 645 645 0 645 650 5
WR 41422 43066 1644 41836 43583 1747
Details of anticipated restricted amp un-restricted demands for the months of November 2013 amp December 2013 are given in Annex 33 (A) The Sub-Committee noted as above ITEM No 4 OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2013 The details of schedule Vs actual generation demand drawl of power from
grid exchanges etc are given in the following Annexure
Annex 41 - Schedule Vs Actual Generation and Requirement for October 2013
Annex 42 - Peak Demand Schedule Vs Actual for October 2013
Annex 43 - Integrated Operation of the System amp Operation of Inter State Tie lines for
October 2013
Annex 45- Details of Declared Capacity Schedules and Injections from Central sector
stations Drawl Schedules and Entitlements of constituents during October 2013
Annex 46 - Inter System Exchanges for October 2013
Annex 47- Details of level of Major Reservoirs in Western Region for October 2013
The sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM No 5 SYSTEM DISTURBANCE IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month
The consolidated list of other grid disturbances as furnished by WRLDC is attached at Annexure- 5
The tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on
first working day of the month The same has to be reported to MOP via GM division
of CEA Accordingly WRLDC were requested to furnish the tripping details to WRPC
along with details immediately in the event of tripping
The Sub-Committee noted as above
ITEM No 6 Confirmation of Healthiness status of SERsDRs equipment in the system
Constituents have furnished the status of healthiness of SERDRs in their
systems on the dates below-
Sl No Name of constituents
Date of Receipt
1 PGCILWRTS-I 08112013 2 PGCILWRTS-II 06112013 3 MPPTCL 15112013 4 NTPC 06112013 5 CSPTCL 04112013 6 GETCO 07112013 7 MSETCL 15112013
Constituents of WR were requested to continue sending the information as per the
recommendation of enquiry committee of Grid disturbances on 25022007 and
28022007
The Sub-Committee noted as above ITEM No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR
71 Status of completion of ongoing Schemes for Commissioning of reactors
As discussed in 453rd OCCM and as per the present status available on the work for
providing additional reactors at the various locations in WR
Minutes of 453rd OCC meeting held on 15th November 2013
Accordingly the information regarding the commissioning schedule is as below
S No
400 kV Substn
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
8 Jabalpur 125 MVAR PGCIL June 2014 9 Khandwa 125 MVAR PGCIL June 2014 10 Shujalpur 125 MVAR PGCIL June 2014 11 Bhatapara 125 MVAR PGCIL June 2014 12 Raigarh 125 MVAR PGCIL June 2014 13 Aurangabad 125 MVAR PGCIL June 2014 14 Nanded 125 MVAR MSETCL 2014 15 Sholapur 125 MVAR MSETCL 2014 16 Kolhapur 125 MVAR MSETCL 2014 17 Akola 125 MVAR MSETCL 2014 18 Nagda 125 MVAR MPPTCL September 2014 19 Bhopal 80 MVAR MPPTCL March 2014 20 Damoh 125 MVAR PGCIL August 2014 21 Bachau 125 MVAR PGCIL August 2014 22 Pirana 125 MVAR PGCIL August 2014 23 Itarsi 2X125
MVAR PGCIL August 2014
24 Seoni 125 MVAR PGCIL August 2014 25 Parli 125 MVAR PGCIL August 2014 26 Raipur 125 MVAR PGCIL August 2014 27 Gwalior 125 MVAR PGCIL August 2014 28 Nagda 50 MVAR MPPTCL 2014 29 ISP 125 MVAR MPPTCL 2014 30 Satpura 50 MVAR MPPTCL 2014
1) During the discussion on the status of the reactors MSETCL clarified that
implementation of Fixed reactors(instead of revival of existing CSRs) at Dhule
would now be in December 2013 instead of Oct2013
The respective utilities were requested to ensure that reactors are installed and commissioned according to the schedule agreed as above
Minutes of 453rd OCC meeting held on 15th November 2013
72 Status of completion of ongoing Transmission Schemes being executedimplemented by POWERGRID Other Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16032013 2 400 kV Navsari - Navi Mumbai DC
Line Dec- 2013 ROW problem
3 765kV SC Satna-Gwalior line (Ckt-I) November - 2013
4 765kV SC Satna-Gwalior line (359Km + 60Km DC Portion) Ckt-II
Dec- 2013
5 765 kV Sasan-Satna-II Commissioned on 010613
GUJARAT 1 400 kV DC Kosamba-Chorania line
(Package I)(From Chorania SS to AP-54)
December -2013
2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)
December -2013
3 400 kV DC Mundra-Zerda line No 1 December -2013
4 400 kV DC Mundra-Zerda line No 2 December -2013
5 400 kV DC Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV DC Amreli-Kasor line(Part-1) December -2013
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 2324102013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt ndashI on 22032013 Ckt-II on 11072013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December ndash 2014
Minutes of 453rd OCC meeting held on 15th November 2013
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20082013
2 400 kV Khedamara- Raita DCDS January -2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora DC November -2013 end
2 400KV DC line from Koradi-II to Wardha SS(PG) DC
December-2013
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd
1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013
2 400 kV Pune (PG)-Aurangabad (MSETCL) DC
November-13 To be commissioned on 30112013
3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC
February -2014
The Sub-Committee noted as above 73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the year 2013-14 The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below
Minutes of 453rd OCC meeting held on 15th November 2013
Name of the Power Projects Unit No Capacity (MW)
Date of Commissioning Schedule Date
GUJARAT Ukai 6 500 COD on 08062013
Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350 December 2013 Bhavnagar Lignite TPP-JV I 250 DEC 2013 II 250 DEC 2013 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013
VEDANTA VIDYUT 1 135 Synchronized on 11082013
MAHARASHTRA INDIABULLS (Amaravati) 1 270 Synchronized on 03062013
INDIABULLS (Amaravati) 2 270 January-2014
INDIABULLS (Sinnar) 1 270 March-2014
VIPL(Butibori) 1 300 COD on 05042013
VIPL (Butibori) 2 300 December-13
GMR EMCO 2 300 COD on 27082013
Dhariwal 1 300 Synd On 2913
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31082013
Coal fired on 30092013
2 600 June-2014 Ms Jhabua Power Seoni
1 300 JANUARY ndash 2014 MB Power Anuppur
1 300 JANUARY ndash 2014 Satpura
11 250 Synchronized on 02102013 SATPURA
10 250 COD on 18082013
CENTRAL SECTOR Vindhyachal TPP IV 12 500 JAN-14
MAUDA 2 500 JAN-14
Minutes of 453rd OCC meeting held on 15th November 2013
The Sub-Committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Second
quarter (July 2013 to September 2013) for the year 2013-14
The Sub-Committee noted as above
82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical amp cyber security in Power Sector for the Second quarter (July
2013 to September 2013) have not been received from some of the constituents
Constituents were requested to furnish the latest status
The Sub-Committee noted as above
83 IEEE SMART GRID RESEARCH AND ROADMAP
IEEE is unveiling a host of resources designed to foster continued innovation and advancement of the global Smart Grid IEEE Smart Grid Research represents a concerted effort to build one of the industryrsquos most comprehensive portfolios of smart grid-related intelligence including materials such as vision documents and research papers that address problems and challenges in both the long- and short-term It leverages potential use cases application scenarios and enabling technologies to deliver the most complete picture possible of the next generation of technology in each respective smart grid space IEEE Smart Grid Research will have a long-term vision document reference model and roadmap for each of the five technology sectors as well as shorter-term research available for addressing more immediate concerns
IEEE Smart Grid Research fellow would made a presentation which covers projections of where the smart grid will evolve to technology challenges and opportunities and areas where additional research is needed
Representative from IEEE gave a nice presentation(enclosed at annexure-83) on smart grid operation
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
84 ELECTRICITY GENERATION PERFORMANCE REVIEW DURING THE PERIOD APRIL-SEPTEMBER 2013(1ST amp 2ND Qtrs)
Director(OPM) CEA vide letter dated 24102013 intimated that CEA has been
monitoring the performance of all generating stations in the country with a view to
improve availability of power in the country During the Periodic review undertaking in
CEA it has been observed that the following thermal generating stations have not
performed as per the programme targets fixed for the period April- September 2013
Sr
No bull StationsU
nits
Capacity bull Agency to furnish the
reason
1 SURAT LIG 500 SLPP SURAT
2 GANDHINAGAR TPS 870 GSECL
3 UKAI TPS 1350 GSECL
4 WANAKBORI TPS 1470 GSECL
5 BHUSAWAL TPS 1470 MSETCL
6 CHANDRAPUR 2340 MSETCL
7 PARLI 1170 MSETCL
8 MIHAN TPS 246 ABHIJIT MIHAN POWER PLANT
NAGPUR
9 GEPL TPP-I 120 GUPTA ENERGY PVT LTD
NAGPUR
10 DSPM 500 CSPGCL
11 KORBA-II(E) 200 CSPGCL
12 PATHADI TPP 600 LANCO
13 TRAMBAY 1400 NPCIL
Minutes of 453rd OCC meeting held on 15th November 2013
14 MAUDA 1000 NTPC
15 SIPAT 2980 NTPC
16 SANJAY GANDHI TPS 1340 MPPGCL
17 SATPURA TPS 1330 MPPGCL
18 BHILAI TPS 500 NSPCL
19 BINA TPS 500 J P BINA
Subsequently a letter from WRPC(Copy attached at Annexure-84-A) has issued to the
concern generating agency to furnish specific reasons which resulted in shortfall in
generation and proposed plan made if any so that the loss of generation suffered during
period April- September 2013 could be made up during the remaining period of the year
2013-2014
In response of the above NTPC HQ-II Raipur furnished the reason(copy enclosed at
Annexure 84-B) and other respective generating stationsagencies are requested to
furnish the reasons
The concern utilities are agreed to furnish the reasons at the earliest
The Sub-Committee noted as above
ITEM NO 85 KORBA UNIT-6 Ramp M WORKS DURING 2014-15
A meeting of Annual Generating Unit outage planning was held on 18102013 at
Mumbai wherein the Korba unit 6 outage planning for the year 2014-15 was
discussed and beneficiary members are not agreed as proposed by NTPC
Beneficiary constituents are requested NTPC to preponed the outages in lean season
AGM(OS) WR-II NTPC Raipur vide letter dated 28102013(Copy attached at
Annexure-85) requested to allow to take the Korba Unit-6 outages from 21112014
to 19012015
Member Secretary WRPC stated that almost all the 500 MW unit of NTPC stations
are proposed in lean period(ie June-July 2014) except Korba unit No-6 He further
informed that NTPC had tied maintenance program with Ms BHEL full year and
Minutes of 453rd OCC meeting held on 15th November 2013
therefore requested the constituents to agree for the same as changing of any one
unit schedule would disrupt whole program
Beneficiariesutilities agreed on the same
The Sub-Committee noted as above
86 ANNUAL MAINTENANCE PROGRAMME OF GENERATING UNITS IN WR
DURING 2014-15
As per the Regulation 574 of Central Electricity Regulatory Commission (Indian Electricity Grid Code)(First Amendment) Regulations 2011(reproduced below for reference)
Quote
ldquo(c) RPCs Secretariat shall compile load Generation Balance Report for peak as well as off peak scenario and also prepare annual outage plan for transmission elements and major generating stations in the region RPCs Secretariats shall then come out with the draft outage programme for the next financial year by 30th November of each year for regional grid taking in to account the available resources in the optimum manner and to maintain security standards This will be done after carrying out necessary system studies and if necessary the outage programmes shall be rescheduled Adequate balance between generation and load requirement shall be ensured while finalizing outage programme The same shall be uploaded by the RPCs on their websiterdquo
Unquote Accordingly WRPC shall come out with the draft outage programme for the Year
2014-15 by 30th November 2013 for Western Grid Subsequently a meeting was held
on 18102013 at WRLDC Mumbai wherein Annual Maintenance programme of
generating units in WR was discussed and finalized and abstract is attached at
Annexure 86 Annual Maintenance programme for the Korba unit-6 is agreed by
constituents as suggested by NTPC Annual maintenance program from some the
generating agencies are still awaited and requested to furnished the maintenance
programme on or before 20th November 2013 otherwise it will considered as no
outages during the year 2014-15 and report would submitted to CEA on 28th
November2013
The Sub-Committee noted as above and agreed to furnish the same
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 87 CERTIFICATION OF AVAILABILITY WITH RESPECT TO ESSAR POWER TRANSMISSION COMPANY LIMITED
EPTCL vide letter dated 19th October 2013 (copy enclosed at Annexure-87A)
intimated that MS EPTCL has been declared as ISTS transmission licensee vide
Honrsquoble CERC order dated 12092013(copy enclosed at Annexure 87B)
Accordingly Ms EPTCL had requested for availability certification of following
transmission elements as per the existing CERC Regulations
Sr No Name of transmission elements Ckt Km Effective COD
1 LILO of 400 kV Sc Vindhyachal-Korba
line at Essar Mahan
20 01042013
2 400 kV twin Moose Gandhar-Hazira
line
97 01042013
3 400220 kV substation at Hazira with 2
Nos 500 MVA ICTs
- 01042013
Member Secretary WRPC informed that the data certification for EPTCL lines shall be
done on monthly basis EPTCL shall submit the same to Member Secretary WRPC and
another to GM WRLDC for verification of the data as per records maintained by
WRLDC and WRLDC shall forward the same with their comments to Member Secretary
WRPC for further necessary action by WRPC
The Sub-Committee noted as above
ITEMS FROM WRLDC
91 COMMISSIONING OF 2ND ICT ALONG WITH LINE AND BUS REACTORS AT 765 KV SASAN
In the 451st meeting of OCC held on 12th September 2013 representative from Sasan had informed that the tentative plan for commissioning of elements at 765 kV Sasan is as under
bull 765 kV Sasan-Satna line-1 reactor By September 2013
Minutes of 453rd OCC meeting held on 15th November 2013
bull 765 kV Sasan-Satna line-2 reactor By December 2013 bull 765400 kV ICT-2 December 2013 bull 765 kV Bus-1 Reactor January 2014 bull 765 kV Bus-2 Reactor January 2014
The 765400 kV ICT at Sasan is loaded critically (850 ndash 900 MW)particularly when the Sasan unit 3 is not available and the generation at Vindhyachal STPS is full
Following details were requested from Reliance Sasan
bull Overload setting adopted in 1000 MVA 765400 kV ICT in operation bull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 765 kV Sasan-Satna lines
at Sasan end bull Progress of commissioning of Bus reactors at 765 kV
Reliance Sasan have submitted the following status through e-mail
1 ICT-2 Ready for charging
2 Sasan-Satna Line-1 Reactor Work in progress awaiting some shortfall materials from OEM - China Expected completion by End December13
3 Sasan-Satna Line -2 Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Feb14
4 Bus Reactor Cyclone damage materials during transit in Sea to be received from OEM China Expected Work completion by Mar14
The Sub-Committee noted as above
92 AVAILING WRLDC CONCURRENCE FOR SWITCHING OF ANY OF THE
IMPORTANT TRANSMISSION ELEMENTS IN WESTERN REGION
WRLDC informed that as per the regulation 52 (c) of the IEGC ldquoNo important element of the NationalRegional grid shall be opened or removed from service at any time except when specifically instructed by RLDC or with specific and prior clearance of RLDC The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users CTU and STUs and be available at the website of NLDCRLDCSLDCsrdquo
Minutes of 453rd OCC meeting held on 15th November 2013
In line with the above provision a list of important element list was compiled in May 2013 and is available on WRLDC website at the following URL
httpwrldccomdocsLIST20OF20IMPORTANT20GRID20ELEMENT
S20in20WR_May_2013pdf
With the growing complexity in the grid and its associated impacts it is now desirable that concurrence of WRLDC is taken in the form of an operation code prior to switching of any of the transmission element included in the important elements of the Western Region
Constituents noted the above and agreed to comply
93 UPDATION OF THE RESTORATION PROCEDURE FOR WESTERN REGION The recovery procedure for Western Region was compiled in November 2012 in consultation with all the stakeholders Since then significant changes have taken place in the transmission network and generation capacity in Western Regional Grid All stakeholders are requested to forward their inputs and suggestions by 30th November 2013 to WRLDC The draft procedure would be put up for discussion and finalization in the next OCC meeting
The Sub-Committee noted as above
94 ENSURING INJECTION FROM (MOUDA + IEPL + TIRODA) WITHIN 1750 MW
WRLDC informed that a meeting was convened by WRPC on 26th June 2013 for discussing the SPS for Wardha flow gate It was decided in the meeting that the total injection by NTPC Mouda APL Tiroda and IEPL would be limited within 1750 MW It is being observed that the schedule issued by SLDC Maharashtra to Tiroda alone is around 1850 MW Consequently the loading on 400 kV Warora-Chadrapur is 900-950 MW loading on 400 kV Chandrapur-Chandrapur is 550-600 MW loading on 400 kV Wardha-Akola DC is 600-650 MW and loading on 400 kV Parli-Lonikhand is 500-550 MW each The system is N-1-1 insecure and following actions are desirable from SLDC Maharashtra
bull Ensure that despatch schedule given to Tiroda as well as its injection in real-time is in line with the WRPC MoM ref WRPCProtectionSPS2013-14949 dated 27062013
bull Ensure that the SPS of Tiroda is in operation bull Coordinate to increase generation at South Western Maharashtra
(KoynaJaigadRGPPL) to control the power flow on EHV lines in Maharashtra MSETCL agreed to the above actions suggested by WRLDC
Minutes of 453rd OCC meeting held on 15th November 2013
95 SPS IMPLEMENTATION STATUS
951 SPS for 765 kV Gwalior-Agra DC (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW KSTPS - 120 MW CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW The matter was already discussed in 449th 450th and 451st OCC and 22nd WRPC meeting During the 451st OCC NTPC intimated that they have got the approval from their corporate centre and it was decided to implement the same within a month Regarding CGPL Power Grid representatives confirmed that tele-link was being provided at Mundra by them 952 SPS at APL Tiroda
WRLDC intimated that further subsequent to the synchronization of 400 kV Warora-Chandrapur-stg-II line -1 it is proposed that the logic at SPS needs to be revised as under
In addition to above action curtailment of drawal by Maharashtra would also be required either by increasing generation on South-west Maharashtra or distress load shedding in South Maharashtra
Contingency Desired automatic action through SPS
1 Tripping of 400 kV Warora-Chandrapur-stg-2 when the total powerflow on Wardhaflowgate plus 400 kV Warora-Chandrapur-stg-2 is more than the limit set for Wardhaflowgate
Trip one unit of APL Tiroda
2 Tripping of either 400 kV Wardha-Parli DC Trip one unit of APL Tiroda
3 Tripping of one ckt of 400 kV Wardha-ParliDC and one ckt of 400 kV Wardha-Akola DC
Trip one unit of APL Tiroda
4 Tripping of 400 kV Wardha-Akola DC Immediate Generation backing by 260 MW on running units at Tiroda
Minutes of 453rd OCC meeting held on 15th November 2013
Member Secretary WRPC stated that a separate meeting is to be called on 18112013 to resolve the above issue Subsequently a meeting was scheduled and held on 18112013 at WRLDC (minutes are enclosed at Annexure-94) wherein following two cases were discussed and concluded as follows
A) 400kV Chandrapur-Warora ckt in service
1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur-Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that
in the event of tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur-Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II is commissioned
Member Secretary WRPC further intimated that the above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora-Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur-Parli at Chandrapur-II
Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
953 SPS at 4x300 MW Balco IPP The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP It was also reported that as a consequence of disconnection from Chattisgarh a revised islanding scheme would be in place at Balco Further as per MOM of 17th meeting of WR regarding connectivityOA applications held on 030113 Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load Balco representative intimated that SPS at Balco will be implemented at the end of November 2013
954 Defense mechanism for high frequency The status of implementation automatic tripping of generation at KSTPS (unit-7500 MW) VSTPS (unit-7 500 MW) CGPL (unit-10 830 MW) was discussed in the meeting CGPL representative intimated that they have already implemented the tripping at CGPL unit at high frequency NTPC representative intimated that Vindhyachal and Korba proposal sent to their corporate office for engineering approval 955 SPS at Sipat As discussed in 449th OCC and subsequently in the special meeting of WRPC on 3-Sep-13 at TAPS 3amp4 regarding review and formulation of SPS and islanding schemes in WR grid NTPC Sipat ACBIL PGCIL were requested to submit the status of implementation of the proposed SPS for reliable operation of Sipat units
NTPC representative intimated proposal sent to their corporate office for engineering approval
The Sub-Committee noted as above
96 SHIFTING OF 125 MVAR SPARE REACTOR AT 400 KV ITARSI TO 400 KV
DAMOH SS It was decided in the 23rd WRPC meeting that the spare 125 MVAR reactor at 400220
kV Itarsi would be shifted to 400220 kV Damoh SS PGCIL WRTS-II intimated that
the reactor had already been shifted to Damoh
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
97 EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451stOCC a proposal for extension of startup supply for JP Bina TPS with from
Rajghat Medikheda HPS was discussed SLDC-MP had stated that they would
examine the proposal and give their feedback
Member Secretary WRPC stated that SLDC-MP JP Bina amp WRLDC device a
appropriate scheme for start-up power at JP Bina so that the scheme be discussed in
next OCC
The Sub-Committee noted as above
98 APPROVED SHUTDOWN OF HVDC TALCHER-KOLAR BIPOLE FROM 10TH TO 13TH JANUARY 2014
Shut down of HVDC Talcher-Kolar Bipole has been approved in the 23rd SRPC
meeting as under
Day HVDC Pole-1 HVDC Pole-2
10012014 In Metal return Mode Under Shut down
11012014 Under shut down (from 0600
hrs)
Under shut down (continued from
previous day)
12012014 Under shutdown (continued
from previous day)
Under shutdown till 1800 hrs
13012014 Under shut down till 1800 hrs In Metal return mode
SRTS-1 is mobilizing manpower of 1600-2000 people for carrying out the
maintenance of the Talcher-Kolar DC lines and crossing of new lines over the DC
lines The outage of the above HVDC link would reduce the transfer capability
between the NEW grid and Southern Grid Proposal for planned outage of other
transmission elements which would affect the transfer capability in that corridor shall
be avoided on those days This is for kind information of all UsersUtilities in Western
Region
The Sub-Committee noted as above
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO991 SYNCHRONIZATION OF SR- NEW GRID WRLDC intimated that as per the latest information received by them synchronization of SR with NEW grid is to be conducted between December 22 to 27 2013 Following points were discussed towards preparedness for smooth synchronization of SR ndash NEW grid
bull Testing of Frequency Response of HVDC Controllers of Chandrapur HVDC Back to back Power Grid WRTS 1 to intimate the entire Scheme and a suitable date for conducting the same
bull The status of 765 KV Sc Raichur ndash Solapur transmission system and transmission elements like Line Reactor Bus reactors required during time of synchronization
bull Readiness of 2nd circuit of 765 KV Sc Raichur ndash Solapur line As per information available this line is being constructed by MS RSTCL
bull Status of installation PMUs at Sholapur required for observation of any oscillation during synchronization to be discussed As per information available PMU has been already installed however its communication link up to WRLDC is yet to be established Power Grid WRTS1 to indicate the present status
bull Implementation of both instantaneous as well as time-delay SPS The present status of installation of this SPS
bull Implementation of UF Load shedding Relay Settings from 492 Hz to 486 in 4 stages by WR Constituents as per National Power Committee
bull Shut downs of Lines and ICTs during the period 22nd to 27th of December 2013 to be avoided for smooth synchronization
AGM WRLDC intimated that first ckt of 765 kV Raichur-Solapur would be synchronized by December 2013 end and power transfer flow would be limited to 400MW initially whereas Second ckt of 765 kV Raichur-Solapur shall be expected to synchronized in the month of April 2014 and power would be increased gradually taking grid security in to account
Member Secretary WRPC intimated that Member GOampD had submitted action plan
to MOP regarding the synchronization of SR with NEW grid Following salient
aspects are covered in action plan
1 Implementation of recommendation of protection audit of under frequency
load shedding relays settings as per National Power Committee
2 Installation of Special Energy Meters and PMUs at Solapur and Raichur ends
Minutes of 453rd OCC meeting held on 15th November 2013
3 Design and implementation of SPS for Solapur‐Raichur 765 kV lines
4 Review of SPS for Talcher‐Kolar HVDC bipole
5 Testing of frequency controller response of HVDC controllers of the
Chandrapur btb Gazuwaka btb and Talchar‐Kolar HVDC bipole links
6 PGCIL shall submit the complete action plan
He opined that local generation should be identified for tripping of units under SPS ie
for Talcher ndash Kolar HVDC the generations in ER should be identified
WRLDC proposed that the KSK amp JPL generation back down shall be chosen for SPS
at Solapur‐Raichur 765 kV lines as their station have PPArsquos with SR constituents
Member Secretary WRPC stated that KSK and JPL representatives are not present
therefore SPS for Solapur‐Raichur 765 kV lines would be designed after consent
received from KSK and JPL Also testing of frequency controller on Chandrapur-
Ramagundam HVDC needed to be carried out urgently and needed to be coordinated
with frequency controller of Talcher-Kolar and Jaypore-Gazuwaka HVDC lines
He stated that synchronization of SR with NEW affects the flow gate like Wardha amp
Bhilai considerably and flows on various lines of MSETCL would alter and therefore
need detailed preparation He stated that synchronization with single 765 kV raichur-
Solapur does not comply to N-1 contingencies and it would be difficult to control flow
by three HVDC link Tripping of any singledouble poleamp mis operation of SPS would
lead to wide spread disturbance Constituents also expressed concern over single line
synchronization attempt Member Secretary stated that concern would be
communicate to Member GOampD CEA and NLDC
Sub Committee noted as above ITEM NO992 SHUTDOWN REQUEST FOR HVDC B2B VINDHYACHAL SUBSTATION
AGM(GM) WRLDC vide letter dated 11112013 intimated that they received proposal for shutdown of HVDC B2B Vindhyachal substation for overhauling of isolators for rectification of hot spot problem to avoid any contingency during upcoming winter season on 18112013 to 22112013 During this time HVDC Block1 will be under shutdown
OCC Sub-Committee agreed for outage
Minutes of 453rd OCC meeting held on 15th November 2013
ITEM NO 910 NOT INFORMING TO SLDC KALWA REGARDING MAJOR SYSTEM OPERATION INSTRUCTIONS ISSUED BY WRLDC TO PGCIL SS IN MAHARASHTRA
CE SLDC Kalwa Maharashtra intimated vide letter dated 11112013 that WRLDC
control room had instructions to PGCIL Ss in Maharashtra directly without giving any
information to SLDC Kalwa Following two such instances which had major impact of
power flow in Maharashtra network are mentioned below
1 On dated 10th Nov 2013 400 KV Parli(PG)-Pune(PG) II was taken in service at
2018 Hrs and 400 KV Parli(PG)-Pune(PG) ndash I was taken in service at 2151 Hrs
Effect Power flow on 400 KV Chakan-Lonikand and Pune(PG) ndash Kalwa
reversed load on Parli-Lonikand reduced Load on 220 KV Talegaon(PG)-
Talegaon(MS) SC increased to 280 MW
2 On dated 11th Nov 2013 at about 1040 Hrs FSC on 400 KV Raipur-Wardha
taken in sevice
Effect Flow on 400 KV Chandrapur-Warora ( SC quad line ) increased from
850 MW to 1128 MW flow on Chandrapur-II ndash Chandrapur-I ( SC twin moose
line ) increased from 360 MW to 685 MW Flow on 400 KV Raipur-Wardha DC
increased from 950 MW to 1450 MW APML generation reduced from 1950
MW to 1650 MW Maharashtra over drawl increased by 300 MW
Any switching operation in CTU network connected to Maharashtra system has major
impact on power flow and many times loading on lines become critical Only after
enquiry with WRLDC control room by SLDC Kalwa switching events are informed It is
informed that FSC was taken in service to improve voltages in South Maharashtra
please note that 400 KV Solapur-Kolhapur-I Kolhapur-Mhapusa-II RGPPL-
Nagothane-I amp RGPPL-Newkoyna-II lines were out of service in south Maharashtra
Voltage profile could have been improved by taking these lines in service
In integrated system any switching event in CTU network has impact on entire state
network and required to be carried out in coordination with state SLDC
Member Secretary WRPC stated that Item no 92 amp 910 are related to communication gap between SLDC MSETCL amp WRLDC with other He requested WRLDC amp SLDC Maharashtra to harmonize datainformation
Minutes of 453rd OCC meeting held on 15th November 2013
exchange and suggested to intimate each other in case of switching of elements in the State as well as ISTS grid WRLDC and SLDC Maharashtra agreed to the above suggestion of Member Secretary
The Sub-Committee noted as above
OTHER ITEMS FROM POWER GRID
SA-1 MOU for Tapping of Auxiliary Power supply from tertiary of 40022033 kV Transformer in POWERGRID sub-station
The ICTs in various POWERGRID substations having 33 kV Bushings which are
connected to AC Distribution Board through 33 kV440 V Transformers The Power
supply through this Transformer is tapped whenever the requirement arises
Generally the back up supply in event of the Auxiliary supply is provided through
DG Set In case of failure of DG Set power is taken from 33 kv of ICT
In this context it is to intimate that the 765 kV Station at Solapur is under construction
and likely to be commissioned by December end The station will have the line
coming from Raichur in Southern Region This will connect POWERGRID
SOUTHERN REGION and WESTERN REGION directly and the entire power system
of India will have one frequency
Further the Solapur sub-station would be the most important station and the failure of
AC power supply to the sub-station will affect the reliability of the station
The MOU for tapping of power through 33 kV side of the Transformer needs to be
addressed by local MSETCL and MSDCL offices
SLDC MSETCL assured to look in to the matter amp advised the PGCIL to consult with local Discom to short out the issue
SA-2 Dismantling of Shunt Reactor at Aurangabad sub-station
The clearances for shifting of Shunt Reactor from MSETCL Aurangabad sub-station to
POWERGRID Aurangabad sub-station was approved in earlier OCCM and
accordingly the Committee has agreed to dismantle the Reactor in Akola-Aurangabad
line I which is in operation without Reactor from last two months
Minutes of 453rd OCC meeting held on 15th November 2013
PGCIL WRTS-I representative intimated that after repeated requests MSETCL
Aurangabad is not allowing the dismantling of Reactor
SLDC MSETCL assured that the matter to take up with Aurangabad MSETCL SS to resolve above issue on urgent basis
SA-3 TESTING OF FREQUENCY CONTROLLER IN HVDC BACK TO BACK STATION AT
BHADRAWATI
WRTS-I PGCIL intimated that as per the guidelines circulated by CEA on 30092013
the Frequency Controller in all the HVDC stations including Back to Back are to be
tested to facilitate the smooth synchronization of 765 kV Raichur-Solapur line The
preparation for charging of Raichur ndashSolapur line is in full swing and the line is likely to
be commissioned by December 2013 end
PGCIL further intimated that as per the procedure received from the CEA the power flow through HVDC Bhadrawati needs to be controlled between 500 to 600 MW and the frequency range shall be 495 HZ to 505 HzThe testing is to be carried out at the earliest so that the necessary feed back is to be given to CEA well before the charging of 765 kV Raichur-Solapur line
Member Secretary WRPC stated that a separate meeting would be held on 19112013 wherein the detailed procedure of frequency controller testing will be discussed thoroughly and testing will be carried out by involving SRPC amp SRLDC on suitable date
Subsequently a meeting was held on 19112013 at WRLDC Mumbai wherein procedure for the testing of frequency controller at HVDC BTB at Bhadravati was agreed upon The detailed procedure for the testing of frequency controller at HVDC BTB at Bhadravati on 22112013 is enclosed at Annexure-SA3 WRTS-I PGCIL intimated that the test was successfully conducted on 22112013(report attached at Annexure-SA31)
ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING CGPGCL agreed to host 454th OCC meeting at suitable place in Chhattisgarh
preferably on 10th amp 11th of December 2013 The exact venue date would be
communicated separately
SlNo Organisation Name amp Designation E-mail Mobile No
I WRPC
1 Shri SD Taksande MS ms-wrpcnicin 9820878384
2 Shri MM Dhakate SE opc-wrpcnicin 8108787778
3 Shri LKS Rathore DD lksr_2000yahoocom 9833371844
II MSETCL MSEDCLMahaGenco
4 Shri DK Rokade SE dkrokadegmailcom 9167831551
5 Shri VD Pande EE vasantpandemahasldcin
6 Shri KD Daware DyEE dawarekdyahoocom 9619892035
7 Shri PK Khandare DyEE cegovmahagencoin
III MPPTCL MPPGCL
8 Shri Mohan Sahu EE mohanssahuyahoocom
IV CSPTCL CSPGCL
9 Shri RK Bhagwat ACE bhagwat48yahoocoin 9407604262
10 Shri HS Rajput SE csebseoperationgmailcom
V GETCO GVCL
11 Shri HA Hadwani EE sldcgetcogmailcom
12 Shri KG Patel DyE detgseclgebmailcom
13 Shri BM Shah Dy E demissldcgetcogebmailcom
VI ELEDEPT GAO
14 Shri Babu Mathew AEE babymundy12gmailcom
VII WRLDC POWERGRID
15 Shri PR Wankhede DGM wankhedepowergridindiacom
16 Shri KY Deone CM kydeoneyahoocoin 9869450224
17 Shri K Muralikrishna CM mkkodakandlagmailcom 9869450219
18 Smt Pushpa Seshadri CM pushpa_seshadrihotmailcom 9869404482
LIST OF PARTICIPANTS OF 453rd OCC MEETING OF WRPC HELD ON 15112013
19 Smt Sachala Mishra CM mishrasachalagmailcom 9869450223
20 Shri Vivek Pandey CM vpandeyyahoocoin 9869404673
21 Shri D Bruhananda Mgr bruhanandadyahoocom 9428504279
22 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569
23 Shri VB Bhandarkar Dy Mgr vbhadarkarpowergridindiacom
24 Shri SW Kolte Dy Mgr shripadkolteyahoocom 9423072643
VIII NTPC
25 Shri Hari Nath AGM harinath01ntpccoin
26 Shri SK Shrivastava AGM sksrivastava09ntpccoin 9425178069
27 Shri N Vara Prasad AGM nvaraprasadntpccoin
28 Shri MK Jain DGM mkjain01ntpccoin
29 Ms Anita Keshkar Mgr anitakeshkarntpccoin 9004497105
IX TATA Power
30 Shri Ravikant Sankhe GM-Opn rmsankhetatapowercom
31 Shri Gadave Prakash R AGM prgadavetatapowercom 9223553341
X APL
32 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255
XI RGPPL
33 Shri Dhananjay Shrikhande AGM dshrikhandestergpplcom 7588690265
XII RINFRA
34 Shri SG Zirpe GM sachinzirperelianceadacom
35 Shri Vijay Chavan Mgr vijaychavanrelianceadacom 9320167746
XIII RAILWAY
36 Shri Milind A Pakhare SE dyceetrdcrgmailcom
XIV NPCIL
37 Shri Gaurav Dubey SOD gauravdubeynpcilcoin
38 Shri S Maskey OS smmaskeynpcilcoin 9423982766
39 Shri AP Phadke SOE apphadkenpcilcoin 9423081670
XV ElecDept DNH
40 Shri HC Surma Asst Eng hcsurmagmailcom
XVI VEDANTA
41 Shri Khirod Barik AGM khirodbarikvedanatcoin
42 Shri Sangeet Sahu Mgr sangeetsahuvedantacoin
XVII ESSAR
43 Shri Sachidanand Bhujade VP sbhujadeessarcom 9909993545
44 Shri Kamlesh Garg Jt GM kamleshgargessarcom 9879102849
45 Shri BJ Saxena Sr Mgr bsaxenaessarcom 9879101268
XVIII TORRENT POWER LTD
46 Shri A B Oza Mgr asitozatorrentpowercom
Operation
O t bOctober
1152013
Highlights
20132013
453rd OCCM of WRPC Venue WRLDC Mumbai
DAILY ENERGY CONSUMPTION OF WEST(2013‐14 vis‐agrave‐vis 2012‐13)
Energy Consumption Oct‐13 Sep‐13 Oct‐12
p
MUDayp
Average 796 787 838Max 883 874 884Date 31‐Oct‐13 11‐Sep‐13 23‐Oct‐12
Apr
May Jun
Jul
Aug Sep
Oct
Nov
MONTHS ‐‐‐‐gt2012‐13 2013‐14
ate 3 Oct 3 Sep 3 3 Oct
1152013 453rd OCCM of WRPC V
Max 883 MU on 31-Oct 2Min 691 MU on 13-Oct-2
ERN REGION)
bull 40‐60 MUs consumptioconsumptioduring first fortnight of13 Due to Phailin effecconsumptioreduced to Mus on 13th
bull Consumptioincreased inf i h
Change wrt last month
Change wrt last Year fortnight
bull Average dein Octrsquo13 decreased b
last month last Year
118 ‐500094 ‐012~ ~ decreased b
1769 MW compared tyear
Dec Jan
Feb
Mar
Venue WRLDC Mumbai
LOAD DURATION CURVE (OCT-2013)Maxdemand met=39233 MW Mindemand = 26319 MW
20 40 60 80 100 of Time
1152013 453rd OCCM of WRPC V
bull Demand met is gt 32GW for 60 of the t
bull Max demand met =39233 MW at 1900 311013
bull Min demand = 26861 MW at 1700 hrs o131013
426 MW rise in peak demand in October asdemand in October as compared to September (38807MW)
Venue WRLDC Mumbai
PEAK DEMAND (this month vmonth)
CATER
STATE OCTrsquo13
GUJARAT 11357
MP 7937
MAHARASHTRA 16925
CHATTISGARH 3024
GOA 411
DD 266
DNH 653
321ESIL 321
WR TOTAL 39233
Figures shown are Maximums in the montRegional demand met was 426 MW more tun restricted demand decreased by 290 M1152013 453rd OCCM of WRPC V
vis-agrave-vis last
ED(MW) UNRESTRICTED(MW)( ) ( )
SEPTrsquo13 OCTrsquo13 SEPTrsquo13
12577 11351 12573
7558 7932 7804
16732 17291 17482
3292 3048 3314
419 425 417
262 271 262
640 658 637
340 376 337340 376 337
38807 39273 39563
thto the month of Septrsquo13 and
MWVenue WRLDC Mumbai
21 Frequency ProfileOCTrsquo13
IEGC Band 89 19 (497- 502 Hz) 8919
gt 502 Hz 980
lt 497 Hz 101
Average freq (Hz) 5003Hz
Maximum inst Freq 5063 (111013 08030hrs) HZ
Minimum inst Freq 4928 (141013 18110hrs) HZ
No of excursions below 0488 Hz 0
No of excursions below 486 Hz 01152013 453rd OCCM of WRPC V
SEPTrsquo13 OCTrsquo12
89 24 90 39 8924 9039
925 628
151 333
5002Hz 4998 Hz
00 5062 (210913 130400 hrs) HZ
5061 (0210120603hrs) HZ
00 4921 (040913 191900 hrs) HZ
4937 (171012 181000 hrs) H
0 00 0
0 0Venue WRLDC Mumbai
lt497 497 ‐ 502 gt50209 94 5103 811 18601 832 1671 6 79 3 19 1
100
F
16 793 19112 918 701 769 2326 888 8609 947 440 8 89 9 9 3
80
90
08 899 93t 08 929 63t 01 621 378t 0 847 153t 03 643 354
0 8 11 9 50
60
70
t 07 874 119t 28 944 28t 03 938 59t 12 808 18t 031 9548 421 30
40
50
Time in
t 08 951 41t 02 971 27t 15 934 51t 01 884 115t 28 969 03
10
20
t 31 942 27t 07 939 54t 19 95 31t 0 922 78t 05 93 65
0
1-O
ct2-
Oct
3-O
ct4-
Oct
5-O
ct6-
Oct
7-O
ct8
Ot
8919 in IEGC t 08 954 38t 28 963 09t 12 984 04
101 8919 98031 984 378
980 gt 502 H101 lt 497 H
1152013 453rd OCCM of WRPC V
Frequency Profile‐ Oct13
8-O
ct9-
Oct
10-O
ct11
-Oct
12-O
ct13
-Oct
14-O
ct15
-Oct
16-O
ct17
-Oct
18-O
ct19
-Oct
20-O
ct21
-Oct
22-O
ct23
-Oct
24-O
ct25
-Oct
26-O
ct27
-Oct
28-O
ct29
-Oct
30-O
ct31
-Oct
Band
gt502 497 - 502 lt49zzVenue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 111013
5)
ency gt 502 for 372 of time on 111013
500
700
900
1100
1300
1500
MW
4
5555
5
FR
EQ
UE
NC
Y (H
z)
-500
-300
-100
100
300
500
44
4444
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 11 10 13
2500
3000M
WMP 111013
5
5
5
FR
EQ
UE
NC
Y (H
z)
1500
2000
4
4
4
1000
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MPSEB SCH MPSEB DRWL
4
1152013 453rd OCCM of WRPC V
51 2
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 111013
49 850
502504506508
51512
486488
49492494496498
0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 11 10 13
501
506
511
MAHARASHTRA 111013
48 6
491
496
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ MSEB SCH MSEB DRWL
Venue WRLDC Mumbai
SCH Vs Actual DRAWAL vis-a-vis Frequency
ency gt 502 for 354 of time on 131013
700900110013001500
MW
SCH Vs Actual DRAWAL vis-a-vis FrequencyChattisgarh 131013
-500-300-100100300500
7 6 5 4 0 7 6 5 4 0 9 8 7 6 5 4
227
316
405
454
543
632
721
81 0
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ CSEB SCH CSEB DRWL
SCH Vs Actual DRAWAL vis-a-vis FrequencyGujarat 13 10 13
3000
3500
4000
4500
5000M
W
Gujarat 131013
500
1000
1500
2000
2500
0
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
234
1
TIMEFREQ GEB SCH GEB DRWL1152013 453rd OCCM of WRPC V
SCH Vs Actual DRAWAL vis a vis Frequency
502504506508
51512
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMP 131013
486488
49492494496498
50FR
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
322
52
TIMFREQ MPSEB SCH MPSEB DRWL
SCH Vs Actual DRAWAL vis a vis Frequency
506
511
RE
QU
EN
CY
(Hz)
SCH Vs Actual DRAWAL vis-a-vis FrequencyMAHARASHTRA 131013
491
496
501FR
486
000
049
138
227
316
405
454
543
632
721
810
859
948
103
711
26
121
513
04
135
314
42
153
116
20
170
917
58
184
719
36
202
521
14
220
3
TIFREQ MSEB SCH MSEB DRWLVenue WRLDC Mumbai
WR Frequ
Time 1917 Date 4913 26 MW load shedding reported by M10
012013
hellip1455
550
2045
1140
235
1730
825
2320
1415
510
2005
1100
155
1650
745
2240
1335
430
1925
1020
115
1610
705
g p y
1152013 453rd OCCM of WRPC V
ency Oct13
Stage‐I
Stage‐II
Stage‐III
Stage‐IStage‐IIStage‐III
Stage‐IV
Stage IIIStage‐IV
MSETCL
705
2200
1255
350
1845
940
035
1530
625
2120
1215
310
1805
900
2355
1450
545
2040
1135
230
1725
820
2315
1410
Venue WRLDC Mumbai
1 3 5 7 9 11 13 15
22 WR NET INTER REGIONAL EXCHANGES FO
‐20
0
20
‐60
‐40
‐120
‐100
‐80
Link Sch Actual U
WR ERWR‐ER 5827 32099
WR‐NR -171820 -183752
WR‐SR -706 80 -706 74WR SR -70680 -70674
NET -236673 -2223271152013 453rd OCCM of WRPC V
5 17 19 21 23 25 27 29 31SCH DRAWL
OR OCT13
UIbull Sept 2013
-12488
17106
-3 26
pbull Schudule ‐2417 Musbull Actual ‐2047 Musbull UI 370 Mus
-326
4292Venue WRLDC Mumbai
1152013 453rd OCCM of WRPC VVenue WRLDC Mumbai
24 UFR (Stage-I) OUnder Frequency Operation for t
Occasion DateOccasion DateO
1 41020131 710201321 14102013
F 49 28 h 14th O t 13 GETCO
1 23102013
n Frequency was 4928 hz on 14th Oct 13 GETCO may
cted relief from WR = 2060 MW at UFR stage‐I
1152013 453rd OCCM of WRPC V
Operation in Oct 2013the Month October 2013 ‐ Gujarat
Time of Load ReliefTime of Load Relief(MW)Operation
915 15501905 9501910 3001810 290
l i th ti f UFR t I
742 3900
explain the operation of UFR stage‐I
Venue WRLDC Mumbai
Desired UFR Operatioeme
The desired UF load sheddingThe desired UF load shedding states
) hHz) WR Gujarat MP Mah
2 2060 580 460 805
0 2070 580 460 8100 0 0 580 60 8 0
8 2080 580 460 815
6 2100 580 465 820
espective constituents may update the pro1152013 453rd OCCM of WRPC V
on as per new
in MW for WR and individualin MW for WR and individual sUTs
CG Goa DD DNH
150 25 10 30
150 25 15 3050 5 5 30
155 25 15 35
155 25 15 35
ogress of installationVenue WRLDC Mumbai
Particulars of OCC approved outagesNumber Ca
B Outage Coordination for Oct 2013
Particulars of OCC approved outagesOutages for Oct 2013 approved during 451st OCCM
226
Reliability Consent was available for 218Outages Availed 90
Em
Op
Outages Availed 90Availed outages as of approved 413 To
OCC Approved Outage Statistics for Oct 2013
87
100100
50
38 36
58
403830 28
36
L GETCO MSETCL MPPTCL WRTS‐II WRTS‐I NSPCL NTPC SASAN TORRE
Approved Availed age
1152013 453rd OCCM of WRPC V
ategory Of Outage Number Reasons
mergency Outage 42 Hot Spot Oil leakage etc
pportunity Outage 7 Maintenance Insulator Replac
etcetc
otal 49
42 Number of Emergency Outages (Availed durin2013)120
10
12
2013)
80
100
6
8
40
60
2
4
0
20
0ACBIL APL CSPTCL DB
PowerGETCO JPL MPPTCLMSETCL
ENT
Venue WRLDC Mumbai
s of incident Date amp Time Generation Load Loss
220 kV Deepnagar Ss 01‐01‐2013 0352 Gen loss 458 MW Bus fault on Main Bus 1 due to CT
During changeover of from Dpole ‐I amp pole ndashII tripped pectively
01‐10‐2013 1628 Load Loss 978 MWAuxiliary supply was observedpumps of pole‐1 amp 2 Because ofCircuit Full Flow ndashVery Lowrdquo Alarm
ments of 220 KV Malanpur bstation
01‐10‐2013 1630 ‐220 kV Auraiya ‐malanpur ckt earoperated resulting in feeding of ttripping of other feeder from rempp g
t 220 kV Badod Ss 10‐10‐2013 2004 ‐ Failure of220 kV Main Bus R Phas
dhipadar‐Raigarh on B‐phase pping of Budhipadar‐Korba II verload respectively
12‐10‐2013 1729 amp 1735
‐220 kV Korba(E)‐Raigarh tripped ooverloading of 220 kV Korba(E) ‐ Bovercurrent protection
ents at 220 kV Amarkantakion Unit 3 amp Unit 5 of ATPS tripped
16‐10‐2013 1107 Gen loss 270 MW
Earth Ground Wire of 220 KV Railon ground which created Earth FATPS end Hence fault was fed byelements from remote end
Unit‐2 of Koyna ‐4 which was run
pping at Karad amp Dhabolbstation
22‐10‐2013 0307 ‐
Unit 2 of Koyna 4 which was runresulting in rise in voltage at KarDabhol‐Newkoyna‐IIKarad‐Sholaon OV
ts at Korba (E) substation AllOpening of in‐service Isolator res
ts at Korba (E) substation All ed at Korba(E) substation
22‐10‐2013 1003 Gen Loss 160 MW remote end on DPR protection dutripped which has resulted in com
I of Adani tripped 25‐10‐2013 1201 ‐Malfunctioning of Oil temperaturterminal
ts of 400 kV Chandrapur Bus‐6 of Chandrapur tripped
27‐10‐2013 1051 Gen loss 436 MWAll elements connected to 400 kVoperation of GT‐7 Folowing whicParli‐Chandrapur 2 section trippe
I of Adani Tripped 29‐10‐2013 1810 ‐
APL Mundra‐Mohindergarh HVDunbalance 6061 stage‐3 trip which results t
Brief Reasons GDGI type DREL Is
T burst GD‐1 Received Bus fault dueDeepnagar is fre
G to Auxiliary supply fluctuationsdip in the 1 Auxiliary Su3‐4 times resulting in tripping of valve coolingthis the pole‐1 amp 2 tripped on ldquoValve cooling Mainm
GD‐1 Recieved y
2 Fluctuationanalysed
rth wire snapped The CB at Malanpur end did not he fault to the Malanpur Bus This resulted in
mote endGI‐I Not Received Fault clearing t
se PT dedicated for 220 kV Kota feeder GI‐I Received
on B phase to earth fault which resulted in Buddhipadar II and III These circuits tripped on GI‐I Not received
way Traction Feeder ndash I from ATPS broke and fell Fault but the breaker of faulty feeder did not trip at y 220 KV Bus ndash I of ATPS resulting in tripping of all GD‐1 Not Received
1 Relay was n2 Fault clearin
nning in synchronous condenser mode had trippednning in synchronous condenser mode had tripped rad and Dabhol SS causing tripping of 400 kV apur‐SC Karad‐Jaigad‐I and Nagothane‐Dabhol‐I GI‐II Received
1 Over Volarea
ulting in bus fault Most of the lines tripped from Not received 1 No Bus b
Korba(E)ue to R phase to earth fault220132 kV ICTs also mplete blackout at Korba (East) Ss
GD‐1 as not available
2 Human Erro3 Fault clearin
re tripping circuit‐1 at Mohindergarh HVDC GI‐II Received
V Bus 1 from Chandrapur due to LBB Relay ch the Chandrapur‐Chandrapur II tripped and the ed on Over voltage
GD‐1 Received 1 MTR relay n2 Issues with
DC Pole‐2 tripped at 1820 hrs due to DCF C1
he blocking of pole‐2 GI‐II Not Received
5 GD 1 at Deepnaga5 GD-1 at DeepnagaDetails
bull 400 kV Main Bus I at Deepnagar got tripped with operationof Bus bar protection due to bursting of B phase Main Bus 1side connected CT for Station transformer 4B
bull Unit 4 and Unit 5 of Deepnagar also tripped resulting inp g pp ggeneration loss of 458 MW
Issues
bull During the previous occurrence on 4th July 2013 atDeepnagar ICT 1 Main CB was kept off and since then itDeepnagar ICT 1 Main CB was kept off and since then itseems that ICT 1 was connected to Main Bus I only via tie CBIn the two months span the problem was not corrected is ofserious concern It reduces the advantage provided by theOne and half circuit brekaer scheme for reliability
bull Reson for keeping the Main CB of 400 kV Deepnagar‐bhusawal II need to be explained This circuit could havebeen saved if the main CB was on
bull This is the third occurrence after the incident of 22nd Mayand 24th May at 400220 kV Deepnagar Ss During theand 24th May at 400220 kV Deepnagar Ss During theprevious occurrence it was observed that severalequipment failed causing loss of generation
1152013 453rd OCCM of WRPC V
ar Ss Date 01‐10‐13ar Ss Time 0345
Venue WRLDC Mumbai
5 GD 1 at Bhadrawa5 GD-1 at BhadrawaDetails
bull During change over from DG‐2 to MIDC Aux supply the DG‐2Breaker Q92 tripped and aux supply feeder breaker Q91closed But the voltage fluctuations occurred in aux supplythree times in succession between 162616998hrs to162649736 hrs162649736 hrs
bull This resulted in tripping of valve cooling pumps in both pole‐1 amp 2 and both poles tripped at 1626 hrs on ldquoValve coolingMain Circuit Full Flow ndashVery Lowrdquo alarm
L d l f 978 MWbull Load loss of 978 MW
Issues
bull The frequent tripping of 33 kV feeders is major reason forPole tripping
bull There is an average of 10 to 12 tripping of aux supplyfeeders per month
bull From Aprilrsquo13 to Septemberrsquo13 there are 109 trippingassociated with the MIDC and Warora Feeders (MIDC feeder(64 times and Warora feeder 45 times)
bull The auxiliary feeders have tripped for 111 numbers of timesout of which HVDC poles have survived during 107 tripping1152013 453rd OCCM of WRPC V
ati HVDC Date 01‐10‐13ati HVDC Time 1626
Venue WRLDC Mumbai
5 GD-1 at Bhadrawa5 GD 1 at Bhadrawacontdhellip
Such frequent Number of trippiSuch frequent Number of trippiconsidering in view the NEW grid and2014HVDC Bhadrawati will play an importHVDC Bhadrawati will play an importin synchronized gridThe Reliable supply of Auxiliary poweM h h SLDC d MSETCL iMaharashtra SLDC and MSETCL is reand resolve the problem at earliest a33 kV feedersPGCIL WR I i t d t fi dPGCIL WR‐I is requested to find oauxiliary supply during the changeoduring the earlier tripping The reasosubmitted for further actionsubmitted for further action
1152013 453rd OCCM of WRPC V
ati HVDCati HVDC
ng of Auxiliary supply is concernng of Auxiliary supply is concernd SR grid synchronization as planned in
tant role in controlling the power flowtant role in controlling the power flow
er to HVDC is must for grid securityd ki dl l k i hquested to kindly look into the matte
ssociated with the frequent tripping o
t th f th fl t ti iout the reason for the fluctuation inover Similar fluctuation was reportedn for the same should be analyzed and
Venue WRLDC Mumbai
5 GD 1 at Chandrap5 GD-1 at ChandrapDetailsDetailsNon reset of master tip relay of GT‐and other factor led to operation of LAll the Main Bus 1 equipment connecChandrapur II‐ Parli tripped on Over‐VSPS of Wardha flow gate operated anSPS of Wardha flow gate operated anssuesIssues with the cable from CT to relayIssues with the cable from CT to relayNon‐resetting of Master Trip relay afAlways takey
1152013 453rd OCCM of WRPC V
pur Ss Date 27‐10‐13pur Ss Time 1051
‐7 ( on Main Bus 1) after taking it ouLBB protection relay for the unitcted tripped due to LBB protectionVoltage protectionnd APML generation reducednd APML generation reduced
y panel for LBB for GT‐7y panel for LBB for GT 7fter withdrawal of the Unit
Venue WRLDC Mumbai
Commissioning of 2h Line and Bus reacannt Expected syn
date asCurrent Status(YN)date as
discussed in 451st OCC
Status(YN)
Sasan‐ Sep 2013 NSasanine‐1 r
Sep 2013 N
Sasan‐ Dec 2013 Nine‐2 r
00 kV ICT‐ Dec 2013 N
Bus‐1 r
Jan 2014 N
Bus‐2 r
Jan 2014 N
1152013 453rd OCCM of WRPC V
2nd ICT along ctors at 765 kV
The 765400 kV ICT at Sasan is loaded critically (8900 MW) i l l h h S i 3 indash 900 MW) particularly when the Sasan unit 3 i
not available and the generation at VindhyachalSTPS is full
1 Representative from Sasan may apprise the OCmembers on the following issuesbull Overload setting adopted in 1000 MVA 7654Overload setting adopted in 1000 MVA 7654
kV ICT in operationbull Progress of commissioning of the 2nd ICT bull Progress of commissioning of Line reactor of 7g g
kV Sasan‐Satna lines at Sasan end bull Progress of commissioning of Bus reactors at
kV
Venue WRLDC Mumbai
92 Switching of Impog pWRLDC codeAs per the regulation 52 (c) of the IEGC p g ( )NationalRegional grid shall be opened oexcept when specifically instructed by RLof RLDC The list of such important grid eapply shall be prepared by the RLDC in capply shall be prepared by the RLDC in cCTU and STUs and be available at the wIn line with the above provision a list of iMay 2013 and is available on WRLDC wehttpwrldccomdocsLIST20OF20IM20WR_May_2013pdfWith the growing complexity in the grid g g p y gdesirable that concurrence of WRLDC is prior to switching of any of the transmisselements of the Western Region
1152013 453rd OCCM of WRPC V
ortant Elements with
ldquoNo important element of the por removed from service at any time LDC or with specific and prior clearance elements on which the above stipulationsconsultation with the concerned Usersconsultation with the concerned Users ebsite of NLDCRLDCSLDCsrdquoimportant element list was compiled in ebsite at the following URLMPORTANT20GRID20ELEMENTS20in
and its associated impacts it is now ptaken in the form of an operation code sion element included in the important
Venue WRLDC Mumbai
3 Up-dation of RestoWRr WR
The recovery procedure for WesternThe recovery procedure for WesternNovember 2012 in consultation with
Since then significant changes haveSince then significant changes have network and generation capacity in
All stakeholders are requested to fosuggestions by 30th November 2013
The draft procedure would be put uh OCC ithe next OCC meeting
1152013 453rd OCCM of WRPC V
oration Procedure
n Region was compiled inn Region was compiled in h all the stakeholders
taken place in the transmissiontaken place in the transmission Western Regional Grid
rward their inputs and 3 to WRLDC
up for discussion and finalization in
Venue WRLDC Mumbai
nsuring injection from (MMW
meeting was convened by WRPC on 2Wardha flow gate
was decided in the meeting that the oda and IEPL would be limited within
b i b d h h h d l ibeing observed that the schedule ioda alone is around 1850 MW
nsequently the loading on 400 kV Wnsequently the loading on 400 kV Wding on 400 kV Chandrapur‐ChandraWardha‐Akola DC is 600‐650 MW aikhand is 500‐550 MW each
system is N‐1‐1 insecure
1152013 453rd OCCM of WRPC V
Mouda + IEPL + Tiroda) with
26th June 2013 for discussing the SP
total injection by NTPC Mouda APLn 1750 MW
d b SLDC M h hssued by SLDC Maharashtra to
Warora Chadrapur is 900 950 MWWarora‐Chadrapur is 900‐950 MW apur is 550‐600 MW loading on 400and loading on 400 kV Parli‐
Venue WRLDC Mumbai
Bhilai ViolatiViolati2nd‐5t2013
Average Over‐Drawal by Maharashtra by 900‐1000MW
1152013 453rd OCCM of WRPC V
Flow gate on duringon during th Nov
Average Under‐Drawal by Chhattisgarh by g y200‐350 MW
Venue WRLDC Mumbai
Ensuring injection frL + Tiroda) within 175L + Tiroda) within 175ollowing actions are desirable fromollowing actions are desirable from
ure that despatch schedule given toeal‐time is in line with the WRPC MPCProtectionSPS2013‐14949 da
ure that the SPS of Tiroda is in oper
ordinate to increase generation at SoynaJaigadRGPPL) to control the poharshtraharshtra
1152013 453rd OCCM of WRPC V
rom (Mouda + 50 MW contd50 MW hellipcontdSLDC MaharshtraSLDC Maharshtra
o Tiroda as well as its injection oM ref ated 27062013
ration
outh Western Maharashtra ower flow on EHV lines in
Venue WRLDC Mumbai
5 SPS Implementation atus
SPS d il i d i WRSPS details envisaged in WR
APML Tiroda SPS
Balco SPS
CGPL SPS
Gwalior Agra tripping (GenerationGwalior‐Agra tripping (Generation Run back in WR) SPS
Sipat SPSSipat SPS
Defense mechanism for backing down at high frequency
1152013 453rd OCCM of WRPC V
C i i i R kCommissioning Status(YN)
Remarks
N MSETCL to update status
N Expected by Nov 2013
N CGPL PGCIL to update status
N NTPCCGPLPGCIL toN NTPCCGPLPGCIL to update status
N NTPC to update statusN NTPC to update status
N NTPCCGPL to update status
Venue WRLDC Mumbai
pproved Shutdown of HVDle from 10th to 13th Januar
HVDC Pole‐1
2014 In Metal return Mode2014 In Metal return Mode
2014 Under shut down (from 06002014 Under shut down (from 0600
hrs)
2014 Under shutdown (continued
from previous day)
2014 Under shut down till 1800 hrs
1152013 453rd OCCM of WRPC V
DC Talcher-Kolarry 2014
HVDC Pole‐2
Under Shut down
1 The outage ofabove HVDC lwould reduceUnder Shut down
Under shut down
transfer capabbetween the NEW grid andSouthern GridUnder shut down
(continued from
i d )
Southern Grid2 Proposal for
planned outagof other t i iprevious day)
Under shutdown till
transmission elements whiwould affect ttransfer capab
1800 hrs
In Metal return mode
pin that corridoshall be avoidon those days
Venue WRLDC Mumbai
Black Start MKawas Ga
St ti (Station(Date 15th
1152013 453rd OCCM of WRPC V
Mock Drill at as Power (NTPC)(NTPC)Oct 2013
Venue WRLDC Mumbai
alient Features
Fi t f l bl k t tFirst ever successful black start moplant
NTPC Kawas Located at Aditya NaNTPC Kawas Located at Aditya Na
Installed Capacity 4 x 106 MW GaSteam Turbines(STs)Steam Turbines(STs)
Black start DG set capacity 2850 k
3 stage‐Islaned operation3 stage‐Islaned operation
Check synchronizing successfully dand Essar))
1152013 453rd OCCM of WRPC V
k i t b d ISGSock exercise at a gas based an ISGS
agar in Surat district in Gujaratagar in Surat district in Gujarat
as Turbines(GTs) + 2 x 116 MW
kW
one at two distinct locations (Vav
Venue WRLDC Mumbai
ments participating in06 MW GT‐2A at Kawas20 kV Kawas Bus‐I20 kV Kawas‐Ichhapore line‐220 kV Bus‐2 at Ichhapore00 MVA 22066 kV Transformer 3 6 kV Bus‐2 at Ichhapore6 kV radial feeders (Pal Pala KosadBus Spitting done at 220 kV KawasCheck synchronization done twice ndashnd then the island was separated any closing 220 kV Ichhapore‐Essar‐2 ay closing 0 kV Ichhapore ssar a
1152013 453rd OCCM of WRPC V
n the exercise
at Ichhapore
) on 660 kV Ichhapore Bus‐2 Ichhapore 66 kV Ichhaporendash First at Vav by 220 kV Kawas‐Vav‐1nd again check‐synchronised at Essaat Essar endat ssar end
Venue WRLDC Mumbai
ematic Network Diag
Ichhapore 66 KV BC CB of Ichhapore
pbus ‐ 2Gen‐2A + Standby unit
Load‐1 Load‐29
Ichhapore
4
Kawas Bus ‐ 1
2 3
7
Kawas‐Ichhapore line No 2
5
Kawas (NTPC) Island
6Kawas‐Vav line No 1
WR grid
Kawas (NTPC) Island
1152013 453rd OCCM of WRPC V
gram
I hh B 1
Load Details at Ichha(MW)
Ichhapore Bus ‐1Agri + JGY Load
Urban load
Indu‐rialload
8
Essar Bus ‐1
66 KV P l
0 25 0
Vav
220 KV Ichhapore ‐Essar line No 2
Pal66 KV Pala
0 11 0
66 KV Kosad
0 10 0
Venue WRLDC Mumbai
525
Black Start Exercise at Kawas Gas Power station (Kz)
Frequency dipaddition of loai l d
515
Freq
uency(Hz island
Island Frequency1037 hrs Kawas Island separated out successfully
Islaned Operation‐I
IO
505 Grid Frequency
495
485
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
1121 hrs Black out created in the island by stopping Gt‐2A at Kawas
1145 hrs GT‐2A black stwith DG set followed by charging at Kawas
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
1152013 453rd OCCM of WRPC V
Kawas GT‐2A and Radial Load at Ichhapore)
p during ad to the
1323 hrs Island separated out again by opening Kawas‐Vav‐1
1343 hrs Island re‐synchronised by
Islaned Operation‐II
y ycheck‐synchronising Ichhapore‐Essar‐2 at Essar end
Islaned Operation‐III
hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip hellip
tarted dead bus
1304 hrs Island synchronised with NEW grid by check synchronising 220 kV Kawas‐Vav‐1 at Vav
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
15‐OCT
‐201
3 hellip
Venue WRLDC Mumbai
MW Unrestricted
DemandOct‐13 Sep‐1
Average 36371 3648
42000
Max 39273 3956Date when Max 31‐Oct‐13 12‐Sep
38000
40000 39563
36000
38000
34000
30000
32000
1 3 5 7 9 11 13
Unrestdemand1152013 453rd OCCM of WRPC V
13 Oct‐12 Change wrt last
month Change wrt
last Year
9 38638 ‐032 ‐587
41478
3 41478 ‐073 ‐532‐13 18‐Oct‐12 ~ ~
39273
15 17 19 21 23 25 27 29 31Date
Unrestdemand UnrestdemandVenue WRLDC Mumbai
Demand MET Oct‐13 Sep‐13
Average 36035 36028M 39233 38807
42000
Max 39233 38807
Date when Max 31‐Oct‐13 12‐Sep‐13
38807
38000
40000
34000
36000MW
32000
34000
28000
30000
1 3 5 7 9 11 13 1D
Demand met De1152013 453rd OCCM of WRPC V
Oct‐12 Change wrt last
month Change wrt
last Year37804 002 ‐46840890 1 10 4 05
40890
40890 110 ‐405
3 18‐Oct‐12 ~ ~
39233
5 17 19 21 23 25 27 29 31Dateemand met Demand metVenue WRLDC Mumbai
DEMAND CHA
39000
40000
37000
38000
35000
36000MW
32000
33000
34000
April13 May13 June13Peak Demand (MW) 39540 39597 37566D d M t (MW) 39009 38760 36657
31000
32000
1152013 453rd OCCM of WRPC V
Demand Met (MW) 39009 38760 36657Shortage 134 211 242
ART - 2013-14
250
300
200
250
150
050
100
3 July13 Aug13 Sept13 Oct136 34541 36727 39563 392737 34317 35680 38807 39233
000
Venue WRLDC Mumbai
7 34317 35680 38807 39233 065 285 191 010
30000Energy pat
25000
15000
20000
10000
Mus
0
5000
April13 May13 June13Requirement 26097 27226 22336Availibilty 25734 26971 22185Shortage 1 39 0 94 0 67
0
Shortage 139 094 067
1152013 453rd OCCM of WRPC V
160ttern
120
140
080
100
040
060
0 00
020
040
July13 Aug13 Sept13 Oct1322166 22494 24561 2483522085 22349 24384 246720 36 0 64 0 72 0 66
000
036 064 072 066
Venue WRLDC Mumbai
NEW ELEMENTS in OC
SSIONING OF NEW GENERATING UNITSCONSTITUENT UNIT NAMEChhatisgarhIPP Korba WestChhatisgarhIPP Korba WestChhatisgarhIPP D B powerChhatisgarhIPP JPL
SSIONING OF NEW TRANSMISSION LINESCONSTITUENT LINE NAMECONSTITUENT LINE NAME
ChhatisgarhPOWERGRID Tamar (JPL)‐ Tamnar (PG)
POWERGRID Tamnar (PG)‐Kotra
POWERGRID Tamnar (PG)‐Kotra
GETCOPOWERGRID DEGEN‐Navsari
GETCOPOWERGRID DEGEN‐Navsari
MaharashtraReliance WRTM Parli‐Pune
SSIONING OF NEW ICTSCONSTITUENT STATION NAMECONSTITUENT STATION NAMEPOWERGRID Satna ICT‐IPOWERGRID Tamnar (PG) ICT‐IPOWERGRID ICT IV at KotraPOWERGRID ICT III at Mapusa
SSIONING OF LINE REACTORSCONSTITUENT STATION NAME
NILSSIONING OF BUS REACTORS
CONSTITUENT STATION NAMEMP Indore
GETCO DEGEN1152013 453rd OCCM of WRPC V
CT‐2013
UNIT NO C`ty(MW) DATE TIME1 600 08 10 131 600 0810131 600 091013 12292 600 291013
CKT NO KV DATE TIMECKT NO KV DATE TIME
IV 400 281013 1905
II 765 311013 2155
I 765 011113 144
I 400 311013 1109
II 400 311013 1145
DC 400 101113
KV RATIO CAPACITY (MVA) DATE TIMEKV RATIO CAPACITY (MVA) DATE TIME765400 1000 131013765400 1500 311013 2242765400 1500 311013 2345400220 315 311013 1845
KV Cty(MVAR) DATE TIME
( )KV Cty(MVAR) DATE TIME765 240 261013 054400 125 311013 1322
Venue WRLDC Mumbai
Deepawali DemWR Demand Met
39233
38120
32851
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
311013 011113 021113 031113 0411
1152013 453rd OCCM of WRPC V
mand Nov-13
bull Demand increased oneDemand increased one before Dhanteras and ar6300 MW crashed on D
3
0
day 1
1 22 23 24
113
Venue WRLDC Mumbai
Madhyapradesh Demand Met
Diwali day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
31 10 13 01 11 13 02 11 13 03 11 13 04 11 13 05 11 13
Maharashtra Demand Met
311013 011113 021113 031113 041113 051113
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
311013 011113 021113 031113 041113 051113
Diwali day
1152013 453rd OCCM of WRPC V
2700
2900
Chhattisgarh Peak Demand met
1900
2100
2300
2500
1500
1700
1900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2
10900
11400Gujarat Demand Met
3500 to 4000 MWdropped
311013 011113 021113 031113 041113
8900
9400
9900
10400
6900
7400
7900
8400
Diwali day
64001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
311013 011113 021113 031113 041113 0511Venue WRLDC Mumbai
WIND GENERA
Gujarat
16
18
j
12
14
6
8
10
MUS
2
4
6
0
2
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15‐O
Date1152013 453rd OCCM of WRPC V
ATION OCT‐13
Maharashtra
Oct
13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
15O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
Venue WRLDC Mumbai
HYDRO GENER
Gujarat Maharashtra
60
j
40
50
30
MUS
10
20
0
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct
13
1152013 453rd OCCM of WRPC V
1‐O
3‐O
5‐O
7‐O
9‐O
11‐O
13‐O
15O
Date
RATION OCT‐13
Madhya Pradesh Chhatisgarhy g
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Oct‐13
Venue WRLDC Mumbai
15‐O
17‐O
19‐O
21‐O
23‐O
25‐O
27‐O
29‐O
31‐O
GUJARAT SOLAR GENERA
45
5
GU
3
35
4
2
25
3
MUs
05
1
15
0
1‐Oct
3‐Oct
5‐Oct
7‐Oct
9‐Oct
11‐Oct
13‐Oct
15‐Oct
1152013 453rd OCCM of WRPC V
ATION Total = 11749 Mus
UJARAT
15Oct
17‐Oct
19‐Oct
21‐Oct
23‐Oct
25‐Oct
27‐Oct
29‐Oct
31‐Oct
Venue WRLDC Mumbai
Date
Total KOYNA Gene
2013 000
50805
101605
32435
83235
14105
64905
115705
50535
101335
32205
83005
13835
64635
115435
50305
101105
31935
82735
13605
64405
115205
50035
100835
31705
82505
133
35
101
Total KO1152013 453rd OCCM of WRPC V
eration‐Octrsquo13
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-26
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
अिनवाय यिनट आऊटज का अ टबर2013का वःता रत यौरा
Details of forced unit outages during the month ofOct2013
अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
स o From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Date
1 सजन Sugen 1
गजरात Gujarat 3825 101 10-Sep-13 अनपल ध Still out
अनपल ध Still out
Low demand
2 एःसार(वा डनार) Essar(VADINAR-)-1
गजरात Gujarat 600 1126 1-Oct-13 2314 5-Oct-13 GT breaker tripped
3 उकई Ukai-6
गजरात Gujarat 500 404 3-Oct-13 28-Oct-13 1844 BTL
4 डब यट पीएस WTPS - 3
गजरात Gujarat 210 500 20-Oct-13 15112013 Low demand
5 जीपक GPEC-2
गजरात Gujarat 165 1930 22-Oct-13 603 26-Oct-13 Gas temp high
6 एसएलपीपी SLPP - I
गजरात Gujarat 125 2317 22-Oct-13 241013 LHS problem
7 एएलट पीएस ALTPS - 1
गजरात Gujarat 125 608 24-Oct-13 2051 201013 Bus-1 protection operated
8 आरजीपीपीएल RGPPL-3B
महारा Maharashtra
320 2158 28-May-13 Ready Ready No requisition
9 आरजीपीपीएल RGPPL-2A
महारा Maharashtra
350 910 6-Jun-13 Ready Ready No requisition
10 आरजीपीपीएल RGPPL-3A
महारा Maharashtra
320 828 6-Jun-13 Ready Ready No requisition
11 आरजीपीपीएल RGPPL-1B
महारा Maharashtra
320 2230 25-Jun-13 Ready Ready No requisition
12 आरजीपीपीएल RGPPL-1A
महारा Maharashtra
320 2147 27-Jun-13 Ready Ready No requisition
13 टाटा TATA-6
महारा Maharashtra
500 2352 19-Jul-13 अनपल ध Still out
अनपल ध Still out
For Economy SD
14 आरजीपीपीएल RGPPL-2B
महारा Maharashtra
230 1503 8-Aug-13 Ready Ready No requisition
15 जयगड Jaigad-2
महारा Maharashtra
300 001 7-Sep-13 2100 2-Oct-13 No schedule
प म ऽय भार षण कि म बई णाली चालन-ISO-I
16 कोराड Koradi-5
महारा Maharashtra
200 127 29-Sep-13 2329 13-Oct-13 ID fan probl em
17 वीआईपीएल VIPL-I
महारा Maharashtra
300 105 2-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine bearing vibration probl em
18 चिपर Chandrapur- 3
महारा Maharashtra
210 1123 3-Oct-13 128 8-Oct-13 Coal bunkering problem
19 खापरखड़ा Kkheda-3
महारा Maharashtra
210 2253 5-Oct-13 1651 16-Oct-13 Flame failure
20 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2049 9-Oct-13 012 13-Oct-13 GTR protection operated
21 भसावल Bhusawal-4
महारा Maharashtra
500 1416 11-Oct-13 246 15-Oct-13 BTL
22 भसावल Bhusawal-3
महारा Maharashtra
210 2310 11-Oct-13 0656 16-Oct-13 Furnace Pressure High
23 भसावल Bhusawal-2
महारा Maharashtra
210 2115 13-Oct-13 2132 23-Oct-13 ID fan problem
24 चिपर Chandrapur-2
महारा Maharashtra
210 2131 16-Oct-13 1345 20-Oct-13 BTL
25 पल Parli-5
महारा Maharashtra
210 036 18-Oct-13 805 24-Oct-13 Boiler validity extension
26 भसावल Bhusawal-5
महारा Maharashtra
500 1516 18-Oct-13 151213 ESP problem
27 भसावल Bhusawal-4
महारा Maharashtra
500 121013 101213 G T fire
28 कोराड Koradi-5
महारा Maharashtra
210 1047 18-Oct-13 2343 25-Oct-13 Bearing temp high
29 द पनगर-औरगाबाद
Deepnagar‐Abad‐I
महारा Maharashtra
400 0906 19‐Oct‐13 1035 28‐Oct‐13 Tower erection work
30 जएसडब य JSW-2
महारा Maharashtra
300 001 21-Oct-13 अनपल ध Still out
अनपल ध Still out
No buyer
31 इ डयाबल India bulls-1
MSEB 270 1332 22-Oct-13 2140 2-Nov-13 Boiler problem
32 चिपर Chandrapur -2
महारा Maharashtra
210 1022 23-Oct-13 932 30-Oct-13 BTL
33 पारस Paras-4
महारा Maharashtra
250 1549 23-Oct-13 0857 27-Oct-13 BTL
34 नािसक Nasik - 3
महारा Maharashtra
210 2249 26-Oct-13 240 31-Oct-13 UAT tripped
35 चिपर Chandrapur -7
महारा Maharashtra
500 1051 27-Oct-13 447 31-Oct-13 Bus-I fault-Cpur-I
36 खापरखड़ा Khaperkheda-1
महारा Maharashtra
210 2037 28-Oct-13 1255 3-Nov-13 Coal mill problem
37 कोराड Koradi-6
महारा Maharashtra
210 545 30-Oct-13 1333 2-Nov-13 Bunkering Problem
38 खापरखड़ा Khaperkheda-3
महारा Maharashtra
210 705 30-Oct-13 2145 30-Oct-13 Low Drum Level
प म ऽय भार षण कि म बई णाली चालन-ISO-I
39 एपीएमएल APLM-3
महारा Maharashtra
660 1425 30-Oct-13 1306 6-Nov-13 R-ph bushing problem
40 नािसक Nasik - 4
महारा Maharashtra
210 1400 31-Oct-13 1135 3-Nov-13 CV transfer trip
41 एसजीट पीएस SGPT-4
म य दश MadhyaPradesh
210 959 21-Sep-13 1830 27-Oct-13 BTL
42 सातपरा Satpura -10
म य दश MadhyaPradesh
250 1823 14-Oct-13 211 7-Nov-13 ESP problem
43 सातपरा Satpura - 6
म य दश MadhyaPradesh
200 2129 6-Oct-13 NA 10-Oct-13 BTL
44 सातपरा Satpura-8
म य दश MadhyaPradesh
210 1305 9-Oct-13 1950 15-Oct-13 BTL
45
ड एसपीएम कोरबा पव
DSPM-1(K(E)-Ext)
छ ीसगड Chhattisgarh
250 914 100213 NA 301213 BTL
46 कोरबा प म Korba(W)-4
छ ीसगड Chhattisgarh
210 1128 14-Oct-13 NA 19-Oct-13 GT oil filtration work
47 कोरबा प म Korba(W)-5
छ ीसगड Chhattisgarh
500 1156 25-Oct-13 2327 30-Oct-13 Turbine problem
48 ससान SASAN - 3
आरईएल REL
660 1700 5-Oct-13 945 11-Oct-13 Coal bunkering problem
49 ससान Sasan-3
ससान Sasan
660 2036 14-Oct-13 1103 3-Nov-13 Coal mill trip
50 ल को Lanco-2
ल को Lanco
300 1220 21-Aug-13 अनपल ध Still out
अनपल ध Still out
Coal shortage
51 वदना Vandana-1
वदना VANDANA
135 1835 16-Sep-13 253 11-Oct-13 Turbine tripped
52 वदना Vandana-1
वदना VANDANA
135 452 11-Oct-13 NA 31-Oct-13 Generator control problem
53 वदना Vandana-1
वदनाVANDANA
135 2042 31-Oct-13 अनपल ध Still out
अनपल ध Still out
Turbine problem
54 जीएमआर GMR-2
जीएमआर GMR
300 137 1-Oct-13 2124 9-Oct-13 CW system problem
55 एमको EMCO - 2
जीएमआरGMR 300 1940 12-Oct-13 1220 21-Oct-13 BTL
56 एमको EMCO - 2
जीएमआर GMR
300 1707 21-Oct-13 अनपल ध Still out
अनपल ध Still out
BTL
57 कएसक KSK - 3
कएसक KSK
600 150 15-Oct-13 205 25-Oct-13 BTL
58 ट स TAPS-1
एनपीसीNPC 160 925 8-Oct-13 510 12-Oct-13 Condenser tube leakage
59 ट स TAPS-4
एनपीसीNPC 540 1346 31-Oct-13 2324 3-Nov-13 Withdrawn- due to reactor side process problem
60 कावास Kawas 2A
एनट पीसीNTPC 164 1317 6-Sep-13 1152 15-Oct-13 Less requisition
प म ऽय भार षण कि म बई णाली चालन-ISO-I
61 गाधार GandharGT-1
एनट पीसीNTPC 219 1231 17-Sep-13 Ready Ready Less requisi tion
62 कावास Kawas 2B
एनट पीसीNTPC 164 1416 18-Sep-13 1226 30-Oct-13 Less requisition
63 कावास Kawas 1B
एनट पीसीNTPC 164 943 21-Sep-13 NA 10-Oct-13 Less requisition
64 िसपत Sipat-5
एनट पीसीNTPC 500 036 3-Oct-13 Ready Ready Less requisition
65 िसपत Sipat-3
एनट पीसीNTPC 660 1953 4-Oct-13 1103 3-Nov-13 Less requisition
66 िसपत Sipat-4
एनट पीसीNTPC 500 040 6-Oct-13 1026 24-Oct-13 Less requisition
67 िसपत Sipat-1
एनट पीसीNTPC 660 050 6-Oct-13 2000 16-Oct-13 Less requisition
68 कावास
Kawas-1A एनट पीसीNTPC 164 1254 9-Oct-13 755 22-Oct-13 Less requisition
69 वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 1829 9-Oct-13 931 12-Oct-13 Furnace Pressure High
70 कावास
Kawas-1B एनट पीसीNTPC 164 039 12-Oct-13 924 31-Oct-13 Less requisition
71 गाधार GandharGT-3
एनट पीसीNTPC 219 1157 12-Oct-13 801 22-Oct-13 Less requisition
72 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1616 12-Oct-13 542 28-Oct-13 Less requisition
73 वीएसट पीएस VSTPS-2
एनट पीसीNTPC 210 748 13-Oct-13 2232 18-Oct-13 Less requisition
74 वीएसट पीएस VSTPS-9
एनट पीसीNTPC 500 748 13-Oct-13 1808 16-Oct-13 Less requisition
75 वीएसट पीएस VSTPS-5
एनट पीसीNTPC 210 1415 13-Oct-13 230 18-Oct-13 Less requisition
76 कावास Kawas-2A
एनट पीसीNTPC 164 1956 15-Oct-13 524 28-Oct-13 Less requisition
77 िसपत Sipat-I
एनट पीसीNTPC 660 2000 16-Oct-13 800 21-Oct-13 Wet preservation of boiler
78 कावास Kawas 1A
एनट पीसीNTPC 164 1045 22-Oct-13 1259 2-Nov-13 Control valve problem
79 गाधार Gandhar GT-3
एनट पीसीNTPC 219 1716 22-Oct-13 1124 28-Oct-13 Less requisition
80 गाधार Gandhar GT-2
एनट पीसीNTPC 219 1131 28-Oct-13 Ready Ready Less requisition
81 कावास Kawas 2A
एनट पीसीNTPC 164 055 31-Oct-13 Ready Ready Less requisition
Note Units out for more than 72 hrs are only included
प म ऽय भार षण कि म बई णाली चालन-ISO-I
सल नकAnnex-27
पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)
प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentreMumbai
िनयो जत यिनट आऊटज का अ टबर2013 का वःता रत यौरा
Details of planned unit outages during the month of Oct2013 अन बमाक SlNo
यिनट Unit
सघटक ConstituentIPP
मता मगावॉटCapMW
सo From
समय दनाक
स o From
समय दनाक
कारण Reason
Time Date Time Date
1 टोरट पावर Torrent Power-E
गजरात Gujarat 110 000 1-Jul-13 1100 27-Oct-13 AOH
2 एएलट पीएस ALTPS-2
गजरात Gujarat 125 000 10-Aug-13 NA 02-Nov-13 AOH
3 पल ParlI-3
महारा Maharashtra
210 2351 13-Feb-13 अनपल ध Still out
अनपल ध Still out
Water shortage
4 चिपर Chandrapur-5
महारा Maharashtra
500 101 14-Jul-13 311213 CTL problem
5 कोराड Koradi-7
महारा Maharashtra
210 722 9-Aug-13 0612 3-Oct-13 AOH
6 खापरखड़ा Kkheda-5
महारा Maharashtra
500 2137 26-Aug-13 2137 2-Oct-13 AOH
7 डब यपीसीएल WPCL-3
महारा Maharashtra
135 2119 16-Sep-13 1407 3-Nov-13 ESP filter problem
8 डब यपीसीएल WPCL-2
महारा Maharashtra
135 515 16-Oct-13 1713 5-Nov-13 AOH
9 कोरबा पव KORBA-(E)-5
छ ीसगड Chhattisgarh
120 1102 7-Sep-13 241113 COH generator rotor problem
10 सीजीपीएल CGPL-40
सीजीपीएलCGPL 830 021 12-sep-13 1551 19-Oct-13 AOH
11 कोरबा Korba-2
एनट पीसीNTPC 200 2328 20-Sep-13 2345 17-Oct-13 AOH
12 वीएसट पीएस VSTPS-6
एनट पीसीNTPC 210 136 20-Sep-13 1012 10-Oct-13 AOH
13 सीजीपीएल CGPL-20
सीजीपीएल CGPL
830 458 25-Oct-13 251113 GT Inspection
Annex- 31
(MW) sao From tk To1 gauivainaila GUVNL
1 AE Co C 60 051213 131213 Boiler Annual Maitenance
2NIL
3 Craiva]kMila CSPGCL
31 DSPM-II II 250 201113 131213 AOH32 Korba West-II 2 210 191213 2214 COH33 Korba West-IV 4 210 251113 181213 AOH
441 DTPS RELIANCE(DAHANU) 1 250 050114 270114 AOH
5 koMd``Iya xao~ Central Sector51 KSTPS 1 200 051213 291213 AOH52 TAPS 2 160 241113 151213 AOH53 CGPL 10 800 251113 200114 R amp M WORK
maraiva]kMila MSPGCL
map`iva]kMila MPPGCL
ReasonS No Unit No
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOVEMBER 2013 AND DECEMBER 201
Capacity Outage as per Annual Maintenance Plan
Outage Planning of Transmission elements during the month of Dec-2013
1 400 Bhilai-Koradi 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
2 400 DC Korba-Birsingpur 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
3 400 Korba-Bhilai 2 1-Dec-13 800 31-Dec-13 1800 Daily For Online PID Line in service with AR in non-auto mode
WRTS-I WRTS-I For IO
4220 Vapi(PG)-Bhilad (Getco)1 and
Vapi(Getco)-Bhilad (Getco) (Common DC Tower)
1-Dec-13 800 2-Dec-13 1800 Daily LILO of 400kV Navsari-Boisar at Loc no58-59 for Magarwada GIS SS PGCIL WRTS-II C
5 765 Bus1 at Gwalior 1-Dec-13 900 1-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus -I
PGCIL WRTS-II C
6 400 BALCO-Birsingpur 400kV Line 1-Dec-13 800 5-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
7 400 SUGEN JHANOR LINE BAY EQUPMENT
1-Dec-13 800 2-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
8 400 315 MVA ICT1 at Dehgam 2-Dec-13 900 2-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
9 400 Korba_ Bhilai-2 2-Dec-13 900 3-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
10 400 400KV Mouda-Wardaha-1 line 2-Dec-13 900 3-Dec-13 1800 Daily Annual Testing WRTS-I NTPC11 400 Karad-Kolhapur Ckt I 2-Dec-13 900 2-Dec-13 1700 Daily QMwork MSETCL MSETCL
12 400 Pune-Parli 2 Line Reactor charged as Bus Reactor at Pune 2-Dec-13 900 2-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
13 765 Bilaspur-Sipat 1 3-Dec-13 1000 4-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C14 400 315 MVA ICT1 at Dehgam 3-Dec-13 900 3-Dec-13 1300 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
15 400 SUGEN VAPI LINE BAY EQUPMENT
3-Dec-13 800 4-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
16 400 400KV Sipat-Pathadi (LANCO) line
3-Dec-13 900 4-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
17 400 400KV Seoni -Bhilai Ckt 3-Dec-13 900 3-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
18 220 Omkareshwar-Khandwa Ckt 3-Dec-13 900 3-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
19 400 Gandhar - Navsari Ckt1 3-Dec-13 800 4-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
20 400 Pune-Parli 1 Line Reactor charged as Bus Reactor at Pune 3-Dec-13 900 3-Dec-13 1800 Daily AMPWarranty test of reactor WRTS-I WRTS-I R
21 220 Kawas-Ich1 220kV Line 4-Dec-13 0375 4-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
22 400 400 KV Nagda-Isp Ckt 4-Dec-13 900 4-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
23 220 Malanpur-Auriya Ckt 4-Dec-13 900 4-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201324 220 Pune-Telegoan 2 5-Dec-13 1000 5-Dec-13 1400 Daily AMP work MSETCL WRTS-I R
25 400 Raipur-Sipat 1 amp 2 5-Dec-13 800 5-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
26 400 Gandhar-Dehgam DC 5-Dec-13 800 5-Dec-13 1900 Daily For line crossing work of 400 kV Pirana-Vadodara lines
PGCIL WRTS-II C
27 400 Korba_ Korba (West) 5-Dec-13 900 6-Dec-13 1900 ys contin Testing of LBB auto reclose M-I amp M-II relays
NTPC NTPC
28 400 Parali-Lonikand II ckt 2 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL29 400 Padgha-Nagothane ckt II 5-Dec-13 900 5-Dec-13 1700 Daily QMwork MSETCL MSETCL
30 400 400 KV Damoh -Katni Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
31 400 50 Mvar Bus Reactor At 400 Kv Nagda
5-Dec-13 800 5-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
32 220 Anuppur - Kotmikala Ckt - I 5-Dec-13 1000 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
33 220 Mehgaon-Auriya Ckt 5-Dec-13 900 5-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
34 220 Damoh Sagar PGCIL Ckt 5-Dec-13 900 5-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
35 400 Gandhar - Navsari Ckt 2 5-Dec-13 800 6-Dec-13 1800 Daily Replacement of devfective insulator strings with polymer insulators PGCIL WRTS-II
36 765 Bilaspur-Sipat 2 6-Dec-13 1000 7-Dec-13 1800 Daily Construction warranty test work WRTS-I WRTS-I C37 220 Bus 2 at Seoni 6-Dec-13 1000 6-Dec-13 1800 Daily AMP work WRTS-I WRTS-I R38 220 Kawas-Ich2 220kV Line 6-Dec-13 0375 6-Dec-13 075 daily CT ampCVT Testing NTPC NTPC
39 400 400 KV Indore-Nagda Ckt 6-Dec-13 900 6-Dec-13 1600 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
40 400 400KV Seoni -Sarni Ckt 6-Dec-13 900 6-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
41 220 Malanpur-Auriya Ckt 6-Dec-13 900 6-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
42 400 Akola-Aurangabad 2 6-Dec-13 900 8-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tube amp LR N2 injection system at Akola amp Bushing oil DGA
WRTS-I WRTS-I C
43 400 Akola-Aurangabad 2 with 400KV Bus-1at Waluj (MSETCL) 6-Dec-13 900 6-Dec-13 1800 Daily Erection of wavetrap of high current
rating amp its jumperingWRTS-I MSETCL WRTS-I C
44220 Vapi(PG)-Bhilad (Getco) 2amp3
(Common DC tower) 7-Dec-13 800 8-Dec-13 1700 Daily LILO of 400kV Navsari-Boisar at Loc no 56-57 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
45 400 Vindhyachal-Mahan 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
46 400 Mahan-Korba 7-Dec-13 800 8-Dec-13 1700 Conticrossing work of 765kV vin pooling- chamradol 2 PGCIL WRTS-II C
47 400 400kV Bus Coupler(Both the 400k 7-Dec-13 800 13-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
48 400 Raipur-Wardha 1 7-Dec-13 700 8-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
49 400 400 KV Nagda-Rajgarh Ckt-1 9-Dec-13 900 9-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
50 400 Bus 1 at Bhatapara 9-Dec-13 1000 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R51 HVDC HVDC West Bus-1 9-Dec-13 900 9-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
52 765 Sipat 765KV Bay-4 ( Bus reactor main bay)
9-Dec-13 900 9-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
53 400 New Koyna-Dabhol ckt 1 9-Dec-13 830 9-Dec-13 1700 Daily QMwork MSETCL MSETCL
54 220 Anuppur - Kotmikala Ckt - II 9-Dec-13 1000 9-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
55 220 Chhegoan-Khandwa Ckt -II 9-Dec-13 900 9-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
56 400 Raipur-Wardha 2 9-Dec-13 700 10-Dec-13 1800 Daily Balance construction activity at loc no 45
WRTS-I WRTS-I C
57 765 Seoni-Bina Line with Reactor amp Seoni-Wardha 2 10-Dec-13 800 20-Dec-13 1700 Daily
Modification (raising bus height) amp extension of 765KV auxillary Bus at Seoni
WRTS-I amp WRTS-II WRTS-I C
58 400 Bus 2 at Bhatapara 10-Dec-13 1000 10-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
59 400 Bhadrawati-Chandrapur 3 10-Dec-13 1000 10-Dec-13 1400 Daily AMP Work WRTS-I WRTS-I R
60 765 Bilaspur-Seoni 1 with Line reactor 10-Dec-13 1000 13-Dec-13 1800 Daily
Construction warranty test of reactor of line equipments amp jumpering of spare reactor aux bus
WRTS-I WRTS-I C
61 400 SUGEN PIRANA LINE BAY EQUPMENT
10-Dec-13 800 11-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
62 765 Sipat 765KV Bay-5 ( Bus reactor tie bay)
10-Dec-13 900 10-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
63 220 Kawas-Nav1 220kV Line 10-Dec-13 0375 10-Dec-13 075 daily Bay Testing NTPC NTPC64 400 Jh-Navsari Line1 10-Dec-13 800 10-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
65 400 400 KV Nagda-Rajgarh Ckt-II 10-Dec-13 900 10-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
66 220 BINA(PGCIL)-Shivpuri Ckt 10-Dec-13 900 10-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
67 220 Damoh(PGCIL) - Tikamgarh PGCIL
10-Dec-13 900 10-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
Outage Planning of Transmission elements during the month of Dec-201368 220 Bus 1 at Bhatapara 11-Dec-13 1000 11-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R69 220 Kakrapar-Vapi ckt 1 11-Dec-13 900 11-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R70 400 Chorania-Asoj 1 11-Dec-13 800 11-Dec-13 1800 Daily PMM Work GETCO GETCO
71 765 Sipat 765KV Bay-6 ( ICT-2 Main bay)
11-Dec-13 900 11-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
72 400 Jh-Navsari Line2 11-Dec-13 800 11-Dec-13 1800 Daily Annual Bay Maintenance NTPC NTPC
73 400 400 KV Rajgarh-Ssp Ckt-I 11-Dec-13 900 11-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
74 400 400 kv Birsingpur- katni Ckt -I 11-Dec-13 900 11-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
75 220 BINA(PGCIL)-Shivpuri Ckt 11-Dec-13 900 11-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
76 220 Chhegoan-Khandwa Ckt -I 11-Dec-13 900 11-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
77 220 Bus 2 at Bhatapara 12-Dec-13 1000 12-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
78 400 Korba-Khedamara (yet to be charged) 12-Dec-13 800 12-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
79 220 Kakrapar-Vapi ckt 2 12-Dec-13 900 12-Dec-13 1700 Daily AMP of bay amp terminal equipment PGCIL WRTS-II R
80 400 SUGEN UNOSUGEN LINE BAY EQUPMENT
12-Dec-13 800 13-Dec-13 1700 DAILY AMP TPL-SUGEN TPL-SUG R
81 220 Kawas-Nav2 220kV Line 12-Dec-13 0375 12-Dec-13 075 daily Bay Testing NTPC NTPC82 400 Karad-Lonikand 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL83 400 Padgha-Talegaon 12-Dec-13 900 12-Dec-13 1700 Daily QMwork MSETCL MSETCL
84 400 400 KV Nagda-Isp Ckt 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
85 400 400 kv Birsingpur- katni Ckt -II 12-Dec-13 900 12-Dec-13 1800 daily For maintenance work MPPTCL EHT- Mamp I
86 400 400 KV Rajgarh-Ssp Ckt-II 12-Dec-13 900 12-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT- Mamp I
87 220 Pithampur-Rajgarh Ckt - I 12-Dec-13 900 12-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
88 220 Transfer Bus at Bhatapara 13-Dec-13 1000 13-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R89 400 Bus1 at Bina 13-Dec-13 900 13-Dec-13 1700 Daily AMP PGCIL WRTS-II R
90220 Bhilad (Getco)-Tarapur(Getco)
amp Vapi(Getco)-Tarapur(Getco) (Common DC Tower)
13-Dec-13 800 14-Dec-13 1700 Daily Lilo of 400kV Navsari-Boisar at Loc No801-802 for Magarwada GIS SS PGCIL WRTS-II C
Outage Planning of Transmission elements during the month of Dec-2013
91 400 Indore - Itarsi -II 13-Dec-13 800 13-Dec-13 1300 Daily Replacement amp testing of AR relay PGCIL WR-II R
92 400 Chorania-Amreli 13-Dec-13 800 13-Dec-13 1800 Daily PMM Work GETCO GETCO
93 220 Pithampur-Rajgarh Ckt - II 13-Dec-13 900 13-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
94 400 Akola-Aurangabad 1 13-Dec-13 900 15-Dec-13 1800 Continuous
Bays upgradation at Waluj by replacement of isolators CTs amp IPS tubeamp Bushing oil DGA
WRTS-I WRTS-I C
95 400Akola-Aurangabad 1 with 400KV Bus-1 at Waluj (MSETCL)
13-Dec-13 900 13-Dec-13 1800 Daily Erection of wavetrap of high current rating amp its jumpering
WRTS-I MSETCL WRTS-I C
96 220 Bus 1 at Raigarh 14-Dec-13 1000 14-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R97 400 Bus2 at Bina 14-Dec-13 900 14-Dec-13 1700 Daily AMP PGCIL WRTS-II R98 +- 500KVMundra-Mahindragarh Bipole 14-Dec-13 1200 14-Dec-13 1700 Daily AMP APL APL IR99 400 Dhule-Babhleswar ckt 2 14-Dec-13 900 14-Dec-13 1700 Daily QMwork MSETCL MSETCL
100 400 Khedamara-Raita 15-Dec-13 800 15-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
101 400 Bhilai-Bhatapara 15-Dec-13 800 19-Dec-13 1800 Daily
Crossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line amp Dismetaling of ERS system
WRTS-I WRTS-I C
102 400 Nagda- Indore 15-Dec-13 800 15-Dec-13 1700 Daily Stringing of 765 kV Indore -Baroda line construction works
MPPTCL WR-II C
103 +- 500KVMundra-Mahindragarh Pole-I 15-Dec-13 700 16-Dec-13 1900 Conti AMP APL APL IR
104 400 Bus2 at Indore 15-Dec-13 900 18-Dec-13 1700 Daily For replacement of 400kV Isolator MOM boxes in all bays PGCIL WRTS-II R
105 400 BALCO-KORBA(NTPC) 400kV Line amp 400kV Bus-1
15-Dec-13 800 19-Dec-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
106 400 Mundra - Jetpur Ckt 1 15-Dec-13 800 18-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
107 220 Bus 2 at Raigarh 16-Dec-13 1000 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R108 HVDC HVDC Bwati South Bus-1 16-Dec-13 900 16-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
109 765 Bus 2 at Gwalior 16-Dec-13 900 16-Dec-13 1800 DailyFor interconnection of newly constructed 765KV Satna gangry to existing 765kV Bus - 2
PGCIL WRTS-II C
110 220 GWL(PGCIL)-Gwalior Ckt-I 16-Dec-13 900 16-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
111 220 Transfer Bus at Raigarh 17-Dec-13 1000 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R112 HVDC HVDC South Bus-2 17-Dec-13 900 17-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R113 +- 500KVMundra-Mahindragarh Pole-I 17-Dec-13 700 19-Dec-13 1900 Daily AMP APL APL IR
114 400 400KV Bay 23 ( ICT-2 tie bay) at Sipat
17-Dec-13 900 17-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
Outage Planning of Transmission elements during the month of Dec-2013
115 220 GWL(PGCIL)-Malanpur Ckt-II 17-Dec-13 900 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
116 220 AMARKANTAK- SUKHA 17-Dec-13 1000 17-Dec-13 1700 daily For maintenance work MPPTCL EHT -MampI
117 220 Khandwa-Nepanagar Ckt 17-Dec-13 900 17-Dec-13 1600 daily Tighting of Jumper cone ampArching Horn amp other maintenance work
MPPTCL EHT -MampI
118 765 Bus 1 at Seoni 18-Dec-13 1000 18-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R
119 400 Marwa TPP- Raipur DC (yet to be charged) 18-Dec-13 800 18-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-
Champa amp Raigarh-Raipur line CSPTCL WRTS-I C
120 400 Indore-Asoj1 SC 18-Dec-13 800 18-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
121 400 Chorania-Amreli 18-Dec-13 800 18-Dec-13 1800 Daily PMM Work GETCO GETCO
122 400 400KV Bay 24 ( ICT-2 main bay) at Sipat
18-Dec-13 900 18-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
123 400 50 Mvar Bus Reactor At 400 Kv Nagda
18-Dec-13 800 18-Dec-13 1700 daily Post mansoon maintentance MPPTCL EHT- Mamp I
124 765 Bus 2 at Seoni 19-Dec-13 1000 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R125 400 Bus-1 at Mapusa 19-Dec-13 800 19-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R126 400 Raita-Khedamara feeder 19-Dec-13 800 19-Dec-13 1700 Daily PMM CSPTCL CSPTCL
127 400 Mundra Jetpur Ckt2 19-Dec-13 800 22-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
128 220 Badod - Kota Ckt 19-Dec-13 900 19-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc repiacement work
MPPTCL EHT -MampI
129 220 DC Kotra-Raigarh 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa line
CSPTCL WRTS-I C
130 400 DB Power- Raigarh PG_400KV 20-Dec-13 800 21-Dec-13 1800 Continuous
Crossing works of 765KV DC Raigarh-Raipur line
DB Power WRTS-I C
131 220 Vapi(PG)-Karadpara(DNH) 1amp2 20-Dec-13 800 21-Dec-13 1700 Cont Lilo of 400kV Navsari-Boisar at Loc no29-30 for Magarwada GIS SS PGCIL WRTS-II
Consent and clarification reqd from DDDNHPGCIL
132 400 Ranchi-Sipat 1 amp 2 20-Dec-13 900 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV Champa - Dharmjaygarh SC
WRTS-I WRTS-I C
133 400 Aurangabad-Akola II 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL134 400 Kalwa-Talegaon(PG) 20-Dec-13 900 20-Dec-13 1700 Daily QMwork MSETCL MSETCL
Outage Planning of Transmission elements during the month of Dec-2013
135 220 Badod - Modak Ckt 20-Dec-13 900 20-Dec-13 1800 daily
For rectification of defects observed during routine patrolling attend the damper arcing hornfo ampbroken disc replacement work
MPPTCL EHT -MampI
136 400 Bus 2 at Solapur 20-Dec-13 800 20-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
137 400 Raipur-Raigarh IV 20-Dec-13 800 20-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
WRTS-I WRTS-I C
138 400 Vchal - Jabalpur Ckt4 amp Vchal - Sasan 20-Dec-13 800 22-Dec-13 1800 Continu
ous Shifting of towers to facilitate ash dyke area for Vchal NTPC Stage IV PGCIL WRTS-II
139 400 DC Korba-Raipur 3 amp 4 21-Dec-13 800 21-Dec-13 1800 Daily Crossing works of 765KV Dc Raipur-Champa amp Raigarh-Raipur line WRTS-I WRTS-I C
140 220 Bus-2 at Mapusa 21-Dec-13 800 21-Dec-13 1800 Daily Amp Work WRTS-I WRTS-I R141 +- 500KVMundra-Mahindragarh Pole-II 21-Dec-13 700 22-Dec-13 1900 Conti AMP APL APL IR142 500 HVDC Pole 2 at Bhadrawati 21-Dec-13 900 22-Dec-13 1800 Daily AMP Work WRTS-I WRTS-I R143 400 Chorania-Asoj 2 21-Dec-13 800 21-Dec-13 1800 Daily PMM Work GETCO GETCO144 400 Dhule-Khandwa CktI 21-Dec-13 900 21-Dec-13 1700 Daily QMwork MSETCL MSETCL145 400 Bus 1 at Solapur 21-Dec-13 800 21-Dec-13 1800 Daily Augmentation works of Busbar WRTS-I WRTS-I C
146 400 ICT3 Bay at BALCO 21-Dec-13 800 25-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
147 400 Indore-Asoj2 SC 22-Dec-13 800 22-Dec-13 1900 DailyFor line crossing work of 400 kV Pirana-Vadodara amp Vadodara -Asoj lines
PGCIL WRTS-II C
148 +- 500KVMundra-Mahindragarh Pole-II 23-Dec-13 700 25-Dec-13 1900 Daily AMP APL APL IR149 400 Seoni-Khedamara feeder 23-Dec-13 800 23-Dec-13 1700 Daily PMM CSPTCL CSPTCL
Outage Planning of Transmission elements during the month of Dec-2013150 400 Chorania-Asoj 2 23-Dec-13 800 23-Dec-13 1800 Daily PMM Work GETCO GETCO
151 400 Korba-Bhilai-1 23-Dec-13 800 23-Dec-13 1800 Dailycrossing work of upcoming 765 kV Champa-Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
152 400 Mundra - Limbdi Ckt1 24-Dec-13 800 26-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
153 400 KSK-Raipur and KSK-DB Power 24-Dec-13 800 24-Dec-13 1800 Daily Crossing work of upcoming 765 KV DCRaigarh-Raipur line
KSK WRTS-I C
154 400 DC Tamnar-Raipur 1amp 2 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV Raigarh-Champa amp Raigarh-Raipur line
JINDAL WRTS-I C
155 765 Sipat 765KV Bay-13 ( Bharari -2 Main bay)
26-Dec-13 900 26-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
156 400 DC Wardha-Warora line 26-Dec-13 800 27-Dec-13 1800 Continuous
Crossing works of 765KV DC Raipur -Wardha Line
MSETCL WRTS-I C
157 765 Sipat 765KV Bay-18 ( Bharari -1 Main bay)
27-Dec-13 900 27-Dec-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
158 400 Mundra - Limbdi Ckt 2 27-Dec-13 800 29-Dec-13 1800 DailyReplacement of defective insulator strings with polymer insulators in polluted sections
PGCIL WRTS-II R
159 220 SEONI - CHHINDWARA CKT I 27-Dec-13 900 27-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
160 400 ICT2 Bay at BALCO 27-Dec-13 800 31-Dec-13 1800 Conti GIS Annual Bay Maintenance Work BALCO BALCO
161 400 Khandwa- Itarsi -II 28-Dec-13 800 30-Dec-13 000 Conti For Commissioning of New equipments
PGCIL WRTS-II c
162 400 Dhule-Khandwa CktII 28-Dec-13 900 28-Dec-13 1700 Daily QMwork MSETCL MSETCL
163 220 SEONI - CHHINDWARA CKT II 28-Dec-13 900 28-Dec-13 1800 daily For maintenance work MPPTCL EHT -MampI
164 400 Wanakbori-Asoj 29-Dec-13 800 29-Dec-13 1900 Daily For line crossing work of 400 kV Vadodara -Asoj lines
GETCO WRTS-II C
165 400 Sipat-Raipur 3 29-Dec-13 800 29-Dec-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
WRTS-I WRTS-I C
166 400 New Koyna-Dabhol ckt 2 30-Dec-13 830 30-Dec-13 1730 Daily QMwork MSETCL MSETCL
Date Time Date Time
1 400 400Kv PGCIL(Pirana)-Pirana(TPL) F2 17-Nov-13 900 17-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
2 220 TAPS-Boisar 17-Nov-13 800 18-Nov-13 1700 DAILY Maintenance work WRTS-I NPCIL
3 400 400Kv Pirana-UNO SUGEN 18-Nov-13 900 18-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
4 400 400Kv Pirana-SUGEN 19-Nov-13 900 19-Nov-13 1900 Daily Tandelta testing of CVTs and General checking TPGL TPL
5 400 Gandhar-Gpec SC 24-Nov-13 800 24-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
6 400 400KV ICT-II Tie Bay-408 (CB-40852) at Gwalior 17-Nov-13 800 20-Nov-13 1800 Contin
eous Removal of PIRs of in ICT 2 Tie CB POWERGRID WRTS-II R
7 400 Nagda - Rajgarh 2 18-Nov-13 800 18-Nov-13 1800 Daily For commissioning of FSC at Rajgarh on Kasor Ckt1 PGCIL WRTS-II C
8 765 Bina - Gwalior Ckt1 19-Nov-13 800 19-Nov-13 1800 Daily For commissioning of spare reactor at Bina PGCIL WRTS-II C
9 765 Tie Bay of Bina Ckt-2 at Gwalior 20-Nov-13 800 20-Nov-13 1700 DailyCommissioning amptesting of 765 kV Satna1 Line amp Reactor relays at Gwalior
PGCIL WRTS-II C
10 765 Satna - Bina Ckt1 SC 20-Nov-13 800 21-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
11 400315MVA ICT 1 at Pirana
20-Nov-13 800 30-Nov-13 1800 Contineous
Replacement of existing ICT (failed in short circuit design) with short circuit tested design ICT
PGCIL WRTS-II R
12 400 Kalwa-Padgha II 20-Nov-13 600 22-Nov-13 1800 Cont Replacement of 29D isolator MSETCL MSETCL C
13 400 Bus 1 at Raipur 21-Nov-13 1000 22-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
14 400 Outage on 400KV Busbar protection panel ( RADSS Scheme) only 21-Nov-13 900 22-Nov-13 1800 Daily Integration of Pune 1amp 2 bays bus-
bar protection with existing scheme MSETCL WRTS-I C
15 400
Jhanor-Dehgam Line 2
21-Nov-13
800
23-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
16 400 400KV 125MVAR Bus Reactor-II Main Bay-409 (CB-40952) at Gwalior 21-Nov-13 800 24-Nov-13 1800 Contin
eous Removal of PIRs in main bay of BR POWERGRID WRTS-II R
17 400 Pune-Aurangabad 1 (line not commision) Line Reactor charged as Bus Reactor at Pune 22-Nov-13 900 22-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
18 765 Satna - Bina Ckt 2 SC 22-Nov-13 800 23-Nov-13 1700 ContiStringing of 765kV Bina -Jabalpur line and completion of balance construction works
PGCIL WR-II C
19 400 Varsana - Hadala 22-Nov-13 900 22-Nov-13 1800 Daily PMM Work GETCO GETCO
20 400 V-HVDC Ckt-1 22-Nov-13 900 22-Nov-13 1900 Daily Basis Rectification of hot spots NTPC NTPC
21 400 400 KV Main Bus-2 22-Nov-13 900 23-Nov-13 1900Coninu
ous Basis
For rectification of hot spots of main-bus HVDC-1 and V-Jabalpur-4 lines
NTPC NTPC
22 765 Bus Reactor amp Sasan 2 LR at Satna 22-Nov-13 800 22-Nov-13 1800 DailyFor commissioning spare reactor at Satna (outage required due to heavyinduction)
PGCIL WRTS-II C
Line From To Basis
Annexure-32-B
Reason System Agency Type
Outage Planning of Transmission elements during the month of November -2013
SN KV
Outage Planning of Transmission elements during the month of November -2013
23 400 Pune-Aurangabad 2 (line not commision) Line Reactor charged as Bus Reactor at Pune 23-Nov-13 900 23-Nov-13 1800 Daily AMPWarranty test of reactor at
Pune WRTS-I WRTS-I R
24 400 V-Jabalpur-4 line 23-Nov-13 900 23-Nov-13 1900 Daily Basis Rectification of Hot spots NTPC NTPC
25 400 400KV Bay 13 (IBT-1 main Bay ) 23-Nov-13 900 23-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
26 400 Mundra-Jetpur2 25-Nov-13 1000 25-Nov-13 1030 Daily For taking out line reactor at Jetpur end to attend oil leakages PGCIL WRTS-II R
27 400 Gandhar-Sugen SC 25-Nov-13 800 26-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
28 400 BUS- Coupler-2 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
29 400 400 KV Bus Reactor at Vchal 25-Nov-13 900 25-Nov-13 1900 Daily Basis AMP NTPC NTPC
30 400 400KV Bay 14 (IBT-1 ICT-1 tie Bay ) at sipat 25-Nov-13 900 25-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
31 220
Jhanor-Haldarwa Line 1
25-Nov-13
800
26-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
32 400 400kV Bay of ICT-1 at BALCO 25-Nov-13 800 29-Nov-13 1800ContinuouGIS Annual Bay Maintenance Work BALCO BALCO
33 400 Parli-Lonikand I 25-Nov-13 900 1-Dec-13 1800 Cont LILO work for 400kV Lonikand II SS MSETCL MSETCL C
34 400 Bus 2 at Raipur 26-Nov-13 1000 27-Nov-13 1800 Daily Bus spliting Works WRTS-I WRTS-I C
35 400 Sugen-Vapi SC 27-Nov-13 800 30-Nov-13 1700 Daily Replacement of defective insulator strings with polymer insulators PGCIL WRTS-II R
36 400 Shunt Reactor of V-Satna line-2 27-Nov-13 900 28-Nov-13 1900Coninu
ous Basis
Reactor Oil Filtration NTPC NTPC
37 400 Sipat 400KV 132KV IBT-2 27-Nov-13 900 27-Nov-13 1900Continuou400KV CTs ( 5 no) replacement work NTPC NTPC
38 220
Jhanor-Haldarwa Line 2
27-Nov-13
800
28-Nov-13
1800Continuous
Replacement of existing soild state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
39 220 Bus-1 at Mapusa 30-Nov-13 800 30-Nov-13 1800 Daily Amp Work WRTS-I WRTS-I R40 400 400KV Bay 15 ( ICT-1 main Bay ) at Sipat 30-Nov-13 900 30-Nov-13 1900 Daily Annual Preventive maintenance job NTPC NTPC
ANNEXURE‐32C1
List of Emergency Outages availed in Oct 2013
SlNo
Element kV Agency From
Date To Date
Remarks
1 Korba‐Korba(W) 400 WRTS‐I 1‐Oct 1‐Oct Hot spot korba(w)
2 Bina‐JP Bina 400 WRTS‐II 1‐Oct 1‐Oct Hot spot
3 Gwalior‐Malanpur‐1 220 MPPTCL 1‐Oct 1‐Oct
Ew Snapped
4 Kapp‐Haldarwa‐II 220 GETCO 3‐Oct 4‐Oct
Emergency sd
5 Karad‐Sholapur SC 400 MSETCL 4‐Oct 4‐Oct
To attend hot spot
6 APL HVDC POLE ‐ II
+‐500 APL 4‐Oct 5‐Oct
Hot spot
7 Khanpur‐Dehgam‐II 220 GETCO 5‐Oct 5‐Oct
Hot spot at Khanpur
8 Seoni ICT‐III
765400 WRTS‐II 5‐Oct 5‐Oct
To attend hot spot
9 Kalwa‐Talegaon 400 MSETCL 8‐Oct 9‐Oct Emergency outage
10 SSP‐Dhule‐1 400 GETCO 10‐Oct 10‐Oct Damaged Insulator replacement
11 Deepnagar‐Bhusawal‐I 400 MSETCL 11‐Oct 11‐Oct
To rectify fault in trip circuit indication
12 APL‐Sami‐II 400 WRTS‐II 12‐Oct 12‐Oct Hot spot
13 Sami‐Dehgam‐II 400 APL 12‐Oct 12‐Oct Hot spot
14 Kalmwshwar‐Pandurna 220 MSETCL 14‐Oct 14‐Oct
To attend hot point on wave trap
15 CGPL‐Chorania‐1 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
16 CGPL‐Chorania‐2 400 WRTS‐II 15‐Oct 15‐Oct To attend hot point
17 Bableswar ICT‐3 400220
MSETCL 16‐Oct 17‐OctTo attend critical tube leakage
SlNo
Element kV Agency From
Date To Date
Remarks
315 MVA
18 VChal‐Waidhan‐2 132 NTPC 16‐Oct 16‐Oct
To attend hot spot
19 CGPL‐Chorania‐2 400 CGPL 16‐Oct 16‐Oct
To attend hot point on Main bus‐I
20 CGPL‐Chorania‐2 400 CGPL 17‐Oct 17‐Oct To attend hot point
21 Raipur‐Tamnar‐1 400 WRTS‐I 17‐Oct 17‐Oct To attend SF‐6 leakage
22 ASOJ‐ICT‐II
400220 GETCO 18‐Oct 18‐Oct
Hot spot
23 Kharghar ICT‐II
400220 MSETCL 19‐Oct 19‐Oct
To attend hot spot
24 Bhilai‐Koradi 400 WRTS‐I 19‐Oct 19‐Oct To replace the hanging IPS tube
25 Korba(w)‐ICT
400220 NTPC 19‐Oct 19‐Oct
To attend hot spot
26 Ksk‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
27 Raigarh‐db power‐sc 400 WRTS‐I 20‐Oct 20‐Oct
Hot spot
28 Nkoynaict‐i
400220 MSETCL 21‐Oct 22‐Oct
Hot spot
29 Ssp‐asoj‐sc 400 GETCO 21‐Oct 21‐Oct Hot spot Asoj
30 Acbil‐bilaspuri 400 APML 22‐Oct 22‐Oct Emergency relay testing works
31 Ssp ‐ dhule ‐ i 400 MSETCL 23‐Oct 27‐Oct To attend hot spots
32 Sholapur‐sholapur (pg) 400 WRTS‐I 23‐Oct 24‐Oct
To attend hot spots
33 Ssp‐kasor 400 GETCO 23‐Oct 23‐Oct Hot spot in pantograph isolator
34 Jblpur‐itarsi iv 400 WRTS‐II 23‐Oct 23‐Oct Emergency sd
35 Korba ‐ korba(w) 400 WRTS‐II 23‐Oct 23‐Oct Hot spot
SlNo
Element kV Agency From
Date To Date
Remarks
36 Itarsi bus‐ii 400 MPPTCL 24‐Oct 24‐Oct To attend conductor damage
37 Raipur(pg)‐urla‐sc 220 CSPTCL 24‐Oct 24‐Oct
Emergency sd to attend isolator sparking
38 Hazira‐jhanor ii 400 NTPC 24‐Oct 24‐Oct
Emergency sd to attend wave trap problem
39 Chornia‐vadavi‐ii 400 RPTL (GUJ) 25‐Oct 25‐Oct Emergency sd
40 Apl‐mgarh‐pole‐1
+‐500 APL 25‐Oct 25‐Oct
Emergency sd
41 Satpura‐isp‐sc 400 MPPTCL 25‐Oct 25‐Oct Hot spot
42 Vchal‐jabalpur‐2 400 WRTS‐II 29‐Oct 29‐Oct
To attend Jumper Cone (got melted)
Sl No kV Element From To Basis Reason Agency Agency Remarks (
1 400 315 MVA 400220 KV X-mer -III At 400KV SS Bhopal 3-Oct-13 900 3-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
2 220 Omkareshwar-Khandwa Ckt 4-Oct-13 900 4-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
3 220 Damoh(PGCIL) - Tikamgarh PGCIL 4-Oct-13 800 4-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
4 400 315 MVA 400220 KV X-mer -III From 220 KV SIDE At 400KV SS Bhopal 4-Oct-13 900 4-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
5 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 7-Oct-13 800 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
6 400 315 MVA 400220 KV X-mer -I At 400KV SS Bina 7-Oct-13 900 7-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
7 400 400 KV Indore-Nagda Ckt 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
8 220 Damoh(PGCIL) - Sagar 8-Oct-13 900 8-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
9 400 315 MVA 400220 KV X-mer - I At 400KV SS Bina 8-Oct-13 900 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
10 400 315 MVA 40022033 KV X-mer - At 400KV SS Katni 8-Oct-13 800 8-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
11 220 Badod - Kota Ckt 9-Oct-13 900 9-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N Non co
12 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 9-Oct-13 900 9-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
13 220 Badod - Modak Ckt 10-Oct-13 900 10-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
14 220 Chhegoan-Khandwa Ckt -II 10-Oct-13 900 10-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
15 400 315 MVA 400220 KV X-mer -II At 400KV SS Bina 10-Oct-13 900 10-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
16 220 GWL(PGCIL)-Malanpur Ckt-I 11-Oct-13 900 11-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
17 220 Chhegoan-Khandwa Ckt -I 11-Oct-13 900 11-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
18 400 315 MVA 400220 KV X-mer -III At 400KV SS Bina 11-Oct-13 900 11-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
19 400 315 MVA 400220 KV X-mer -III 220kv At 400KV SS Bina 12-Oct-13 900 12-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
20 400 400 KV Main Bus -I I At 400KV SS Bina 14-Oct-13 900 14-Oct-13 900 daily For maintenance work MPPTCL EHT -
MampI N
OCC Approved outages not availed deferred during Oct 2013ANNEXURE-32C2
21 220 GWL(PGCIL)-Gwalior Ckt-I 15-Oct-13 900 15-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
22 220 Pithampur-Rajgarh Ckt - I 17-Oct-13 900 17-Oct-13 1800 dailyTieghting of Jumper cone ampArching Horn ampother maintenance work
MPPTCL EHT -MampI N
23 400 400 KV Birsinghpur-Katni Ckt-II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
24 220 Pithampur-Rajgarh Ckt - II 18-Oct-13 900 18-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
25 220 Khandwa-Nepanagar Ckt 19-Oct-13 900 19-Oct-13 1800 dailyTieghting of Jumper cone amp Arching Horn amp other maintenance work
MPPTCL EHT -MampI N
26 220 Damoh(pgcil) -Damoh Ckt -II 22-Oct-13 900 22-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
27 400 400KV Seoni -Bhilai Ckt 23-Oct-13 900 23-Oct-13 1800 daily For maintenance work MPPTCL EHT- Mamp I N
28 220 GWL(PGCIL)-Gwalior Ckt-II 23-Oct-13 900 23-Oct-13 1700 dailyTieghting of Jumper cone ampArching Horn ampother MPPTCL EHT -
MampI N
29 400 400 KV Nagda-Indore Ckt 24-Oct-13 800 24-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
30 400 400 KV Bhopal-Bina Ckt-I 26-Oct-13 900 26-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
31 400 400 KV Bhopal-Bina Ckt-II 28-Oct-13 900 28-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
32 400 400 KV Bhopal-Bina CktII 29-Oct-13 900 29-Oct-13 1700 daily For maintenance work MPPTCL EHT- Mamp I N
33 220 Pandhurna - Kalmeshwar Ckt 29-Oct-13 900 29-Oct-13 1800 daily For maintenance work MPPTCL EHT -MampI N
34
765 kV Satna - Bina 2 29-Oct-13 800 30-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
POWERGRID
WR-II
N Deferre
35 400 Tie bay of Indore Line amp ICT -III At 400 Kv SS Nagda 31-Oct-13 800 31-Oct-13 1700 daily For maintenance work MPPTCL EHT -
MampI N
36 400 Bus-2 at Mapusa 25-Oct-13 800 26-Sep-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
37 400 Bhilai-Bhadrawati 1-Oct-13 1000 1-Oct-13 1100 Daily To take line recator out of service for testing WRTS-I WRTS-I N
38 220 Navsari-Dastan-1 1-Oct-13 800 1-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N39 400KV Lamboti-Solapur PG 2-Oct-13 900 2-Oct-13 1700 Daily QMwork MSETCL MSETCL N40 220 Navsari-Dastan-2 2-Oct-13 800 2-Oct-13 1800 Daily Logic check PoMM WRTS-II GETCO N
41 400 Korba-Khedamara (Yet to be charged) 3-Oct-13 800 3-Oct-13 1800 Daily Crossing work of DC
765KV Raigarh-Raipur CSPTCL WRTS-I N
42 400 Asoj-SSP 3-Oct-13 800 3-Oct-13 1800 Daily For wiring checking in PLCC as well as control amp relay
GETCO GETCO N
43 400 Akola -Aurangabad 1 3-Oct-13 800 4-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
44 400 400KV Sipat-Pathadi (LANCO) line 3-Oct-13 900 4-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N45 400 Bhadrawati-Ramagundam 1 4-Oct-13 800 4-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a
46400 kV Nagda - Dehgam1 1-Oct-13 900 5-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
47400 kV Satna-Bina1amp2 4-Oct-13 700 5-Oct-13 1900 Contin
uousFor crossing of 765 kV Jabalpur-Bina line (for completion of balance work
POWERGRID
WR-II
N48 400 Bhadrawati-Ramagundam 2 5-Oct-13 800 5-Oct-13 1600 Daily AMP Works WRTS-I WRTS-I N NLDC a49 400KV Dhule-Babhleswar ckt 1 5-Oct-13 900 5-Oct-13 1700 Daily QMwork MSETCL MSETCL N
50 400 Akola -Aurangabad 2 5-Oct-13 800 6-Oct-13 1800 contReplacement of HCB line isolator CTs amp IPS tube for upgradation work at Waluj
WRTS-I WRTS-IN
51 220 Mehgaon-Auriya Ckt 6-Oct-13 900 6-Oct-13 1700 daily For maintenance work MPPTCL EHT -MampI N
52 400KV New Koyna-Karad ckt 1 7-Oct-13 830 7-Oct-13 1730 Daily QMwork MSETCL MSETCL N
53 400 Korba-Bhilai (CSPTCL line) 8-Oct-13 800 8-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
CSPTCL WRTS-IN
54 400KV Karad-Kolhapur Ckt II 8-Oct-13 900 8-Oct-13 1700 Daily QMwork MSETCL MSETCL N55 220 Haldarva-KAPP-1 8-Oct-13 800 8-Oct-13 1800 Daily For PMM work of bay GETCO GETCO N
56 765Sipat 765KV Bay-4 ( Bus reactor main bay) 8-Oct-13 900 8-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
57 400 315MVA ICT 1 at Boisar 9-Oct-13 1000 9-Oct-13 1300 Daily AMP work WRTS-I WRTS-I N58 400KV Karad-Jaigad II 9-Oct-13 900 9-Oct-13 1700 Daily QMwork MSETCL MSETCL N
59 765Sipat 765KV Bay-5 ( Bus reactor tie bay) 9-Oct-13 900 9-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
60 400 kV Nagda - Dehgam2 6-Oct-13 900 10-Oct-13 1800 DailyInsulator Replacement
POWERGRID
WR-IIN
61 220 Bus-1 at Mapusa 9-Oct-13 800 10-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
62 400 kV Bus-2 at Gwalior 9-Oct-13 900 10-Oct-13 1800 Continuous
POWERGRID
WR-IIN
63 400 Akola -Aurangabad 1 amp Bus-1 at Waluj (MSETCL) 11-Oct-13 800 11-Oct-13 1800 Daily Erection of wave traps for
upgradation work WRTS-I WRTS-I NPostpon64 400KV Deepnagar-Aurangabad I 11-Oct-13 900 11-Oct-13 1700 Daily QMWork MSETCL MSETCL N
65 400 Aurangabad-Pune (Yet to be charged) 11-Oct-13 700 12-Oct-13 1800 Daily
Crossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
Reliance WRTS-INPostpon
66 220 DC Jalna - Aurangabad 11-Oct-13 700 12-Oct-13 1800 DailyCrossing work of upcoming 400KV Aurangabad(PGCIL)- Aurangabad(MSETCL)
MSETCL WRTS-INPostpon
67 400 Akola -Aurangabad 2 amp Bus-1 at Waluj (MSETCL) 12-Oct-13 800 12-Oct-13 1800 Daily Dismantling amp Openning of
line reactor at Waluj WRTS-I WRTS-I N68 400KV Padgha-Babhleswar ckt I 12-Oct-13 900 12-Oct-13 1700 Daily QMwork MSETCL MSETCL N
69 400 Satpura Koradi Line 12-Oct-13 900 12-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIN
70 400 Bus-1 at Raigarh_400KV 14-Oct-13 800 14-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
71 400 Korba-Bhilai 2 14-Oct-13 800 14-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
72 400 Raigarh-Jarsuguda 1( Part of Raigarh-Rourkela 1) 14-Oct-13 800 14-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I No confirm73 400KV Bhusawal-Aurangabad 14-Oct-13 900 14-Oct-13 1700 Daily QMwork MSETCL MSETCL N74 400KV New Koyna-Karad ckt 2 14-Oct-13 830 14-Oct-13 1730 Daily QMwork MSETCL MSETCL N75 220KV Kawas-Vav 1 14-Oct-13 900 14-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
76 400
Satpura Itarsi Line
14-Oct-13
900
14-Oct-13
1800 Daily Dismantling of existing TELK make CB For maintaining electrical clearance outage is
POWERGRID
WR-II
CPCC def77 220KV Kawas-Vav 2 15-Oct-13 900 15-Oct-13 1800 daily Distance Relay testing NTPC NTPC N
78220 kV Kawas - Haldarwa1 13-Oct-13 900 16-Oct-13 1800 Daily Replacement of defective
insulators strings with Polymer Insulators
POWERGRID
WR-II
N
79 400 Raigarh-SEL 1( Part of Raigarh-Rourkela 2) 16-Oct-13 800 16-Oct-13 1600 Daily Line terminal equipment
AMP Works WRTS-I WRTS-I Deferred b80 400KV Chandrapur-Khaparkheda 16-Oct-13 900 16-Oct-13 1700 Daily QMwork MSETCL MSETCL N81 220KV Kawas-Haldarva 2 16-Oct-13 900 16-Oct-13 1800 daily Distance Relay testing NTPC NTPC N82 400 Sipat 400KV 132KV IBT-2 16-Oct-13 900 17-Oct-13 1900 ontinuou400KV CTs ( 3no) replaceme NTPC NTPC N83 400KV Koradi-Khaparkheda I 17-Oct-13 900 17-Oct-13 1700 Daily QMwork MSETCL MSETCL N
84 400
Satpura Itarsi Line
17-Oct-13
900
17-Oct-13
1800 Daily Erection of new CGL make CBFor maintaining electrical clearance outage is required After erection
POWERGRID
WR-II
Deferred b
85 220 DC Raigarh-Raigarh 1 amp 2 18-Oct-13 800 19-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
CSPTCL WRTS-IN
86 400 Korba-Bhilai 1 20-Oct-13 800 20-Oct-13 1800 DailyCrossing work of DC 765KV Raigarh-Raipur amp Champa-Raipur
WRTS-I WRTS-IN
87 220 kV Kawas - Haldarwa2 18-Oct-13 900 21-Oct-13 1800 Daily Insulator Replacement POWERGRID
WR-IIN
88 220 Bus-2 at Mapusa 7-Oct-13 800 22-Oct-13 1800 Daily Augmentation works of Busbar for up-coming ICT WRTS-I WRTS-I N
89 400 Mouda-Wardha 2 19-Oct-13 900 22-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
90 400 kV Itarsi-Indore2 22-Oct-13 1200 22-Oct-13 1500 Daily Replacement amp testing of AR relay
POWERGRID
WR-IIDeferred b
91 765Sipat 765KV Bay-13 ( Bharari -2 Main bay) 22-Oct-13 900 22-Oct-13 1900 Daily Annual Preventive maintenan NTPC NTPC N
92 400 Korba-Bhilai line(CSPTCL) 22-Oct-13 800 22-Oct-13 1800 DailyCrossing work of upcoming 765 KV Champa - Raipur DC amp Raigarh-Raipur line
CSPTCL WRTS-I N
93 400 Satpura Itarsi Line 23-Oct-13 900 23-Oct-13 1800 Daily Testing and commisioning of new CGL make CB
POWERGRID
WR-IIDeferred d
94 220 Bus 2 at Seoni 23-Oct-13 1000 23-Oct-13 1800 Daily AMP amp aligment work WRTS-I WRTS-I Deferred due to
95
400 kV Satna - Bina Ckt3amp4 23-Oct-13 800 24-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
f
POWERGRID
WR-II
Deferred d96 400 Bus-2 at Seoni 24-Oct-13 800 24-Oct-13 1800 Daily AMP Work WRTS-I WRTS-I N
97 400 Sipat-Ranchi 1 24-Oct-13 800 24-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
98
400 ICT1 Itarsi 24-Oct-13 1000 24-Oct-13 1400 Daily AMP SD already approved in 451st OCC meeting but due to heavy rain same could not be availed
POWERGRID
WR-II
N
99 400 Mouda-IEPL 24-Oct-13 900 25-Oct-13 1800 Daily Insulator replacement WRTS-I WRTS-I N
100
400KV Bay-12 amp Bay-
11
Sasan-Vindhyachal Line-3
24-Oct-13 900 25-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De-dusting Cleaning and SASAN SASAN N
101 400 Bus-1 at Aurangabad (Waluj)MSETCL 25-Oct-13 800 25-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I NAdvised
102 400 Sipat-Ranchi 2 25-Oct-13 800 25-Oct-13 1600 Daily Bay maintenance works at NTPC (Sipat) WRTS-I WRTS-I
NTPC NNo conf
103 400 kV Indore-Asoj2 25-Oct-13 700 25-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
104 400KV Deepnagar-Khadka I 25-Oct-13 900 25-Oct-13 1700 Daily QMwork MSETCL MSETCL N
105 765 Seoni-Bina with Line reactor 25-Oct-13 1000 25-Oct-13 1800 DailyAMP Work
WRTS-2 WRTS-INAdvise
d to
106220 kV Kawas - Vav1 23-Oct-13 900 26-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
Deferred d
107 400 DC Tamnar-Raipur 1 amp 2 25-Oct-13 800 26-Oct-13 1800 Continuous
Crossing of 765 kv DC Raigarh-Raipur (Part-1) TL amp 765 kv SC Raigarh-
Jindal WRTS-IN
108 400 Bus-2 at Aurangabad (WalujMSETCL 26-Oct-13 800 26-Oct-13 1800 Daily Checking of jumper
connection amp tightning MSETCL WRTS-I N
109 400 Raigarh-Raipur 4 21-Oct-13 900 27-Oct-13 1800 Continuous
For lilo of line at KSK Mahanadi PCL WRTS-I KSK N
110 400 Raipur-KSK(part of Raigarh-Raipur 3) 25-Oct-13 900 27-Oct-13 1800 Contin
uousFor lilo of Raigarh-Raipur 4 at KSK Mahanadi PCL WRTS-I KSK N
111 400 IEPL-Wardha 26-Oct-13 900 27-Oct-13 1700 Daily Insulator replacement WRTS-I WRTS-I N
112
765 kV Satna - Bina 1 26-Oct-13 800 27-Oct-13 1800 Continous
Crossing of 765kV Satna - Gwalior 1 Shutdown already approved in 450th OCC meeting however
h d l h b d f d
POWERGRID
WR-II
N Deferre
113 400 kV Indore-Asoj1 27-Oct-13 700 27-Oct-13 1900 Daily For crossing of 400 kV Asoj-Vadodara line
POWERGRID
WR-IIN
114 400 Khandwa-Dhule 1 22-Oct-13 900 23-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b115 400KV New Koyna-Koyna Stg-4-1 28-Oct-13 830 28-Oct-13 1730 Daily QMwork MSETCL MSETCL N116 400 315MVA ICT 2 at Pune 28-Oct-13 1000 28-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
117
400KV Bay-10 amp Bay-
11
Sasan-Jabalpur Line-3
28-Oct-13 900 29-Oct-13 1400 Daily 1) Testing of CB CT CVT Isolator LA 2) Clamp-Connector Tightness Checking 3) De dusting Cleaning and
SASAN SASAN N
118 400 Khandwa-Dhule 2 24-Oct-13 900 24-Oct-13 1800 Daily Insulator Replacement WRTS-2 WRTS-I Deferred b
119 400 Bus 1 at Solapur 28-Oct-13 900 29-Oct-13 1800 DailyExtension of Bus-1 at Solapur WRTS-I WRTS-I Deferred
by WR-1
120 400 Bus Reactor at Pune 29-Oct-13 1000 29-Oct-13 1400 Daily AMP Work WRTS-I WRTS-I N
121220 kV Kawas - Vav2 28-Oct-13 900 30-Oct-13 1800 Daily Replacement of defective
insulators strings with POWER
GRIDWR-II
N Deferre
122 400 kV Gandhar-Dehgam DC 30-Oct-13 700 30-Oct-13 1900 Daily For crossing of 400 kV Vadodara-Pirana line
POWERGRID
WR-IIDeferred b
123400 Seoni - Khandwa 1
26-Oct-13 800 26-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
30 10 13124 400 Soja-Dehgam(PG) 30-Oct-13 800 31-Oct-13 1800 Daily For PMM WORK GETCO GETCO N125 400KV Jejuri-Lonikand 31-Oct-13 900 31-Oct-13 1700 Daily QMwork MSETCL MSETCL N
126 400 Bus 2 at Solapur 30-Oct-13 900 31-Oct-13 1800 DailyExtension of Bus-2 at Solapur WRTS-I WRTS-I Deferred
by WR-1
127400 Seoni - Khandwa 2
27-Oct-13 800 27-Oct-13 1900 DailyAMP amp Fixing replacement open spacer dampers
POWERGRID
WR-II Deferred to
311013
128 765KV -Main Bus-2A at Sasan21-Oct-13 800 2-Nov-13 1800 Daily Equipment Connections-180
NosCi i B k d CT
SASAN SASAN N
Anaulagnak 33(A)
navambar 2013 AaOr idsambar 2013 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR NOVEMBER 2013 AND DECEMBER 2013
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)navambar 2013 idsambar 2013 navambar 2013 idsambar 2013
NOVEMBER 2013 DECEMBER 2013 NOVEMBER 2013 DECEMBER 2013
1 gaujarat
saIimat 11600 11300 7090 7590
AsaIimat 11640 11340 7100 7600
2 maQya p`doSa
saIimat 10220 11446 6973 7409
AsaIimat 10220 11446 6973 7409
3 CltaIsagaZ
saIimat 2928 2840 1583 1583
AsaIimat 3003 2915 1624 1628
4 maharaYT
saIimat 18250 18150 10350 10500
AsaIimat 18300 18200 10400 10550
5 gaaovaa
saIimat 425 420 280 290
AsaIimat 430 425 285 295
6 dmana dIva
saIimat 350 345 220 225
AsaIimat 355 350 225 230
7 DI ena eca
saIimat 645 650 465 475
AsaIimat 645 650 465 475
8 piScama xao~
saIimat 42898 43605 26250 27500
AsaIimat 43066 43583 26845 27680
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah ATaobar 2013 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa
1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)
GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL
kaorbaa esaTIpIesa Korba STPS 1406104 241047 327175 140610 453865 142107 34039 36469 1406104kaorbaa esaTIpIesa -III Korba STPS-III 353459 67864 54191 106038 96321 3853 4391 14931 353459ivanQa esaTIpIesa I Vindhyachal STPS-I 811936 148211 287767 0000 299615 23741 8981 26821 16800 811936ivanQa esaTIpIesa II Vindhyachal STPS-II 684049 163488 219743 0000 247412 9187 6794 22178 684049ivanQa esaTIpIesa III Vindhyachal STPS-III 722420 192164 178454 75854 217612 8270 8685 25143 722420ivanQa esaTIpIesa IV Vindhyachal STPS-IV 358953 86120 102203 22453 117231 4702 4705 15580 358953kvaasa gaOsa Kawas GPP 458914 130779 98504 0000 142668 8651 21673 56641 458914gaMQaar gaOsa Gandhar GPP 469855 169391 84331 0000 142945 9027 22378 41783 469855saIpt Sipat 2004599 546898 355887 316833 619356 23649 24901 77736 2004599kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana
[Midra saagar Indira Sagar 245570 245570 245570
(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 42248 0000 21124 0000 0000 0000 63373
kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 13470580 3345424 2403031 748432 4933642 269814 234965 467295 1067977 13470580 Actual injection
2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula
(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH
HVDC+HWB Outside region(NR amp
SR) TOTALkaorbaa esaTIpIesa Korba STPS 1345022 241062 273762 135187 453890 142092 33876 35110 1345022kaorbaa esaTIpIesa -III $ Korba STPS-III $ 341790 67855 47450 102073 96306 3853 4391 13993 341790ivanQa esaTIpIesa I Vindhyachal STPS-I 688180 140657 178529 0000 295987 22638 8981 25419 15970 688180ivanQa esaTIpIesa II Vindhyachal STPS-II 612099 162931 150995 0000 246006 9054 6794 21343 612099ivanQa esaTIpIesa III Vindhyachal STPS- III 627105 186218 106307 62004 216193 8270 8685 23460 627105ivanQa esaTIpIesa IV Vindhyachal STPS- IV 304647 85310 64414 7793 117164 4702 4705 14601 304647kvaasa gaOsa Kawas GPP 35840 17284 4922 0000 9791 1968 1728 0147 0000 35840gaMQaar gaOsa Gandhar GPP 32201 13069 4393 0000 9939 1974 2820 0006 0000 32201saIpt Sipat 1075050 71339 127749 161119 559402 23241 24260 69344 1075050kakrapar Kakrapar APS 293711 83441 74265 0000 100508 10329 5539 7665 11965 293711tara`pur 3 AaOr 4 Tarapur APS 3amp4 692908 175794 149663 30796 283963 8170 8602 26718 692908
(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570
RPPC(NVVNL) 0000
0000
0000
(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana
tara`pur 1 AaOr 2 Tarapur APS 1amp2 196463 98232 0000 0000 98232 0000 0000 0000 196463esaesapI SSP 609862 97578 347621 0000 164663 0000 0000 0000 609862ponca Pench 63373 0000 42248 0000 21124 0000 0000 0000 63373kula [M saagar kao CaoD kr Total (excl Ind Sagar) 9175755 2186104 1601315 510488 3115484 236380 166053 318445 1041485 9175754
Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA
3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
k pUvaI- xao~ ko rasto Import SDLs through ER 332348Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 74914
Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 22280ER (NTPC) 5895 8828 8404 38131 0000 1257 1960 58580
15967
GANDHAR(RLNG)
KAWAS(RLNG)
Anaulagnak 45
DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF OCTOBER 2013
(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)
DVC to MPPTCL (Long Term Open Access) 0000 211312 0000 0000 0000 0000 0000 211312Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354
CSEB to APPCC ( MPPL) 0000 0000 -14970 0000 0000 0000 0000 -14970EMCO to APPCC ( EMCO) 0000 0000 0000 -9823 0000 0000 0000 -9823
JPL to APPCC ( JPL) 0000 0000 -16110 0000 0000 0000 0000 -16110JPL to APPCC ( KISPL) 0000 0000 -1708 0000 0000 0000 0000 -1708
JSWEL(RTNGIRI) MSEB to APPCC ( JSW PTL) 0000 0000 0000 -26787 0000 0000 0000 -26787JSPL_DCPP to APPCC ( KISPL) 0000 0000 -1126 0000 0000 0000 0000 -1126APL1 GUVNL to BIHAR ( AEL) -60595 0000 0000 0000 0000 0000 0000 -60595APL2 GUVNL to BIHAR ( AEL) -32590 0000 0000 0000 0000 0000 0000 -32590
GUVNL to BIHAR ( IEXL) -0750 0000 0000 0000 0000 0000 0000 -0750MPSEB to BIHAR ( IEXL) 0000 -0500 0000 0000 0000 0000 0000 -0500
MPPMCL MPSEB to BIHAR ( IEXL) 0000 -2000 0000 0000 0000 0000 0000 -2000GUVNL to BESCOM ( GUVNL) -2078 0000 0000 0000 0000 0000 0000 -2078
ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -6765 0000 0000 0000 0000 0000 -6765VIPL MSEB to BESCOM ( RETL) 0000 0000 0000 -0153 0000 0000 0000 -0153
MPPMCL MPSEB to BSES_RAJ ( IEXL) 0000 -15000 0000 0000 0000 0000 0000 -15000GRIDCO to ESIL_WR ( IEXL) 0782 0000 0000 0000 0000 0000 0000 0782
MPSEB to JK ( IEXL) 0000 -1700 0000 0000 0000 0000 0000 -1700GOA to JSEB(ER) ( MPPL) 0000 0000 0000 0000 -8217 0000 0000 -8217JPL to NPCL ( INSTINCT) 0000 0000 -1976 0000 0000 0000 0000 -1976
JSPL_DCPP to NPCL ( INSTINCT) 0000 0000 -0401 0000 0000 0000 0000 -0401STERLITE to STL MSEB ( STL MSEB) 0000 0000 0000 7071 0000 0000 0000 7071
STERLITE to SHENDRA MSEB ( SHENDRA MSEB) 0000 0000 0000 0231 0000 0000 0000 0231TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 0288 0000 0000 0000 0288
JPL to TNEB ( INSTINCT) 0000 0000 -1352 0000 0000 0000 0000 -1352JPL to TNEB ( JPL) 0000 0000 -12883 0000 0000 0000 0000 -12883
JPL to TNEB ( NVVNL) 0000 0000 -1614 0000 0000 0000 0000 -1614PIL CSEB to TNEB ( INSTINCT) 0000 0000 -1948 0000 0000 0000 0000 -1948STERLITE to TPC MSEB ( SCL) 0000 0000 0000 30731 0000 0000 0000 30731
STERLITE to TORRAHM GUVNL ( STERLITE) 145994 0000 0000 0000 0000 0000 0000 145994MPL_ER to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0857 0000 0000 0000 0000 0000 0857
GUVNL to WBSEB ( IEXL) -0450 0000 0000 0000 0000 0000 0000 -0450MPPMCL MPSEB to WBSEB ( IEXL) -0550 0000 0000 0000 0000 0000 0000 -0550
SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL
K dixaNa xao~ ko rasto Import SDLs through SR 2546
Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 3277Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0640
CSEB to APPCC ( MPPL) 0000 0000 -1000 0000 0000 0000 0000 -1000GOA (SR) to GOA ( WHEELING) 0000 0000 0000 0000 0469 0000 0000 0469RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 0615 0000 0000 0615
NSPCL TO VISL(SAIL) 0000 0000 -1454 0000 0000 0000 0000 -1454
ga ]trI xao~ ko rasto Import SDLs through NR -169542Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -320588
Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -20060Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 5772 0000 0000 0000 0000 0000 5772
Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 3787 0000 0000 0000 0000 0000 3787MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0120 0000 0000 0000 0000 0000 -0120
MPPMCL MPSEB to BSES YM (DTL)-NR ( IEXL) 0000 -0240 0000 0000 0000 0000 0000 -0240KWHEPS to ESPF MSEB ( PTC LTD) 0000 0000 0000 0240 0000 0000 0000 0240
JVVNL-NR to ESIL_WR ( IEXL) 0250 0000 0000 0000 0000 0000 0000 0250KWHEPS to ESIL_WR ( IEXL) 0140 0000 0000 0000 0000 0000 0000 0140
SIKKIM to ESIL_WR ( PTC LTD) 14597 0000 0000 0000 0000 0000 0000 14597KWHEPS to ESIL MSEB ( PTC LTD) 5000 0000 0000 0000 0000 0000 0000 5000
ESSAR_MAHAN to HARIYANA ( IEXL) 0000 -0010 0000 0000 0000 0000 0000 -0010JSPL_DCPP to JVVNL-NR ( PTC LTD) 0000 0000 -50845 0000 0000 0000 0000 -50845
MPPMCL MPSEB to JVVNL-NR ( IEXL) 0000 -0800 0000 0000 0000 0000 0000 -0800CSEB to JK ( NVVNL) 0000 0000 -4443 0000 0000 0000 0000 -4443
BSES_RAJ to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 1450 0000 0000 0000 0000 0000 1450BSES_RAJ to MPPMCL MPSEB ( PTC LTD) 0000 62496 0000 0000 0000 0000 0000 62496
HARIYANA to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 300576 0000 0000 0000 0000 0000 300576PSEB-NR to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 52800 0000 0000 0000 0000 0000 52800
UPPCL to MPPMCL MPSEB ( MPPMCL MPSEB) 0000 170376 0000 0000 0000 0000 0000 170376BSES_RAJ to MICRO GUVNL ( MICRO GUVNL) 5312 0000 0000 0000 0000 0000 0000 5312
JPL to MUNJAL NR ( MUNJAL NR) 0000 0000 -2007 0000 0000 0000 0000 -2007ACBIL to NPCL ( KISPL) 0000 0000 -13149 0000 0000 0000 0000 -13149
EMCO to NPCL ( INSTINCT) 0000 0000 0000 -0090 0000 0000 0000 -0090SPECT ACBIL to NPCL ( RETL) 0000 0000 -10210 0000 0000 0000 0000 -10210JPL to ORBIT NR ( ORBIT NR) 0000 0000 -0773 0000 0000 0000 0000 -0773
JSWEL(RTNGIRI) MSEB to PSEB-NR ( JSW PTL) 0000 0000 0000 -68664 0000 0000 0000 -68664APL2 GUVNL to RPPC ( AEL) -71798 0000 0000 0000 0000 0000 0000 -71798APL3 GUVNL to RPPC ( AEL) -102104 0000 0000 0000 0000 0000 0000 -102104
JPL to RPPC ( AEL) 0000 0000 -107934 0000 0000 0000 0000 -107934GRIDCO to RINFRA MSEB ( IEXL) 0000 0000 0000 0135 0000 0000 0000 0135
KWHEPS to RINFRA MSEB ( PTC LTD) 0000 0000 0000 11146 0000 0000 0000 11146TPDDL_DTL to STL MSEB ( NVVNL) 0000 0000 0000 0014 0000 0000 0000 0014
JPL to SUNBEAM NR ( SUNBEAM NR) 0000 0000 -2110 0000 0000 0000 0000 -2110TRIPURA to SPLR MSEB ( NVVNL) 0000 0000 0000 1944 0000 0000 0000 1944
JPL to SONA NR ( SONA NR) 0000 0000 -1582 0000 0000 0000 0000 -1582MPL_ER to TPC MSEB ( PXIL) 0000 0000 0000 5200 0000 0000 0000 5200
JPL to UPCL-NR ( JPL) 0000 0000 -33816 0000 0000 0000 0000 -33816STERLITE to VARDHMAN YARNS MPSEB ( TPTCL) 0000 0565 0000 0000 0000 0000 0000 0565
Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000
JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 2372 0000 0000 0000 2372ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 5761 0000 0000 0000 0000 5761
SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 1524 0000 0000 0000 0000 1524JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 0842 0000 0000 0000 0842
JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0646 0000 0000 0000 0646EMCO to DNH ( EMCO) 0000 0000 0000 -145624 0000 0000 145624 0000
JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710JPL to ETLT MSEB ( ETL) 0000 0000 0000 0710 0000 0000 0000 0710
ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 122198 -122198 0000 0000 0000 0000 0000 0000MPPMCL MPSEB to ESIL_WR ( IEXL) 0416 -0416 0000 0000 0000 0000 0000 0000
JPL to ETLW MSEB ( ETL) 0000 0000 0000 0705 0000 0000 0000 0705HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -3559 0000 0000 3559 0000 0000 0000 0000
JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 4664 0000 0000 0000 4664JPL to KFIL MSEB ( KFIL MSEB) 0000 0000 0000 1415 0000 0000 0000 1415
GUVNL to MSEB ( PXIL) -0900 0000 0000 0900 0000 0000 0000 0000ESSAR_MAHAN to MPPMCL MPSEB ( ESSAR_MAHAN) 0000 0670 0000 0000 0000 0000 0000 0670
JPL to MML MSEB ( MML MSEB) 0000 0000 0000 1633 0000 0000 0000 1633JPL to OWENS MSEB ( OWENS MSEB) 0000 0000 0000 5900 0000 0000 0000 5900
JPL to ORIENT MSEB ( ORIENT MSEB) 0000 0000 0000 2520 0000 0000 0000 2520JPL to POSCO MSEB ( POSCO MSEB) 0000 0000 0000 2517 0000 0000 0000 2517
JPL to PEPSICO MSEB ( PEPSICO MSEB) 0000 0000 0000 0813 0000 0000 0000 0813JPL to RILD GUVNL ( KISPL) 6716 0000 0000 0000 0000 0000 0000 6716
JPL to SIEMENS MSEB ( SIEMENS MSEB) 0000 0000 0000 0880 0000 0000 0000 0880JPL to SDDL MSEB ( SDDL MSEB) 0000 0000 0000 2520 0000 0000 0000 2520
JPL to TPC MSEB ( KISPL) 0000 0000 0000 37178 0000 0000 0000 37178JPL to TORRSUR GUVNL ( JPL) 109925 0000 0000 0000 0000 0000 0000 109925
JPL to TISPL MSEB ( TISPL MSEB) 0000 0000 0000 1308 0000 0000 0000 1308NSPCL TO DD 0000 0000 0000 0000 0000 6526 0000 6526
NSPCL TO DNH 0000 0000 0000 0000 0000 0000 6423 6423[MiDyana [najaI- esacaoMja IEE 285022 -441738 -311896 161967 0000 21185 0000 -285460pavar [najaI- esacaoMja PEI -0743 0000 -0655 2997 0000 0000 0000 1598
ca kula Aayaat Total Import 1888277 702247 819489 17043 332757 1084 28968 154007 1888277kula inayaa-t Total Export 1722924 276117 591487 595963 251141 8217 0000 0000 1722924naoT Aayaat inayaa-t Net Imp (+)Exp (-) 165353 426129 228002 -578920 81616 -7133 28968 154007 165353
4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula
Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL13635932 3771553 2631033 169513 5015258 262681 263933 621301 16800 13635932
5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9341107 2612233 1829317 -68432 3197101 229247 195021 472452 15970 93411076 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 7860881 1315540 2050441 302287 3313845 233976 182911 460912 0969 78608817 xait imalaakr kula D`avala Total Drl incl Tr Loss 8164253 1366310 2129573 313953 3441735 243006 189970 478700 1006 81642538 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3033729 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula
vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1691240 1294592 607803 33739 30522 293711 889371 609862 63373 10377985
] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net
ivainamaya (ima yauinaTsa) (MUs) 0000 1856522 -1856522 0000 700003 -700003 358844 16051 342793 -2213732
AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta
Total Entitlement incl IR and bi-lateral exchange schedule
maah ATaobar 2013 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF OCTOBER 2013 Annex-46
k`maaMkFrom To
gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules
included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH NR SR ER WR TOTAL
1 gauivainaila GUVNL 4459 4459
2 map`iva]kMila MPPGCL 0000
3 Craivabaao CSEB 0000
4 maraiva]kM ila MSPGCL 145624 145624
5 gaaovaa GOA 0000
6da na h DNH 0000
7kaorbaa KORBA-III 0000
8 iMjadla pavar JPL 116641 68207 184848
9 ADanaI pavar APL 0000
10 ESSAR MAHAN 122614 0670 123284
11 laonakao Lanco -Pathadi 0000
12 esaIbaIAa[-ela -ACBIL 7286 7286
13 ena esa pI saI ela NSPCL 0000
14 ]ltarI xao~ NRegion (WR end) 0000 0000
15 dixaNaI xao~ S Region (S Bus) 0000 0000
16 pUvaI- xao~ E Region (WR end) 358844 358844
17 p xao~ WRegion (WR end) 700003 16051 2572576
18 enaTIpIsaI NTPC Injection 4646596
19 enapIsaI NPC Injection 1183082
20 Total ISGS drawal from the Grid incl interregional bi-lateral
1366310 2129573 313953 3441735 243006 189970 478700
B InterstateIR Exchanges not included in ISGS
20 knaa-Tk Karnataka 4344 43440
21 yaUpIpIsaIela UPPCL 0710 0710
22 AarvaIpIenaela RVPNL -809 -8090
23 UPPCL ( Excess Drawn From Rajghat 2330 2330
24 kaoTa ]jjaOna Kota - Ujjain 0000 0000
25 kula ba Total B (13 to 17) 0000 -5050 0000 0000 43440 0000 0000 38390
C inavala ivainamaya Net Exchange (12+18) 1366310 2124523 313953 3441735 286446 189970 478700 8201637
D kula Aayaat Total Imp by WR 397234
E kula inayaa-t Total Export by WR 2572576
F inavala ivainamaya Net Exchange (D-E) -2175342
G p xao~ Wara vaIlD jaa- Energy wheeled by WR
26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000
0000
27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000
0000
28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000
0000
29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000
0000
30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR226868
226868
31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR54192
54192
32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000
0000
33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000
0000
ANNEXURE‐5
GDGITRIPPING IN OCTOBERrsquo13
Grid Disturbance
Sl No Category Date Time Fault details
1 GD-1 011013 0352 Bus fault at 400220 KV Deep nagar Substation
2 GD-1 011013 16281642 HVDC Bhadrawati pole -I amp pole ndashII tripped respectively
3 GD-1 161013 1107 Tripping of all elements at 220KV Amarkantak Thermal Power Station Unit 3 amp Unit 5 of ATPS tripped
4 GD-1 221013 1003 Tripping of all elementsat Korba (E) substation All running units tripped at Korba(E) substation
5 GD-1 271013 1051 Tripping of all elements of 400 KV chandrapur Bus-I In this unit 3 amp 6 of Chandrapurtripped
6 GI- I 011013 1630 Tripping of all elements of 220 KV Malanpur Substation
7 GI- I 101013 2004 Bus fault at 220 KV Badod substation
8 GI- I 121013 17291735
Tripping of 220 KV Budhipadar-Raigarh on B-phase to earth fault and tripping of Budhipadar-Korba II amp III line on overload respectively
9 GI- II 221013 0307 Multiple tripping at KaradampDhabol substation
10 GI- II 251013 1201 HVDC Pole-I of Adani tripped
11 GI- II 291013 1820 HVDC Pole-II of Adani Tripped
Who could benefit from access
Utilities Worldwide
Innovators with a vision to redefine the
energy industry
Traditional meter companies who are making
the transition to Smart Grid technologies
Large-scale companies who are leading the
installation of Smart Grid technologies
around the world
Small startups who are eager to capitalize on
the market
For a quote tailored to your
organizationrsquos needs contact your IEEE
Account Manager or the IEEE Customer
Operations Team at
onlinesupportieeeorg
IEEE Smart Grid Research
Coming Soon to the IEEE Xplorereg Digital Library
Stay ahead of the competition with access to Smart
Grid Research from the IEEE
IEEE Smart Grid Research represents a concerted effort to build one
of the industryrsquos most comprehensive portfolios of smart grid-related
intelligence that address problems and challenges including
materials such as long-term vision documents reference documents
and road maps based on five technology sectors as well as short-
term research papers
Potential use cases application scenarios and enabling technologies
are leveraged to deliver the most complete picture possible of the
next generation of technology in each respective smart grid industry
IEEE Smart Grid Research materials will cover projections of where
the smart grid will evolve to technology challenges and
opportunities and areas where additional research is needed
Focused research from technology experts
Five technical areas have been identified for the vision project
Power
Computing
Communications
Control Systems
Vehicular Technology
Additional short-term research papers will examine cyber security
and consumer awareness relative to the smart grid
Contents for each Technology Sector
Each sector is sold as a Technology Bundle that includes the
following documents
Long-term Vision Document
Reference Model
Roadmap Document
Subscribe Today
See how IEEE Xplore can help drive your research and innovation
Visit wwwieeeorgsmartgridresearch or contact your local IEEE
Account Manager
Phone +1 800 701 IEEE (4333) (USACanada) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)
E-mail onlinesupportieeeorg
Information current as of 31 July 2013
Brought to you by the IEEE Xplorereg
digital library
IEEE Xplore includes top-ranked journals and
technology research that is cited in patents
three times more than the nearest
competitor With over three million full-text
articles and papers IEEE Xplore is your
gateway to more than 30 of the worldrsquos
current literature in electrical engineering
electronics and computer science
Find relevant research faster with powerful
search tools
IEEE Xplore combines an easy-to-use
interface with powerful search tools that
make finding relevant research faster
and more streamlined
Search
Find the right standards easily by standards
number or topic Intelligent features such as
convenient type-ahead a functional search
breadcrumb trail and a ldquoRefineExpand
Resultsrdquo module let you modify and find
results easier than ever before
Personalize
You can also personalize IEEE Xplore
to create targeted saved searches and
receive e-mail alerts or RSS feeds of
new content updates
IEEE Smart Grid Research Whatrsquos available
Power
IEEE Grid Vision 2050
Describes the IEEE Power amp Energy Societyrsquos (PES) vision of the power system infrastructure into the year 2050 This document sets the stage and includes future scenarios electricity generation (Make) electricity transmission and distribution (Move) and electricity usage (Use)
Computing
IEEE Smart Grid Vision for Computing 2030 and Beyond
Examines potential branches for the evolution of both smart grid operational concepts and computing technologies It aims to stimulate investments in those computing technologies enabling achievement of Smart Grid visions and improving electric power system performance and capability for greater efficiency speed reliability and resiliency It also focuses on a broad array of computing technologies spanning multiple disciplines and outlines
their possible roles in the future electric grid
Communications
IEEE Vision for Smart Grid Communications 2030 and Beyond Provides a vision of the communications-related aspects of the Smart Grid in the year 2030 and lays out the technology roadmap that will lead us to the vision This document starts with some basic knowledge of the power grid and follows up with fundamental building blocks for the communication infrastructure that will accompany the Smart Grid
Control Systems
IEEE Vision for Smart Grid Controls 2030 and Beyond Highlights the role of control systems in the evolution of the Smart Grid including an overview of research investigations that are needed for renewable integration reliability self-healing energy efficiency and resilience to physical and cyber-attacks
Coming Soon
Vehicular Technology
Vision document - Expected in December Roadmap - Expected in December Reference model -Expected in December
Subscribe Today
See how IEEE Xplore can help drive
research and innovation
Visit wwwieeeorgsmartgridresearch
wwwieeeorginnovatePhone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
Smart Grid Organizations Innovate with IEEE InformationWhether yoursquore researching intelligent appliances home automation power line networking
renewable energy or any smart grid technology IEEE is the only organization able to provide
the diversity of expertise information resources and vision needed to realize the smart gridrsquos full
promise and potential With the intuitive IEEE Xplorereg digital library yoursquoll find the journal articles
conference proceedings and standards needed to lead smart grid innovationmdashand boost your
companyrsquos bottom line
IEEE Information Drives Smart Grid PatentsTodayrsquos corporations deliver new patented technologies at an increasing pace based on research that
is at the forefront of the industry Patent references to IEEE papers have increased 660 since 1997
and recent studies of the top patenting companies show that IEEE scientific and technical articles
are cited over 3 times more often than any other scholarly or commercial publisher
Essential IEEE Content in Smart Grid TechnologyIEEE content remains crucial to the smart grid industrymdashproviding research in a wide variety of topics
through the IEEE Xplore digital library
Energy Management Systems 7800+ documents
Distributed Solar and Wind Generation 9800+ documents
Renewable Energy Sources 12900+ documents
Smart Sensor 6100+ documents
Zigbee Wireless Networks 11800+ documents
Cyber Security 4300+ documents
Hybrid-Electric Vehicles 31000+ documents
MicrogridIslanded Systems 5500+ documents
Network Communications 16800+ documents
Energy Storage 37900+ documents
Counts are accurate as of June 2013 and include IEEEIET content
IEEE the Top-Cited Publisher in Smart Grid Patents IEEE is the top scientific and technical research source with 66 of all patent citations in smart grid
Source 1790 Analytics LLC Copyright 2013
IEEE66
Institution of Engineering amp Technology (IETIEE)
Association for Computing Machinery (ACM)
7035 40 45 50 55 60 6525 3010 15 200 5
PATEnT CITATIonS(1997ndash2012)
Visit the IEEE Smart Grid Portalhttpsmartgridieeeorg
ldquo IEEE is leveraging its strong foundation and collaborating [with others] to evolve
standards share best practices publish developments and provide related educational offerings to advance [smart-grid] technology and facilitate successful deployments throughout the worldrdquo
mdash Wanda Reder Past President of IEEE PES
Smar
t G
rid
IEEE Transactions on Smart Grid
This quarterly journal features research on smart grid technologies and systems relating to energy generation transmission distribution and delivery
Learn which IEEE subscription option is right for your organizationRequest a free trial at wwwieeeorginnovate
Phone +1 800 701 IEEE (4333) (in the US) +1 732 981 0060 (worldwide)E-mail onlinesupportieeeorg
IEEE Leads Smart Grid TechnologyIEEE enables innovation as a leading developer and producer of content across a wide range of
industries from standards to conferences eBooks and eLearning courses for aspiring individuals and
growing organizations Below is a sampling of IEEE content
StandardsResearchers and developers of smart grid technologies rely on IEEErsquos significant breadth of technology
expertise resources and standards With over 200 existing standards relevant to smart grid and many
standards in development IEEE is uniquely positioned to guide smart grid interoperability
IEEE 2030ndash2011trade IEEE Guide for Smart Grid Interoperability of Energy
Technology and Information Technology operation
with the Electric Power System (EPS) and End-Use
Applications and Loads
IEEE802 LAnMAn Standards for Local and Metropolitan Area networks
IEEE 1547-2003 Standard for Interconnecting Distributed Resources with
Electric Power Systems
IEEE 1159-2009 Recommended Practice for Monitoring Electric Power Quality
762-2006 Standard Definitions for Use in Reporting Electric Generating Unit Reliability Availability and Productivity
IEEE Foundations for Smart Grid A collection of standards in diverse technology
fields including over 20 IEEE standards named in
the nIST Framework and Roadmap for Smart Grid
Interoperability Standards
IEEE 3000 Standards Collectiontrade For Industrial amp Commercial Power Systems (formerly
IEEE Color Booksreg Power Pack) industry-proven
standards on every key aspect of industrial and
commercial power systems
JournalsmdashIEEE Transactions on Smart Grid
mdashIEEE Transactions on Sustainable Energy
ConferencesIEEE Green Technologies Conference
IEEE Innovative Smart Grid Technologies
IEEE International Conference on Smart Grid Communications
IEEE International Conference on Smart Grid Engineering
IEEE International Energy Conference
IEEE International Workshop on Smart Grid Modeling and Simulation
IEEEPES Transmission amp Distribution Conference amp Exposition
International Conference on Sustainable Energy and Intelligent Systems
For more information about our content types please visit wwwieeeorgdigitalsubscriptions
13-P
IM-0
175L
81
3
Smar
t G
rid
The IEEE Xplorereg Digital Library
Find a subscription thatrsquos right for youmdashfrom tailored journal collections to the entire research catalogmdashwith the IEEE Xplore digital library Along with journals magazines conferences standards eBooks and eLearning IEEE Xplore delivers
The worldrsquos most highly cited journals in technology
More than 3 million full-text documents
Full-text searchable PDFs for all documents and a growing number of HTML documents
Full INSPEC abstract and citation records
Weekly content updatesmdash 20000+ new IEEEIET articles every month
Multiple search options Interactive reference linking Free e-mail alerts
SlNo Power Station Unit Capacity Schedule Remarks From To
1 2 3 4 5 6 7A GUJARAT1 UKAI TPS 1 120 150714 200814 AOH
2 120 010314 290414 AOH3 200 010914 250914 AOH4 200 150614 100714 COH5 210 150315 190415 AOH
2 GANDHINAGAR 1 120 171114 071214 AOH2 120 030814 230814 AOH3 210 120714 010814 AOH4 210 200614 100714 AOH5 210 250814 140914 COH
3 WANAKBORI 1 210 011114 301114 AOH2 210 090714 290714 AOH3 210 170115 060215 AOH4 210 010814 210814 AOH5 210 200614 290714 COH6 210 250814 230914 AOH7 210 011214 211214 COH
4 SIKKA 1 120 290514 1806142 120 040315 240315 AOH
5 KLTPS 1 70 040815 240815 AOH2 70 200714 090814 AOH3 75 310814 200914 AOH4 75 010414 300414 AOH
6 DHUVRAN GAS 1 107 010115 290115 CI2 112 130614 270614 CI
7 AKRIMOTA 1 125 11113 301113 AOH2 125 11013 311013 AOH
8 URAN 2 375 010813 070813 AOH
9 TORRENT POWER LTD C 60 090115 230115 AOHD 120 231014 111214 COHE 121 291214 070115 AOHF 121 1312114 271214 AOH
10 SUGEN 10 3825 NO OUTAGE20 3825 NO OUTAGE30 3825 NO OUTAGE
11 ESSAR GT 2 110 NO OUTAGEGT 3 110 NO OUTAGEGT 1 110 NO OUTAGEGT 3 110 NO OUTAGE
12 GPEC GT-11 138 NO OUTAGEGT-12 138 NO OUTAGEGT-13 138 NO OUTAGESTG 414 NO OUTAGE
13
14 SLPP 1 125 NO OUTAGE2 125 NO OUTAGE3 125 NO OUTAGE4 125 NO OUTAGE
16 APL 1 330 010115 200115 AOH2 330 NO OUTAGE3 330 NO OUTAGE4 330 NO OUTAGE5 660 010215 200215 AOH6 660 010714 200714 AOH7 660 NO OUTAGE8 660 NO OUTAGE9 660 010914 200914 AOH
17 EPGL 1 600 14813 31813 Boiler amp turbine inspection2 600 11214 28214 Boiler amp turbine inspection
18 ACBIL 1 135 160814 310814 AOH2 135 080914 230914 AOH
B CHHATISGARH
1 KORBA(EAST) 1 50 100614 300614 AOH2 50 040714 240714 AOH3 50 300714 130914 COH4 50 200914 101014 AOH5 120 071214 301214 COH
OVERHAULING AND MAINTENANCE PROGRAMME OF GENERATING UNITS IN WESTERN REGION FOR THE PERIOD APRIL 2014 TO MARCH 2015
6 120 150714 070814 AOH
2 KORBA(WEST) 1 210 100814 020914 AOH2 210 070914 300914 AOH3 210 041014 271014 AOH4 210 101114 031214 AOH5 500 010714 150714 AOH
3 KORBA (DSPM) 1 250 231013 171113 AOH2 250 201113 131213 AOH
KORBA EXTN 1 500010714 150714 BOILER LICENCE REVALIDATION amp
CURSORY CHEKING4 MARWA PROJECT 1 500
2 500KSK MAHANADI 3 600 050714 230714 AOH
5 JPL 1 250 250814 280814 BOILER INSPECTION2 250 030914 300914 COH3 250 081114 111114 BOILER INSPECTION4 250 250714 100814 AOH
C MADHYA PRADESH
1 AMARKANTAK 3 120 NO OUTAGE PLAN4 120 NO OUTAGE PLAN5 210 010714 300714 AOH
SATPURA 6 200 100814 280914 APH amp RE-HEATER REPLACEMENT7 210 010714 140814 HP IP DPGM REP8 210 NO OUTAGE PLAN9 210 010814 190914 COH
3 SANJAY GANDHI 1 210 010714 140814 COH2 210 NO OUTAGE PLAN3 210 NO OUTAGE PLAN4 210 010914 250914 AOH5 500 010814 250814 AOH
D MAHARASHTRA
1 KORADI 5 200 - -6 210 23714 16814 AOH7 210 - -8 660 - -9 660 - -
2 NASIK 3 210 15914 101014 AOH4 210 - -5 210 20814 14914 AOH
3 BHUSAWAL 2 210 1714 20814 COH3 210 25814 19914 AOH4 500 - -5 500 1714 25714 AOH
4 PARLI 3 210 - -4 210 - -5 210 - -6 250 - -7 250 - -8 250 - -
5 CHANDRAPUR 1 210 1714 20814 COH2 210 - -3 210 1914 61014 COH4 210 - -5 500 - -6 500 1814 29914 COH7 500 1714 26714 AOH8 500 - -9 500 - -
6 KHAPERKHEDA 1 210 21714 9914 COH2 210 15914 101014 AOH3 210 - -4 210 - -5 500 - -
7 JSW 1 300 NO OUTAGE PLAN2 300 NO OUTAGE PLAN3 300 NO OUTAGE PLAN4 300 NO OUTAGE PLAN
8 PARAS 3 250 30714 3914 COH4 250 11914 61014 AOH
9 RELIANCE 1 250 010914 070914 BOILER LICENSE RENEWAL2 250 050115 270115 AOH
10 TROMBAY 5 500 160715 190215 COH6 500 NO OUTAGE PLAN7 180 220714 280714 AOH8 250 011214 301214 AOH
EMCO 1 300 040614 240614 AOH2 300 050215 250215 AOH
APL TIRORA 1 600 010714 200714 AOH2 600 010814 200814 AOH
11 WPCL(KSK)1 135 NO OUTAGE PLAN2 135 NO OUTAGE PLAN3 135 NO OUTAGE PLAN4 135 NO OUTAGE PLAN
D CENTRAL SECTOR
1 KORBA ( KSTPS ) 1 200 NO OUTAGE PLAN2 200 NO OUTAGE PLAN3 200 010914 301014 R amp M WORK4 500 130614 110814 R amp M WORK5 500 100514 030614 Boiler Overhaul6 500 211114 190115 R amp M WORK7 500 NO OUTAGE PLAN
2 VINDHYACHAL 1 210 30414 19514 GEN + Boiler Overhaul2 210 8414 27414 Boiler Overhaul3 210 22514 28514 Boiler Licence renewal4 210 1414 7414 Boiler Licence renewal
5 21020914 31114 CAP + TG Pedestal Checking + Boiler
Chem Cleaning + ESP RampM6 210 18914 24914 Boiler Licence renewal7 500 No OH No OH NO OVERHAUL8 500 1614 15714 Boiler + HPT+ IPT + ESP RampM9 500 16714 19814 Boiler + HPT+ IPT + GEN
10 500 No OH No OH NO OVERHAUL11 24814 17914 Boiler + TG Bearing Inspection
3 SIPAT 1 660 5914 191014 Boiler + HPT+IPT(2 Nos)+LPT + GEN2 660 1614 15714 Boiler + HPT+IPT(2 Nos)+LPT + GEN3 660 No OH No OH NO OVERHAUL4 500 25714 28814 Boiler + HPT + IPT + GEN5 500 271014 311014 Boiler Licence renewal
4 KAWAS
GT 1A 106 131014 221014 CI + Exhaust Plenum Insulation work
GT 1B 106 090814 110814 BLRGT 1B 106 080115 170115 CI
GT 2A 106 010614 310714 R amp M WORKGT 2B 106 160115 180115 BLRST2C 1161 080614 250714 R amp M WORK
5 JHANOR GT 1 1443 150514 300614 R amp M WORKGT 1 1443 050215 050215 BLRGT 2 1443 010414 080414 A-InspectionGT 2 1443 250215 100315 R amp M WORKGT 2 1443 261214 261214 BLRGT 3 1443 010714 080714 A-InspectionGT 3 1443 050914 050914 BLRGT 3 1443 060215 150215 B-INSPECTIONST 22449 050914 050914 OVER SPEED TEST
MAUDA1 500 260514 030614 BLR2 500 080115 150115 BLR
6 KAPS 1 220 NO OUTAGE PLAN2 220 NO OUTAGE PLAN
7 TAPS 1 160 011014 121214 R amp M WORK2 160 010115 010415 R amp M WORK
8 TAPS 3 540 010414 300514 MAINTENANCE WORK4 540 NO OUTAGE PLAN
9 RGPPLCTG1A 220 NO OUTAGE PLANCTG1B 220 NO OUTAGE PLANSTG 1X 230 NO OUTAGE PLANCTG2A 240 NO OUTAGE PLANCTG2B 240 NO OUTAGE PLANSTG 2X 260 NO OUTAGE PLANCTG3A 240 NO OUTAGE PLANCTG3B 240 NO OUTAGE PLANSTG 3X 260 NO OUTAGE PLAN
10 CGPL 10 800 011214 151214 Boiler rectification20 800 010514 050614 Boiler overhaul30 800 010914 061014 Boiler overhaul40 800 010315 310315 Boiler overhaul50 800 161114 301114 Boiler rectification
Annexure‐94
Minutes of the meeting held on 18112013 at Mumbai to discuss modificationrevision in SPS for Wardha flow gate
A meeting was held on 18112013 at Mumbai to discuss the revision of the existing SPS for control of power flow in the Wardha flow gate due to synchronization of 400kV Warora‐Chandrapur Ckt‐I as decided in the 453rd OCC Meeting of WRPC
The list of participants is enclosed at Annexure‐ 1
Shri S D Taksande Member Secretary WRPC welcomed the participants He stated that the SPS for controlling power flow through Wardha flow gate was finalized in the meeting held on 26062013 He further informed that the matter was discussed in the 453rd OCC meeting in light of synchronization of 400kV Warora‐Chandrapur Ckt‐I and the proposed synchronization of SR grid with NEW grid To restrict the flow through this corridor within safe limits for secure operation of the grid it was suggested by OCC to discuss the issue in a separate meeting Further the FSC on Raipur‐Wardha DC has increased the margin of the Bhilai flow gate but increased in injection of power at Wardha The network beyond Wardha towards Western part of Maharashtra is unable to mitigate this inflow as per the studies carried out by WRLDC resulting in frequent violation of the margin limit He requested WRLDC and MSETCL to clarify on the following issues
1) Reasons for revising the Wardha flow gate margin of 2480MW decided in the 26062013 meeting to 2050MW communicated by WRLDC vide their letter WRLDCMO‐I176113532 dated 25102013 and whether the synchronization of Chandrapur ‐Warora Ckt has affected the network flow through Wardha flow gate
2) There is no change in network topology of the Wardha flow gate comprising of 400kV Wardha‐Akola DC and 400kV Wardha‐Parli DC Whether the FSC on Raipur‐Wardha DC is affecting the margins of Wardha flow gate
3) Commissioning schedule of the 400kV Chandrapur 2‐Warora ckt‐2 and the LILO of second circuit of Chandrapur‐Parli ckt at Chandrapur‐II since this would further require modificationrevision of the SPS
SLDC Maharashtra representative intimated that the 400kV Warora‐ Chandrapur Ckt‐2 would be commissioned within one week and LILO of second circuit of Chandrapur‐ Parli ckt at Chandrapur‐II would take around one month The flow on 400kV Chandrapur‐ Warora ckt is around 900MW and would increase to around 1200‐1300 MW after charging the second circuit and completion of LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II He further informed that even after synchronization of second circuit of 400kV Chandrapur‐ Warora ckt the flow will have to be restricted to 900MW till the commissioning of the LILO of second circuit of Chandrapur Parli ckt at Chandrapur‐II
WRLDC representative clarified that the margin of Wardha flow gate has not been reduced and the margin of 2480MW shall be limited to 2050MW in the event of tripping of 400kV Warora‐ Chandrapur Ckt and therefore requested that the SPS logic for backing down generation at APL Tiroda envisaged earlier shall be modified and one unit of 660MW at APL Tiroda be tripped under the contingency of loss of 400kV Warora‐ Chandrapur Ckt‐1
APL representative stated that after synchronization of the 400kV Warora‐ Chandrapur Ckt‐1 during violation of the limits the SPS has operated successfully however even after backing down of generation at APL Tiroda due to SPS operation has not reduced the flow on Wardha flow gate significantly (Sensitivity of the APL generation on Wardha flow gate envisaged in the existing SPS have an effect of 50 reduction of flow on Wardha flow gate) The above sensitivities have not been observed during the recent operation of the SPS and the relieving of Wardha flow gate was very less The units at APL are observing frequent unloading and loading of its units due to operation of SPS since there is frequent violation of the Wadha flow gate limit in the recent past Further if tripping of Unit is incorporated in the SPS tripping of the unit may not give desired relief due to less sensitivity
WRLDC representative stated that the increase in power at Bhilai gate is due to increase in UI power from ER therefore load reduction in Western part of Maharashtra or increase in generation of Koyna is the only resort to control the power flow
MSETCL representative stated that they will take all necessary manual steps such as picking of generation at Koyna etc However he suggested that the manual Load shedding is a tedious process and would take considerable time Further he pointed out that in spite of 400kV Wardha‐Parli being a Quad conductor the margin considered for these lines is around 600MW each as against the margin considered for Raipur‐Wardha line (Quad conductor) with FSC is considered significantly more than that of 400kV Wardha‐Parli Putting FSC only enhances the power transfer capability and not the margin He further suggested that at least FSC on one of the Raipur‐Wardha lines be bypassed to relieve congestion at Wardha
POWERGRID representative stated that the FSC can be bypassed automatically by taking signal from Wardha
The above was discussed in detail and following was decided in the meeting
A) 400kV Chandrapur‐Warora ckt in service 1) SLDC Maharashtra may take appropriate manual actions (such as generation pickup at
Koyna RGPPL and Parli and control generation in Wardha pocket) to relive the congestion of the corridor and load shedding in Western Maharashtra as a last resort
2) The short term schedules shall be curtailed in the event of crossing of the margins as per the regulatory frame work
3) Since the sensitivity of APL Tiroda generation to the Wardha flow gate is significantly low in case of Warora Chandrapur ckt in service therefore WRLDC would suggest the factor by which the generation of APL Tiroda is required to be backed down (if it is found that the effect of backing down of generation at APL Tiroda under such condition is effective in controlling the flow through Wardha flow gate) to control incremental flow on Wardha flow gate this additional set of logic will be incorporated
B) 400kV Chandrapur‐Warora ckt out of service 1) The SPS suggested in the 26062013 meeting shall be in operation such that in the event of
tripping of Warora Chandrapur line backing down of 600MW at APL Tiroda shall be wired up All other settingsconditions decided in the 26062013 meeting shall be same
2) In the event of tripping of Warora Chandrapur line POWERGRID shall automatically bypass FSC on one circuit of Raipur‐Wardha line
3) This arrangement shall be implemented till the 2nd ckt of Warora Chandrapur and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II is commissioned
The above suggestionsmodifications in the SPS of Wardha flow gate will be reviewed after synchronization of the 400kV Warora‐Chandrapur ckt 2 and LILO of 2nd ckt of Chandrapur‐Parli at Chandrapur‐II
The meeting ended with thanks to the Chair
ANNEXURE SA‐3
2x500MW HVDC BTB STATION BHADRAWATI
BRIEF FREQUENCY CONTROL TEST amp FREQUENCY LIMIT TEST AT HVDC BHADRAWATI
The test of frequency control function and frequency limit function of HVDC Bhadrawati was carried out on 22112013 from 1422Hrs to 1620Hrs Following observation was made during the test
1) Frequency control function of south side ndash case rsquoArsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Time Grid under freq control
Frequency demand set
Slope Power flow South freq West freq
142200 (test start)
South 4995Hz (present south freq)
4 600MW 4995Hz 4979Hz
After this the demand freq on south side was set to 5016Hz and following power flow changes were observes
Grid under freq control
Frequency demand set
Slope Time Power flow MW
South freq Hz
West freq Hz
South 5016
4 1422 600 4995 4979 1432 655 5003 4993 1449 601 5016 4982
2) Frequency control function of south side ndash Case‐rsquoBrsquo
Condition before test
‐ Power 600MW ‐ Direction W‐gtS
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 4 144930 (test start)
600MW 5016Hz 4979Hz
145300 507 5014 4980 145900 550 5005 4982
The slope was changed from 4 to 2 and following was observed
Grid under freq control
Frequency demand set
Slope Time Power flow
South freq West freq
South 4996 2 150000 552 5005 4984 150030 549 5005 4986 150900 600 4996 4984
3) Frequency limit function of south side case ‐ C
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 5000Hz ‐ Freq range south 005Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4995Hz To 5005Hz
2 151500 600 4992 4984
152300 631 4985 4978 152500 596 5001 4979
4) Frequency limit function south side case ndashD
Condition before test
‐ Power 600MW ‐ Direction W‐gtS ‐ Center freq south 4980Hz ‐ Freq range south 01Hz
Grid under freq control
Frequency limit
Slope Time Power flow
South freq West freq
South 4990Hz To 4970Hz
3 160430 596 5003 4988
160500 530 4996 5026 160700 541 4996 5020 161600 598 4990 4987 From above readings it is found that the functionality of frequency control and frequency limit function of HVDC controller is working correctly
The above readings were noted from MIMIC and may involve some delay The details report using data captured in SCADA and MPM will be prepared subsequently
Suhas Dambhare DKKhobragade
Chief Manager Engr(TampC)
1
Annexure-SA31
2x500MW BHADRAWATI HVDC BTB STATIONPOWERGRID
PROCEDURE FOLLOWED FOR TESTING OF FREQUENCY CONTROL amp FREQUENCY LIMIT FUNCTION TEST AT HVDC BHADRAWATI ON 2211013
A) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-Power
increase) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action(HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x+ min02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power increase) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
Deselect the freq control function on south side Test complete
2
B) FREQUENCY CONTROL FUNCTION TEST (SOUTH SIDE-POWER DECREASE) Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action (HVDC bhadrawati)
a) Select the freq control on south side in the mimic b) With this the actual south freq shall be set present freq demand value (Target freq) say lsquoxrsquo c) The freq slope will also be activated to previous set value
d) Adjust the freq slope to 4 on the mimic (ie 50MW01Hz)
e) Now change and set freq demand value to x-02Hz on south side Thus the new freq demand shall become active
f) The freq control shall operate and shall modulate the DC power (Power decrease) to bring the actual south freq to new freq demand value
g) The contribution on activation of freq control shall be of the order of 100MW to 400MW depending upon selection of differential freq range determined in step lsquoersquo above
h) Note down the values of West freq South freq DC power preferably every 30Sec
i) Change the slope to 2 and repeat the readings as above
Deselect the freq control function on south side Test complete
3
C) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power Increase)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within the normal range
Operator action (HVDC bhadrawati)
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Note the present running freq of south bus say lsquoxrsquo - Set the freq limit function at south side such that the lower freq limit is x+005Hz
Keep the range of +-005Hz Ex If south freq is 4990Hz Then set the center freq to 5000Hz and range to 005Hz
- Set slope at 3 - Enable the freq limit function on south side - With this freq limit function on south side will be activated and power flow will
increase in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
4
D) FREQUECNY LIMIT FUNCTION TEST (SOUTH SIDE-Power decrease)
Pre condition (to be coordinated by RLDCNLDC)
-Power flow 600MW -Direction West -gt South -Both poles in service in station mode -Both west and south freq are within normal range
Operator action at HVDC station
- Ensure Frequency limit function on both south and west side are in disabled condition
- Set the frequency limit function on west side as follows Centre freq=500Hz Range=+- 10Hz
- Enable the freq limit function on west side - Set the freq limit function at south side such that the upper freq limit is 01Hz below
the running frequency Keep the range of +-01Hz Ex If south freq is 5000Hz Then set the center freq to 4980Hz and range to 010Hz
- Set slope at 2 - Enable frequency limit function on south side - With this freq limit function on south side will be activated and power flow will
decrease in west -gt south direction - Note down the following readings
West freq south freq power time
- The contribution on activation of freq limit shall be of the order of 100MW to 400MW
During changing of center frequency or range frequency first put frequency limiting function in OFFDisable mode